CN109827996A - Sewage network flammable gas explosion communication process test device and method - Google Patents

Sewage network flammable gas explosion communication process test device and method Download PDF

Info

Publication number
CN109827996A
CN109827996A CN201910232793.2A CN201910232793A CN109827996A CN 109827996 A CN109827996 A CN 109827996A CN 201910232793 A CN201910232793 A CN 201910232793A CN 109827996 A CN109827996 A CN 109827996A
Authority
CN
China
Prior art keywords
pipeline
explosion
pressure
horizontal pipe
vertical pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910232793.2A
Other languages
Chinese (zh)
Inventor
吕鹏飞
张家旭
刘开沅
崔世奇
庞磊
杨凯
张瑾
翟曼如
商沛源
陶宗琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Institute of Petrochemical Technology
Original Assignee
Beijing Institute of Petrochemical Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Institute of Petrochemical Technology filed Critical Beijing Institute of Petrochemical Technology
Priority to CN201910232793.2A priority Critical patent/CN109827996A/en
Publication of CN109827996A publication Critical patent/CN109827996A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of sewage network flammable gas explosion communication process test device and methods, including vertical pipeline system and horizontal pipe system, spark lever is installed in the side of vertical pipeline, and the other side installs a pair of of pressure/temperature sensor, installs venting of dust explosion piece/blind plate at the top of vertical pipeline;Horizontal pipe and vertical pipeline collectively form a closed restricted clearance, install a pair of of pressure/temperature sensor respectively in every section of horizontal pipe top center;Vertical pipeline material is transparent explosion-proof glass, and horizontal pipe installs circular non-opaque form, and the outside for corresponding to transparent explosion-proof glass and circular non-opaque form position is equipped with high-speed camera;Horizontal pipe is connected with pressure gauge, water filling port/dewatering outlet, vacuum pump and fuel gas gas cylinder.Can simulation of real scenes carry out sewage network gas burst experiment, including Vertical Well vented explosion tests and the non-vented explosion tests of Vertical Well, and be able to achieve the process monitoring of blast pressure, temperature and flame.

