CN201819001U - Secondary fueling station, and pipeline system and control system of secondary fueling station - Google Patents

Secondary fueling station, and pipeline system and control system of secondary fueling station Download PDF

Info

Publication number
CN201819001U
CN201819001U CN2010201856793U CN201020185679U CN201819001U CN 201819001 U CN201819001 U CN 201819001U CN 2010201856793 U CN2010201856793 U CN 2010201856793U CN 201020185679 U CN201020185679 U CN 201020185679U CN 201819001 U CN201819001 U CN 201819001U
Authority
CN
China
Prior art keywords
pressure
station
gas cylinder
air feed
fortune
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201856793U
Other languages
Chinese (zh)
Inventor
庞维龙
张剑辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tyne Boneng Gas Equipment (tianjin) Ltd By Share Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010201856793U priority Critical patent/CN201819001U/en
Application granted granted Critical
Publication of CN201819001U publication Critical patent/CN201819001U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model discloses a secondary fueling station, and a pipeline system and a control system of the secondary fueling station. The pipeline system of the secondary fueling station comprises a pressurizing mechanism, a fueling machine, a gas delivery cylinder set and an in-station gas storage cylinder set. The gas delivery cylinder set includes gas delivery cylinders; output ends of the gas delivery cylinders are communicated with a low-pressure port of the fueling machine; the in-station gas storage cylinder set includes in-station gas storage cylinders; the nominal operating pressure of the in-station gas storage cylinders is larger than that of the gas delivery cylinders; the in-station gas storage cylinders are communicated with a high-pressure port of the fueling machine; and output ends of the in-station gas storage cylinders are communicated with the gas delivery cylinders by the aid of gas inlet valves. The pipeline system is capable of simultaneously filling CNG (compressed natural gas) exhausted by the gas delivery cylinder set into the fueling machine and the n-station gas storage cylinders, thereby pressurizing and converting the CNG with lower pressure of the gas delivery cylinder set into CNG with high pressure by the aid of the in-station gas storage cylinder set, and simultaneously ensuring safety of the gas delivery cylinder set and improving system pressure and overall fueling capacity of the secondary fueling station.

