CN104631464A - Construction method for blocking up between bridge high-pile cap underwater steel jacket box bottom and steel casing - Google Patents
Construction method for blocking up between bridge high-pile cap underwater steel jacket box bottom and steel casing Download PDFInfo
- Publication number
- CN104631464A CN104631464A CN201510029608.1A CN201510029608A CN104631464A CN 104631464 A CN104631464 A CN 104631464A CN 201510029608 A CN201510029608 A CN 201510029608A CN 104631464 A CN104631464 A CN 104631464A
- Authority
- CN
- China
- Prior art keywords
- steel
- jacket box
- flange
- steel jacket
- wide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a construction method for blocking up between a bridge high-pile cap underwater steel jacket box bottom and a steel casing. A circular flange is formed by a steel plate which is 8 mm thick and 25 cm wide and divided into three pieces, the circular flange is arranged between the steel jacket box bottom plate and the steel casing, and the three wide steel plates are connected with each other through binding with rubber tape; 16# bolts are used for anchoring 25 cm wide and 25 mm thick cord fabric rubber plates at the spacing distance of 10 cm on the flange pieces, the cord fabric rubber plates are connected with the flange in a lap joint mode by 10 cm, and the connecting portions of the flange overlap with each other by 10 cm; on the base plate of the steel jacket box, six 10# steel channels are arranged along a circle of the steel casing to press the tail end of the flange. According to the construction method for blocking up between the bridge high-pile cap underwater steel jacket box bottom and the steel casing, rigidity-flexibility combination is adopted, the situations that concrete leakage occurs when the underwater steel jacket box sinks to the designed position to conduct sub-sealing concrete pouring, and sub-sealing concrete pouring is failed are prevented. A diver does not need to go down to the steel jacket box bottom to check the spacing distance situation between the steel jacket box and the steel casing, the construction operation is simple, the sub-sealing concrete quality and the construction efficiency are improved, and the construction cost is reduced.
Description
Technical field
To the present invention relates in a kind of bridge highrise pile cap water at the bottom of steel jacket box and blocking technology between steel pile casting, highrise pile cap bottom concrete construction quality in raising bridge water is a kind of less investment and effective construction method.
Background technology
Along with the increase of navigation channel shipping vessels flow and resist crashproof Capability Requirement to improve to bridge, when sluicing of controlling flood allows, major part cross a river, Oversea bridge underwater support table adopt highrise pile cap form, cushion cap are exposed ordinary water level to guarantee navigation safety and to improve bridge-collision-avoidance ability.High-rise pile cap construction all belongs to underwater work, it is most important that cushion cap bottom concrete builds effect, build if having concrete leakage path not check out before bottom concrete is built between steel jacket box and steel pile casting and carry out bottom concrete, it is failed certainly that bottom concrete builds effect, cannot accomplish in casing it is anhydrous operation during bearing platform construction, and follow-up secondary plugging builds certainly comparatively first time, and successful back cover weak effect is a lot, the duration of bearing platform construction also can extend greatly, labor waste is a lot; So steel jacket box how to control well at the bottom of steel pile casting and steel jacket box after sinking to design elevation between gap particularly important.
Summary of the invention
The present invention will solve in existing highway bridge highrise pile cap water easily to form bottom concrete leakage path at the bottom of steel jacket box and between steel pile casting, bottom concrete builds unsuccessful or that effect is poor technical problem, and to provide in a kind of bridge highrise pile cap water plugging construction method between steel jacket box and steel pile casting.
For achieving the above object, the present invention is achieved by the following technical solutions:
In a kind of highrise pile cap water, plugging construction method between steel jacket box and steel pile casting, the steps include:
1) between steel jacket box base plate and steel pile casting, arrange one divides three pieces to organize conglobate flange with the wide steel plate of the thick 25CM of 8mm, connects between three blocks of wide steel plates with rubber strip colligation;
2) press the thick cord rubber tile of the wide 25mm of spacing 10CM anchoring 25CM with 16# bolt thereon by flange piecemeal, cord rubber tile and flange overlap 10CM, dish junction, method hurdle overlapping 10CM each other;
3) on steel jacket box base plate, 6 10# channel-section steels are set along steel pile casting one circle and push down method hurdle dish tail end.
Cord rubber tile used adopts natural rubber to make, its tensile strength >=15Mpa, and continue your A level hardness 60 ± 5.
The invention has the beneficial effects as follows: blocking technology at the bottom of steel jacket box of the present invention and between steel pile casting, adopt the soft combination of steel; Can well carry out that concrete occurs when bottom concrete is built and leak sinking to design attitude by steel jacket box in anti-sealing, the situation that bottom concrete can not built occurs.Namely improve bottom concrete quality, bottom concrete also sinks at the bottom of steel jacket box without the need to diver before building and checks steel jacket box and steel pile casting spacer conditions, improves efficiency of construction, has saved construction cost.