Description

Sewage network flammable gas explosion communication process test device and method
Technical field
The present invention relates to a kind of municipal sewage pipe network flammable gas explosion measuring technologies more particularly to a kind of sewage network can Combustion gas body detonation propagation procedural test device and method.
Background technique
Gas burst research is particularly important in safety engineering field, wherein carrying out gas for urban public infrastructure The researchs such as risk of explosion assessment, security protection are gradually taken seriously.Flammable gas explosion is the heat studied in restricted clearance at present Point, municipal sewage pipe network as typical restricted clearance, however at present in it flammable gas explosion disaster variation evolutionary process, Diaster prevention and control technology etc. studies relative deficiency, and municipal sewage pipe network flammable gas explosion accident occurs often in recent years, right Public's personal safety affects greatly.
In the prior art, researcher has carried out different scale, without flammable gas explosion process in pipeline under water storage condition Research.
However, municipal sewage pipe network is a complicated pipe-line system by Vertical Well and horizontal well construction, and in pipeline There are water storages, and when blast pressure reaches a certain level, Vertical Well well lid will fly out under surge effect, at this time well lid phase When in a venting of dust explosion face.The conditions such as presence, water storage situation, the Vertical Well of different scale and the horizontal well of well lid (venting of dust explosion face) with There are fundamental differences for pipeline into research, and true there has been no relatively meeting for flammable gas explosion in municipal sewage pipe network The test device and method of scene constrain flammable gas explosion communication process in municipal sewage pipe network, cause calamity mechanism and safety The development of protection etc. research work.
Summary of the invention
The object of the present invention is to provide a kind of sewage network flammable gas explosion communication process test device and methods.
The purpose of the present invention is what is be achieved through the following technical solutions:
Sewage network flammable gas explosion communication process test device of the invention, including vertical pipeline system and horizontal tube Road system, the vertical pipeline system includes vertical pipeline, and spark lever, other side installation one are installed in the side of the vertical pipeline To pressure/temperature sensor, when carrying out vented explosion tests, venting of dust explosion piece is installed at the top of the vertical pipeline, when carrying out non-vented explosion tests, Blind plate is installed at the top of the vertical pipeline;
The horizontal pipe system includes multistage horizontal pipe, multistage horizontal pipe and vertical pipeline collectively form one it is close Restricted clearance is closed, a pair of of pressure/temperature sensor is installed respectively in every section of horizontal pipe top center;
The vertical pipeline material is transparent explosion-proof glass, and the horizontal pipe is steel material, and in every section of horizontal tube Circular non-opaque form, the outside of corresponding transparent explosion-proof glass and circular non-opaque form position are installed in center respectively immediately ahead of road Equipped with high-speed camera;
Pressure gauge is installed in the top left side of first segment horizontal pipe, bottom left is equipped with water filling port/dewatering outlet, It is connect respectively with vacuum pump and fuel gas gas cylinder at the top of final stage horizontal pipe by valve one and valve two.
Above-mentioned sewage network flammable gas explosion communication process test device carries out sewage network flammable gas explosion biography The method for broadcasting procedural test carries out vertical pipeline venting of dust explosion/non-vented explosion tests, and primary complete testing procedure is as follows:
A, test device installation and debugging: vertical pipeline system is mounted and connected, horizontal pipe system, water system, matches Gas system, Iganition control system, data collection system wherein install venting of dust explosion piece at the top of vertical pipeline 1 when vented explosion tests, non-to let out Blind plate is installed at the top of vertical pipeline when quick-fried experiment, each section is debugged, it is ensured that seal for pipe joints is good and guarantees each system It can operate normally;
B, fill the water in pipeline: the water in water tank is injected into pipeline by Open valve three by water filling port/dewatering outlet, is led to It crosses transparent explosion-proof glass at observation vertical pipeline and determines water injection rate, valve three is closed when reaching predetermined water injection rate and stops water filling;
C, vacuumize in pipeline: Open valve one starts vacuum pump, vacuumizes to pipe-line system, pass through pressure gauge Manifold pressure variation is observed, stop vacuum pump when reaching setting pressure and closes valve one, vacuumizes end;
D, distribution in pipeline: the gas in fuel gas gas cylinder is filled in pipeline by Open valve two based on partial pressure method, is led to Manifold pressure variation is apparently examined in excess pressure, closes valve two when a predetermined pressure has been reached, and pipeline is stood a period of time, is guaranteed Fuel gas is sufficiently mixed with air in pipeline, and is evenly distributed in pipeline;
E, it lights a fire: by Computer controlled ignition system, certain ignition energy, ignition delay time being set, make to light a fire Bar electrion generates electric spark, lights the fuel gas in pipeline;
F, data acquire: after igniting, passing through computer, pressure and temp acquisition system, seven pairs of pressure/temperature sensor acquisitions Blast pressure and temperature data in each segment pipe acquire explosive flame by high-speed camera, computer, flame acquisition system Data when transparent explosion-proof glass at circular non-opaque form and vertical pipeline are traveled to, and the data of acquisition are saved in calculating Machine;
G, power supply and test macro are closed;
H, pipeline discharges water: Open valve three, and water storage emptying will be remained in pipeline after explosion;
I, data are analyzed: the blast pressure of computer record, temperature, flame data are arranged and analyzed.
As seen from the above technical solution provided by the invention, sewage network fuel gas provided in an embodiment of the present invention Detonation propagation procedural test device and method, can simulation of real scenes carry out sewage network gas burst experiment, including it is vertical Well vented explosion tests and the non-vented explosion tests of Vertical Well, and it is able to achieve the process monitoring of blast pressure, temperature and flame.
