CN201837624U - Combustible gas explosion limit testing system under non-standard states - Google Patents

Combustible gas explosion limit testing system under non-standard states Download PDF

Info

Publication number
CN201837624U
CN201837624U CN201020563850XU CN201020563850U CN201837624U CN 201837624 U CN201837624 U CN 201837624U CN 201020563850X U CN201020563850X U CN 201020563850XU CN 201020563850 U CN201020563850 U CN 201020563850U CN 201837624 U CN201837624 U CN 201837624U
Authority
CN
China
Prior art keywords
explosion
gas
links
chamber
input end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020563850XU
Other languages
Chinese (zh)
Inventor
蒋军成
王志荣
崔益清
周小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN201020563850XU priority Critical patent/CN201837624U/en
Application granted granted Critical
Publication of CN201837624U publication Critical patent/CN201837624U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The utility model relates to a combustible gas explosion limit testing system under non-standard states, which is characterized by comprising a distribution device, an explosion device, a temperature control device and a data acquisition and processing device; the explosion device comprises an anti-explosion tank body and a heat insulating jacket, a heating element is arranged between the anti-explosion tank body and the heat insulating jacket, a partition board is arranged in the anti-explosion tank body, the partition board divides the inner cavity of the anti-explosion tank body into a gas buffer chamber and a gas explosion chamber, the partition board is provided with an electromagnetic valve which communicates the gas buffer chamber and the gas explosion chamber, the input port of the explosion device is communicated with the gas buffer chamber, and the input port is also provided with a vacuum pump; and a buffer pressure sensor and a buffer temperature sensor are arranged in the gas buffer chamber, and a temperature sensor before explosion, a pressure sensor before explosion, an igniter and an explosion pressure sensor for explosion testing are arranged in the gas explosion chamber. The Combustible gas explosion limit testing system under the non-standard states has simple structure and good operability, and solves the difficulty problem in the combustible gas explosion characteristic test under high temperature, high pressure and other non-standard states.