Description

A kind of air entraining substation and pipe-line system thereof and control system
Technical field
The utility model relates to a kind of CNG (Compressed Natural Gas, compressed natural gas) aerating technology, specially refers to a kind of air entraining substation pipe-line system, control system and comprises the air entraining substation of above-mentioned pipe-line system and control system.
Background technique
Adopt CNG as fuel have pollution less, characteristics such as safe and reliable and operating cost is low.In order to enlarge the scope of utilizing of CNG, make things convenient for the filling of CNG fuel, the current mainly mode by gas station is that automobile or other are done the equipment aerating of fuel with CNG.
Current refueling system generally adopts the mode at primary and secondary station to design, and refueling system comprises refueling mother station and air entraining substation.
Refueling mother station links to each other with natural-gas transfer pipeline, is that the external world provide CNG as source of the gas by compressor with the rock gas in the gas pipeline.Refueling mother station generally comprises compressor, filling machine or adds gas column, also comprises the air cylinder group that a plurality of air cylinders are formed sometimes; The rock gas that flows out from gas pipeline is stored in the air cylinder with predetermined pressure under the compressor effect, or directly is injected in the fortune gas cylinder group.When refueling is arranged, CNG in the air cylinder is joined in the automobile gas holder by filling machine.CNG with air cylinder group storage prearranging quatity can provide reliable and stable source of the gas for refueling mother station, guarantees the stability and the reliability of refueling mother station aerating.The air cylinder of refueling mother station shifts for fixedly installing, do not need transportation; Therefore, this air cylinder is called air cylinder in the station, and the air cylinder group of formation is called air cylinder group in the station.
Air entraining substation comprises source of the gas, booster body and filling machine, and wherein source of the gas is the gas cylinder group that is formed by a plurality of gas cylinders.The working principle of air entraining substation is: booster body utilizes the incompressibility of liquid, utilizes high-pressure service pump will be scheduled to the supercharging medium and charges in the gas cylinder, the CNG in the gas cylinder is extruded, and then charge in the gas holder for the treatment of the aerating automobile through filling machine.When in the gas cylinder group, not having CNG or CNG amount to be less than predetermined value, this gas cylinder group is carried on the refueling mother station by the fortune car; On refueling mother station, in the gas cylinder with the gas cylinder group on the CNG injection fortune car of prearranging quatity; After filling is finished, be carried on the air entraining substation by will annotate the again gas cylinder of CNG of fortune car, as the outside air feed of the source of the gas on the air entraining substation.For the ease of transportation, to be convenient between refueling mother station and air entraining substation, shift, the gas cylinder of air entraining substation is arranged on the fortune car; Therefore, the gas cylinder that is positioned at the fortune car is called the fortune gas cylinder, and the gas cylinder group of formation is called fortune gas cylinder group.
Because the difference of working environment for the safety that CNG uses, makes the nominal operating pressure of the nominal operating pressure of fortune gas cylinder less than air cylinder in the station usually.At present, must not be higher than 20MPa with regard to regulation fortune gas cylinder nominal operating pressure in the China national current standard, the pressure of air cylinder must not be higher than the regulation of 25MPa in standing.
CNG is different with liquid fuel, to the gas holder aerating of automobile the time, in the pressure difference inflow automobile air cylinder between CNG mainly depends in air cylinder (air cylinder or fortune gas cylinder in standing) and the automobile gas holder.Because the nominal operating pressure of the fortune gas cylinder of air entraining substation is less than the nominal operating pressure of air cylinder in the refueling mother station station, and its nominal operating pressure difference reaches 5MPa, therefore, the aerating speed of air entraining substation is much smaller than the aerating speed of refueling mother station, makes the aerating ability of air entraining substation aerating ability far below refueling mother station.Because refueling mother station will be based on suitable natural-gas transfer pipeline, not only cost is very high to build more refueling mother station, and is difficult to guarantee the Safety performance of refueling mother station.
Along with the raising of current social to the CNG demand, current refueling system can not satisfy the current social needs far away; Therefore, how when guaranteeing air entraining substation fortune gas cylinder safely, improve the aerating ability of air entraining substation, satisfying the current social needs is technical barriers of current this technical field.
The model utility content
At above-mentioned technical barrier, first purpose of the present utility model is, a kind of air entraining substation pipe-line system is provided, this pipe-line system can not reach in the nominal pressure of fortune gas cylinder group in the nominal pressure of air cylinder group in the station, when guaranteeing air entraining substation fortune gas cylinder safely, improve the system pressure of air entraining substation, thereby improve the aerating speed of air entraining substation, satisfy the needs that current social is utilized CNG.
Second purpose of the present utility model is, a kind of control system of controlling above-mentioned air entraining substation pipe-line system is provided, to realize adding the operation automation of substation under the condition with two groups of different nominal pressure gas cylinder groups.
The 3rd purpose of the utility model is, a kind of air entraining substation that comprises above-mentioned pipe-line system and control system is provided.
The 4th purpose of the utility model is, a kind of controlling method of air entraining substation is provided.
In order to realize above-mentioned first purpose, the air entraining substation pipe-line system that the utility model provides comprises booster body, filling machine and is positioned at fortune gas cylinder group on the fortune car that described fortune gas cylinder group comprises at least two fortune gas cylinders; Described fortune gas cylinder output terminal is connected with the low pressure port of described filling machine by outlet valve respectively, and pressurized end is connected with the boost port of booster body by pressure charging valve respectively; Be that with the difference of technology also comprise air cylinder group in the station, the air cylinder group comprises air cylinder at least two stations in the described station, the nominal operating pressure of air cylinder is greater than the nominal operating pressure of fortune gas cylinder in the described station; The output terminal of air cylinder is connected with the high-pressure mouth of filling machine by outlet valve respectively in the described station, and pressurized end is connected with the boost port of booster body by pressure charging valve respectively; The output terminal of air cylinder is connected by the described fortune gas cylinder of suction valve and at least one at least one described station.
Preferably, the output terminal of air cylinder is connected with any fortune gas cylinder by suction valve in each described station.
Preferably, described fortune gas cylinder group has first pipeline that is connected with described fortune gas cylinder outlet valve respectively, the air cylinder group has second pipeline that is connected with air cylinder suction valve in the described station respectively in the described station, and described second pipe ends is connected with the low pressure port of described first pipeline and filling machine respectively; Have between described first pipeline and second pipeline and stop the one-way valve of compressed natural gas CNG from second pipeline flow-direction, first pipeline.
Preferably, also comprise the pressure transducer that is used to detect pressure charging valve input end pressure; Described booster body has a boost port, is connected with switch valve between the pressure charging valve of described fortune gas cylinder and the boost port of described booster body.
In order to realize above-mentioned second purpose, the control system that is used to control above-mentioned a kind of air entraining substation pipe-line system that the utility model provides, this control system comprises first processing unit and first performance element; Described first processing unit can be according to predetermined at least one fortune gas cylinder of policy selection as the low pressure air feed bottle; When the CNG amount in described low pressure air feed bottle was less than predetermined value, it was the low pressure air feed bottle that described first processing unit can be selected another fortune gas cylinder according to predetermined policy; Described first performance element can be opened the outlet valve of low pressure air feed bottle according to the selection of first processing unit, and this control system also comprises second processing unit and second performance element; Described second processing unit can be according to air cylinder be as the high-pressure air feed bottle at least one station of predetermined policy selection, and described second performance element can be opened the outlet valve of high-pressure air feed bottle according to the selection of second processing unit; When described high-pressure air feed bottle can not satisfy the high-pressure air feed needs, it is interim high-pressure air feed bottle that second processing unit can be selected the other interior air cylinder at least one station according to predetermined policy, and instruct second performance element to open the outlet valve of interim high-pressure air feed bottle, close the outlet valve of high-pressure air feed bottle; Can also instruct second performance element to open the suction valve of high-pressure air feed bottle, the CNG that fortune gas cylinder group is discharged mends in the high-pressure air feed bottle; After tonifying Qi was finished, described second processing unit can instruct second performance element to close the suction valve of high-pressure air feed bottle, and the pressurized end of high-pressure air feed bottle is connected with the boost port of booster body; When described high-pressure air feed bottle satisfied the high-pressure air feed needs, described second processing unit can instruct second performance element to open the outlet valve of high-pressure air feed bottle output terminal.
Preferably, when described high-pressure air feed bottle can not satisfy the high-pressure air feed needs, described second processing unit can also judge whether the CNG amount in the high-pressure air feed bottle is less than predetermined value; If not, then instruct second performance element that the pressurized end of high-pressure air feed bottle is connected with the boost port of booster body; If, then instruct second performance element to open the suction valve of high-pressure air feed bottle, the CNG that fortune gas cylinder group is discharged mends into the high-pressure air feed bottle.
Preferably, described second processing unit can also judge whether the high-pressure air feed pressure of the inside of a bottle is higher than predetermined value according to predetermined strategy, perhaps keeps the time of predetermined pressure whether to surpass predetermined length in the high-pressure air feed bottle; If, then instruct second performance element will stand in the air cylinder group in other at least one stations the outlet valve of air cylinders open.
Preferably, described first processing unit can also judge whether described low pressure air feed bottle internal pressure is higher than predetermined value, perhaps keeps the time of predetermined pressure whether to surpass predetermined length in the low pressure air feed bottle; If then instruct first performance element that the outlet valve of other at least one fortune gas cylinder in the fortune gas cylinder group is opened.