Detailed description of the invention
Fig. 1 is sewage network flammable gas explosion communication process test device structural representation provided in an embodiment of the present invention Figure.
In figure:
1- vertical pipeline;2- blind plate/venting of dust explosion piece;3- spark lever;4- pressure/temperature sensor one;5- high-speed camera;6- First segment horizontal pipe;7- second segment horizontal pipe;8- third section horizontal pipe;The 4th section of horizontal pipe of 9-;The 5th Duan Shui of 10- Flat pipeline;The 6th section of horizontal pipe of 11-;12- pressure/temperature sensor two;13- pressure/temperature sensor three;14- pressure/temperature Spend sensor four;15- pressure/temperature sensor five;16- pressure/temperature sensor six;17- pressure/temperature sensor seven;18, 19,20,21,22,23- circular non-opaque form;24- pressure gauge;25- water filling port/dewatering outlet;26- valve one;27- vacuum pump; 28- valve two;29- fuel gas gas cylinder;30- valve three;31- water tank;32- ignition system;33- computer;34,35- pressure Temperature acquisition system;36- flame acquisition system.
Specific embodiment
The embodiment of the present invention will be described in further detail below.What is be not described in detail in the embodiment of the present invention is interior Appearance belongs to the prior art well known to professional and technical personnel in the field.
Sewage network flammable gas explosion communication process test device of the invention and method, preferable specific embodiment party Formula is:
Sewage network flammable gas explosion communication process test device includes vertical pipeline system and horizontal pipe system, institute Stating vertical pipeline system includes vertical pipeline, and spark lever is installed in the side of the vertical pipeline, and a pair of of pressure/temperature is installed in the other side Sensor is spent, when carrying out vented explosion tests, venting of dust explosion piece is installed at the top of the vertical pipeline, it is described vertical when carrying out non-vented explosion tests Blind plate is installed at the top of pipeline;
The horizontal pipe system includes multistage horizontal pipe, multistage horizontal pipe and vertical pipeline collectively form one it is close Restricted clearance is closed, a pair of of pressure/temperature sensor is installed respectively in every section of horizontal pipe top center;
The vertical pipeline material is transparent explosion-proof glass, and the horizontal pipe is steel material, and in every section of horizontal tube Circular non-opaque form, the outside of corresponding transparent explosion-proof glass and circular non-opaque form position are installed in center respectively immediately ahead of road Equipped with high-speed camera;
Pressure gauge is installed in the top left side of first segment horizontal pipe, bottom left is equipped with water filling port/dewatering outlet, It is connect respectively with vacuum pump and fuel gas gas cylinder at the top of final stage horizontal pipe by valve one and valve two.
Water filling port/the dewatering outlet is connect by valve three with water tank.
The spark lever is connect with ignition system, and the pressure/temperature sensor is connect with pressure and temp acquisition system, institute High-speed camera is stated to connect with flame acquisition system.
The pressure and temp acquisition system, flame acquisition system and ignition system are connect with computer respectively.
Above-mentioned sewage network flammable gas explosion communication process test device carries out sewage network flammable gas explosion biography The method for broadcasting procedural test, which is characterized in that carry out vertical pipeline venting of dust explosion/non-vented explosion tests, primary complete testing procedure is such as Under:
A, test device installation and debugging: vertical pipeline system is mounted and connected, horizontal pipe system, water system, matches Gas system, Iganition control system, data collection system wherein install venting of dust explosion piece at the top of vertical pipeline 1 when vented explosion tests, non-to let out Blind plate is installed at the top of vertical pipeline when quick-fried experiment, each section is debugged, it is ensured that seal for pipe joints is good and guarantees each system It can operate normally;
B, fill the water in pipeline: the water in water tank is injected into pipeline by Open valve three by water filling port/dewatering outlet, is led to It crosses transparent explosion-proof glass at observation vertical pipeline and determines water injection rate, valve three is closed when reaching predetermined water injection rate and stops water filling;
C, vacuumize in pipeline: Open valve one starts vacuum pump, vacuumizes to pipe-line system, pass through pressure gauge Manifold pressure variation is observed, stop vacuum pump when reaching setting pressure and closes valve one, vacuumizes end;
D, distribution in pipeline: the gas in fuel gas gas cylinder is filled in pipeline by Open valve two based on partial pressure method, is led to Manifold pressure variation is apparently examined in excess pressure, closes valve two when a predetermined pressure has been reached, and pipeline is stood a period of time, is guaranteed Fuel gas is sufficiently mixed with air in pipeline, and is evenly distributed in pipeline;
E, it lights a fire: by Computer controlled ignition system, certain ignition energy, ignition delay time being set, make to light a fire Bar electrion generates electric spark, lights the fuel gas in pipeline;
F, data acquire: after igniting, passing through computer, pressure and temp acquisition system, seven pairs of pressure/temperature sensor acquisitions Blast pressure and temperature data in each segment pipe acquire explosive flame by high-speed camera, computer, flame acquisition system Data when transparent explosion-proof glass at circular non-opaque form and vertical pipeline are traveled to, and the data of acquisition are saved in calculating Machine;
G, power supply and test macro are closed;
H, pipeline discharges water: Open valve three, and water storage emptying will be remained in pipeline after explosion;
I, data are analyzed: the blast pressure of computer record, temperature, flame data are arranged and analyzed.
Sewage network flammable gas explosion communication process test device of the invention and method, can simulation of real scenes open Open up sewage network gas burst experiment, including Vertical Well vented explosion tests and the non-vented explosion tests of Vertical Well, and be able to achieve blast pressure, The process monitoring of temperature and flame.
Specific embodiment:
Sewage network flammable gas explosion communication process test device schematic diagram is as shown in Figure 1.The test device is by vertical Pipe-line system, horizontal pipe system, water system, air distribution system, Iganition control system, six part of data collection system are constituted.
