CN201802119U - Foundation guide rail for leg section of power transmission line tower assembled by aid of helicopter - Google Patents

Foundation guide rail for leg section of power transmission line tower assembled by aid of helicopter Download PDF

Info

Publication number
CN201802119U
CN201802119U CN2010205392923U CN201020539292U CN201802119U CN 201802119 U CN201802119 U CN 201802119U CN 2010205392923 U CN2010205392923 U CN 2010205392923U CN 201020539292 U CN201020539292 U CN 201020539292U CN 201802119 U CN201802119 U CN 201802119U
Authority
CN
China
Prior art keywords
guide rail
guide
guide strip
tower
gusset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205392923U
Other languages
Chinese (zh)
Inventor
黄克信
缪谦
朱艳君
夏拥军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN2010205392923U priority Critical patent/CN201802119U/en
Application granted granted Critical
Publication of CN201802119U publication Critical patent/CN201802119U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model provides a foundation guide rail for a leg section of a power transmission line tower assembled by the aid of a helicopter, which comprises guide plates, ribbed plates of the guide plates and a hoop. The ribbed plates of the guide plates are welded to the lower sides of the guide plates, and the hoop is welded to the lower ends of the ribbed plates of the guide plates. The guide plates are used for guiding positioning of suspension setting of the leg section by the helicopter, the ribbed plates of the guide plates support the guide plates and transmit impact force of the suspended leg section on the guide plates to the hoop, and the hoop is used for connecting the foundation guide rail with a leg foundation. The foundation guide rail is simple in structure and convenient in manufacturing, can realize load transmission with the leg transmission without any connectors, realizes installation of the foundation guide rail without any modification of the leg foundation, can be used for suspension setting of leg sections of various supporting towers by helicopters, and is high in universality and wide in applicable range.