Preferably, described first processing unit can also judge whether to the supercharging of low pressure air feed bottle according to predetermined policy, if then instruct first performance element that the pressurized end of low pressure air feed bottle is connected with the boost port of booster body.
Preferably, described booster body has a boost port, and described first processing unit judges whether that according to predetermined policy described predetermined policy comprises in the supercharging of low pressure air feed bottle: when booster body is not given the supercharging of high-pressure air feed bottle, be judged as and be.
In order to realize above-mentioned the 3rd purpose, the air entraining substation that the utility model provides comprises above-mentioned any pipe-line system and above-mentioned each described control system.
In order to realize above-mentioned the 4th purpose, the utility model provides the controlling method of air entraining substation, and described air entraining substation comprises above-mentioned any air entraining substation pipe-line system; Described controlling method comprises respectively to the operation of fortune gas cylinder group with to the operation of air cylinder group in standing:
Described operation to fortune gas cylinder group comprises step:
S110, according to predetermined at least one fortune gas cylinder of policy selection as the low pressure air feed bottle;
S120 opens the outlet valve of low pressure air feed bottle;
S130, when the CNG amount in the low pressure air feed bottle was less than predetermined value, selecting at least one other fortune gas cylinder according to predetermined policy was the low pressure air feed bottle, returns step S120;
Described operation to air cylinder group in standing comprises step:
S210, air cylinder was as the high-pressure air feed bottle at least one was stood according to predetermined policy selection;
S220 opens the outlet valve of high-pressure air feed bottle;
S230, when described high-pressure air feed bottle can not satisfy the high-pressure air feed needs, selecting the other interior air cylinder at least one station according to predetermined policy was interim high-pressure air feed bottle, and opens the outlet valve of interim high-pressure air feed bottle; Close the outlet valve of high-pressure air feed bottle, open its suction valve, the CNG that fortune gas cylinder group is discharged mends into the high-pressure air feed bottle, treat that tonifying Qi is finished after, enter next step;
S240 makes high-pressure air feed bottle pressurized end be connected with the boost port of booster body, makes the high-pressure air feed bottle satisfy the high-pressure air feed needs, returns step S220.
Preferably, between described step S220 and step S230, described operation to fortune gas cylinder group also comprises: the pressure in the high-pressure air feed bottle is higher than predetermined value, when perhaps the time of maintenance predetermined pressure surpasses predetermined length in the high-pressure air feed bottle, the outlet valve of other at least one interior air cylinder in station in the air cylinder group in the station is opened.
Preferably, specifically comprise step at described step S230:
S231, when described high-pressure air feed bottle can not satisfy the high-pressure air feed needs, selecting the other interior air cylinder at least one station according to predetermined policy was interim high-pressure air feed bottle, and opens the outlet valve of interim high-pressure air feed bottle; Close the outlet valve of high-pressure air feed bottle; Judge that whether the CNG in the high-pressure air feed bottle measures greater than predetermined value; If enter step S240; If, then enter step S232 for not;
S232 opens the suction valve of high-pressure air feed bottle, and the CNG that fortune gas cylinder group is discharged mends into the high-pressure air feed bottle, treat that tonifying Qi is finished after, enter next step.
Preferably, between step S120 and step S130, described operation to fortune gas cylinder group also comprises step: when judging that needs are given the supercharging of low pressure air feed bottle, low pressure air feed bottle pressurized end is connected with the boost port of booster body.
Preferably, between step S120 and step S130, described operation to fortune gas cylinder group also comprises step: the pressure in the low pressure air feed bottle is higher than predetermined value, when perhaps the time of maintenance predetermined pressure surpasses predetermined length in the low pressure air feed bottle, the outlet valve of other at least one fortune gas cylinder in the fortune gas cylinder group is opened.
Compared with prior art, the air entraining substation pipe-line system that provides of the utility model also comprises air cylinder group in the station.Owing to air cylinder group in the station does not need transportation, can make the interior air cylinder in station have higher working pressure; Make the nominal operating pressure of the nominal operating pressure of air cylinder group in the station greater than the fortune gas cylinder.Specifically, can make the nominal operating pressure of fortune gas cylinder group reach 20MPa, make the nominal operating pressure of air cylinder in the station reach 25MPa; So both meet the nation's security regulation, and can guarantee the Security of air entraining substation again.Simultaneously, because air cylinder is connected with at least one fortune gas cylinder by suction valve at least one station, like this, when air cylinder emptying or CNG amount is less than predetermined value in the station, in standing, interior at least one of the interior air cylinder group of the CNG injection station that fortune gas cylinder group is discharged in air cylinder, increase the pressure of the interior air cylinder of standing again by booster body; Therefore, the air entraining substation pipe-line system that the utility model provides not only can be used the low pressure port air feed of fortune gas cylinder to filling machine, low pressure CNG in the fortune gas cylinder can also be injected the interior air cylinder that arrives at a station, pass through boost pressure again, with this portion C NG by high-pressure mouth with the outside air feed of higher pressure, can improve the whole gas supply capacity of air entraining substation so significantly, satisfy the needs that current social is utilized CNG.
In further technological scheme, the output terminal of air cylinder in each described station is connected by the output terminal of suction valve with any fortune gas cylinder; CNG in arbitrary fortune gas cylinder is injected in the interior air cylinder in any station, and then the pressurization of the CNG in arbitrary fortune gas cylinder by air cylinder group in the station can be become the outside air feed of high-pressure mouth of high pressure air air cylinder group in standing.Practical operation proves, this mode can not influence under the situation of gas taking rate of fortune car, and the system that improves air entraining substation adds atmospheric pressure; Reliable self the pressure of CNG in the fortune car directly provides the part air feed to filling machine in addition, reduces the power requirement of system, reduces system's total energy consumption.Can satisfy the needs of more high-pressure air feeds like this, improve the aerating ability and the adaptive capacity of air entraining substation.
In further technological scheme, be provided with one-way valve between second pipeline of air cylinder group in first pipeline of described fortune gas cylinder group and the station; In the time of can avoiding suction valve inefficacy or leakage like this, the high pressure CNG in avoiding standing in the air cylinder blows back in the fortune gas cylinder, avoids fortune gas cylinder internal pressure too high, guarantees the Security of air entraining substation pipe-line system.
In further technological scheme, described booster body is provided with a boost port; With a booster body is air cylinder group supercharging in fortune gas cylinder group and the station, can simplify the structure of air entraining substation pipe-line system, makes things convenient for the operation and the control of air entraining substation, reduces the construction cost of air entraining substation.
On the basis that above-mentioned air entraining substation pipe-line system is provided, the control system that provides can combine with pipe-line system, make in fortune gas cylinder and the station air cylinder respectively to the low pressure port and the high-pressure mouth air feed of filling machine, when CNG can not satisfy the high-pressure air feed needs in the air cylinder in the station, can also control respective valve automatically, fortune gas cylinder group air cylinder group in the station is mended into CNG, and the high-pressure air feed needs are satisfied in the CNG supercharging that the fortune gas cylinder is supplied with again; Not only can guarantee the Security of air entraining substation like this, improve the gas supply capacity of air entraining substation, can also improve the automation of air entraining substation control, make things convenient for the running of air entraining substation.
When described high-pressure air feed bottle can not satisfy the high-pressure air feed needs, whether the amount of further judging CNG in the high-pressure air feed bottle when high-pressure air feed bottle in CNG be no less than predetermined value, by the mode of supercharging improved the supply gas pressure of high-pressure air feed bottle less than predetermined value; Can avoid fortune gas cylinder group air cylinder air feed in the station continually like this, reduce the adverse effect of high-pressure air feed fortune gas cylinder low pressure air feed.
In further technological scheme, be higher than predetermined value in described low pressure air feed bottle internal pressure, when perhaps keeping in the low pressure air feed bottle time of predetermined pressure to surpass predetermined length, the outlet valve of other at least one fortune gas cylinder in the fortune gas cylinder group is opened for its ftercompction; Can when the aerating ebb, make the pressure in the fortune gas cylinder remain on maximum pressure at any time like this, increase the stored energy of system, the boost demand between balance aerating peak and the aerating ebb.
In further technological scheme, need supercharging in the low pressure air feed bottle, supply a bottle supercharging to low pressure again; Can adjust the pressure of low pressure port so in a predetermined manner, improve the stability and the reliability of low pressure air feed.
In further technological scheme, when booster body has a boost port, control system is according to the high-pressure air feed principle of priority, booster body is worked in the intended manner, not only can improve the aerating ability of air entraining substation, can also simplify the structure of air entraining substation, reduce the construction cost of air entraining substation.
Because the air entraining substation that the utility model provides comprises above-mentioned pipe-line system and control system, therefore, air entraining substation also has corresponding technique effect.
The controlling method of the air entraining substation that the utility model provides is corresponding with above-mentioned control system, also has corresponding technique effect.
Description of drawings
Fig. 1 is the structural representation of first kind of air entraining substation pipe-line system providing of the utility model;
Fig. 2 is the working principle schematic representation of first kind of air entraining substation pipe-line system providing of the utility model; Simultaneously, also be first kind of air entraining substation controlling method flow chart that the utility model provides;
Fig. 3 is second kind of air entraining substation controlling method flow chart that the utility model provides;
Fig. 4 is the part-structure schematic representation of second kind of air entraining substation pipe-line system providing of the utility model.
Embodiment
Below in conjunction with accompanying drawing the utility model is described in detail, the description of this part only is exemplary and explanatory, should any restriction not arranged to protection domain of the present utility model.Should be noted that the fortune gas cylinder can be any high-pressure bottles that can transport, store CNG such as the steel cylinder of big capacity or small capacity and even composite material gas cylinder.In standing in the air cylinder station air cylinder can be any high-pressure bottles that can store CNG such as the steel cylinder of big capacity or small capacity and even composite material gas cylinder, also can be arranged on gas storage or other gas storage facilities of fixing of air entraining substation.