Wherein vertical pipeline system is made of vertical pipeline 1 and blind plate/venting of dust explosion piece 2, when carrying out vented explosion tests, vertical pipeline Venting of dust explosion piece is installed at 1 top, when carrying out non-vented explosion tests, blind plate is installed at the top of vertical pipeline 1, in vented explosion tests, when in pipeline When pressure reaches predetermined cracking pressure, venting of dust explosion occurs for the rupture of venting of dust explosion piece.Spark lever 3 is installed on the left of vertical pipeline 1, for lighting Fuel gas in pipeline installs a pair of of pressure/temperature sensor 1, for measuring pressure of exploding in pipeline on the right side of vertical pipeline 1 Power and temperature.Vertical pipeline material is transparent explosion-proof glass, cannot be only used for water storage content in observation pipeline, and can be used for height Fast video camera 5 shoots explosive flame.Pipeline section is circle, a diameter of 0.15m.
Horizontal pipe system include six sections of horizontal pipes (6,7,8,9,10,11), with vertical pipeline 1 collectively form one it is close Restricted clearance is closed, four sections of horizontal pipe (6,7,10,11) length are 0.5m, and two sections of horizontal pipe (8,9) length are 1m, pipe Road section is circle, and a diameter of 0.15m installs six pairs of Pressure/Temperatures in every section of horizontal pipe top center respectively and passes Sensor (12,13,14,15,16,17), for measuring blast pressure and temperature in horizontal pipe.Horizontal pipe is steel material Material, and six circular non-opaque forms (18,19,20,21,22,23) are installed in center respectively immediately ahead of every segment pipe, it is straight Diameter is 2.5cm, shoots explosive flame for high-speed camera 5.Pressure is installed in the top left side of first segment horizontal pipe 6 Table 24, the pressure change for vacuumizing with being observed in pipeline when distribution, is equipped with note in 6 bottom left of first segment horizontal pipe The mouth of a river/dewatering outlet 25 is equipped with valve 1 at the top of the 6th section of horizontal pipe 11 for injection/emptying water storage in pipeline, uses In control vacuum pump 27 vacuumizes, valve 2 28 is for controlling 29 air inlet of fuel gas gas cylinder.
Water system is made of valve 3 30, water tank 31 and water filling port/dewatering outlet 25, passes through 3 30 controlled level pipe of valve Reservoir storage in road.
Air distribution system is made of pressure gauge 24, valve 1, vacuum pump 27, valve 2 28, fuel gas gas cylinder 29, distribution When vacuumized by vacuum pump 27, by valve 1 control pipeline in initial pressure, based on partial pressure method by valve 2 28 control The air inflow of fuel gas gas cylinder 29 makes 24 numerical value of pressure gauge reach scheduled pressure value.
Iganition control system is made of spark lever 3, ignition system 32, computer 33, is punctured by 3 electrion of spark lever Air generates spark and lights the fuel gas in pipeline.
Data collection system is by seven pairs of pressure/temperature sensors (4,12,13,14,15,16,17), high-speed camera 5, meter Calculation machine 33, pressure and temp acquisition system (34,35), flame acquisition system 36 are constituted.Wherein pass through seven pairs of pressure/temperature sensors (4,12,13,14,15,16,17), computer 33, pressure and temp acquisition system (34,35) acquire pipeline in blast pressure and Temperature data;Acquiring explosive flame by high-speed camera 5, computer 33, flame acquisition system 36, to travel to six circles saturating Data at photopic vision window (18,19,20,21,22,23) and vertical pipeline 1 when transparent explosion-proof glass.
Test method and step:
By sewage network flammable gas explosion communication process test device, it is real that vertical pipeline venting of dust explosion/non-venting of dust explosion can be carried out It tests, primary complete testing procedure is as follows:
1, test device installation and debugging.Vertical pipeline system is mounted and connected, horizontal pipe system, water system, matches Gas system, Iganition control system, data collection system wherein install venting of dust explosion piece at the top of vertical pipeline 1 when vented explosion tests, non-to let out Blind plate is installed at the top of vertical pipeline 1 when quick-fried experiment, each section is debugged, it is ensured that seal for pipe joints is good and guarantees each system It can operate normally.
2, water filling in pipeline.Water in water tank 31 is injected into pipeline by water filling port/dewatering outlet 25 by Open valve 3 30 It is interior, water injection rate is determined by transparent explosion-proof glass at observation vertical pipeline 1, valve 3 30 is closed when reaching predetermined water injection rate and is stopped Only fill the water.
3, it is vacuumized in pipeline.Open valve 1 starts vacuum pump 27, vacuumizes to pipe-line system, pass through pressure Power table 24 observes manifold pressure variation, stops vacuum pump 27 when reaching setting pressure and closes valve 1, vacuumizes knot Beam.
4, distribution in pipeline.Gas in fuel gas gas cylinder 29 is filled with pipeline based on partial pressure method by Open valve 2 28 It is interior, manifold pressure variation is observed by pressure gauge 24, closes valve 2 28 when a predetermined pressure has been reached, pipeline is stood one section Time guarantees that fuel gas is sufficiently mixed with air in pipeline, and is evenly distributed in pipeline.
5, it lights a fire.Ignition system 32 is controlled by computer 33, certain ignition energy, ignition delay time are set, made 3 electrion of spark lever generates electric spark, lights the fuel gas in pipeline.
6, data acquire.After igniting, pass through computer 33, pressure and temp acquisition system (34,35), seven pairs of Pressure/Temperatures Sensor (4,12,13,14,15,16,17) acquires the blast pressure and temperature data in each segment pipe, passes through high-speed camera 5, computer 33, flame acquisition system 36 acquire explosive flame travel to six circular non-opaque forms (18,19,20,21,22, 23) and the data at vertical pipeline 1 when transparent explosion-proof glass, and the data of acquisition are saved in computer 33.
7, power supply and test macro are closed.
8, pipeline discharges water.Open valve 3 30 will remain water storage emptying in pipeline after explosion.
9, data are analyzed.The blast pressure of the record of computer 33, temperature, flame data are arranged and analyzed.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Within the technical scope of the present disclosure, any changes or substitutions that can be easily thought of by anyone skilled in the art, It should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with the protection model of claims Subject to enclosing.