Description

A kind of basic guide rail that is used to go straight up to the upright iron tower of power transmission line tower leg section of unit
Technical field
The utility model belongs to overhead transmission line iron tower vertical construction equipment field, is specifically related to a kind of basic guide rail that is used to go straight up to the upright iron tower of power transmission line tower leg section of unit.
Background technology
According to the difference of form of structure, size, weight and the orographic condition of iron tower of power transmission line, its lifting group is upright generally two kinds of job practicess, promptly whole Li Tafa and split tower erection method.Whole Li Tafa is meant on ground and iron tower is kept flat after assembling finishes, use equipment such as pole, crane with the whole pull-up of iron tower a kind of job practices in place, this method generally is applicable to simple, the lightweight Guywire tower of form of structure, requires to have the smooth place of certain limit for assembling and upright tower simultaneously.The split tower erection method is meant iron tower is split into single, monolithic or single hop, use equipment such as pole, crane to lift separately, dock, organize upright a kind of job practices according to the order of sequence in the air, it is upright that the self-supporting tower that volume and weight is all bigger generally uses this method to organize.
Fig. 1 a and Fig. 1 b have provided the structure line frame graph of two kinds of self-supporting towers.Self-supporting tower has that turriform is more roomy, good rigidly, need not characteristics such as backguy, be generally by hundreds of and even the thousands of trussed constructions that shaped steel is formed by connecting by bolt or rivet, its cross section is square or rectangle more, each side is plane frame (being called the tower sheet), Quan Take is divided into multistage, comprises tower leg section 11 (first section truss on the basis), body of the tower 12 (can be divided into the multistage truss again) and tower head 13 from bottom to top.It is upright that self-supporting tower generally uses the split tower erection method to organize, and construction equipment commonly used has pole, runabout crane, group tower special tower crane etc.The trussed construction that pole is made up of a plurality of standard knots, the quality of single standard knot is below 200kg, can adopt manpower or animal power mode to carry and enter the job site, but under abominable construction environments such as high and steep mountains, its transportation inconvenience still, and in work progress, need for it is provided with the multiple tracks backguy work progress complexity, poor stability.Use runabout crane group tower efficiency of construction height, but need open up the special passage that travels, be subjected to the landform restriction bigger, only be suitable for generally that the place is open, the scene of traffic convenience for it.Group tower special tower crane has multiple safety guard; the working security height; but the group of himself is upright and dismounting needs the cost certain hour; cause integral construction efficient not high; simultaneously its standard knot quality is also often greater than the quality of pole standard knot, so it generally also only is used for scene of traffic convenience.
Going straight up to the upright iron tower of power transmission line of unit is the iron tower assemblage construction method of a kind of novelty, uniqueness.When the unit tower is gone straight up in use, at first the iron tower segmentation is assembled at traffic convenience, place solution space open, that distance is suitable, use then helicopter with its handling to the sky, installation site, the helicopter pilot is by the booster action of various guide rail, to be slipped into the installation site along guide rail by the tower crane section, last constructor Deng Ta will be connected by securing members such as tower crane Duan Yuyi installation tower section use bolts, thereby it is upright to finish the iron tower group.Use is gone straight up to the unit tower and is had the following advantages:
(1) because the tower section is assembled on ground, reduced amount of high-altitude operation, safety is good;
(2) reduce transport channel and opened up and the vegetation felling, protected ecological environment, be particularly suitable for the abominable places of construction environment such as high and steep mountains;
(3) group column efficiency height;
(4) construction technology level advanced person.
Going straight up to unit tower job practices all has higher requirements to the segmentation weight of iron tower, joint form, joint location etc., and maximum difficult point is how to guarantee that the tower section is skyborne accurately, automatic butt, avoid manual intervention as far as possible, guarantee construction safety, efficient, so the butt joint of tower section is most important with guide rail.
The unit tower is gone straight up in use, and at first to need to organize upright be tower leg section 11, as shown in Figure 2.The tower leg section 11 of self-supporting tower has four tower legs (restricted by orographic condition, the level height of four tower legs may there are differences), and four tower leg bases 23 (cross section is generally square or rectangle) are arranged accordingly.Its work progress is as follows:
(1) the basic guide rail 22 of a cover is installed on each tower leg basis 23;
(2) use suspension arrangement 21 that the tower leg section 11 that assembles is hung on helicopter ventral below, then with its handling to the top, basis and hover;
(3) helicopter pilot reduces hover height gradually, and it is in place to make tower leg section 11 slowly slip into the installation site by the guide effect of basic guide rail 22;
(4) constructor uses nut that stone bolt pre-buried on the tower leg plate 24 on the tower leg section 11 and the tower leg basis 23 is connected, thereby finishes the helicopter vertical construction of iron tower tower leg section.
Fig. 3 is the schematic diagram of tower leg plate 24, which is provided with the anchor (bolt) hole 25 that passes for stone bolt, makes with dashed lines provide the final on-station position of tower leg plate 24 among Fig. 4.
The utility model content
The purpose of this utility model is to provide a kind of simple in structure, safe and reliable basic guide rail, and it is used to satisfy the helicopter vertical construction of iron tower of power transmission line tower leg section.
For achieving the above object, the utility model is taked following technical scheme:
A kind of basic guide rail that is used to go straight up to the upright iron tower of power transmission line tower leg section of unit, it is characterized in that: this basis guide rail comprises guide strip, guide strip gusset and anchor ear, described guide strip below is welded with the guide strip gusset, and the lower end of described guide strip gusset is welded with anchor ear.
Wherein, described guide strip has two, and two guide strip symmetries connect, and the rear portion of every guide strip all is welded with trapezoidal guide strip gusset.
Wherein, the rear portion of described every guide strip all is welded with two trapezoidal guide strip gussets, and described two trapezoidal guide strip gussets connect by strip guide strip gusset always.
Wherein, guide strip is formed by connecting by hang plate and vertical panel.
Wherein, the vertical panel of described two guide strips is 90 ° of connections, and the hang plate of two guide strips tilts to the iron tower outside, and promptly the angle γ of the intersection of two hang plates and plumb line is 25 °~40 °.