Description

Flammable gas explosion limit test system under the nonstandard state
Technical field
The utility model relates to a kind of safety instrumentation, especially the gas in a kind of airtight container is in the proving installation of flammable gas explosion ultimate value under the non-standard condition of High Temperature High Pressure or normal temperature high voltage, flammable gas explosion limit test system under specifically a kind of nonstandard state.
Background technology
At present, in chemical industry and the petrochemical production process, inflammable gas adopts closed container or pipeline to store usually or carries.Because the effect of suffering restraints, the gas burst meeting produces higher pressure and pressure climbing speed, to such an extent as to cause casualties and property loss.Combustible (inflammable gas, steam and dust) must evenly mix in certain concentration range with air (or oxygen), form premix gas, meeting ignition source just can blast, this concentration range is called explosion limits, or the explosion ratio limit, it can be used for evaluating inflammable gas and fire dangerous size, can be used as the foundation of fire-proof and explosion-proof Safety Design, for example determine the fire resistance rating of buildings, design house ventilating system etc.
At present, the product of the great majority test flammable gas explosion limit all only is confined to the explosion limits of inflammable gas under the testing standard state, and less for the research of flammable gas explosion limit test technology and device under the off-rating.1996, AdolfK ü hnerAG designs the spherical blast of 20 L proving installation, adopt the circulation distribution to mix, can test the blast characteristics of inflammable gas (liquid vapors) in the room temperature to 230 ℃, and 1993, the Zhang Jinglin invention has designed inflammable gas (liquid vapors) blast characteristics proving installation, this device can be tested the explosion limits and the minimum ignition energy of inflammable gas (liquid vapors) in the room temperature to 300 ℃, more than involved equipment all under normal pressure, change temperature and test, do not relate to the change of pressure.The determinator that also not can be used for (as High Temperature High Pressure, normal temperature high voltage etc.) flammable gas explosion limit under the off-rating does not at present have the pertinent literature report yet.
Summary of the invention
The purpose of this utility model is all to carry out under condition of normal pressure at existing inflammable gas detonation test, measured value can not accurately reflect the problem of inflammable gas actual operating conditions, designs flammable gas explosion limit test system under a kind of nonstandard state that can be used for High Temperature High Pressure or normal temperature high voltage.
The technical solution of the utility model is:
Flammable gas explosion limit test system under a kind of nonstandard state is characterized in that it comprises:
One air distributing device 1, this air distributing device 1 comprises distribution jar 5, and the input end of distribution jar 5 links to each other with inflammable gas source of the gas 6 and distribution source of the gas 7 respectively, and one tunnel output of distribution jar 5 is connected with the input port 9 of explosive release 2; Another road output of distribution jar 5 links to each other with the input end of supercharge pump 8, and the output terminal of supercharge pump (8) is connected with the input port 9 of explosive release 2.
One explosive release 2, this explosive release 2 comprises explosion-proof tank body 12 and heat insulation sheath 14, between explosion-proof tank body 12 and the heat insulation sheath 14 heating element 13 is installed, in the explosion-proof tank body 12 dividing plate 15 is installed, dividing plate 15 is separated into gas buffer chamber 16 and gas explosion chamber 17 with the inner chamber of explosion-proof tank body 12, gas buffer chamber and gas explosion chamber are measure-alike, volume equates, the solenoid valve 18 of conducting gas buffer chamber 16 and gas explosion chamber 17 is installed on the dividing plate 15, the input port 9 of explosive release 2 is connected with gas buffer chamber 16, the also other vacuum pump 19 that is connected in described input port 9; Compensator or trimmer pressure sensor 20 and buffering temperature sensor 21 are installed, the explosion pressure sensor 25 that the preceding temperature sensor 22 of blast, the preceding pressure transducer 23 of blast, lighter 24 is installed and tests usefulness as blast in described gas burst chamber 17 in described gas buffer chamber 16;
One attemperating unit 3, this attemperating unit 3 are used for controlling according to the temperature surveyed of temperature sensor 22 before the buffering temperature sensor 21 of explosive release 2 and the blast and the difference of design temperature the start and stop of heating element 13;
One data acquisition processing device 4, this data collector 4 mainly is made up of the explosion pressure sensor 25, signal amplification circuit 26, data acquisition circuit 27 and the computing machine 28 that are installed in the described gas burst chamber 17, explosion pressure sensor 25 links to each other with the input end of signal amplification circuit 26, the output terminal of signal amplification circuit 26 links to each other with the input end of data acquisition circuit 27, and the output terminal of data acquisition circuit 27 links to each other with computing machine 28.
The input end of described distribution jar 5 links to each other with the output terminal of distributing instrument 11 (model can be GH-1), and the input end of distributing instrument 11 links to each other with inflammable gas source of the gas 6 and distribution source of the gas 7 respectively.
Described distribution source of the gas 7 is a pure air.
The heating arrangement 10 that the inflammable gas that flows out distribution jar 5 is heated is installed on the output terminal of distribution jar 5.
Described heating element 13 is electrical heating elements or heat conduction coil pipe.