Claims (5)

1. a kind of sewage network flammable gas explosion communication process test device, which is characterized in that including vertical pipeline system and Horizontal pipe system, the vertical pipeline system includes vertical pipeline, and spark lever, the other side are installed in the side of the vertical pipeline A pair of of pressure/temperature sensor is installed, when carrying out vented explosion tests, venting of dust explosion piece is installed at the top of the vertical pipeline, carries out non-venting of dust explosion When experiment, blind plate is installed at the top of the vertical pipeline;
The horizontal pipe system includes multistage horizontal pipe, multistage horizontal pipe and vertical pipeline collectively form one it is closed by Space is limited, a pair of of pressure/temperature sensor is installed respectively in every section of horizontal pipe top center;
The vertical pipeline material be transparent explosion-proof glass, the horizontal pipe be steel material, and every section of horizontal pipe just Circular non-opaque form is installed in front center respectively, and the outside for corresponding to transparent explosion-proof glass and circular non-opaque form position is equipped with High-speed camera;
Pressure gauge is installed in the top left side of first segment horizontal pipe, bottom left is equipped with water filling port/dewatering outlet, last It is connect respectively with vacuum pump and fuel gas gas cylinder at the top of one section of horizontal pipe by valve one and valve two.
2. sewage network flammable gas explosion communication process test device according to claim 1, which is characterized in that described Water filling port/dewatering outlet is connect by valve three with water tank.
3. sewage network flammable gas explosion communication process test device according to claim 2, which is characterized in that described Spark lever is connect with ignition system, and the pressure/temperature sensor is connect with pressure and temp acquisition system, the high-speed camera It is connect with flame acquisition system.
4. sewage network flammable gas explosion communication process test device according to claim 3, which is characterized in that described Pressure and temp acquisition system, flame acquisition system and ignition system are connect with computer respectively.
5. a kind of described in any item sewage network flammable gas explosion communication process test devices of Claims 1-4 carry out dirty The method of pipe network flammable gas explosion communication process test, which is characterized in that carry out vertical pipeline venting of dust explosion/non-vented explosion tests, Primary complete testing procedure is as follows:
A, vertical pipeline system, horizontal pipe system, water system, distribution system test device installation and debugging: is mounted and connected System, Iganition control system, data collection system, wherein install venting of dust explosion piece at the top of vertical pipeline 1 when vented explosion tests, non-venting of dust explosion is real Blind plate is installed at the top of vertical pipeline when testing, each section is debugged, it is ensured that seal for pipe joints is good and guarantees that each system can It operates normally;
B, fill the water in pipeline: the water in water tank is injected into pipeline by water filling port/dewatering outlet, passes through sight by Open valve three It examines transparent explosion-proof glass at vertical pipeline and determines water injection rate, valve three is closed when reaching predetermined water injection rate and stops water filling;
C, vacuumize in pipeline: Open valve one starts vacuum pump, vacuumizes to pipe-line system, observed by pressure gauge Manifold pressure variation stops vacuum pump when reaching setting pressure and closes valve one, vacuumizes end;
D, distribution in pipeline: the gas in fuel gas gas cylinder is filled in pipeline based on partial pressure method, passes through pressure by Open valve two Power apparently examines manifold pressure variation, closes valve two when a predetermined pressure has been reached, and pipeline is stood a period of time, is guaranteed flammable Gas is sufficiently mixed with air in pipeline, and is evenly distributed in pipeline;
E, it lights a fire: by Computer controlled ignition system, certain ignition energy, ignition delay time being set, make spark lever height It presses electricity and generates electric spark, light the fuel gas in pipeline;
F, data acquire: after igniting, acquiring each section by computer, pressure and temp acquisition system, seven pairs of pressure/temperature sensors Blast pressure and temperature data in pipeline are acquired explosive flame and are propagated by high-speed camera, computer, flame acquisition system Data at circular non-opaque form and vertical pipeline when transparent explosion-proof glass, and the data of acquisition are saved in computer;
G, power supply and test macro are closed;
H, pipeline discharges water: Open valve three, and water storage emptying will be remained in pipeline after explosion;
I, data are analyzed: the blast pressure of computer record, temperature, flame data are arranged and analyzed.
CN201910232793.2A 2019-03-26 2019-03-26 Sewage network flammable gas explosion communication process test device and method Pending CN109827996A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910232793.2A CN109827996A (en) 2019-03-26 2019-03-26 Sewage network flammable gas explosion communication process test device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910232793.2A CN109827996A (en) 2019-03-26 2019-03-26 Sewage network flammable gas explosion communication process test device and method