Please refer to Fig. 1, Fig. 1 is the structural representation of first kind of air entraining substation pipe-line system providing of the utility model.This air entraining substation pipe-line system comprises air cylinder group 300 in booster body 100, filling machine 400, fortune gas cylinder group 200 and the station.
In order to reduce the construction cost of air entraining substation, simplify the structure of air entraining substation pipe-line system, in this example, the air entraining substation pipe-line system comprises a booster body 100.Booster body 100 comprises medium storage tank, high-pressure service pump and power-driven mechanism; The medium storage tank is used to store an amount of supercharging medium; High-pressure service pump turns round under the driving of power-driven mechanism, supplies with the supercharging medium by boost port with predetermined amount of flow.Supercharging medium in fortune gas cylinder group 200 and the station in the air cylinder group 300 can be back to the medium storage tank by refluxing opening under suitable condition.Booster body can have multiple concrete combination, as single motor+single pump+single medium storage tank, and dual-motor+double pump+two medium storage tanks, dual-motor+double pump+single medium storage tank or the like.The structure of booster body can be with reference to booster body of the prior art, and its working principle and structure thereof repeat no more.In order to bring into play the efficient of high-pressure service pump to greatest extent, and the gas supply capacity and the air feed efficient of raising air entraining substation, the preferred variable speed electric motors, particularly that uses Frequency Converter Control is as power-driven mechanism, so that high-pressure service pump can be exported the supercharging medium with predetermined flow according to actual needs.
Filling machine 400 comprises low pressure port L and high-pressure mouth H.Generally speaking, air entraining substation has plural filling machine, and all low pressure ports of filling machine are connected in parallel, and high-pressure mouth is connected in parallel.Fortune gas cylinder group 200 is a plurality of filling machine low pressure port air feed simultaneously like this; Air cylinder group 300 is given a plurality of filling machine high-pressure mouth air feed simultaneously in standing.
Fortune gas cylinder group 200 comprises a plurality of fortune gas cylinders 201, and in this example, fortune gas cylinder group 200 comprises m fortune gas cylinder 201.Fortune gas cylinder 201 front ends are output terminal, and the rear end is a pressurized end; Each fortune gas cylinder 201 output terminal is equipped with outlet valve 202, and pressurized end is equipped with back control valve group 203.In this example, fortune gas cylinder group 200 has first pipeline 204 that a while is connected with each fortune gas cylinder 201 outlet valves 202; Like this, each fortune gas cylinder 201 all can be exported CNG by first pipeline 204 outside fortune gas cylinder group 200.In this example, first pipeline 204 links to each other with second pipeline, 306 1 ends described later by rapid pipe joint 103, and is connected with the low pressure port L of filling machine 400 by second pipeline 306.The back control valve group 203 of each fortune gas cylinder 201 pressurized end comprises a pressure charging valve and a reflux valve respectively, the pressure charging valve of a plurality of backs control valve group 203 is communicated with the boost port of booster body 100 simultaneously by a rapid pipe joint 105, when fortune gas cylinder 201 superchargings, open the pressure charging valve of control valve group of corresponding back with it 203, just can inject the supercharging medium to this fortune gas cylinder 201 by booster body 100, its pressure is increased, so that the CNG that it is inner releases; The reflux valve of a plurality of backs control valve group 203 is communicated with the refluxing opening of booster body 100 simultaneously by a rapid pipe joint 104, so that the supercharging medium in the corresponding fortune gas cylinder 201 can be back in the medium storage tank under suitable condition.
For the convenience of transporting, fortune gas cylinder group 200 is positioned on the fortune car; CNG seldom or all during emptying, can push rapid pipe joint 103,104,105 aside in fortune gas cylinder group 200 each fortune gas cylinder 201, and air cylinder group 300 and booster body 100 are separated.By the fortune car fortune gas cylinder group 200 is carried to refueling mother station.By known method, charge into CNG to each fortune gas cylinder 201 on refueling mother station, the fortune car is carried to air entraining substation with fortune gas cylinder 201 again; Make fortune gas cylinder group 200 provide source of the gas for air entraining substation.For the safety that guarantees to transport, the nominal operating pressure of each fortune gas cylinder 201 is less; According to domestic relevant criterion, make the nominal operating pressure of each fortune gas cylinder 201 not be higher than 20MPa.
Air cylinder group 300 comprises air cylinder 301 in n the station in standing.Air cylinder 301 front ends are output terminal in standing, and the rear end is a pressurized end.Control valve group before air cylinder 301 output terminals are installed respectively in each station, the control valve group is parallel with suction valve 302 and outlet valve 303 before each, and each suction valve 302 all is connected with second pipeline 306; Second pipeline, 306 two ends are connected with the low pressure port of aforesaid first pipeline 204 and filling machine 400 respectively.For fear of losing efficacy at suction valve 302 or during operate miss, CNG blows back in first pipeline 204, also is provided with one-way valve 305 between first pipeline 204 and second pipeline 306, one-way valve 305 can stop the CNG refluence.Identical with fortune gas cylinder 201, the back control valve group 304 of air cylinder 301 pressurized ends comprises a pressure charging valve and a reflux valve respectively in each station, and the function of pressure charging valve and reflux valve is identical with the pressure charging valve and the reflux valve of fortune gas cylinder 201 pressurized ends, repeats no more.
Because air cylinder 301 is fixedly set in the air entraining substation in the station, be not used in transportation CNG, its nominal operating pressure can be higher.According to the concerned countries standard, can make the nominal operating pressure of air cylinder 301 in the station not be higher than 25MPa, and be higher than the nominal operating pressure of fortune gas cylinder 201.The physical size of air cylinder 301 can be different from the physical size of fortune institute bottles 201 in standing.
In order to guarantee the Safety performance of air entraining substation, the output terminal of air cylinder 301 also is provided with rupture disk in each fortune gas cylinder 201 and the station, and during the too high or overpressure of temperature, rupture disk explosion automatically is in order to avoid cause bigger accident in each gas cylinder.
Below air entraining substation pipe-line system working principle is described.When the working principle to above-mentioned air entraining substation pipe-line system was described, the controlling method of the air entraining substation that the utility model is provided described.
Before air entraining substation carries out aerating, monitor the pressure in air cylinder and the amount of CNG in each fortune gas cylinder and each station by suitable mode, based on the information that monitoring obtains, air entraining substation is carried out control operation.The mode of monitoring pressure can be known pressure meter.Because fortune gas cylinder internal pressure is measured into positive correlation with CNG, can determine the amount of CNG in the fortune gas cylinder 201 according to pressure; Because the CNG flow velocity is relevant with pressure difference, when the amount of CNG was less than predetermined value in fortune gas cylinder 201, its internal pressure also can reduce, thereby the external and internal pressure difference is reduced, and therefore, also can determine the amount of CNG in the fortune gas cylinder 201 according to output terminal CNG flow velocity; Suitable level meter can also be set,, determine that according to the amount of supercharging medium the CNG in the fortune gas cylinder 201 measure again by the amount of supercharging media in the level meter measurement fortune gas cylinder 201.Monitoring to the amount of the pressure of air cylinder 301 in standing and CNG also can be used aforesaid way.
Please refer to Fig. 2, this figure is the working principle schematic representation of first kind of air entraining substation pipe-line system providing of the utility model, simultaneously, also is first kind of air entraining substation controlling method flow chart that the utility model provides.The air entraining substation controlling method comprises two-part: the one, and to the operation of fortune gas cylinder group, the 2nd, to the operation of air cylinder group in standing.These two-part are to carry out respectively, except that offering some clarification on, do not influence each other between the two.
Operation to fortune gas cylinder group 200 comprises step:
S110, according to predetermined at least one fortune gas cylinder 201 of policy selection as the low pressure air feed bottle.Predetermined strategy comprises multiple mode, can select according to the pressure in each fortune gas cylinder 201; Also can select according to the amount of CNG in each fortune gas cylinder 201; Can also select one or more fortune gas cylinders 201 as the low pressure air feed bottle successively according to predetermined order more in advance with each fortune gas cylinder 201 numbering; Can also be according to treating that the selection of aerating automobile gas holder internal pressure has the fortune gas cylinder 201 of suitable pressure, to obtain a suitable aerating pressure difference, the flow velocity of CNG during the control aerating; The low pressure port of filling machine 400 is associated with high-pressure mouth, and selecting the fortune gas cylinder 201 of fortune gas cylinder 201 internal pressures in prespecified range according to high-pressure mouth pressure is the low pressure air feed bottle, or the like.
S120 opens the outlet valve of low pressure air feed bottle.After opening the low pressure air feed bottle, its inner CNG can outwards flow by first pipeline 204, can arrive the low pressure port L of filling machine 400 further by second pipeline 306, outwards supplies with CNG with the low pressure port L by filling machine 400.
S130, when the CNG amount in the low pressure air feed bottle was less than predetermined value, selecting at least one other fortune gas cylinder 201 according to predetermined policy was the low pressure air feed bottle, returns step S120.
Carry out said process repeatedly, can make the outside CNG of supply of each fortune gas cylinder 201 orders in the whole fortune gas cylinder group 200, make air entraining substation have low pressure air feed source of the gas continuously.
For the CNG in each fortune gas cylinder 201 is flowed out as much as possible, improve gas taking rate to fortune gas cylinder group 200, can also utilize booster body 100 for the supercharging of low pressure air feed bottle, release as much as possible with the CNG that it is inner.Therefore, between step S120 and step S130, described operation to fortune gas cylinder group also is included as the step S111 of low pressure air feed bottle supercharging.
S111 when low pressure air feed bottle internal pressure is lower than predetermined value, makes low pressure air feed bottle pressurized end be connected with the boost port of booster body 100.In the low pressure air feed bottle, inject the supercharging medium by booster body 100, be low pressure air feed gas storage supercharging.