Described attemperating unit 3 is mainly by heating element 13, input oil pump 30, output oil pump 31, closed heater 32, sealing refrigerator 33 and water flowing heat interchanger 34 and temperature controller 35 are formed, heat conduction coil pipe 29 as heating element 13 is installed between explosion-proof tank body 12 and the heat insulation sheath 14, heat conduction coil pipe 29 links to each other with the output terminal of input oil pump 30, the output terminal of heat conduction coil pipe 29 links to each other with the input end of output oil pump 31, output oil pump 31 output terminal respectively with closed heater 32, the input end of sealing refrigerator 33 and water flowing heat interchanger 34 links to each other, at the output terminal and corresponding closed heater 32 that connect output oil pump 31, be separately installed with the electric control valve 36 that is controlled by temperature controller 35 and controls the corresponding pipeline break-make on the pipeline between the input end of sealing refrigerator 33 and water flowing heat interchanger 34, the control end of described electric control valve 36 links to each other with the control output end of temperature controller 35, closed heater 32, the output terminal of sealing refrigerator 33 and water flowing heat interchanger 34 links to each other with the input end of output oil pump 30; The signal input part of temperature controller 35 links to each other with the signal output part of buffering temperature sensor 21 and blast temperature sensor 22.
The beneficial effects of the utility model:
The utility model is rational in infrastructure, and is powerful, the automaticity height.By control pressurer system and temperature control system can test out that inflammable gas is pressed in High Temperature High Pressure, normal temperature high voltage, normal temperature high voltage, high temperature and off-rating such as low-temp low-pressure under explosion limits.
The utility model can be widely used in chemical industry and the petrochemical production device combustible gas explosion risk analysis under the actual condition, is used for fire-proof and explosion-proof Safety Design, prevents the generation of particularly serious explosion accident, brings significant social and economic benefit.
Description of drawings
Fig. 1 is that system of the present utility model forms structural representation.
Fig. 2 be explosive release of the present utility model structural representation.
Fig. 3 is the structural representation of attemperating unit of the present utility model.
Fig. 4 is a gas distributing system structural representation of the present utility model.
Fig. 5 is a data acquisition system (DAS) structural representation of the present utility model.
Fig. 6 is a pressure control fundamental diagram of the present utility model.
Embodiment
Below in conjunction with drawings and Examples the utility model is further described.
Shown in Fig. 1-5.
Flammable gas explosion limit test system under a kind of nonstandard state, it is mainly by air distributing device 1, explosive release 2, attemperating unit 3 and data acquisition processing device 4 are formed, as shown in Figure 1, air distributing device 1(wherein is as shown in Figure 4) comprise distribution jar 5, the input end of distribution jar 5 can adopt gas cylinder with inflammable gas source of the gas 6(respectively or directly link to each other with gas generating unit) and distribution source of the gas 7(can be pure air or other inert gas) link to each other, for the combined amount of accurate control inflammable gas with the distribution (air) of being joined, a distributing instrument 11 (model can be GH-1) can be installed before the input end of distribution jar 5, the input end of distributing instrument links to each other with inflammable gas source of the gas 6 and distribution source of the gas 7 respectively, also can require to install corresponding flowmeter on the distribution pipeline according to control when specifically implementing, electric-air valve, electric control elements such as retaining valve are to improve the automatization level of control.The a road the most basic output of distribution jar 5 is connected with the input port 9 of explosive release 2; During concrete enforcement, in order to adapt to the requirement of Hi-pot test, 5 increases by a tunnel of distribution jar have the output of supercharge pump 8, the output terminal of supercharge pump 8 is connected with the input port 9 of explosive release 2, so both can in explosive release 2, import atmosphere gas, also can import gases at high pressure, make pressure rises in the gas buffer chamber in the explosive release 2 to more than two times of the pressure that needs explosion time.In addition, in order to make the inflammable gas that enters in the explosive release 2 have temperature, the heating arrangement 10(that the inflammable gas that flows out distribution jar 5 is heated also can be installed on one or two output terminal of distribution jar 5 individually or simultaneously can adopt heating wire heating, oil bath heating etc.).
Explosive release 2 of the present utility model as shown in Figure 2, it comprises explosion-proof tank body 12 and heat insulation sheath 14, explosion-proof tank body 12(is by the steel plate manufacturing) and heat insulation sheath 14(can adopt the asbestos manufacturing, asbestos add sheath outward again) between heating element 13 is installed, explosion-proof tank body 12 should adopt the steel plate manufacturing, in explosion-proof tank body 12, dividing plate 15 is installed, dividing plate 15 is separated into gas buffer chamber 16 and gas explosion chamber 17 with the inner chamber of explosion-proof tank body 12, the solenoid valve 18 of conducting gas buffer chamber 16 and gas explosion chamber 17 is installed on the dividing plate 15, the input port 9 of explosive release 2 is connected with gas buffer chamber 16, the also other vacuum pump 19 that is connected in described input port 9; Compensator or trimmer pressure sensor 20 and buffering temperature sensor 21 are installed in described gas buffer chamber 16, pressure transducer 23, lighter 24(lighter 24 comprised sparker, spark plug, lead before temperature sensor 22 before the blast, blast were installed in described gas burst chamber 17, adopt sparker and spark plug simulation industrial gasses blast weak ignition situation, ignition energy can be regulated and control.Portfire is provided with the spark plug of different length, realizes container inner wall millet cake fire and centerfire) and as the explosion pressure sensor 25 of blast test usefulness; Air pressure in air distributing device 1 and the explosive release 2 can adopt the controller of routine techniques design to be controlled by one.