The soft automatic regulating gap form that combines of steel is adopted with the gap between steel pile casting at the bottom of steel jacket box when construction method of the present invention has considered that when mounting flange steel jacket box sinks to design attitude, make that constructing operation is easy, efficiency of construction improve, construction quality promotes, construction cost saving, have a extensive future in similar bridge highrise pile cap steel jacket box construction operating mode.
Accompanying drawing explanation
Fig. 1 is flange mounting plane schematic diagram;
Fig. 2 is that generalized section installed by flange.
Detailed description of the invention
Below in conjunction with accompanying drawing and embodiment, the invention will be further described.
As shown in Figure 1 to Figure 2, plugging construction method between steel jacket box and steel pile casting in bridge highrise pile cap water of the present invention, its construction sequence is:
(1) between steel jacket box base plate 6 and steel pile casting 7, arrange one divides three pieces to organize conglobate flange with the wide steel plate of the thick 25CM of 8mm
3, between three blocks of wide steel plates, use rubber strip
5colligation connects.(Fig. 1)
(2) the thick cord rubber tile 1 of the wide 25mm of spacing 10CM anchoring 25CM is pressed with 16# bolt 2 thereon by flange 3 piecemeal, cord rubber tile 1 and flange 3 overlap 10CM, flange 3 junction is overlapping 10CM(Fig. 1,2 each other), can ensure in steel jacket box sinking watching, to guarantee that steel pile casting is close to by cord rubber tile.
(3) on steel jacket box base plate 6,6 10# channel-section steels are set along steel pile casting 7 one circle
4push down flange 3 tail end (Fig. 2), prevent flange tail end hind wing and form concrete leakage path.
Cord rubber tile 1 used adopts natural rubber to make, its tensile strength >=15Mpa, and continue your A level hardness 60 ± 5.
Claims (2)
1. a plugging construction method at the bottom of steel jacket box and between steel pile casting in bridge highrise pile cap water, it is characterized in that, concrete steps are:
1) one is divided three pieces of circles formed flange (3) with the wide steel plate of the thick 25CM of 8mm is set between steel jacket box base plate (6) and steel pile casting (7), connects with rubber strip (5) colligation between three blocks of wide steel plates;
2) use 16# bolt (2) by the thick cord rubber tile (1) of the wide 25mm of spacing 10CM anchoring 25CM thereon by flange (3) piecemeal, cord rubber tile (1) and flange (3) overlap 10CM, flange (3) junction overlapping 10CM each other;
3) on steel jacket box base plate (6), 6 10# channel-section steels (4) are set along steel pile casting (7) circle and push down flange (3) tail end.
2. plugging construction method at the bottom of steel jacket box and between steel pile casting in bridge highrise pile cap water according to claim 1, it is characterized in that: cord rubber tile (1) used adopts natural rubber to make, its tensile strength >=15Mpa, continue your A level hardness 60 ± 5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510029608.1A CN104631464A (en) | 2015-01-21 | 2015-01-21 | Construction method for blocking up between bridge high-pile cap underwater steel jacket box bottom and steel casing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510029608.1A CN104631464A (en) | 2015-01-21 | 2015-01-21 | Construction method for blocking up between bridge high-pile cap underwater steel jacket box bottom and steel casing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104631464A true CN104631464A (en) | 2015-05-20 |
Family
ID=53210662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510029608.1A Pending CN104631464A (en) | 2015-01-21 | 2015-01-21 | Construction method for blocking up between bridge high-pile cap underwater steel jacket box bottom and steel casing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104631464A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105092181A (en) * | 2015-07-26 | 2015-11-25 | 中铁十八局集团有限公司 | Test device and method for testing sealing performance of pipe joint in pipe-jacking construction |
CN108342983A (en) * | 2018-01-15 | 2018-07-31 | 中铁大桥局集团有限公司 | Underwater steel pile casting connects high method in constructing for deep-water bridge foundation |
CN109371963A (en) * | 2018-11-16 | 2019-02-22 | 中铁上海工程局集团有限公司 | Back taper steel jacket box and its construction method in water in the prefabricated constructing tie beam of pier foundation |