Publications (1)

Publication Number Publication Date
CN109827996A true CN109827996A (en) 2019-05-31

Family

ID=66872383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910232793.2A Pending CN109827996A (en) 2019-03-26 2019-03-26 Sewage network flammable gas explosion communication process test device and method

Country Status (1)

Country Link
CN (1) CN109827996A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110736580A (en) * 2019-10-28 2020-01-31 中国科学院合肥物质科学研究院 hydrogen-dry air-water vapor explosion pressure testing device and testing method
CN111665277A (en) * 2020-06-22 2020-09-15 福州大学 Visual gas cylinder cabinet explosion venting experimental device and experimental method
CN112683947A (en) * 2020-12-30 2021-04-20 太原理工大学 Angle coupling structure pipe network explosion simulation test analysis system
CN113092529A (en) * 2021-04-02 2021-07-09 东北大学 Gas distribution device and method for protecting explosion venting film based on pressure balance principle
CN113834853A (en) * 2021-08-27 2021-12-24 北京石油化工学院 Device and method for testing explosion characteristics of combustible gas in oil-water-gas coexistence limited space
CN113866218A (en) * 2021-09-29 2021-12-31 应急管理部天津消防研究所 Experimental device and experimental method for inhibiting non-uniform concentration gas explosion by multi-phase medium
CN115372585A (en) * 2022-08-26 2022-11-22 中国矿业大学 Visual gas explosion bidirectional propagation experimental device and test method thereof