In this example, because booster body 100 has a boost port, this booster body 100 not only will be given 200 superchargings of fortune gas cylinder group, also to give air cylinder group 300 superchargings in the station, and because fortune gas cylinder 201 is different with the nominal operating pressure of air cylinder 301 in the station, therefore, booster body air cylinder group 300 superchargings in fortune gas cylinder group 200 and station simultaneously within the predetermined time.Therefore, preferred, in step S111, before making low pressure air feed bottle pressurized end and the boost port of booster body 100 be connected, to determine that also can booster body 100 give the supercharging of low pressure air feed bottle, when booster body 100 is given in the station 300 superchargings of air cylinder group, just can not give the supercharging of low pressure air feed bottle.Therefore, step S111 can also for: when booster body 100 can be lower than predetermined value for the supercharging of low pressure air feed bottle and low pressure air feed bottle internal pressure, low pressure air feed bottle pressurized end is connected with the boost port of booster body 100.This example is to operate with air cylinder group 300 preferential superchargings in standing.At booster body 100 boost port is arranged, those skilled in the art can determine that also promptly the time according to demand is that the basis determines that booster body 100 is to be air cylinder group 300 superchargings in standing, and still is 200 superchargings of fortune gas cylinder group according to the time priority principle.Booster body 100 can be provided with different relief valves or safety valve, for air cylinder group 300 in standing or 200 superchargings of fortune gas cylinder group the time, different relief valves or safety valve are connected with boost port, to obtain different system pressures, satisfy needs for air cylinder group 300 and 200 superchargings of fortune gas cylinder group in the station.
Certainly, when air entraining substation system comprises two boost port, can pass through known manner,, and make two boost port be respectively air cylinder group 300 superchargings in fortune gas cylinder group 200 and the station for each boost port is set different pressure.Such as: when booster body has two high-pressure service pumps, can make different high-pressure service pumps be respectively air cylinder group 300 and 200 superchargings of fortune gas cylinder group in the station; When having a high-pressure service pump, in for the station when air cylinder group 300 and 200 superchargings of fortune gas cylinder group, different relief valves or safety valve are connected, with different boost port to obtain different system pressures.
In the optimized technical scheme, between step S120 and step S130, described operation to fortune gas cylinder group 200 also comprises step S112:
S112, the pressure in the low pressure air feed bottle is higher than predetermined value, when perhaps the time that predetermined pressure keeps in the low pressure air feed bottle surpasses predetermined length, then the outlet valve 202 of other at least one fortune gas cylinder 201 in the fortune gas cylinder group 200 is opened.
The meaning that increases this step is: the pressure ratio in the low pressure air feed bottle is higher, or keep-ups pressure higher state during the long period, utilizes this pressure, and the low pressure air feed bottle is inflated in other fortune gas cylinders.Can when the aerating ebb, make fortune gas cylinder group 200 store more aerating energy like this, interim to come on the aerating peak, for more vehicle air feed, satisfy peak aerating needs.Opening the mode of other fortune gas cylinders can select according to actual conditions, such as: can also can select according to select progressively in advance, can also select according to the pressure in other fortune gas cylinders according to the CNG amount of other fortune gas cylinders, or the like; Preferably, when fortune gas cylinder A1 is low pressure air feed gas cylinder, open fortune gas cylinder A2-Am at interval, add inflation in each fortune gas cylinder 201 with order by predetermined order and preset time.
Should be noted that: above-mentioned low pressure air feed bottle air feed, not only comprise air feed to filling machine 400 low pressure ports, also comprise to following as the station of high-pressure air feed bottle in air cylinder 301 air feed.
Operation to air cylinder group in standing may further comprise the steps:
S210, air cylinder was as the high-pressure air feed bottle at least one was stood according to predetermined policy selection.The low pressure air feed bottle is identical with selecting, and predetermined strategy can have multiple choices, does not repeat them here.In this example, selecting the interior air cylinder B1 in station is the high-pressure air feed bottle.
S220 opens the outlet valve 303 of high-pressure air feed bottle.Make the inner CNG of high-pressure air feed bottle can arrive the high-pressure mouth H of filling machine 400, so that the high-pressure mouth H of filling machine 400 outwards supplies with CNG.
S230, when described high-pressure air feed bottle can not satisfy the high-pressure air feed needs, selecting the other interior air cylinder at least one station according to predetermined policy was interim high-pressure air feed bottle, and opens the outlet valve 303 of interim high-pressure air feed bottle; Close the outlet valve 303 of high-pressure air feed bottle, open the suction valve of high-pressure air feed bottle, the CNG that fortune gas cylinder group is discharged mends into the high-pressure air feed bottle, treat that tonifying Qi is finished after, enter next step.
Judge whether the high-pressure air feed bottle satisfies the high-pressure air feed needs multiple mode can be arranged, and can measure the CNG flow velocity of high-pressure air feed bottle output terminal, can measure the pressure in the high-pressure air feed bottle, can also determine the amount of CNG in the high-pressure air feed bottle by known mode.
Selecting the other interior air cylinder 301 at least one station according to predetermined policy is in the interim high-pressure air feed bottle, predetermined policy can be identical with the predetermined policy among the above-mentioned steps S130, air cylinder satisfies the high-pressure air feed needs as interim high-pressure air feed bottle in the suitable station to select.In this example, selecting the interior air cylinder B2 in station is interim high-pressure air feed bottle.
In this step, open the suction valve of high-pressure air feed bottle B1, the CNG that fortune gas cylinder group 200 is discharged mends into the concrete grammar of high-pressure air feed bottle B1 can be the reflux valve of opening high-pressure air feed bottle B1 earlier, after treating that the supercharging medium back flow finishes in the high-pressure air feed bottle B1, again the closing volume valve, open suction valve 302; Because the output terminal of air cylinder 301 all is connected with second pipeline 306 by suction valve 302 in each station, when opening the suction valve 302 of high-pressure air feed bottle B1, the CNG that discharges from the low pressure air feed bottle can inject high-pressure air feed bottle B1 by suction valve 302; When CNG pressure reached balance in the pressure in high-pressure air feed bottle B1 and second pipeline 306, tonifying Qi was finished, and enters next step again.It will be understood by those skilled in the art that also and can simultaneously suction valve 302 and reflux valve be opened.Tonifying Qi is finished and is not limited to reach balance with CNG pressure in the pressure among the high-pressure air feed bottle B1 and second pipeline 306 and is as the criterion, and also can reach predetermined value at high-pressure air feed bottle B1 pressure, or high-pressure air feed bottle B1 output terminal CNG flow is lower than predetermined value and is as the criterion.When the air entraining substation pipe-line system has other concrete structures, also can mend among the high-pressure air feed bottle B1 by the CNG that other concrete modes are discharged the low pressure air feed bottle.
S240 makes high-pressure air feed bottle B1 pressurized end be connected with the boost port of booster body 100, makes high-pressure air feed bottle B1 satisfy the high-pressure air feed needs, returns step S220.After tonifying Qi is finished,, therefore, high-pressure air feed bottle B1 internal pressure is increased, to satisfy the needs of high-pressure air feed because the CNG pressure that the low pressure air feed bottle is supplied with is lower than the high-pressure air feed needs.Therefore, needing by booster body 100 is high-pressure air feed bottle B1 supercharging, when treating that high-pressure air feed bottle B1 internal pressure reaches predetermined value, makes high-pressure air feed bottle B1 supply with high pressure air to the high-pressure mouth H of filling machine 400 again.In the optimized technical scheme,, close the outlet valve 303 of interim high-pressure air feed bottle B2, make interim high-pressure air feed bottle B2 stop air feed returning step S220 simultaneously.
With above-mentioned similar to the step S112 in 200 operations of fortune gas cylinder group, between step S220 and step S230, described operation to air cylinder group 300 in standing can also comprise step S221:
S221, the pressure in the high-pressure air feed bottle is higher than predetermined value, and when perhaps the time of the interior predetermined pressure maintenance of high-pressure air feed bottle surpassed predetermined length, the outlet valve 303 of other at least one interior gas storage gas cylinder 301 in station was opened in the interior air cylinder group of then will standing.The mode of opening air cylinder 301 in other stations can have multiple choices, and is similar with the explanation of above-mentioned steps S112, repeats no more.Equally, preferred, when air cylinder B1 is the high-pressure air feed gas cylinder in the station, open fortune gas cylinder B2-Bn at interval, with the inflation in the air cylinder 301 in the station of predetermined order by predetermined order and preset time.
According to foregoing description and explanation, can determine in the air entraining substation pipe-line system that the utility model provides, make the nominal operating pressure of fortune gas cylinder group reach 20MPa, the nominal operating pressure of air cylinder in the station is reached at 25MPa, can guarantee the Security of air entraining substation meeting the nation's security regulation; Simultaneously, because air cylinder 301 is connected by the output terminal of suction valve 302 with fortune gas cylinder group 200 each fortune gas cylinder 201 in the station, when air cylinder 301 emptyings or CNG amount is less than predetermined value in the station, air cylinder 301 at least one stations in the CNG injection that fortune gas cylinder group 200 is discharged is arrived at a station in the air cylinder group 300 passes through the pressure that booster body 100 increases air cylinder 301 in the station again; This just makes the air entraining substation pipe-line system not only can use fortune gas cylinder 201 to the low pressure port L of filling machine 400 air feed, CNG in the fortune gas cylinder 201 can also be injected the interior air cylinder 301 that arrives at a station, pass through boost pressure again, CNG in the fortune gas cylinder group is passed through high-pressure mouth H with the outside air feed of higher pressure, increasing system pressure reduction, the gas supply capacity of raising air entraining substation.
According to above description, as can be seen, key of the present utility model is to make the CNG of fortune gas cylinder group 200 mend inbound interior air cylinder group 300; On the one hand, the CNG amount in can guaranteeing like this to stand in the air cylinder 301 guarantees the supply of high-pressure air feed source of the gas; On the other hand, can utilize the interior air cylinder group 300 in station to have the advantage of higher working pressure like this, improve the pressure difference of system, and then improve the aerating speed of high pressure air filling gun.
The reason that the high-pressure air feed bottle can not satisfy the high-pressure air feed needs is that mainly its internal pressure is lower than predetermined value, have two reasons and the high-pressure air feed bottle pressure is low: the CNG amount is less than predetermined value in the high-pressure air feed bottle, the 2nd, also have a certain amount of CNG in the high-pressure air feed bottle, but its space is bigger, makes that its internal pressure is lower.When in the high-pressure air feed bottle, a certain amount of CNG being arranged, also can improve its pressure, satisfy the high-pressure air feed needs by the mode of direct supercharging.In order to distinguish above-mentioned different situations, also provide the controlling method of second kind of air entraining substation at the utility model.