Wherein, be provided with small gusset between described anchor ear and the guide strip gusset.
Wherein, described anchor ear is made of four block plates, is equipped with small gusset between per two blocks of adjacent steel plates.
Wherein, the two ends of described four block plates are equipped with bolt hole, and the bolt hole on per two blocks of adjacent steel plates is by bolt tightening.
Wherein, all have lightening hole on described guide strip gusset and the anchor ear.
The upright basic guide rail of the supporting usefulness of iron tower of power transmission line tower leg section of unit of going straight up to of the present utility model has following beneficial effect:
(1) this type basis guide rail need not any connector with the tower leg basis and can realize impact by the transmission of basic guide rail to the tower leg basis, and tower leg is basic, and it goes without doing that any modification can be installed this type guide rail, highly versatile.
(2) this type basis guide rail is made by steel plate, forms through welding or Bolt Connection between each member, and form of structure is simple, convenient processing and manufacture.
(3) this type basis guide rail can be used for the helicopter vertical construction of various iron tower, and its each size can be definite, applied widely according to helicopter pilot's the conditions such as technical ability, landform, meteorology, suspended object of controlling, construction technology level advanced person.
Use basic guide rail of the present utility model, can guarantee to go straight up to the safe, accurate, automatic, reliable, advanced of the upright iron tower of power transmission line tower leg section of unit, have good economic and social benefit.
Description of drawings
Fig. 1 a and Fig. 1 b are the structural representation of two kinds of self-supporting towers, 11-tower leg section among the figure, 12-body of the tower, 13-tower head;
Fig. 2 founds schematic diagram for the unit of going straight up to of iron tower tower leg section, 11-tower leg section among the figure, 21-suspension arrangement, 22-basis guide rail, 23-tower leg basis, 24-tower leg plate;
Fig. 3 is the schematic diagram of tower leg plate, 24-tower leg plate among the figure, 25-anchor (bolt) hole;
Fig. 4 is the Facad structure schematic diagram of the utility model basis guide rail;
Fig. 5 is the axis side views such as the back side of the utility model basis guide rail, 31-guide strip among the figure, 32-guide strip gusset, 33-anchor ear, 34-small gusset, 35-bolt hole, 36-lightening hole, 41-hang plate, 42-vertical panel;
Fig. 6 is the angled view of the utility model basis guide rail, contains the critical size parameter of basic guide rail among the figure.
The specific embodiment
Below in conjunction with accompanying drawing the basic guide rail in the utility model is further described in detail.
Shown in Fig. 4-6, the basic guide rail that is used to go straight up to the upright iron tower of power transmission line tower leg section of unit of the present utility model comprises guide strip 31, guide strip gusset 32, anchor ear 33 and small gusset 34, make by steel plate with upper member, guide strip 31 belows are provided with guide strip gusset 32, and the lower end of guide strip gusset 32 is provided with anchor ear 33, are provided with small gusset 34 between anchor ear 33 and the guide strip gusset 32, use welding or Bolt Connection to form between each parts, form of structure is simple, convenient processing and manufacture.
Guide strip 31 has two, can limit after linking together by the outer side oscillation of tower crane leg section along continuous straight runs to basis in place, thereby provide guide effect for tower leg section 11 in place.Every guide strip 31 comprises hang plate 41 and vertical panel 42 two parts, and 42 one-tenth 90 degree of the vertical panel of two guide strips 31 connect.The height H of the intersection of the hang plate 41 of two guide strips 31 and the angle γ of plumb line, guide strip 31 and the length of side a of vertical panel 42 need determine according to helicopter pilot's airmanship and construction environment, the above-mentioned parameter value is big more, and is also just low more to the requirement of helicopter pilot's airmanship and construction environment.In the above-mentioned parameter, the span at γ angle is between 25 °~40 °, and the span of height H is between 700mm~1300mm, and the span of length of side a is between 400mm~600mm.Tower leg is embedded with stone bolt in the basis, the tower leg plate 24 of iron tower (structure of tower leg plate 24 as shown in Figure 3) is seated on the tower leg basis, have the anchor (bolt) hole 25 that passes for stone bolt on it, can guarantee after 24 pairs of stone bolt of tower leg plate are fastening that iron tower can not tumble, therefore the height h of the vertical panel 42 of guide strip 31 should exceed the length 20mm~100mm of tower leg surface of base greater than stone bolt, with the guide effect that guarantees that basic guide rail can be brought into normal play.
Guide strip gusset 32 is for guide strip provides support, and the rear portion of every guide strip 31 all is welded with two trapezoidal guide strip gussets 32 that be arranged in parallel.In order to improve integrally-built mechanical property, can connect strip guide strip gusset 32 always two trapezoidal guide strip gusset 32 ends.Guide strip 31 and guide strip gusset 32 directly are placed on the tower leg basis 23, do not have with tower leg basis 23 to be fastenedly connected.
The lower end of guide strip gusset 32 is connected with anchor ear 33, and it is used for being connected of the utility model basis guide rail and tower leg basis 23.These anchor ear 33 rectangular structures, form by four block plates, closely be wrapped in tower leg basis 23 around, thereby the impact by tower crane leg section that guide strip 31 can be subjected to is passed to the tower leg basis.The two ends of four blocks of anchor ear plates all have bolt hole 35, and the available between any two bolt of anchor ear plate is connected.Described four blocks of anchor ear plates should have enough height, and the span of its height d is between 200mm~500mm.
In order to improve the local impact resistant capability of basic guide rail, between guide strip gusset 32 and anchor ear 33, all be connected with small gusset 34 between any two with the anchor ear plate.
According to the concrete numerical value of form of structure and size, all have some lightening holes 36 on guide strip gusset 32 and the anchor ear 33, can effectively alleviate the overall weight of basic guide rail, convenient transportation and on-the-spot the use.
Basic guide rail structure of the present utility model is simple, easily manufactured, need not any connector with the tower leg basis and can realize loading transfer, the tower leg basis need not to make any modification can install this type guide rail, and its each size is determined according to helicopter pilot's the conditions such as technical ability, landform, meteorology, suspended object of controlling, can be used for the helicopter lifting of various self-supporting tower tower leg sections, highly versatile, applied widely.
Should be noted that at last: above embodiment only is not intended to limit in order to the explanation the technical solution of the utility model, although the utility model is had been described in detail with reference to the foregoing description, those of ordinary skill in the field are to be understood that: still can make amendment or be equal to replacement the specific embodiment of the present utility model, and do not break away from any modification of the utility model spirit and scope or be equal to replacement, it all should be encompassed in the middle of the claim scope of the present utility model.

Claims (9)

1. one kind is used to go straight up to the basic guide rail that unit founds iron tower of power transmission line tower leg section, it is characterized in that: this basis guide rail comprises guide strip (31), guide strip gusset (32) and anchor ear (33), described guide strip (31) below is welded with guide strip gusset (32), and the lower end of described guide strip gusset (32) is welded with anchor ear (33).
2. basic guide rail according to claim 1 is characterized in that: described guide strip (31) has two, and two guide strips (31) symmetry connects, and the rear portion of every guide strip (31) all is welded with trapezoidal guide strip gusset (32).
3. basic guide rail according to claim 2, it is characterized in that: the rear portion of described every guide strip (31) all is welded with two trapezoidal guide strip gussets (32), and described two trapezoidal guide strip gussets (32) connect by strip guide strip gusset (32) always.
4. basic guide rail according to claim 3 is characterized in that: guide strip (31) is formed by connecting by hang plate (41) and vertical panel (42).
5. basic guide rail according to claim 4 is characterized in that: the vertical panel of described two guide strips (42) is 90 ° of connections, and the hang plate of two guide strips (41) tilts to the iron tower outside.
6. according to the arbitrary described basic guide rail of claim 2-5, it is characterized in that: be provided with small gusset (34) between described anchor ear (33) and the guide strip gusset (32).
7. basic guide rail according to claim 6 is characterized in that: described anchor ear (33) is made of four block plates, is equipped with small gusset (34) between per two blocks of adjacent steel plates.
8. basic guide rail according to claim 7 is characterized in that: the two ends of described four block plates are equipped with bolt hole (35), and the bolt hole (35) on per two blocks of adjacent steel plates is by bolt tightening.
9. basic guide rail according to claim 1 is characterized in that: all have lightening hole (36) on described guide strip gusset (32) and the anchor ear (33).
CN2010205392923U 2010-09-25 2010-09-25 Foundation guide rail for leg section of power transmission line tower assembled by aid of helicopter Expired - Lifetime CN201802119U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205392923U CN201802119U (en) 2010-09-25 2010-09-25 Foundation guide rail for leg section of power transmission line tower assembled by aid of helicopter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205392923U CN201802119U (en) 2010-09-25 2010-09-25 Foundation guide rail for leg section of power transmission line tower assembled by aid of helicopter