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202870016U (en) * 2012-10-11 2013-04-10 南京工业大学 Test system for size effect of gas explosion characteristics
CN103604833A (en) * 2013-11-07 2014-02-26 安徽理工大学 Coal-dust explosion characteristic test system and coal-dust explosion characteristic test method
CN203465230U (en) * 2013-09-23 2014-03-05 中国科学技术大学 Test device for flame propagation and inhibition in explosion process of combustible gas and air premixed gas
JP2016061665A (en) * 2014-09-18 2016-04-25 大陽日酸株式会社 Liquefaction container for low temperature liquefied gas combustion/explosion test
CN105928978A (en) * 2016-04-20 2016-09-07 中国石油化工股份有限公司 Testing apparatus for burning and explosion of combustible gas in narrow, long and restricted space
CN205643223U (en) * 2016-04-15 2016-10-12 中国石油化工股份有限公司 Restricted space gas fires vortex testing arrangement
JP2017101926A (en) * 2015-11-30 2017-06-08 鹿島建設株式会社 Combustion test device and combustion test device operation method
CN107796645A (en) * 2017-10-20 2018-03-13 安徽理工大学 A kind of method of testing of cavity body structure to Gas Detonation wave absorption effect
CN107870180A (en) * 2018-01-10 2018-04-03 南京工业大学 The test system of gas burst feature structure effect
CN108061788A (en) * 2017-11-27 2018-05-22 北京理工大学 A kind of simulation underwater explosion experiment explosive energy output performance test method
CN108362855A (en) * 2018-02-12 2018-08-03 北京石油化工学院 A kind of quick-fried experimental provision of dust prevention and control
CN108627404A (en) * 2018-08-03 2018-10-09 南京工业大学 Venting of dust explosion flame induces the test system and its test method of vaporous cloud explosion
CN208297496U (en) * 2018-01-24 2018-12-28 中国矿业大学(北京) A kind of fork pipelines gas explosion experimental simulation device
CN209803040U (en) * 2019-03-26 2019-12-17 北京石油化工学院 Sewage pipe network combustible gas explosion propagation process testing device

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202870016U (en) * 2012-10-11 2013-04-10 南京工业大学 Test system for size effect of gas explosion characteristics
CN203465230U (en) * 2013-09-23 2014-03-05 中国科学技术大学 Test device for flame propagation and inhibition in explosion process of combustible gas and air premixed gas
CN103604833A (en) * 2013-11-07 2014-02-26 安徽理工大学 Coal-dust explosion characteristic test system and coal-dust explosion characteristic test method
JP2016061665A (en) * 2014-09-18 2016-04-25 大陽日酸株式会社 Liquefaction container for low temperature liquefied gas combustion/explosion test
JP2017101926A (en) * 2015-11-30 2017-06-08 鹿島建設株式会社 Combustion test device and combustion test device operation method
CN205643223U (en) * 2016-04-15 2016-10-12 中国石油化工股份有限公司 Restricted space gas fires vortex testing arrangement
CN105928978A (en) * 2016-04-20 2016-09-07 中国石油化工股份有限公司 Testing apparatus for burning and explosion of combustible gas in narrow, long and restricted space
CN107796645A (en) * 2017-10-20 2018-03-13 安徽理工大学 A kind of method of testing of cavity body structure to Gas Detonation wave absorption effect
CN108061788A (en) * 2017-11-27 2018-05-22 北京理工大学 A kind of simulation underwater explosion experiment explosive energy output performance test method
CN107870180A (en) * 2018-01-10 2018-04-03 南京工业大学 The test system of gas burst feature structure effect
CN208297496U (en) * 2018-01-24 2018-12-28 中国矿业大学(北京) A kind of fork pipelines gas explosion experimental simulation device
CN108362855A (en) * 2018-02-12 2018-08-03 北京石油化工学院 A kind of quick-fried experimental provision of dust prevention and control
CN108627404A (en) * 2018-08-03 2018-10-09 南京工业大学 Venting of dust explosion flame induces the test system and its test method of vaporous cloud explosion
CN209803040U (en) * 2019-03-26 2019-12-17 北京石油化工学院 Sewage pipe network combustible gas explosion propagation process testing device