CN109778891A (en) * | 2019-01-03 | 2019-05-21 | 中交二航局第四工程有限公司 | A method of the enhancing back cover bond stress based on offshore steel taper pile basis |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09170331A (en) * | 1995-12-20 | 1997-06-30 | Penta Ocean Constr Co Ltd | Concrete filling method |
CN101240549A (en) * | 2008-01-22 | 2008-08-13 | 山东省路桥集团有限公司 | Single-arm steel hanging box and construction method thereof |
CN201180270Y (en) * | 2008-04-10 | 2009-01-14 | 中交第二公路工程局有限公司 | Assembled arcuated plugging plate |
CN201843087U (en) * | 2010-11-11 | 2011-05-25 | 中国路桥工程有限责任公司 | Bottom plate packing structure for steel overhead bin |
CN201972153U (en) * | 2011-01-25 | 2011-09-14 | 中交一公局厦门工程有限公司 | Concrete construction device for sealing bottoms of underwater steel-jacketed cases |
-
2015
- 2015-01-21 CN CN201510029608.1A patent/CN104631464A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09170331A (en) * | 1995-12-20 | 1997-06-30 | Penta Ocean Constr Co Ltd | Concrete filling method |
CN101240549A (en) * | 2008-01-22 | 2008-08-13 | 山东省路桥集团有限公司 | Single-arm steel hanging box and construction method thereof |
CN201180270Y (en) * | 2008-04-10 | 2009-01-14 | 中交第二公路工程局有限公司 | Assembled arcuated plugging plate |
CN201843087U (en) * | 2010-11-11 | 2011-05-25 | 中国路桥工程有限责任公司 | Bottom plate packing structure for steel overhead bin |
CN201972153U (en) * | 2011-01-25 | 2011-09-14 | 中交一公局厦门工程有限公司 | Concrete construction device for sealing bottoms of underwater steel-jacketed cases |
Non-Patent Citations (1)
Title |
---|
刘晓妍: "有底单壁钢套箱围堰施工有限元仿真研究及应用", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105092181A (en) * | 2015-07-26 | 2015-11-25 | 中铁十八局集团有限公司 | Test device and method for testing sealing performance of pipe joint in pipe-jacking construction |
CN108342983A (en) * | 2018-01-15 | 2018-07-31 | 中铁大桥局集团有限公司 | Underwater steel pile casting connects high method in constructing for deep-water bridge foundation |
CN109371963A (en) * | 2018-11-16 | 2019-02-22 | 中铁上海工程局集团有限公司 | Back taper steel jacket box and its construction method in water in the prefabricated constructing tie beam of pier foundation |
CN109778891A (en) * | 2019-01-03 | 2019-05-21 | 中交二航局第四工程有限公司 | A method of the enhancing back cover bond stress based on offshore steel taper pile basis |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631464A (en) | Construction method for blocking up between bridge high-pile cap underwater steel jacket box bottom and steel casing | |
CN102011412A (en) | Concrete anti-seepage wall joint | |
CN103696564A (en) | Novel construction joint formwork | |
CN209493948U (en) | Bracing members end fixed structure in a kind of foundation pit | |
US11634879B2 (en) | Tower packer for packing cement slurry of jacket | |
CN201756801U (en) | Double water-stop copper sheet shaping mold plate | |
CN209308693U (en) | A kind of portal temporary plugging structure suitable for shield tunnel | |
CN207211168U (en) | A kind of separable pier formula cofferdam | |
CN101649746B (en) | Method for arranging drain plug peripheral water stopping sheet of tunnel plug | |
CN212479247U (en) | Composite lining segment sealing groove | |
CN105386447A (en) | Construction method for replacement support of post-cast strip in construction site | |
CN204000622U (en) | Road and bridge concreting preformed hole or built-in fitting are from active and inactive mold stripper apparatus | |
CN201762728U (en) | Built-in drainage waterstop for tunnel project seam | |
CN209874074U (en) | Porous inclined plane slip casting embedded pipe | |
CN104213546B (en) | Wholecircle tunnel cushion block of concrete bar protective layer construction method and topping cushion block thereof | |
CN204356915U (en) | The self waterproof structure that steel pipe column is crossing with concrete of basement exterior wall | |
CN203905244U (en) | Concrete baffle plate with corner protection edge | |
CN206267103U (en) | The protection device of Face Rockfill Dam Copper water stop | |
CN204266219U (en) | Non-navigable cofferdam structure | |
CN204753601U (en) | Interior support supporting construction | |
CN103362136B (en) | For the antipriming between precast construction and pile foundation | |
CN204282355U (en) | Deep water area bored pile steel protects a section of thick bamboo | |
CN204662500U (en) | A kind of waterstop | |
CN204252171U (en) | The rubber fastening band at basement shrinkage joint installs fixing special tool | |
CN220767730U (en) | Wading bridge bent cap template strutting arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150520 |
|
RJ01 | Rejection of invention patent application after publication |