As shown in Figure 3, this figure is the controlling method flow chart of second kind of air entraining substation providing of the utility model, is that with above-mentioned controlling method difference described step S230 also comprises the steps:
S231, when described high-pressure air feed bottle can not satisfy the high-pressure air feed needs, selecting the other interior air cylinder at least one station according to predetermined policy was interim high-pressure air feed bottle, and opens the outlet valve 303 of interim high-pressure air feed bottle; Close the outlet valve 303 of high-pressure air feed bottle; Judge that whether the CNG in the high-pressure air feed bottle measures greater than predetermined value; If enter step S240; If, then enter step S232 for not.
S232 opens the suction valve and the reflux valve of high-pressure air feed bottle, and the CNG that fortune gas cylinder group is discharged mends into the high-pressure air feed bottle, treat that tonifying Qi is finished after, enter step S240 again.
Among this embodiment, when the high-pressure air feed bottle can not satisfy the high-pressure air feed needs, no longer directly carry out tonifying Qi, but judge that further whether the CNG amount is greater than predetermined value in the high-pressure air feed bottle; , then determine just can make the high-pressure air feed bottle satisfy the high-pressure air feed needs when being in judged result, directly enter the supercharging flow process, when denying, enter the tonifying Qi flow process again in judged result by supercharging; CNG that the low pressure air feed bottle discharges is entered in the high-pressure air feed bottle to small part, part low pressure air feed source of the gas is converted to the high-pressure air feed source.
Be appreciated that when the output terminal that makes air cylinder 301 at least one station is connected with the output terminal of at least one fortune gas cylinder 201 by suction valve 302, also can realize the purpose of this utility model.In this example, the output terminal of air cylinder 301 in each station is connected by the output terminal of suction valve 302 with any fortune gas cylinder 201, the CNG in arbitrary fortune gas cylinder 201 is injected in the interior air cylinder 301 in any station; In the practical operation, the gas taking rate of fortune gas cylinder group 200 is improved; In addition, when improving system's gas taking rate, the low pressure CNG in the fortune gas cylinder group 200 is converted to high pressure CNG, can also satisfies the needs of more high-pressure air feeds, improve the aerating ability and the adaptive capacity of air entraining substation.
Refer again to Fig. 1, among the embodiment, switch valve 101 also has been linked in sequence between the pressure charging valve of described fortune gas cylinder 201 and the boost port.When booster body 100 is fortune gas cylinder 201 superchargings of fortune gas cylinder group 200, also need to open simultaneously switch valve 101.The meaning of setting up switch valve 101 is: because when giving the supercharging of high-pressure air feed bottle, the pressure of the supercharging medium that booster body provides is higher than the nominal operating pressure of fortune gas cylinder 201, can avoid fortune gas cylinder group 200 to bear high pressure by switch valve 101, guarantee the safety of fortune gas cylinder group 200.Pressure transducer 102 is set monitors fortune gas cylinder 201 pressure charging valve input end pressure.Described pressure charging valve input end is in the pressurization, the end that the supercharging medium flows into; When switch valve 101 lost efficacy, can determine the Security of fortune gas cylinder 201 according to the survey data of pressure transducer 102.It will be appreciated by those skilled in the art that, on the basis of pressure transducer 102, suitable warning device can also be set, and warning device is linked to each other with pressure transducer 102, when the pressure of pressure transducer 102 measurements is higher than predetermined value, make warning device produce suitable alarm signal.
According to foregoing description, realize that the air entraining substation pipe-line system of the utility model purpose is not limited to said structure.As shown in Figure 4, this illustrates the part-structure schematic representation of second kind of air entraining substation pipe-line system that the utility model provides.Be that with first kind of air entraining substation pipe-line system difference fortune gas cylinder group 200 has a total pressure charging valve 210 of fortune and the total reflux valve 220 of fortune, air cylinder group 300 has in the station in total pressure charging valve 210 and the station reflux valve 320 always in standing.The pressure charging valve of a plurality of fortune gas cylinders 201 is connected with the boost port and the refluxing opening of booster body 100 respectively by total pressure charging valve 210 of fortune and the total reflux valve 220 of fortune simultaneously, and the pressure charging valve of air cylinder 301 is connected with the boost port and the refluxing opening of described booster body respectively by total reflux valve 320 in total pressure charging valve 310 and the station in standing simultaneously in a plurality of stations.The benefit of this structure is, can facilitate for pressurization control, is convenient to the construction of air entraining substation pipe-line system.In addition, because the structure of pipe-line system has produced variation, the concrete mode that the CNG that fortune gas cylinder group 200 is discharged mends in the high-pressure air feed bottle also needs to adjust accordingly, and during the supercharging medium back flow, need open total reflux valve 320 in pressure charging valve and the station in making the high-pressure air feed bottle.
Be to realize the automation to air entraining substation control, the utility model also provides a kind of control system of the air entraining substation that above-mentioned air entraining substation pipe-line system is controlled.Control system can be by the control of above-mentioned controlling method flow process realization to air entraining substation; Detailed description for the working principle of control system can be with reference to above-mentioned description to controlling method, and identical content repeats no more.
The control system of this air entraining substation comprises first processing unit and first performance element; Described first processing unit can be according to predetermined at least one fortune gas cylinder of policy selection as the low pressure air feed bottle; When the compressed natural gas CNG amount in described low pressure air feed bottle was less than predetermined value, it was the low pressure air feed bottle that described first processing unit can be selected another fortune gas cylinder according to predetermined policy; Described first performance element can be opened the outlet valve of low pressure air feed bottle according to the selection of first processing unit.
Be that with the different of prior art control system also comprises second processing unit and second performance element; Described second processing unit can be according to air cylinder be as the high-pressure air feed bottle at least one station of predetermined policy selection, and described second performance element can be opened the outlet valve of high-pressure air feed bottle output terminal according to the selection of second processing unit.When described high-pressure air feed bottle can not satisfy the high-pressure air feed needs, it is interim high-pressure air feed bottle that second processing unit can be selected the other interior air cylinder at least one station according to predetermined policy, and instruct second performance element to open the outlet valve of interim high-pressure air feed bottle, close the outlet valve of high-pressure air feed bottle; Simultaneously, second processing unit can also instruct second performance element to open the suction valve and the reflux valve of high-pressure air feed bottle, and the CNG that fortune gas cylinder group is discharged mends into the high-pressure air feed bottle.After tonifying Qi was finished, second processing unit can instruct second performance element to close the suction valve of high-pressure air feed bottle, and high-pressure air feed bottle pressurized end is connected with the boost port of booster body.When described high-pressure air feed bottle satisfied the high-pressure air feed needs, second processing unit can instruct second performance element to open the outlet valve of high-pressure air feed bottle output terminal.Its working principle is identical with above-mentioned controlling method, repeats no more.
In order to handle accordingly, can also make second processing unit have more function according to the concrete condition of high-pressure air feed bottle.Specifically: when described high-pressure air feed bottle can not satisfy the high-pressure air feed needs, second processing unit can also judge whether the CNG amount in the high-pressure air feed bottle is less than predetermined value, if not, then instruct second performance element that high-pressure air feed bottle pressurized end is connected with the boost port of booster body, if, then instruct second performance element to open the suction valve and the reflux valve of high-pressure air feed bottle, the CNG that fortune gas cylinder group is discharged mends into the high-pressure air feed bottle.
In order to preserve more aerating energy when the aerating ebb, aerating ability when improving the aerating peak, can also make first processing unit judge whether described low pressure air feed bottle internal pressure is higher than predetermined value, perhaps whether the time that predetermined pressure keeps in the low pressure air feed bottle surpasses predetermined length; If instruct first performance element that the outlet valve of other at least one fortune gas cylinder in the fortune gas cylinder group is opened again.
In order to keep the connectedness of low pressure supply gas pressure and low pressure air feed, first processing unit is judged whether to the supercharging of low pressure air feed bottle according to predetermined policy, if then instruct first performance element that low pressure air feed bottle pressurized end is connected with the boost port of booster body.Have a boost port increasing mechanism, described predetermined policy can comprise: when booster body is not given the supercharging of high-pressure air feed bottle, be judged as and be.Also can determine suitable predetermined policy according to actual needs.
Equally, during for balance aerating peak and aerating ebb, the power consumption of air entraining substation can also make second processing unit judge according to predetermined strategy whether the high-pressure air feed pressure of the inside of a bottle is higher than predetermined value, and perhaps whether the time that predetermined pressure keeps in the high-pressure air feed bottle surpasses predetermined length; If, then instruct second performance element will stand in the air cylinder group in other at least one stations the outlet valve of air cylinders open.
In addition, control system can also be provided with the pressurization control unit of control booster body 100 running, with according to actual needs, makes booster body 100 in suitable moment running or stop.
Should be noted that in conjunction with to the description of controlling method the control system that the utility model provides can also be in the mode of control respective valve or miscellaneous part according to the realization of the description of the above-mentioned controlling method control to the air entraining substation pipe-line system.
On the basis that above-mentioned air entraining substation pipe-line system and control system are provided, the utility model also provides a kind of air entraining substation, this air entraining substation comprises above-mentioned pipe-line system and control system, also has the technique effect that pipe-line system and control system can produce, and does not repeat them here.
The above only is a preferred implementation of the present utility model; should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (6)