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
WAN S J: "influence of side venting positionmenthane/air explosion characteristics inanendvented ductcontaining an obstacle", 《EXPERIMENTAL THERMAL AND FLUID SCIENCE》, no. 92, pages 202 - 210 *
吕鹏飞: "点火位置对污水管网可燃气体爆燃特性影响模拟研究", 《中国安全生产科学技术》, vol. 15, no. 10, pages 51 - 56 *
吕鹏飞: "竖直分支管道泄爆开启压力对甲烷爆燃压力的影响研究", 《中国安全生产科学技术》, vol. 18, no. 4, pages 69 - 77 *
谭迎新: "可燃气体动态爆炸极限测试装置设计", 《消防科学与技术》, vol. 37, no. 9, pages 1235 - 1238 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110736580A (en) * 2019-10-28 2020-01-31 中国科学院合肥物质科学研究院 hydrogen-dry air-water vapor explosion pressure testing device and testing method
CN110736580B (en) * 2019-10-28 2021-04-27 中国科学院合肥物质科学研究院 Hydrogen-dry air-water vapor explosion pressure testing device and testing method
CN111665277A (en) * 2020-06-22 2020-09-15 福州大学 Visual gas cylinder cabinet explosion venting experimental device and experimental method
CN112683947A (en) * 2020-12-30 2021-04-20 太原理工大学 Angle coupling structure pipe network explosion simulation test analysis system
CN112683947B (en) * 2020-12-30 2023-06-23 太原理工大学 Explosion simulation test analysis system for angle connection constructed pipe network
CN113092529A (en) * 2021-04-02 2021-07-09 东北大学 Gas distribution device and method for protecting explosion venting film based on pressure balance principle
CN113834853A (en) * 2021-08-27 2021-12-24 北京石油化工学院 Device and method for testing explosion characteristics of combustible gas in oil-water-gas coexistence limited space
CN113834853B (en) * 2021-08-27 2024-01-12 北京石油化工学院 Device and method for testing explosion characteristics of fuel gas in oil-water-gas coexistence limited space
CN113866218A (en) * 2021-09-29 2021-12-31 应急管理部天津消防研究所 Experimental device and experimental method for inhibiting non-uniform concentration gas explosion by multi-phase medium
CN115372585A (en) * 2022-08-26 2022-11-22 中国矿业大学 Visual gas explosion bidirectional propagation experimental device and test method thereof

Similar Documents

Publication Publication Date Title
CN109827996A (en) Sewage network flammable gas explosion communication process test device and method
CN102879429B (en) Testing system for gas explosion characteristic size effect
CN111474208B (en) Simulation experiment and suppression device for gas cloud explosion of non-uniform gradient concentration formed by gas leakage in urban underground pipe gallery cabin
CN203287341U (en) Explosion experiment device for unevenly distributed methane gas
CN101975717B (en) Combustible gas explosion limit test system in non-standard state
CN202870016U (en) Test system for size effect of gas explosion characteristics
CN102935275B (en) A kind of test method and device evaluating total flooding extinguishing property
CN104976504B (en) Real-time hydrogen and natural gas mixed filling method and equipment
CN102818821A (en) Combustible gas explosion feature experiment system in ultralow temperature environment
CN211980004U (en) Gas leakage explosion simulation system for gas extraction pipeline
CN111307863A (en) Combustible gas hot surface ignition experimental device and method in flowing state
CN113624405B (en) Hydrogen leakage diffusion test device in limited space
CN102788815A (en) Exploding tank used for ultralow temperature gas explosion characteristic test
CN201837624U (en) Combustible gas explosion limit testing system under non-standard states
CN108037026A (en) Gas combustion explosion analogue experiment installation in a kind of Urban Underground pipe gallery cabin
CN206038582U (en) A safe type explosion test testing arrangement for datonation -inhibition effect of water smoke
Liu et al. Influencing factors of the chain effect of spherical gas cloud explosion
CN115639247A (en) Small-scale visual hydrogen explosion monitoring system and monitoring method
CN109856184A (en) Constraint space flammable gas explosion flow-field test device and method under water storage condition
CN109001255A (en) A kind of compound negative pressure cavity inhibits fork tunnel gas explosion experimental provision and method
CN104931529A (en) Test method of safe critical partial pressure of vinyl acetylene gas
CN205748959U (en) A kind of assay device for pipeline explosion arrestment spark arrester performance test
CN109752409A (en) A kind of flammable gas explosion propagation law simulation test device
CN202942579U (en) Testing apparatus for evaluating total-flooding fire extinguishing performance
CN209803040U (en) Sewage pipe network combustible gas explosion propagation process testing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination