CN208250893U - A kind of device of rapid build large span lightweight emergency bridge - Google Patents

A kind of device of rapid build large span lightweight emergency bridge Download PDF

Info

Publication number
CN208250893U
CN208250893U CN201721306889.1U CN201721306889U CN208250893U CN 208250893 U CN208250893 U CN 208250893U CN 201721306889 U CN201721306889 U CN 201721306889U CN 208250893 U CN208250893 U CN 208250893U
Authority
CN
China
Prior art keywords
girder
group
bridge
emergency bridge
nose
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721306889.1U
Other languages
Chinese (zh)
Inventor
孙建
张冬冬
曾智刚
张宏建
潘大荣
陈立
李宏伟
汪效良
赵栋
陈浩森
李飞
高峰
高一峰
陶杰
马森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INSTITUTE OF ENGINEERING DESIGN, CHINESE PEOPLE'S ARMED POLICE FORCE
Original Assignee
Institute Of Engineering Design Academy Of Chinese People's Armed Police Forces
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute Of Engineering Design Academy Of Chinese People's Armed Police Forces filed Critical Institute Of Engineering Design Academy Of Chinese People's Armed Police Forces
Application granted granted Critical
Publication of CN208250893U publication Critical patent/CN208250893U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of device of rapid build large span lightweight emergency bridge provided by the utility model, including auxiliary nose-girder, weight and driving means;The auxiliary nose-girder is composite material nose girder;The weight includes the rectangular steelframe of bottom opening, one group of steel sheet pile, one group of wirerope and one group of idler wheel;The driving means includes driving motor and one group of pulley, and the driving motor is connect with idler wheel, and one group of pulley is fixed on the girder bottom of auxiliary nose-girder and/or emergency bridge.The utility model additionally provides a kind of method of rapid build large span lightweight emergency bridge.The apparatus structure is simple, convenient transportation, assembled simple and direct, sets up fast and reliable, sets up composite truss bridge using the place that it is inconvenient that the device may be implemented in narrow space, transport.

Description

A kind of device of rapid build large span lightweight emergency bridge
Technical field
The utility model belongs to bridge apparatus field, in particular to a kind of to be suitable for rapid build large span when rescue and relief work The device of lightweight emergency bridge, a kind of method for further relating to rapid build large span lightweight emergency bridge.
Background technique
With the rapid development of economy, the road and bridge industry in China achieves huge advance.Bridge is as economic development Important carrier, strength and stability is particularly important.In recent years, China some areas earthquake disaster frequently occurs, many bridges Beam, by more serious destruction, not only brings huge property loss under geological process, the life security of the people also by Threat is arrived.After earthquake disaster occurs, road is caused to be buried for strong seismic wave or collapsing depression, bridge tunnel are damaged, friendship It is logical to block.It at this moment is exactly that a large amount of personnel need to evacuate, noneffectives need to give treatment to transfer, and substance equipment needs allocation and transportation and rescues to speedily carrying out rescue work As soon as helping the crucial moment of line, extremely important and urgent is shown to logical speedily carry out rescue work of robbing of road.However, existing truss-type bridges weight is big, It is inconvenient to set up, and after shaking mountain area set up space it is narrow, can only single bank erection be difficult to set up existing truss-type bridges.
Road and bridge ensures that weight, the mobility of instrument are all important guarantee parameter index, composite truss bridge tool Have the characteristics that intensity is high, light-weight, quick detachable, therefore using the truss-type bridges of composite material preparation, composite material can be given full play to The advantage of high-strength light can better meet mountainous region narrow zone as application background, to ensure that emergency when earthquake relief work is handed over Logical demand.However, setting up emergency bridge after shake also has more difficulty, it is typically only capable to set up from one end, in order to avoid toppling, The modes such as sand hill ballast, vehicle ballast must be generallyd use in end ballast, in this manner, bridge bottom is also necessary It is pushed on road surface;However, the modes such as pushing directly on using sand hill ballast, vehicle ballast, ground easily causes composite wood bridge Beam damage.
Utility model content
Technical problem: in order to solve the defects of prior art, when the utility model provides one kind suitable for rescue and relief work The device of rapid build large span lightweight emergency bridge additionally provides a kind of rapid build large span lightweight emergency bridge Method can be realized safety, quick erection truss bridge using the device under relatively blunt execution conditions.
Technical solution: a kind of device of rapid build large span lightweight emergency bridge provided by the utility model, including Auxiliary nose-girder, weight and driving means;
The auxiliary nose-girder is composite material nose girder, is made of several modularization triangle trusses units;
The weight includes the rectangular steelframe of bottom opening, one group of steel sheet pile, one group of wirerope and one group of idler wheel;Institute One group of steel sheet pile is stated to be individually fixed in the ground on the outside of rectangular steelframe;The top of described one group of wirerope one end and rectangular steelframe Connection, the other end are connect with steel sheet pile;The idler wheel is fixed in the top inner wall of rectangular steelframe, i.e., the described idler wheel side of being fixed on On the crossbeam inner wall at the top of shaped steel frame;
The driving means includes driving motor and one group of pulley, and the driving motor is connect with idler wheel, one group of cunning Wheel is fixed on the girder bottom of auxiliary nose-girder and/or emergency bridge.It ensure that the arrival pair of nose girder front end by the way that weight is arranged Before bank, keeping entire push structure includes the balance of spanning girder and auxiliary nose-girder, is not toppled.
As an improvement, the auxiliary nose-girder is made of one group of sequentially connected triangular prism;The each edge of each triangular prism is equal For composite bar or aluminium alloy rod, a pair of of composite material or aluminium alloy diagonal web member are additionally provided with inside each triangular prism;Composite wood Expect that the end of bar or aluminium alloy rod is connected using common metal connector.
The utility model additionally provides a kind of method of rapid build large span lightweight emergency bridge, it is characterised in that: Using above-mentioned apparatus, set up using cantilever push method, comprising the following steps:
(1) weight is fixed on wait near the position that builds a bridge: rectangular steelframe bottom, one group of steel sheet pile is solid respectively In wait the ground near the position that builds a bridge, one group of wirerope one end is connect with the top of rectangular steelframe, the other end with Steel sheet pile connection;
(2) pulley is fixed on to the girder bottom of auxiliary nose-girder and/or emergency bridge;
(3) one end of auxiliary nose-girder is connect with one end of emergency bridge girder to be set up;
(4) girder of auxiliary nose-girder and emergency bridge is passed through into weight, makes the girder top surface of idler wheel and emergency bridge It is in close contact;
(5) girder of auxiliary nose-girder and emergency bridge is pushed using driving motor, make auxiliary nose-girder and emergency bridge according to The secondary ground for reaching opposite to be built a bridge, fixed emergency bridge, dismantles auxiliary nose-girder.
Wherein, in step (3), pass through single ears connection between the auxiliary nose-girder and emergency bridge.
The utility model has the advantages that apparatus structure provided by the utility model is simple, convenient transportation, assembled simple and direct, set up it is fast and reliable, It may be implemented in narrow space using the device, the place of transport inconvenience sets up composite truss bridge.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of auxiliary nose-girder;
Fig. 2 is the side view of auxiliary nose-girder;
Fig. 3 is the top view of auxiliary nose-girder;
Fig. 4 is the usage state diagram of auxiliary nose-girder;
Fig. 5 is the structural schematic diagram of weight and driving means;
Fig. 6 is the side view of weight;
Fig. 7 is the process status figure one of rapid build large span lightweight emergency bridge;
Fig. 8 is the process status figure two of rapid build large span lightweight emergency bridge;
Fig. 9 is the process status figure three of rapid build large span lightweight emergency bridge;
Figure 10 is the process status figure four of rapid build large span lightweight emergency bridge.
Specific embodiment
The device and method of the utility model rapid build large span lightweight emergency bridge are made furtherly below It is bright.
The device of rapid build large span lightweight emergency bridge, including auxiliary nose-girder 1, weight 2 and driving means 3;
Auxiliary nose-girder 1 is composite material nose girder;Auxiliary nose-girder 1 is shown in Fig. 1 to 4, by one group of sequentially connected triangular prism group At;The each edge of each triangular prism is composite bar or aluminium alloy rod, and a pair of of composite wood is additionally provided with inside each triangular prism Expect diagonal web member or aluminium alloy diagonal web member;The end of composite bar or aluminium alloy rod is connected using common metal connector.
Main beam structure is in double inverted triangle box truss patterns, is spliced by multiple single bridge sections.Each bar connects in main gantry It connects mode all and is after assembling all FRP rod pieces end and span centre node location with pretightning force tooth interconnection technique, then using weldering Node plate structure is connect to be attached;Between the single double tracks of bridge section other than winding up and connecting the sway bracing of floorings, also Lower edge is located at the transverse direction of pretightning force tooth joint location and oblique connection is, lower edge connection system is attached using single ears, It is to be attached using single ears of lower boom and the jacking block for the floorings that wind up between each modularization bridge section.The composite material Truss-type bridges can adjust bridge section number according to actual needs, and the method by breaking the whole up into parts has unique in transport and erection After advantage, especially increase beam-string structure, it is suitable for requiring the application in region compared with large span.
Weight 2 is shown in Fig. 5 to 6,21, one groups of rectangular steelframe, 22, one groups of the steel sheet pile wirerope 23 including bottom opening With one group of idler wheel 24;One group of steel sheet pile 22 is individually fixed in the ground in rectangular 21 outside of steelframe;One group of 23 one end of wirerope with The top of rectangular steelframe 21 connects, and the other end is connect with steel sheet pile 22;Idler wheel 24 is fixed on the top cross-bar of rectangular steelframe 21 On inner wall;
Driving means 3 is shown in that Fig. 5, including driving motor 31 and one group of pulley 32, driving motor 31 are connect with idler wheel 24, one Group pulley 32 is fixed on the girder bottom of auxiliary nose-girder 1 and/or emergency bridge.
Rapid build large span lightweight emergency bridge is set up using cantilever push method using above-mentioned apparatus, sees Fig. 7 extremely 10, comprising the following steps:
(1) weight 2 is fixed on wait near the position that builds a bridge: by rectangular 21 bottom of steelframe, one group of steel sheet pile 22 It is individually fixed in wait which in the ground near the position that builds a bridge, one group of 23 one end of wirerope and the top of rectangular steelframe 21 are connected It connects, the other end is connect with steel sheet pile 22;
(2) pulley 32 is fixed on to the girder bottom of auxiliary nose-girder 1 and/or emergency bridge;
(3) one end of auxiliary nose-girder 1 is connect with one end of emergency bridge girder to be set up;
(4) girder of auxiliary nose-girder 1 and emergency bridge is passed through into weight 2, makes the girder of idler wheel 24 Yu emergency bridge Top surface be in close contact;
(5) it is pushed using girder of the driving motor 31 to auxiliary nose-girder 1 and emergency bridge, makes auxiliary nose-girder 1 and emergency bridge Beam successively reaches the ground on opposite to be built a bridge, and fixed emergency bridge dismantles auxiliary nose-girder 1.
Wherein, in step 3, pass through single ears connection between auxiliary nose-girder 1 and emergency bridge.

Claims (2)

1. a kind of device of rapid build large span lightweight emergency bridge, it is characterised in that: including auxiliary nose-girder (1), ballast Device (2) and driving means (3);
The auxiliary nose-girder (1) is composite material nose girder;
The weight (2) include the rectangular steelframe (21) of bottom opening, one group of steel sheet pile (22), one group of wirerope (23) and One group of idler wheel (24);One group of steel sheet pile (22) is individually fixed in the ground on the outside of rectangular steelframe (21);One group of steel Cord (23) one end is connect with the top of rectangular steelframe (21), and the other end is connect with steel sheet pile (22);The idler wheel (24) is fixed In in the top inner wall of rectangular steelframe (21);
The driving means (3) includes driving motor (31) and one group of pulley (32), the driving motor (31) and idler wheel (24) Connection, one group of pulley (32) are fixed on the girder bottom of auxiliary nose-girder (1) and/or emergency bridge.
2. a kind of device of rapid build large span lightweight emergency bridge according to claim 1, it is characterised in that:
The auxiliary nose-girder (1) is made of one group of sequentially connected triangular prism;The each edge of each triangular prism is composite material Bar or aluminium alloy rod are additionally provided with a pair of of composite material diagonal web member or aluminium alloy diagonal web member inside each triangular prism;Composite bar Or the end of aluminium alloy rod is connected using metal connecting piece.
CN201721306889.1U 2017-07-12 2017-10-11 A kind of device of rapid build large span lightweight emergency bridge Active CN208250893U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201720846401 2017-07-12
CN2017208464018 2017-07-12

Publications (1)

Publication Number Publication Date
CN208250893U true CN208250893U (en) 2018-12-18

Family

ID=64618897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721306889.1U Active CN208250893U (en) 2017-07-12 2017-10-11 A kind of device of rapid build large span lightweight emergency bridge

Country Status (1)

Country Link
CN (1) CN208250893U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761543A (en) * 2017-07-12 2018-03-06 赵启林 A kind of apparatus and method of rapid build large span lightweight emergency bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761543A (en) * 2017-07-12 2018-03-06 赵启林 A kind of apparatus and method of rapid build large span lightweight emergency bridge

Similar Documents

Publication Publication Date Title
CN103031978B (en) The auxiliary mounting system vertical for iron tower of power transmission line group and method for assembling thereof
CN108086127B (en) Assembled aluminum alloy emergency bridge
CN107761543A (en) A kind of apparatus and method of rapid build large span lightweight emergency bridge
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN111042540A (en) Construction method for aerial butt joint of ground suspension cables of super-large-span prestressed pipe truss
CN102251483B (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN110904868A (en) Bridge dismantling construction method for reverse segment hoisting of bridge girder erection machine
CN103882812A (en) Construction method for midspan main beams of cable-stayed bridge
CN104164833A (en) Telescopic emergency bridge
CN105952133A (en) Suspended large-span reinforced concrete structure construction steel platform and construction method
CN204212046U (en) A kind of telescopic emergency bridge
CN107642225A (en) A kind of hanging scaffold and its assembly and method for dismounting
CN208250893U (en) A kind of device of rapid build large span lightweight emergency bridge
CN108797379A (en) Become the method that spacing double width bridge uses Segmental assembling bridge-erecting machine synchronous construction
CN101481903A (en) Method for erecting main truss of suspension bridge in mountain area by reversely assembling cross-cable cranes
CN208309362U (en) A kind of large span modular composite emergency bridge suitable for artificial assembly
CN203113883U (en) Auxiliary installation system for assembling tower by helicopter
CN210366808U (en) Lifting and dismantling device for rail walking
CN208201616U (en) A kind of nose girder suitable for large span lightweight emergency bridge
CN205500579U (en) Moving die carrier for lock
CN105464007B (en) A kind of folding plane girder in longitudinal direction and its application process
CN106836000A (en) Curve via holes Summarized Account of Bridge Erection Construction method based on DJ series Bridge Erectors
CN101967903A (en) Basic guide rail for helicopter assembly transmission line iron tower leg section
CN101967902A (en) Basic guide rail for helicopter assembly transmission line iron tower leg section
CN213979839U (en) Assembled I-shaped girder steel operation device that encorbelments that can have enough to meet need not wear wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Sun Jian

Inventor after: Li Fei

Inventor after: Tao Jie

Inventor after: Ma Sen

Inventor after: Zeng Zhigang

Inventor after: Zhang Hongjian

Inventor after: Pan Darong

Inventor after: Chen Li

Inventor after: Li Hongwei

Inventor after: Wang Xiaoliang

Inventor after: Zhao Dong

Inventor after: Chen Haosen

Inventor before: Sun Jian

Inventor before: Chen Haosen

Inventor before: Li Fei

Inventor before: Gao Yifeng

Inventor before: Tao Jie

Inventor before: Ma Sen

Inventor before: Zhang Dongdong

Inventor before: Zeng Zhigang

Inventor before: Zhang Hongjian

Inventor before: Pan Darong

Inventor before: Chen Li

Inventor before: Li Hongwei

Inventor before: Wang Xiaoliang

Inventor before: Zhao Dong

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210918

Address after: 210007 room 703, building 15, No. 100, houbiaoying Road, Qinhuai District, Nanjing, Jiangsu Province

Patentee after: Zhao Qilin

Patentee after: INSTITUTE OF ENGINEERING DESIGN, CHINESE PEOPLE'S ARMED POLICE FORCE

Address before: 210000 No.1 Haifu lane, Guanghua Road, Qinhuai District, Nanjing City, Jiangsu Province

Patentee before: Zhao Qilin

Patentee before: Zhang Dongdong

Patentee before: INSTITUTE OF ENGINEERING DESIGN, CHINESE PEOPLE'S ARMED POLICE FORCE