CN201843087U CN2010206018612U CN201020601861U CN201843087U CN 201843087 U CN201843087 U CN 201843087U CN 2010206018612 U CN2010206018612 U CN 2010206018612U CN 201020601861 U CN201020601861 U CN 201020601861U CN 201843087 U CN201843087 U CN 201843087U
Authority
CN
China
Prior art keywords
steel box
base plate
encapsulating structure
casing
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206018612U
Other languages
Chinese (zh)
Inventor
李全怀
梁青山
王方立
杨小刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Road and Bridge Corp
Original Assignee
China Road and Bridge Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Road and Bridge Corp filed Critical China Road and Bridge Corp
Priority to CN2010206018612U priority Critical patent/CN201843087U/en
Application granted granted Critical
Publication of CN201843087U publication Critical patent/CN201843087U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a bottom plate packing structure for a steel overhead bin, which comprises the steel overhead bin and a protecting drum. The bottom plate packing structure is characterized by further comprising a plurality of suspension rods fixedly welded on the protecting drum and a plurality of arc-shaped plates. The arc-shaped plates are sequentially fixedly connected onto the circumference of the protecting drum in an encircling manner, and a sealing layer for plugging seams at connecting positions of the protecting drum is further disposed on the inner bottom wall of the steel overhead bin.

Description

A kind of base plate encapsulating structure that is used for the steel box
Technical field
The utility model relates to the over-water construction technology, particularly relates to a kind of base plate encapsulating structure that is used for the steel box.
Background technology
Construct on over-water construction and the traditional road and compare, has the construction environment complexity, execution conditions are abominable, meteorological condition is changeable, unhandy shortcoming is especially for the pier stud construction of bearing large bridge, the large steel suspension box integral construction method that adopts at present, utilize the steel box construction of integral solder, transportation by driving, crane barge installation on the bank, can improve processing conditions.Improve efficiency of construction, improve construction quality.
The utility model content
The purpose of this utility model is to provide a kind of steel box base plate encapsulating structure that is used for large steel suspension box integral construction method.
The technical solution of the utility model is as follows:
A kind of base plate encapsulating structure that is used for the steel box, comprise steel box and casing, it is characterized in that: described base plate encapsulating structure also comprises some suspension rods, described suspension rod is fixedly welded on the casing, described base plate encapsulating structure also comprises some arcs, described each arc around being fixed on the casing excircle, also is provided with the sealant in slit, shutoff casing junction successively on the diapire in the described steel box.
Described sealant is the layer of concrete that continuous pouring forms.
Described sealant also comprises the layer of concrete that the continuous pouring that is arranged at steel box bottom wall outer forms.
Technique effect of the present utility model is:
By the layer of concrete of arc and monobloc cast, can guarantee not take place between steel box and the casing seepage.
Description of drawings
Figure 1 shows that structural representation of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further.
Figure 1 shows that the structural representation that is used for the base plate encapsulating structure of steel box of the present utility model.
Be positioned at the steel casing 1 of steel box, its arranged outside has some arc shutoff plates 2.
Behind the box positioning stablity, in time weld suspension rod to casing by the order of peripheral rear center of elder generation.Suspension rod is installed on the base plate before box lifting prerequisite.
Adopt arc shutoff plate and packed dried shutoff, each casing periphery is provided with some arc shutoff plates, preferred embodiment for the number of arc shutoff plate 2 is divided into 4~6 according to the casing excircle, about the heavy 40kg of single-piece.Utilize examination to hang the gap before the lifting, with each piece shutoff plate separately and after move and be arranged in 3 places, base plate perforate edge, utilize nut temporary fixed; After the hoisting and locating, the fastening under water shutoff plate of diver is adjacent to casing.
To satisfy that conduit layouts is that principle is carried out the back cover operation platform and set up, and arranges conduit.The form that back cover adopts full height to advance is built, and progradation is by two side direction centre or by the downstream upstream, basic symmetry is carried out.The layout of conduit can be determined general desirable mobile radius 5-8m according to slump.
In conjunction with the concrete supply ability, bottom concrete is carried out branch storehouse subregion, relatively independent construction reduces the risk that the concrete supply interruption causes.The branch storehouse subregion symmetry of should trying one's best, storehouse, both sides behind elder generation's intermediate bin is undertaken by the storehouse symmetry during concreting.
By improving concrete service behaviour and encrypting conduit and arrange, make the bottom concrete end face smooth as far as possible.Concrete thickness is with the amount of cutting after reducing to draw water as far as possible, and guaranteeing simultaneously has enough back cover thickness to be advisable.