Publications (1)

Publication Number Publication Date
CN201802119U true CN201802119U (en) 2011-04-20

Family

ID=43871627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205392923U Expired - Lifetime CN201802119U (en) 2010-09-25 2010-09-25 Foundation guide rail for leg section of power transmission line tower assembled by aid of helicopter

Country Status (1)

Country Link
CN (1) CN201802119U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321472A (en) * 2013-06-24 2013-09-25 国家电网公司 Training frame for training helicopter tower assembling personnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321472A (en) * 2013-06-24 2013-09-25 国家电网公司 Training frame for training helicopter tower assembling personnel
CN103321472B (en) * 2013-06-24 2016-03-02 国家电网公司 A kind of for training the training stand of going straight up to set tower personnel

Similar Documents

Publication Publication Date Title
CN102561788B (en) Guide track series for helicopter assemblage power transmission line iron tower
CN103225408A (en) Construction method for long-span net rack multiple-mast independent type integral lifting
CN206032726U (en) Modular pipe truss coal transporting trestle
CN207017435U (en) Large span bolt-ball net frame
CN203296361U (en) Long-span steel structure cross assembling hoisting platform
CN102127987B (en) Guide rail system for assembling flange connection tower sections of power transmission line iron tower through helicopter
CN105839947B (en) A kind of lifting room and hanging method based on rectangle formed steel construction pedestal
CN202131824U (en) Serial guide rail used for helicopter assembly transmission line iron tower
CN101967902B (en) Basic guide rail for helicopter assembly transmission line iron tower leg section
CN202007566U (en) Guide rail system for flange connected tower section of power transmission line tower assembled through helicopter
CN102134932B (en) Guide rail system for assembling single-limb main material tower sections in power transmission line iron tower through helicopter
CN203113883U (en) Auxiliary installation system for assembling tower by helicopter
CN101967903A (en) Basic guide rail for helicopter assembly transmission line iron tower leg section
CN201802119U (en) Foundation guide rail for leg section of power transmission line tower assembled by aid of helicopter
CN109989590B (en) Auxiliary fixing device for mounting roof overlong steel beam and hoisting method of steel beam
CN205257792U (en) Bridge crane with triangular support girder
CN204126297U (en) A kind of temporary support of steel truss roof
CN107795133B (en) Integral protective frame platform and construction method thereof
CN102108801A (en) Guide rail system for use on end part of cross arms of helicopter-assembled power transmission line iron tower
CN209742334U (en) Steel construction vestibule bottom curtain construction platform
KR100493505B1 (en) Method of constructing a transmission tower by helicopter
CN202450838U (en) Assembling type iron tower base station
CN201794357U (en) Basal guide rail for tower leg section of power transmission line iron tower erected by helicopter
CN208932809U (en) Rectangular push pipe suspender
CN208250893U (en) A kind of device of rapid build large span lightweight emergency bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: CHINA ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20140327

Owner name: CHINA ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20140327

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100192 HAIDIAN, BEIJING TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20140327

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: China Electric Power Research Institute

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Patentee before: China Electric Power Research Institute

CX01 Expiry of patent term

Granted publication date: 20110420

CX01 Expiry of patent term