CN201812010U - Comprehensive testing device for power load management terminal - Google Patents
Comprehensive testing device for power load management terminal Download PDFInfo
- Publication number
- CN201812010U CN201812010U CN2010205663925U CN201020566392U CN201812010U CN 201812010 U CN201812010 U CN 201812010U CN 2010205663925 U CN2010205663925 U CN 2010205663925U CN 201020566392 U CN201020566392 U CN 201020566392U CN 201812010 U CN201812010 U CN 201812010U
- Authority
- CN
- China
- Prior art keywords
- links
- load management
- management terminal
- control device
- electric energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000005070 sampling Methods 0.000 claims abstract description 17
- 230000005611 electricity Effects 0.000 claims description 28
- 230000011664 signaling Effects 0.000 description 5
- 230000005284 excitation Effects 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 238000005286 illumination Methods 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000013642 negative control Substances 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205663925U CN201812010U (en) | 2010-10-19 | 2010-10-19 | Comprehensive testing device for power load management terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205663925U CN201812010U (en) | 2010-10-19 | 2010-10-19 | Comprehensive testing device for power load management terminal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201812010U true CN201812010U (en) | 2011-04-27 |
Family
ID=43894951
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010205663925U Expired - Lifetime CN201812010U (en) | 2010-10-19 | 2010-10-19 | Comprehensive testing device for power load management terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201812010U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102290864A (en) * | 2011-08-17 | 2011-12-21 | 航天科工深圳(集团)有限公司 | Method and device for implementing virtual load management terminal |
CN102520298A (en) * | 2012-01-05 | 2012-06-27 | 广西电网公司电力科学研究院 | On-site detecting system for electrical power load management terminal and detecting method thereof |
CN103018695A (en) * | 2011-09-28 | 2013-04-03 | 南京丹迪克科技开发有限公司 | Calibrating device for checking power demand side management terminal |
CN103235232A (en) * | 2013-04-27 | 2013-08-07 | 安徽省电力公司蚌埠供电公司 | Debugging device applied to pairing of negative control terminal and ammeter |
CN104375019A (en) * | 2014-09-24 | 2015-02-25 | 广东电网有限责任公司佛山供电局 | Load management terminal trip test system and test method thereof |
CN104764954A (en) * | 2015-03-24 | 2015-07-08 | 天津师范大学 | Networked intelligent load recognition device and method |
-
2010
- 2010-10-19 CN CN2010205663925U patent/CN201812010U/en not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102290864A (en) * | 2011-08-17 | 2011-12-21 | 航天科工深圳(集团)有限公司 | Method and device for implementing virtual load management terminal |
CN102290864B (en) * | 2011-08-17 | 2013-04-17 | 航天科工深圳(集团)有限公司 | Method and device for implementing virtual load management terminal |
CN103018695A (en) * | 2011-09-28 | 2013-04-03 | 南京丹迪克科技开发有限公司 | Calibrating device for checking power demand side management terminal |
CN102520298A (en) * | 2012-01-05 | 2012-06-27 | 广西电网公司电力科学研究院 | On-site detecting system for electrical power load management terminal and detecting method thereof |
CN103235232A (en) * | 2013-04-27 | 2013-08-07 | 安徽省电力公司蚌埠供电公司 | Debugging device applied to pairing of negative control terminal and ammeter |
CN104375019A (en) * | 2014-09-24 | 2015-02-25 | 广东电网有限责任公司佛山供电局 | Load management terminal trip test system and test method thereof |
CN104375019B (en) * | 2014-09-24 | 2017-04-19 | 广东电网有限责任公司佛山供电局 | Load management terminal trip test system and test method thereof |
CN104764954A (en) * | 2015-03-24 | 2015-07-08 | 天津师范大学 | Networked intelligent load recognition device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201812010U (en) | Comprehensive testing device for power load management terminal | |
CN101739877B (en) | Simulation training system of 10KV typical customer distribution room | |
CN101867208B (en) | Charging post | |
CN202975289U (en) | Photovoltaic grid connected inverter automatic testing platform | |
CN103424692A (en) | Direct-current circuit breaker on-off characteristic test method | |
CN103364662B (en) | For the power supply test macro of machine room | |
CN103580264A (en) | Direct current micro-grid system supplying power in looped network mode | |
CN202837423U (en) | Wireless GPRS wind power power grid electric energy quality detection device based on DSP and ARM | |
CN201935973U (en) | Integrative test device of electric test of transformer | |
CN202940463U (en) | Power-supply switching box | |
CN202794383U (en) | Wind power grid electric energy quality parameter detecting device based on DSP, CPLD, and ARM | |
CN203164394U (en) | Inverter aging test platform of small wind or solar generator | |
CN202976623U (en) | Simulation demonstration device used for training remote electrical load control | |
CN204719205U (en) | Isolating switch time-parameters test simulator | |
CN204230892U (en) | A kind of electric automobile can flexible access containing important load DC distribution net | |
CN207638399U (en) | A kind of Intelligent power distribution case | |
CN216411535U (en) | Distributed deployed portable current transformer polarity detection equipment | |
CN201708566U (en) | Charging pile | |
CN205945149U (en) | A power supply unit for middling pressure circuit breaker cabinet secondary control loop | |
CN204230893U (en) | A kind of high reliability DC distribution net being applicable to electric automobile and registering one's residence | |
CN201758256U (en) | AC distribution box | |
CN203733339U (en) | Anti-electricity stealing program controlled simulation apparatus | |
CN204349469U (en) | A kind of be applicable to that electric automobile registers one's residence containing important load DC distribution net | |
CN209979752U (en) | Portable off-board charging facility detection device | |
CN103531061A (en) | On-load installation wiring training device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20120914 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20120914 Address after: 110811 eight Heping Street, 94 Heping Street, Liaoning, Shenyang Patentee after: Liaoning Shenyang Electric Power Supply Co., Ltd. Patentee after: State Grid Corporation of China Address before: 110811 eight Heping Street, 94 Heping Street, Liaoning, Shenyang Patentee before: Liaoning Shenyang Electric Power Supply Co., Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20110427 |