1. air entraining substation pipe-line system comprises booster body, filling machine and is positioned at fortune gas cylinder group on the fortune car that described fortune gas cylinder group comprises at least two fortune gas cylinders; Described fortune gas cylinder output terminal is connected with the low pressure port of described filling machine by outlet valve respectively, pressurized end is connected with the boost port of booster body by pressure charging valve respectively, it is characterized in that, also comprise air cylinder group in the station, the air cylinder group comprises air cylinder at least two stations in the described station, and the nominal operating pressure of air cylinder is greater than the nominal operating pressure of fortune gas cylinder in the described station; The output terminal of air cylinder is connected with the high-pressure mouth of filling machine by outlet valve respectively in the described station, and pressurized end is connected with the boost port of booster body by pressure charging valve respectively; The output terminal of air cylinder is connected by the described fortune gas cylinder of suction valve and at least one at least one described station.
2. air entraining substation pipe-line system according to claim 1 is characterized in that, the output terminal of air cylinder is connected with any fortune gas cylinder by suction valve in each described station.
3. air entraining substation pipe-line system according to claim 2, it is characterized in that, described fortune gas cylinder group has first pipeline that is connected with described fortune gas cylinder outlet valve respectively, the air cylinder group has second pipeline that is connected with air cylinder suction valve in the described station respectively in the described station, and described second pipe ends is connected with the low pressure port of described first pipeline and filling machine respectively; Have between described first pipeline and second pipeline and stop the one-way valve of compressed natural gas CNG from second pipeline flow-direction, first pipeline.
4. according to each described air entraining substation pipe-line system of claim 1-3, it is characterized in that, also comprise the pressure transducer that is used to detect pressure charging valve input end pressure; Described booster body has a boost port, is connected with switch valve between the pressure charging valve of described fortune gas cylinder and the boost port of described booster body.
5. a control system is used to control each described air entraining substation pipe-line system of claim 1-3, and this control system comprises first processing unit and first performance element; It is characterized in that this control system also comprises second processing unit and second performance element.
6. an air entraining substation comprises pipe-line system and control system, and described pipe-line system is each described air entraining substation pipe-line system of claim 1-3, and described control system is the described control system of claim 5.
CN2010201856793U 2010-04-29 2010-04-29 Secondary fueling station, and pipeline system and control system of secondary fueling station Expired - Lifetime CN201819001U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201856793U CN201819001U (en) 2010-04-29 2010-04-29 Secondary fueling station, and pipeline system and control system of secondary fueling station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201856793U CN201819001U (en) 2010-04-29 2010-04-29 Secondary fueling station, and pipeline system and control system of secondary fueling station