Attemperating unit 3 of the present utility model as shown in Figure 3, it is mainly used in the start and stop of the difference control heating element 13 of the temperature surveyed according to the buffering temperature sensor 21 in the explosive release 2 and blast temperature sensor 22 and design temperature; Heating element 13 wherein can be the electrical heating elements (not shown), also can adopt oily heating element.The attemperating unit 3 of present embodiment is mainly by heating element 13, input oil pump 30, output oil pump 31, closed heater 32, sealing refrigerator 33 and water flowing heat interchanger 34(high temperature oil pipe pass the heat interchanger that is connected with chilled water to carry out heat interchange and lowers the temperature) and temperature controller 35 form, water flowing heat interchanger 34 itself also is provided with chilled water water inlet end and water side, the action of water inlet end is subjected in automatically controlled water valve, automatically controlled water valve is controlled by temperature controller again, heat conduction coil pipe 29 as heating element 13 among Fig. 3 is installed between explosion-proof tank body 12 and the heat insulation sheath 14, the entrance point of heat conduction coil pipe 29 passes heat insulation sheath 14 backs and links to each other with the output terminal of input oil pump 30, the output terminal of heat conduction coil pipe 29 passes heat insulation sheath 14 backs equally and links to each other with the input end of output oil pump 31, output oil pump 31 output terminal respectively with closed heater 32, the input end of sealing refrigerator 33 and water flowing heat interchanger 34 links to each other, at the output terminal and corresponding closed heater 32 that connect output oil pump 31, be separately installed with the electric control valve 36 that is controlled by temperature controller 35 and controls the corresponding pipeline break-make on the pipeline between the input end of sealing refrigerator 33 and water flowing heat interchanger 34, the control end of described electric control valve 36 links to each other with the control output end of temperature controller 35, closed heater 32, the output terminal of sealing refrigerator 33 and water flowing heat interchanger 34 links to each other with the input end of output oil pump 30; The signal input part of temperature controller 35 links to each other with the signal output part of buffering temperature sensor 21 and blast temperature sensor 22.
Data collector 4 of the present utility model as shown in Figure 5, it mainly can be PT500-503H by the explosion pressure sensor 25(model that is installed in the described gas burst chamber 17), signal amplification circuit 26(can adopt custom circuit), data acquisition circuit 27(can adopt custom circuit to be realized) and computing machine 28 form, explosion pressure sensor 25 links to each other with the input end of signal amplification circuit 26, the output terminal of signal amplification circuit 26 links to each other with the input end of data acquisition circuit 27, and the output terminal of data acquisition circuit 27 links to each other with computing machine 28.Data acquisition circuit 27 also can adopt multi-channel data acquisition instrument and data acquisition software to be realized, data processing and analysis part adopt the universal signal analysis software that data and signal are analyzed and handled.Part of data acquisition adopts JV5231 type multi-channel data acquisition instrument synchronous acquisition data, and maximum sample rate is 20M, and resolution is 12bit, and trueness error is less than 1.0%.Adopt SignalView universal signal analysis software that data and signal are analyzed and handled.
Experimental implementation process of the present utility model is: (1) at first assembles explosive release and experimental apparatus according to Fig. 1, air distributing device 1, explosive release 2, attemperating unit 3 and data acquisition processing device have been linked and packed, check the circuit of various parts, and guarantee to connect well the testing fixture impermeability; (2) preparing certain density flammable premixed gas body by distributing instrument is stored in the distribution jar; (3) import experimental temperature in temperature controller, the debugging test macro makes each passage in running order, waiting signal; (4) starting vacuum pump 19 makes explosive release be evacuated to negative pressure-0.006MPa, when the explosive release temperature reaches experimental temperature, opens solenoid valve, to the indoor slow conveying flammable premixed gas body of gas buffer, the indoor compensator or trimmer pressure sensor of gas buffer begins the pressure signal of receiver gases surge chamber, according to the experimental pressure situation, start supercharge pump, and setup pressure value; (5) satisfy when imposing a condition when gas buffer chamber gaseous tension, automaton cuts out solenoid valve automatically and stops to carry the flammable premixed gas body; (6) when pressure and temperature all reaches requirement of experiment, leave standstill certain hour, the flammable premixed gas body is mixed, the solenoid valve of opening between gas buffer chamber and the gas burst chamber is slowly inflated the gas burst chamber, and the preceding pressure transducer of blast simultaneously begins the pressure signal of receiver gases explosion chamber.When the indoor pressure of gas burst reached experimental pressure, automaton cut out solenoid valve automatically and stops to charge into the flammable premixed gas body; (7) the cleaning personnel are left standstill experimental provision to the safety zone, and the flammable premixed gas body is mixed, and igniting blasting gas subsequently by explosion pressure sensor test pressure signal, and passes to data collecting instrument with signal, carries out collection, processing and the analysis of data.
Below in conjunction with Fig. 6 the condition that surge chamber gaseous tension P1 of the present utility model satisfies is done an explanation.
Original pressure after the inflation of-gas buffer chamber, MPa;
Figure 510933DEST_PATH_IMAGE001
-gas buffer chamber volume,
Figure 933430DEST_PATH_IMAGE002
Original pressure before the inflation of-gas burst chamber, MPa;
Figure 824343DEST_PATH_IMAGE004
-gas burst chamber volume,
Figure 800389DEST_PATH_IMAGE002
Figure 528043DEST_PATH_IMAGE005
-experimental pressure, MPa;
Figure 109197DEST_PATH_IMAGE006
-experimental temperature, ℃.
If the pressure of final surge chamber and explosion chamber all is experimental pressure P, according to The Ideal-Gas Equation and mole law of conservation:
Put in order:
Figure 861700DEST_PATH_IMAGE008
By =
Figure 376175DEST_PATH_IMAGE004
=1
Figure 882243DEST_PATH_IMAGE002
:
Figure DEST_PATH_IMAGE010
Explosive release is evacuated in advance,
Figure DEST_PATH_IMAGE012
, can ignore
Figure 167917DEST_PATH_IMAGE013
The influence that causes, therefore
Figure DEST_PATH_IMAGE014
=2
Figure 458084DEST_PATH_IMAGE005
, in the practical operation, P 1〉=2P can satisfy requirement of experiment.
The utility model does not relate to the part prior art that maybe can adopt all same as the prior art to be realized.

Claims (7)

1. flammable gas explosion limit test system under the nonstandard state is characterized in that it comprises:
One air distributing device (1), this air distributing device (1) comprises distribution jar (5), the input end of distribution jar (5) links to each other with inflammable gas source of the gas (6) and distribution source of the gas (7) respectively, one tunnel output of distribution jar (5) is connected with the input port (9) of explosive release (2), another road output of distribution jar (5) links to each other with the input end of supercharge pump (8), and the output terminal of supercharge pump (8) is connected with the input port (9) of explosive release (2);
One explosive release (2), this explosive release (2) comprises explosion-proof tank body (12) and heat insulation sheath (14), between explosion-proof tank body (12) and the heat insulation sheath (14) heating element (13) is installed, dividing plate (15) is installed in the explosion-proof tank body (12), dividing plate (15) is separated into gas buffer chamber (16) and gas explosion chamber (17) with the inner chamber of explosion-proof tank body (12), the solenoid valve (18) of conducting gas buffer chamber (16) and gas explosion chamber (17) is installed on the dividing plate (15), the flammable premixed gas body input port (9) of explosive release (2) is connected with gas buffer chamber (16), described input port (9) also other vacuum pump (19) that is connected to; Compensator or trimmer pressure sensor (20) and buffering temperature sensor (21) are installed, the explosion pressure sensor (25) that the preceding temperature sensor (22) of blast, the preceding pressure transducer (23) of blast, lighter (24) is installed and tests usefulness as blast in described gas burst chamber (17) in described gas buffer chamber (16);
One attemperating unit (3), this attemperating unit (3) are used for the start and stop according to the buffering temperature sensor (21) of explosive release (2) and blast temperature sensor (22) temperature of being surveyed and the difference of design temperature control heating element (13);
One data acquisition processing device (4), this data collector (4) mainly is made up of the explosion pressure sensor (25), signal amplification circuit (26), data acquisition circuit (27) and the computing machine (28) that are installed in the described gas burst chamber (17), explosion pressure sensor (25) links to each other with the input end of signal amplification circuit (26), the output terminal of signal amplification circuit (26) links to each other with the input end of data acquisition circuit (27), and the output terminal of data acquisition circuit (27) links to each other with computing machine (28).
2. flammable gas explosion limit test system under the nonstandard state according to claim 1, the input end that it is characterized in that described distribution jar (5) links to each other with the output terminal of distributing instrument (11), and the input end of distributing instrument (11) links to each other with inflammable gas source of the gas (6) and distribution source of the gas (7) respectively.
3. flammable gas explosion limit test system under the nonstandard state according to claim 1 and 2 is characterized in that described distribution source of the gas (7) is a pure air.
4. flammable gas explosion limit test system under the nonstandard state according to claim 1 is characterized in that the size of described gas buffer chamber (16) and gas explosion chamber (17) is all identical with volume.
5. flammable gas explosion limit test system under the nonstandard state according to claim 1 is characterized in that described heating element (13) is electrical heating elements or heat conduction coil pipe.
6. flammable gas explosion limit test system under the nonstandard state according to claim 1, it is characterized in that described attemperating unit (3) is mainly by heating element (13), input oil pump (30), output oil pump (31), closed heater (32), sealing refrigerator (33) and water flowing heat interchanger (34) and temperature controller (35) are formed, heat conduction coil pipe (29) as heating element (13) is installed between explosion-proof tank body (12) and the heat insulation sheath (14), the input end of heat conduction coil pipe (29) links to each other with the output terminal of input oil pump (30), the output terminal of heat conduction coil pipe (29) links to each other with the input end of output oil pump (31), output oil pump (31) output terminal respectively with closed heater (32), the input end of sealing refrigerator (33) and water flowing heat interchanger (34) links to each other, at the output terminal and corresponding closed heater (32) that connect output oil pump (31), be separately installed with the electric control valve (36) that is controlled by temperature controller (35) and controls the corresponding pipeline break-make on the pipeline between the input end of sealing refrigerator (33) and water flowing heat interchanger (34), the control end of described electric control valve (36) links to each other with the control output end of temperature controller (35), closed heater (32), the output terminal of sealing refrigerator (33) and water flowing heat interchanger (34) links to each other with the input end of output oil pump (30); The signal input part of temperature controller (35) links to each other with the signal output part of buffering temperature sensor (21) and the preceding temperature sensor (22) of blast.
7. flammable gas explosion limit test system under the nonstandard state according to claim 1 is characterized in that being equipped with on the output terminal of described distribution jar (5) heating arrangement (10) that the inflammable gas that flows out distribution jar (5) is heated.
CN201020563850XU 2010-10-18 2010-10-18 Combustible gas explosion limit testing system under non-standard states Expired - Fee Related CN201837624U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020563850XU CN201837624U (en) 2010-10-18 2010-10-18 Combustible gas explosion limit testing system under non-standard states

