CN201793602U - Novel fully-closed lead discharge tank for blast-furnace bottom - Google Patents

Novel fully-closed lead discharge tank for blast-furnace bottom Download PDF

Info

Publication number
CN201793602U
CN201793602U CN2010205330217U CN201020533021U CN201793602U CN 201793602 U CN201793602 U CN 201793602U CN 2010205330217 U CN2010205330217 U CN 2010205330217U CN 201020533021 U CN201020533021 U CN 201020533021U CN 201793602 U CN201793602 U CN 201793602U
Authority
CN
China
Prior art keywords
brick
groove
bricks
way
discharge tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205330217U
Other languages
Chinese (zh)
Inventor
唐利中
牛天仓
王群德
李中伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingdingshan Hangxing Refractories Co.
Original Assignee
唐利中
牛天仓
王群德
李中伟
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 唐利中, 牛天仓, 王群德, 李中伟 filed Critical 唐利中
Priority to CN2010205330217U priority Critical patent/CN201793602U/en
Application granted granted Critical
Publication of CN201793602U publication Critical patent/CN201793602U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Blast Furnaces (AREA)

Abstract

The utility model discloses a novel fully-closed lead discharge tank for a blast-furnace bottom. The lead discharge tank is constructed by laying universal bricks, three-way bricks, four-way bricks and end bricks in a furnace bottom carbon block groove and filling a carbon ramming material at the periphery, wherein heat preservation bricks are arranged at a lead outlet of the lead discharge tank; through holes are formed in the middle of the universal bricks; T-shaped holes are formed in the center of the three-way bricks; crossed holes are formed in the center of the four-way bricks; and blind holes are formed at one end of the end bricks. By improving the shape of a single brick of the lead discharge tank, the lead discharge tank has a simple and practical structure, reduces the investment cost of the material, is convenient to construct and shortens the brick laying time.

Description

At the bottom of the State of Blast Furnace with novel fully-closed lead discharging groove
Technical field
The utility model belongs to the blast-furnace smelting field, relates in particular at the bottom of a kind of State of Blast Furnace with novel fully-closed lead discharging groove.
Background technology
During the more iron ore of blast-furnace smelting lead tolerance, have low-melting lead solution to generate at furnace bottom, if the lead discharging groove is not set at the bottom of the State of Blast Furnace, lead solution just can't be discharged, and is easy at furnace bottom along charcoal piece slit furnace bottom charcoal piece jack-up destruction furnace bottom furnace lining structure.The structure of past lead discharging groove is at furnace bottom charcoal piece surface fluting, places the clay matter lead discharging groove brick of 3 combinations in groove, and wherein 2 dock into groove through processing, and another piece is a cover block.This complex structure, single brick processing quantity is many, difficulty of construction is big, the time is long, and it is poor to build many stopping propertys of brickwork joint by laying bricks or stones, lead solution is easy to ooze out from brickwork joint, destroy furnace bottom brick fuel interior tissue, influence whole furnace lining structure, add the water-cooled of lead outlet cooling stave, cause lead solution frozen plug lead outlet.
The utility model content
The purpose of this utility model provides at the bottom of a kind of State of Blast Furnace with novel fully-closed lead discharging groove groove, by the improvement to lead discharging groove list brick shape, reduces the investment cost of material, prolongs furnace bottom work-ing life.
In order to achieve the above object by the following technical solutions: at the bottom of a kind of State of Blast Furnace with novel fully-closed lead discharging groove groove, by general brick, threeway brick, four-way brick and end brick build in furnace bottom charcoal piece groove and be filled with the plain ramming mass of charcoal at periphery constitute, lead outlet place at the lead discharging groove is provided with insulating brick, described general brick is the middle brick that through hole is set, the threeway brick is the brick that the center is provided with the T-shaped hole, the four-way brick is the brick that the center is provided with cross bore, and the end brick is the brick that an end is provided with blind hole.
The aperture of described through hole, T-shaped hole, cross bore and blind hole equates.
The two ends of described general brick, threeway brick and four-way brick are respectively arranged with projection and the groove that matches.The blind hole end of described end brick is provided with projection.
The projection at described general brick, threeway brick and four-way brick two ends and the diameter of groove are all greater than the aperture of through hole, T-shaped hole, cross bore and blind hole; The projection of end brick and the groove of general brick match.
The utility model is by the improvement to lead discharging groove list brick shape, make the lead discharging groove simple and practical, reduce the investment cost of material, easy construction, shorten the time of building stove, inlay mutually between brick and the brick and build by laying bricks or stones, improved stability of structure, and lead discharging groove area occupied is little, little to the heat transfer influence of furnace bottom, and lead solution is discharged out of the furnace more smoothly by the lead discharging groove, minimizing is to the destruction of furnace lining structure, prolongs furnace bottom work-ing life, and novel fully-closed lead discharging groove is simple in structure, the lead discharging groove is to be formed by a brick boring, is the hermetically sealed structure of closing.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the enlarged view of a-quadrant among Fig. 1;
Fig. 3 is the enlarged view in B zone among Fig. 1;
Fig. 4 is that the D-D of Fig. 1 is to view;
Fig. 5 be among Fig. 4 C-C to enlarged view;
Fig. 6 is the structural representation of the general brick of the utility model;
Fig. 7 is the left view of the general brick of the utility model;
Fig. 8 is the structural representation of the utility model threeway brick;
Fig. 9 is the left view of the utility model threeway brick;
Figure 10 is the structural representation of the utility model four-way brick;
Figure 11 is the left view of the utility model four-way brick;
Figure 12 is the structural representation of the utility model end brick;
Figure 13 is the left view of the utility model end brick.
Embodiment
As at the bottom of kind of the State of Blast Furnace of Fig. 1~5 one with novel fully-closed lead discharging groove groove, build by laying bricks or stones in the groove of furnace bottom charcoal piece 6 and be filled with the plain ramming mass 7 of charcoal by general brick 1, threeway brick 2, four-way brick 3 and end brick 4 and constitute at periphery, lead outlet place at the lead discharging groove is provided with insulating brick 5, shown in Fig. 6,7, general brick 1 is the middle brick that through hole 8 is set, and the two ends of brick are respectively arranged with projection 9 and the groove 10 that matches; Shown in Fig. 8,9, threeway brick 2 is provided with the brick in T-shaped hole 11 for the center, and the two ends of brick are respectively arranged with projection 9 ' and the groove 10 ' that matches; Shown in Figure 10,11, four-way brick 3 is provided with the brick of cross bore 12 for the center, and the two ends of brick are respectively arranged with the projection 9 that matches " and groove 10 "; Shown in Figure 12,13, end brick 4 is the brick that an end is provided with blind hole 13, and the blind hole end of brick is provided with projection 9 " '.Wherein the aperture of through hole 8, T-shaped hole 11, cross bore 12 and blind hole 13 equates; The projection at described general brick 1, threeway brick 2, four-way brick 3 and end brick 4 two ends and the diameter of groove are all greater than the aperture of through hole, T-shaped hole, cross bore and blind hole.
During use, general brick, the threeway brick, the four-way brick is combined into the lead discharging groove by using the position difference to build by laying bricks or stones respectively in furnace bottom charcoal piece groove, and use end brick sealing of hole, straight line is connected between brick and the brick, the front end boss inserts groove position, back, block is stung at the brick two ends mutually, improved the stopping property of lead discharging groove, at general brick, the threeway brick, the periphery of four-way brick and end brick is filled the plain ramming mass of charcoal, lead discharging groove insulating brick is set going out the lead bath mouth, builds by laying bricks or stones with layer, in case cooling stave place temperature is low, lead solution solidifies row does not go out, and adopts the insulation measure in plumbous liquid exit, has solved because the low problem that causes the outlet of lead solution frozen plug of cooling stave temperature.

