CN201812010U - Comprehensive testing device for power load management terminal - Google Patents

Comprehensive testing device for power load management terminal Download PDF

Info

Publication number
CN201812010U
CN201812010U CN2010205663925U CN201020566392U CN201812010U CN 201812010 U CN201812010 U CN 201812010U CN 2010205663925 U CN2010205663925 U CN 2010205663925U CN 201020566392 U CN201020566392 U CN 201020566392U CN 201812010 U CN201812010 U CN 201812010U
Authority
CN
China
Prior art keywords
links
load management
management terminal
control device
electric energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205663925U
Other languages
Chinese (zh)
Inventor
李驰
陈�光
李安平
黄立新
庞玉晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shenyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Original Assignee
Shenyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd filed Critical Shenyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Priority to CN2010205663925U priority Critical patent/CN201812010U/en
Application granted granted Critical
Publication of CN201812010U publication Critical patent/CN201812010U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a comprehensive testing device for a power load management terminal. In the structure of the testing device, a power supply device is connected with a control device; the control device is connected with an alternating current sampling meter through three voltmeters and three ammeters; the alternating current sampling meter is connected with an electric energy meter; and the alternating current sampling meter and the electric energy meter are connected with the power load management terminal respectively. The device can simulate tripping of a load control switch to safely, conveniently and intuitionally test the tripping control function of the power load management terminal and can test the wiring correctness of the power load management terminal, the current sampling meter and the electric energy meter and the completeness of the device.

Description

The electricity load management terminal comprehensive test device
Technical field
The utility model relates to a kind of electricity load management terminal comprehensive test device, particularly a kind of device of simulating the load control switch tripping operation.
Background technology
At present, power marketing department of the national grid subordinate electric company power load management system of being administered is covered with urban area electrical network 10KV and above high-tension electricity user.The hardware of power load management system is made up of the outside main website that is installed in electric company and numerous terminal that is installed in the high-tension electricity user side; The electricity load management terminal that is installed in the power consumer side receives the information about power of electric energy meter and AC sampling module respectively and passes outside main website back by two-way 485 communication interfaces; Export four road trip signals by terminal and be connected on and be subjected on electricity or the transformer breaker shunt opening coil, by accepting the radio command that outside main website sends, control user side electric load; At the scene of new clothes electricity load management terminal engineering, the power supply of often not constructing, illumination can't not installed and debug; Can't verification terminal be installed by the correctness of wiring and the integrity of equipment operation; When particularly sending electricity back to install, equipment is charged to exist unsafe problem.
Summary of the invention
The purpose of this utility model provides the whole comprehensive test device of a kind of management of power load, this device not only can be simulated the device of load control switch tripping operation, thereby safety, convenience, test the tripping operation control function of electricity load management terminal intuitively, can also test the wiring correctness of electricity load management terminal and current sample table and electric energy meter and the integrity of device.
For overcoming the above problems, concrete technical scheme of the present utility model is as follows: a kind of electricity load management terminal comprehensive test device, supply unit is connected with control device, control device is by three voltage tables and three reometers and AC sampling epiphase company, the AC sampling table links to each other with electric energy meter again, and the AC sampling table links to each other with electricity load management terminal respectively with electric energy meter.
Described control device is that control main board connects the two-way exchange that the I/O plate carries out data, and the I/O plate is connected the two-way exchange of carrying out data with four groups of simulated high-pressure isolating switchs; Control main board also links to each other with the electric current digital to analog converter with the voltage digital to analog converter, realizes the two-way exchange of data; Wherein four groups of simulated high-pressure isolating switchs are connected with the contact of electricity load management terminal.
In control device, also be provided with lighting circuit power supply and working power; Described supply unit is that accumulator links to each other with circuit power, and accumulator is also delivered stream transformer with direct current and linked to each other, and the output terminal that direct current is delivered stream transformer links to each other with the input end of sine-wave inverter, and the output terminal of sine-wave inverter links to each other with working power; The periphery of described accumulator also can connect charger.
This device adopts said structure, can control the switch of contact by management of power load module, not only can simulate the device of load control switch tripping operation, thereby safety, convenience, test the tripping operation control function of electricity load management terminal intuitively, can also test the wiring correctness of electricity load management terminal and current sample table and electric energy meter and the integrity of device.
Description of drawings
Fig. 1: be circuit theory diagrams of the present utility model;
Embodiment
As shown in Figure 1, a kind of electricity load management terminal comprehensive test device, it is characterized in that: supply unit 1 is connected with control device 2, control device 2 links to each other with AC sampling table 5 with three reometers 4 by three voltage tables 3, AC sampling table 5 links to each other with electric energy meter 6 again, and AC sampling table 5 links to each other with electricity load management terminal 7 respectively with electric energy meter 6.
Described control device is that control main board 21 connects the two-way exchange that I/O plate 22 carries out data, and I/O plate 22 is connected the two-way exchange of carrying out data with four groups of simulated high-pressure isolating switchs 23; Control main board 21 also links to each other with electric current digital to analog converter 25 with voltage digital to analog converter 24, realizes the two-way exchange of data; Wherein four groups of simulated high-pressure isolating switchs 23 are connected with the contact of electricity load management terminal 7.
In control device 2, also be provided with lighting circuit power supply 26 and working power 27; Described supply unit 1 is that accumulator 12 links to each other with circuit power 26, accumulator 12 is also delivered stream transformer 13 with direct current and is linked to each other, the output terminal that direct current is delivered stream transformer 13 links to each other with the input end of sine-wave inverter 14, and the output terminal of sine-wave inverter 14 links to each other with working power 27; The periphery of described accumulator 12 also can connect charger 11.
The course of work of the whole comprehensive test device of this management of power load is:
A 12V/12AH accumulator 12 provides the power supply of this proving installation, exports the two-way power supply altogether, and the first via+12V supplies with DY+12V terminal and the GND terminal that the PLC working power meets PLC; The second tunnel+12V connects the input+12V terminal and the GND terminal of sinewave inverter.Carry out the DC/AC conversion by inverter, produce the sinusoidal wave 220V voltage of 50HZ.Its output terminal L220V and N connect B stepup transformer primary side, B stepup transformer secondary side, and B stepup transformer secondary side produces 380V voltage, and has the 220V tap.Output terminal L380V, the L220V of sine-wave inverter 13, N insert the JK interface of PLC: the working power that 1, the FK electricity load management terminal is provided; 2, provide operating power for KG primary cut-out or low tension switch; 3, as working illumination and electric tool power supply.
Control device 2 is cores of this proving installation, partly is made up of ZB control main board 21, D/A switch 3U24, D/A switch 3I25, input and output I/O mouth 22 etc.Wherein 3U is UA, UB, UC three-phase 100V voltage, and inner three voltage tables of VAB, VBC, VCA and metering electric energy meter are put in tipping respectively; And output UA, UB, UC, the external detected JCB AC sampling table 5 of IN terminal.With the method simulation electric load and the metering of electric energy meter 6 and the metering of JCB AC sampling table 5 that change electric current, information about power is passed outside main website back through electricity load management terminal 7.
Input and output I/O mouth is connected with simulation KG primary cut-out 23, and having 4 is 1KG, 2KG, 3KG, 4KG, and every has breaker tripping and closing coil and one group of remote signalling idle contact.Take turns the control contact by external FK negative control terminal 4, control 1KG, 2KG, 3KG, 4KG breaking coil respectively.Send the 1st when taking turns trip command when the remote control of outside main website, the FK1 junction closure makes 1KG breaking coil excitation, 1KG primary cut-out separating brake.1KG remote signalling junction closure, electricity load management terminal 7YX1 receive primary cut-out separating brake flexure curve number, pass outside main website back.Send the 2nd when taking turns trip command when the remote control of outside main website, the FK2 junction closure makes 2KG breaking coil excitation, 2KG primary cut-out separating brake.2KG remote signalling junction closure, electricity load management terminal 7YX2 receive primary cut-out separating brake flexure curve number, pass outside main website back.Send the 3rd when taking turns trip command when the remote control of outside main website, the FK3 junction closure makes 3KG breaking coil excitation, 3KG primary cut-out separating brake.3KG remote signalling junction closure, electricity load management terminal 7YX3 receive primary cut-out separating brake flexure curve number, pass outside main website back.Send the 4th when taking turns trip command when the remote control of outside main website, the FK4 junction closure makes 4KG breaking coil excitation, 4KG primary cut-out separating brake.4KG remote signalling junction closure, electricity load management terminal 7YX4 receive primary cut-out separating brake flexure curve number, pass outside main website back.
If the information that outside main website receives, 1KG, 2KG, 3KG, 4KG displacement, the metering of electric energy meter is consistent with the metering numerical value of JCB AC sampling table, proves that the installation wiring of electricity load management terminal 7 is correct.

Claims (3)

1. electricity load management terminal comprehensive test device, it is characterized in that: supply unit (1) is connected with control device (2), control device (2) links to each other with AC sampling table (5) with three reometers (4) by three voltage tables (3), AC sampling table (5) links to each other with electric energy meter (6) again, and AC sampling table (5) links to each other with electricity load management terminal (7) respectively with electric energy meter (6).
2. comprehensive test device as claimed in claim 1, it is characterized in that: described control device is that control main board (21) connects the two-way exchange that I/O plate (22) carries out data, and I/O plate (22) is connected the two-way exchange of carrying out data with four groups of simulated high-pressure isolating switchs (23); Control main board (21) also links to each other with electric current digital to analog converter (25) with voltage digital to analog converter (24), realizes the two-way exchange of data; Wherein four groups of simulated high-pressure isolating switchs (23) are connected with the contact of electricity load management terminal (7).
3. comprehensive test device as claimed in claim 1 is characterized in that: also be provided with lighting circuit power supply (26) and working power (27) in control device (2); Described supply unit (1) is that accumulator (12) links to each other with circuit power (26), accumulator (12) is also delivered stream transformer (13) with direct current and is linked to each other, the output terminal that direct current is delivered stream transformer (13) links to each other with the input end of sine-wave inverter (14), and the output terminal of sine-wave inverter (14) links to each other with working power (27); The periphery of described accumulator (12) also can connect charger (11).
CN2010205663925U 2010-10-19 2010-10-19 Comprehensive testing device for power load management terminal Expired - Lifetime CN201812010U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205663925U CN201812010U (en) 2010-10-19 2010-10-19 Comprehensive testing device for power load management terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205663925U CN201812010U (en) 2010-10-19 2010-10-19 Comprehensive testing device for power load management terminal

Publications (1)

Publication Number Publication Date
CN201812010U true CN201812010U (en) 2011-04-27

Family

ID=43894951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205663925U Expired - Lifetime CN201812010U (en) 2010-10-19 2010-10-19 Comprehensive testing device for power load management terminal

Country Status (1)

Country Link
CN (1) CN201812010U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102290864A (en) * 2011-08-17 2011-12-21 航天科工深圳(集团)有限公司 Method and device for implementing virtual load management terminal
CN102520298A (en) * 2012-01-05 2012-06-27 广西电网公司电力科学研究院 On-site detecting system for electrical power load management terminal and detecting method thereof
CN103018695A (en) * 2011-09-28 2013-04-03 南京丹迪克科技开发有限公司 Calibrating device for checking power demand side management terminal
CN103235232A (en) * 2013-04-27 2013-08-07 安徽省电力公司蚌埠供电公司 Debugging device applied to pairing of negative control terminal and ammeter
CN104375019A (en) * 2014-09-24 2015-02-25 广东电网有限责任公司佛山供电局 Load management terminal trip test system and test method thereof
CN104764954A (en) * 2015-03-24 2015-07-08 天津师范大学 Networked intelligent load recognition device and method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102290864A (en) * 2011-08-17 2011-12-21 航天科工深圳(集团)有限公司 Method and device for implementing virtual load management terminal
CN102290864B (en) * 2011-08-17 2013-04-17 航天科工深圳(集团)有限公司 Method and device for implementing virtual load management terminal
CN103018695A (en) * 2011-09-28 2013-04-03 南京丹迪克科技开发有限公司 Calibrating device for checking power demand side management terminal
CN102520298A (en) * 2012-01-05 2012-06-27 广西电网公司电力科学研究院 On-site detecting system for electrical power load management terminal and detecting method thereof
CN103235232A (en) * 2013-04-27 2013-08-07 安徽省电力公司蚌埠供电公司 Debugging device applied to pairing of negative control terminal and ammeter
CN104375019A (en) * 2014-09-24 2015-02-25 广东电网有限责任公司佛山供电局 Load management terminal trip test system and test method thereof
CN104375019B (en) * 2014-09-24 2017-04-19 广东电网有限责任公司佛山供电局 Load management terminal trip test system and test method thereof
CN104764954A (en) * 2015-03-24 2015-07-08 天津师范大学 Networked intelligent load recognition device and method

Similar Documents

Publication Publication Date Title
CN201812010U (en) Comprehensive testing device for power load management terminal
CN101739877B (en) Simulation training system of 10KV typical customer distribution room
CN101867208B (en) Charging post
CN202975289U (en) Photovoltaic grid connected inverter automatic testing platform
CN103424692A (en) Direct-current circuit breaker on-off characteristic test method
CN103364662B (en) For the power supply test macro of machine room
CN103580264A (en) Direct current micro-grid system supplying power in looped network mode
CN202837423U (en) Wireless GPRS wind power power grid electric energy quality detection device based on DSP and ARM
CN201935973U (en) Integrative test device of electric test of transformer
CN202940463U (en) Power-supply switching box
CN202794383U (en) Wind power grid electric energy quality parameter detecting device based on DSP, CPLD, and ARM
CN203164394U (en) Inverter aging test platform of small wind or solar generator
CN202976623U (en) Simulation demonstration device used for training remote electrical load control
CN204719205U (en) Isolating switch time-parameters test simulator
CN204230892U (en) A kind of electric automobile can flexible access containing important load DC distribution net
CN207638399U (en) A kind of Intelligent power distribution case
CN216411535U (en) Distributed deployed portable current transformer polarity detection equipment
CN201708566U (en) Charging pile
CN205945149U (en) A power supply unit for middling pressure circuit breaker cabinet secondary control loop
CN204230893U (en) A kind of high reliability DC distribution net being applicable to electric automobile and registering one's residence
CN201758256U (en) AC distribution box
CN203733339U (en) Anti-electricity stealing program controlled simulation apparatus
CN204349469U (en) A kind of be applicable to that electric automobile registers one's residence containing important load DC distribution net
CN209979752U (en) Portable off-board charging facility detection device
CN103531061A (en) On-load installation wiring training device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20120914

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120914

Address after: 110811 eight Heping Street, 94 Heping Street, Liaoning, Shenyang

Patentee after: Liaoning Shenyang Electric Power Supply Co., Ltd.

Patentee after: State Grid Corporation of China

Address before: 110811 eight Heping Street, 94 Heping Street, Liaoning, Shenyang

Patentee before: Liaoning Shenyang Electric Power Supply Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110427