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020563850XU CN201837624U (en) 2010-10-18 2010-10-18 Combustible gas explosion limit testing system under non-standard states

Publications (1)

Publication Number Publication Date
CN201837624U true CN201837624U (en) 2011-05-18

Family

ID=44007732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020563850XU Expired - Fee Related CN201837624U (en) 2010-10-18 2010-10-18 Combustible gas explosion limit testing system under non-standard states

Country Status (1)

Country Link
CN (1) CN201837624U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102608287A (en) * 2012-03-02 2012-07-25 北京理工大学 System and method for testing critical pipe diameter of detonation of combustible gas
CN102928466A (en) * 2012-10-25 2013-02-13 四川威特龙消防设备有限公司 Oil-gas explosive critical parameter testing device and method
CN103364531A (en) * 2013-07-17 2013-10-23 中北大学 Combustible liquid vapor explosion and explosion suppression characteristic test system
CN103424531A (en) * 2013-01-10 2013-12-04 中国矿业大学(北京) Explosion simulation and explosion suppression experimental device for combustible gases
CN103954737A (en) * 2014-04-11 2014-07-30 中国石油化工股份有限公司 Minimum ignition energy testing device
CN104020272A (en) * 2014-06-23 2014-09-03 中国安全生产科学研究院 Explosion simulation testing device capable of controlling explosible mixed gas proportion in mine
CN107290384A (en) * 2017-07-25 2017-10-24 北京市劳动保护科学研究所 A kind of datonation-inhibition heat transfer of woven wire and free radical extinguishing effect test device and method
CN109613060A (en) * 2018-11-20 2019-04-12 中煤科工集团重庆研究院有限公司 Measure the device and method of gas explosion lower limit under regenerative oxidation hot conditions