Publications (1)

Publication Number Publication Date
CN201819001U true CN201819001U (en) 2011-05-04

Family

ID=43916953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201856793U Expired - Lifetime CN201819001U (en) 2010-04-29 2010-04-29 Secondary fueling station, and pipeline system and control system of secondary fueling station

Country Status (1)

Country Link
CN (1) CN201819001U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929602A (en) * 2010-04-29 2010-12-29 庞维龙 Gas filling substation as well as pipeline system, control system and control method thereof
CN103060962A (en) * 2012-12-14 2013-04-24 常熟市华博毛纺织有限公司 Air supply device with stable air pressure
CN103185200A (en) * 2011-12-31 2013-07-03 安瑞科(廊坊)能源装备集成有限公司 Gas conveying system and gas conveying method
RU2574790C1 (en) * 2011-12-31 2016-02-10 Энрик (Ланфан) Энерджи Эквипмент Интергрейшн Ко., Лтд. Gas supply system and method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929602A (en) * 2010-04-29 2010-12-29 庞维龙 Gas filling substation as well as pipeline system, control system and control method thereof
CN101929602B (en) * 2010-04-29 2012-04-18 庞维龙 Gas filling substation as well as pipeline system, control system and control method thereof
CN103185200A (en) * 2011-12-31 2013-07-03 安瑞科(廊坊)能源装备集成有限公司 Gas conveying system and gas conveying method
WO2013097399A1 (en) * 2011-12-31 2013-07-04 Enric (Langfang) Energy Equipment Integration Co., Ltd. Gas delivery system and gas delivery method
RU2574790C1 (en) * 2011-12-31 2016-02-10 Энрик (Ланфан) Энерджи Эквипмент Интергрейшн Ко., Лтд. Gas supply system and method
CN103060962A (en) * 2012-12-14 2013-04-24 常熟市华博毛纺织有限公司 Air supply device with stable air pressure

Similar Documents

Publication Publication Date Title
CN101929602B (en) Gas filling substation as well as pipeline system, control system and control method thereof
US9464761B2 (en) Gas supply method and gas supply apparatus
CN109185699B (en) Hydrogenation method and system simultaneously suitable for filling pressure of 70MPa and 35MPa
CN211315766U (en) Hydrogen filling system
CN101813237B (en) Hydraulic CNG (Compressed Natural Gas) gas filling substation and pipeline system, control system and control method thereof
CN111256028A (en) Hydrogen filling system
WO1995009105A1 (en) System and method for compressing natural gas
CN104718408A (en) Method for filling a fuel storage system of a motor vehicle
CN201819001U (en) Secondary fueling station, and pipeline system and control system of secondary fueling station
CN213810006U (en) Filling system for combined work of hydrogenation machine and supercharging equipment
KR102336633B1 (en) Hydrogen charging system reusing hydrogen left after charger
CN113130940B (en) Fuel cell automobile hydrogen storage system with high-pressure hydrogen cylinder and low-pressure hydrogen cylinder mixed
CN209495135U (en) One kind plus hydrogen oiling hybrid station
CN109945067A (en) A kind of control method and system that hydrogenation stations hydrogen energy source quickly fills
CN206817171U (en) Suitable for the vehicle-mounted hydrogen-feeding system of fuel cell electric vehicle
CN102913753A (en) Storage and gasification project output system of LNG (Liquefied Natural Gas) receiving terminal as well as method
CN210014208U (en) Device for improving HCNG unloading efficiency and saving energy
CN204387673U (en) LNG skid gas station
CN202056505U (en) Safety carriage type compressed natural gas agent charger
CN113375047B (en) Hydrogen station with double compression systems operating and operation method thereof
CN202868303U (en) Storage and gasification engineering output system of liquefied natural gas (LNG) accepting station
CA2958446C (en) Multi-tank methanol water storage system of fuel cell vehicle
CN100542860C (en) Secondary gas filling station self-complementing voltage-stabilizing charging method and device
CN206831142U (en) The line refueling system of hydraulic natural gas automobile secondary gas filling station double pump three
CN203052196U (en) Recovery device for residual liquid in filing pipeline of cryogenic liquid tank lorry

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GAS TECHNOLOGY + ENGINEERING GLOBAL(TIANJIN) CO.,

Free format text: FORMER OWNER: PANG WEILONG

Effective date: 20130114

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100176 DAXING, BEIJING TO: 300467 TANGGU, TIANJIN

TR01 Transfer of patent right

Effective date of registration: 20130114

Address after: 300467 Tianjin City Eco City Waterfront Road No. 3667, No. 02 building eco industrial park

Patentee after: Tyne Boneng gas equipment (Tianjin) Co., Ltd.

Address before: 100176 Beijing Yinghai Beijing economic and Technological Development Zone manor 41 B 101

Patentee before: Pang Weilong

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Secondary fueling station, and pipeline system and control system of secondary fueling station

Effective date of registration: 20150204

Granted publication date: 20110504

Pledgee: Pudong Shanghai Development Bank Limited by Share Ltd Tianjin branch

Pledgor: Tyne Boneng gas equipment (Tianjin) Co., Ltd.

Registration number: 2015120000011

C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 300467, No. 02, eco industrial park, 3667 eco city road, Tanggu District, Tianjin

Patentee after: Tyne Boneng gas equipment (Tianjin) Limited by Share Ltd

Address before: 300467 Tianjin City Eco City Waterfront Road No. 3667, No. 02 building eco industrial park

Patentee before: Tyne Boneng gas equipment (Tianjin) Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110504