Claims (3)

1. base plate encapsulating structure that is used for the steel box, comprise steel box and casing, it is characterized in that: described base plate encapsulating structure also comprises some suspension rods, described suspension rod is fixedly welded on the casing, described base plate encapsulating structure also comprises some arcs, described each arc around being fixed on the casing excircle, also is provided with the sealant in slit, shutoff casing junction successively on the diapire in the described steel box.
2. the base plate encapsulating structure that is used for the steel box as claimed in claim 1 is characterized in that: described sealant is the layer of concrete that continuous pouring forms.
3. the base plate encapsulating structure that is used for the steel box as claimed in claim 2 is characterized in that: described sealant also comprises the layer of concrete that the continuous pouring that is arranged at steel box bottom wall outer forms.
CN2010206018612U 2010-11-11 2010-11-11 Bottom plate packing structure for steel overhead bin Expired - Fee Related CN201843087U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206018612U CN201843087U (en) 2010-11-11 2010-11-11 Bottom plate packing structure for steel overhead bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206018612U CN201843087U (en) 2010-11-11 2010-11-11 Bottom plate packing structure for steel overhead bin

Publications (1)

Publication Number Publication Date
CN201843087U true CN201843087U (en) 2011-05-25

Family

ID=44037982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206018612U Expired - Fee Related CN201843087U (en) 2010-11-11 2010-11-11 Bottom plate packing structure for steel overhead bin

Country Status (1)

Country Link
CN (1) CN201843087U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631464A (en) * 2015-01-21 2015-05-20 上海市基础工程集团有限公司 Construction method for blocking up between bridge high-pile cap underwater steel jacket box bottom and steel casing
CN105887935A (en) * 2016-04-20 2016-08-24 中铁建港航局集团路桥工程有限公司 Sealing up method for gap between bottom plate of steel suspension box and steel pile casing in bearing platform
CN106906745A (en) * 2017-01-17 2017-06-30 中交第二航务工程局有限公司 Hanger rod component and steel lifted trunk construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631464A (en) * 2015-01-21 2015-05-20 上海市基础工程集团有限公司 Construction method for blocking up between bridge high-pile cap underwater steel jacket box bottom and steel casing
CN105887935A (en) * 2016-04-20 2016-08-24 中铁建港航局集团路桥工程有限公司 Sealing up method for gap between bottom plate of steel suspension box and steel pile casing in bearing platform
CN106906745A (en) * 2017-01-17 2017-06-30 中交第二航务工程局有限公司 Hanger rod component and steel lifted trunk construction method

Similar Documents

Publication Publication Date Title
CN105862916A (en) Superimposed assembled type underground pipe gallery system and construction and manufacturing process
CN205000256U (en) Cast -in -place case roof beam of high mound of bridge construction support system
CN103215962A (en) Pier stud type pile foundation tie beam steel hanging box cofferdam
CN201843087U (en) Bottom plate packing structure for steel overhead bin
CN204224191U (en) For the Steel Inner Core of Chimney lifting mounting device of flue-gas desulfurizing engineering
CN203222733U (en) Pier column type pile foundation collar beam steel hanging box cofferdam
CN202240228U (en) Accurate butt-joint control device for large-span column-shaped cylinder body
CN204570712U (en) Suspension steel cofferdam hermetic seal structure
CN202272718U (en) Special oil pouring frame equipment for rotary thin oil barrel
CN204212176U (en) Fishing net can slide past formula underwater facility mud mat basis
CN104195990B (en) Large span U-shaped aqueduct circumferential reinforcement mounting method
CN202787291U (en) Main pier steel cover box on-site two-abreast-machine hoisting construction structure
CN203346804U (en) Accurate positioning device of bridge whole piggy back
CN201702535U (en) Welding fixture for producing ring crane corbel
CN201554033U (en) Tower crane foundation for deep foundation ditch
CN205711786U (en) Big cross section porous overlength cast-in-place box culvert formwork system
CN210477335U (en) Precast box culvert concreting equipment
CN207862787U (en) A kind of pin-connected panel slideway
CN210127486U (en) Wind power foundation steel combined barrel structure
CN201553529U (en) Steel pipe combined type caisson mold plate lifting frame
CN208252131U (en) A kind of interim median septum support replacement device of CD method
CN207227959U (en) Overall peace is torn open connects high construction platform built in formula radial pattern colyliform steel pile casting
CN210216462U (en) Backfill structure for water supply pipe crossing foundation pit
CN206625850U (en) Tunnel concrete liner Simple steel scaffold
CN202061429U (en) Split type thickener transported and arranged in modularization manner

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110525

Termination date: 20191111

CF01 Termination of patent right due to non-payment of annual fee