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102608287B (en) * 2012-03-02 2013-09-04 北京理工大学 System and method for testing critical pipe diameter of detonation of combustible gas
CN102608287A (en) * 2012-03-02 2012-07-25 北京理工大学 System and method for testing critical pipe diameter of detonation of combustible gas
CN102928466A (en) * 2012-10-25 2013-02-13 四川威特龙消防设备有限公司 Oil-gas explosive critical parameter testing device and method
CN102928466B (en) * 2012-10-25 2015-01-07 四川威特龙消防设备有限公司 Oil-gas explosive critical parameter testing device and method
CN103424531A (en) * 2013-01-10 2013-12-04 中国矿业大学(北京) Explosion simulation and explosion suppression experimental device for combustible gases
CN103364531B (en) * 2013-07-17 2015-09-30 中北大学 Flammable liquid steam fires, datonation-inhibition characteristic test system
CN103364531A (en) * 2013-07-17 2013-10-23 中北大学 Combustible liquid vapor explosion and explosion suppression characteristic test system
CN103954737A (en) * 2014-04-11 2014-07-30 中国石油化工股份有限公司 Minimum ignition energy testing device
CN104020272A (en) * 2014-06-23 2014-09-03 中国安全生产科学研究院 Explosion simulation testing device capable of controlling explosible mixed gas proportion in mine
CN107290384A (en) * 2017-07-25 2017-10-24 北京市劳动保护科学研究所 A kind of datonation-inhibition heat transfer of woven wire and free radical extinguishing effect test device and method
CN107290384B (en) * 2017-07-25 2023-12-22 北京市劳动保护科学研究所 Wire mesh explosion suppression heat conduction and free radical quenching test device and method
CN109613060A (en) * 2018-11-20 2019-04-12 中煤科工集团重庆研究院有限公司 Measure the device and method of gas explosion lower limit under regenerative oxidation hot conditions
CN109613060B (en) * 2018-11-20 2021-07-20 中煤科工集团重庆研究院有限公司 Device and method for measuring gas explosion lower limit under heat storage oxidation high temperature condition

Similar Documents

Publication Publication Date Title
CN101975717B (en) Combustible gas explosion limit test system in non-standard state
CN201837624U (en) Combustible gas explosion limit testing system under non-standard states
CN102928466B (en) Oil-gas explosive critical parameter testing device and method
CN205426830U (en) Gas explosion causes coal dust explosion's analogue means
CN108802100B (en) Combustible gas explosion experimental device with concentration gradient and use method
CN102384962A (en) Gas sensor performance testing device
CN103439360A (en) Solid propellant multi-thermocouple dynamic combustion performance testing system and method
CN109827996A (en) Sewage network flammable gas explosion communication process test device and method
CN114137024B (en) System and method for testing burnout characteristics of combustible fluid under variable temperature and variable humidity conditions
CN109991029A (en) Mineral electrical apparatus explosion insulation performance test macro
CN111255723A (en) System and method for testing explosion-proof performance of explosion-proof fan
CN206906014U (en) A kind of inflammable gas pipeline spark arrester Performance Test System
CN110992660B (en) Detection system and detection method for gas vehicle leakage alarm device
CN110660496B (en) Real-time monitoring system for rupture and failure of cladding for high-temperature mandrel test
CN111175434A (en) Experimental device for combustible gas combustion characteristic integrated test
CN101776529B (en) Equipment for small scale booster test
CN108918355B (en) Method for evaluating explosion sensitivity parameters of low-density polyethylene powder
CN110006947A (en) Coal spontaneous combustion and coal and gas mixed explosion pilot system
CN104931530A (en) Test method of safe critical partial pressure of easily-decomposable gas
CN215768357U (en) Oil-gas mixture explosion test system
CN103163179B (en) Alternative purging-type double-tube ignition device for determining flammability of polytropic combustible gas
CN104897722A (en) Miniature calorimeter
CN114136863A (en) Sandstone uranium ore permeability testing device
CN114062816A (en) Electric explosion valve test system and test method thereof
CN204066538U (en) In transparent pipeline, demonstrating experiment device is propagated in gas burst

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110518

Termination date: 20111018