Claims (5)

  1. At the bottom of the State of Blast Furnace with novel fully-closed lead discharging groove, it is characterized in that: by general brick, threeway brick, four-way brick and end brick build in furnace bottom charcoal piece groove and be filled with the plain ramming mass of charcoal at periphery constitute, lead outlet place at the lead discharging groove is provided with insulating brick, described general brick is the middle brick that through hole is set, the threeway brick is the brick that the center is provided with the T-shaped hole, the four-way brick is the brick that the center is provided with cross bore, and the end brick is the brick that an end is provided with blind hole.
  2. 2. with novel fully-closed lead discharging groove, it is characterized in that: the aperture of described through hole, T-shaped hole, cross bore and blind hole equates at the bottom of the State of Blast Furnace according to claim 1.
  3. 3. with novel fully-closed lead discharging groove, it is characterized in that: the two ends of described general brick, threeway brick and four-way brick are respectively arranged with projection and the groove that matches at the bottom of the State of Blast Furnace according to claim 1.
  4. 4. with novel fully-closed lead discharging groove, it is characterized in that at the bottom of the State of Blast Furnace according to claim 1: described end brick blind hole end is provided with projection.
  5. According at the bottom of claim 3 or the 4 described State of Blast Furnace with novel fully-closed lead discharging groove, it is characterized in that: the projection at described general brick, threeway brick and four-way brick two ends and the diameter of groove are all greater than the aperture of through hole, T-shaped hole, cross bore and blind hole; The projection of end brick and the groove of general brick match.
CN2010205330217U 2010-09-17 2010-09-17 Novel fully-closed lead discharge tank for blast-furnace bottom Expired - Fee Related CN201793602U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205330217U CN201793602U (en) 2010-09-17 2010-09-17 Novel fully-closed lead discharge tank for blast-furnace bottom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205330217U CN201793602U (en) 2010-09-17 2010-09-17 Novel fully-closed lead discharge tank for blast-furnace bottom

Publications (1)

Publication Number Publication Date
CN201793602U true CN201793602U (en) 2011-04-13

Family

ID=43848521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205330217U Expired - Fee Related CN201793602U (en) 2010-09-17 2010-09-17 Novel fully-closed lead discharge tank for blast-furnace bottom

Country Status (1)

Country Link
CN (1) CN201793602U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110042182A (en) * 2019-05-24 2019-07-23 中天钢铁集团有限公司 A kind of Blast Furnace Bottom automatic lead discharging device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110042182A (en) * 2019-05-24 2019-07-23 中天钢铁集团有限公司 A kind of Blast Furnace Bottom automatic lead discharging device
CN110042182B (en) * 2019-05-24 2023-12-26 中天钢铁集团有限公司 Automatic lead discharging device for blast furnace bottom

Similar Documents

Publication Publication Date Title
CN102399926B (en) Furnace halt residue iron outlet method for middle and large-sized blast furnaces
CN201793602U (en) Novel fully-closed lead discharge tank for blast-furnace bottom
CN103302280A (en) Construction method of steel ladle bottom for ultra-low carbon steel
CN103157785B (en) Construction method of ladle lining
CN202074829U (en) Full sealed lead discharging groove type ore-smelting furnace bottom
CN2263655Y (en) Blast-furnace hearth furnace bottom lining structure
CN205077079U (en) Cooling wall for "bosh of blast furnace
CN202246380U (en) Novel tank wall-cooling heat preservation structure for glass tank furnace
CN202779663U (en) Tundish flow control device
CN203559063U (en) Blast furnace thin-wall lining
CN203848668U (en) Smelting furnace used for producing magnesium alloy
CN207407693U (en) A kind of bath smelting furnace top furnace wall structure
CN207763491U (en) A kind of furnace hearth and smelting furnace
CN207662205U (en) A kind of electric arc furnace body structure
CN206207997U (en) A kind of energy saving and environment friendly oxygen-enriched air smelting stove
CN2495966Y (en) Ore-smelting electric furnace built with cold-pounding mud
CN207344795U (en) Fused cast refractories incubator
CN203758262U (en) Receiving hopper leveling wall masonry structure
CN202450111U (en) Device for charging materials during turndown
CN206387256U (en) A kind of durable tin metallurgy electric furnace of liner chromium and magnesium brick
CN206207998U (en) Oxygen enriched molten bath smelting furnace
CN201154969Y (en) Iron notch mud gun spherical fireproof cap
CN202915692U (en) Electric arc furnace for separating titanium from iron
CN201670846U (en) Embedded swing nozzle prefabricated part
CN209867340U (en) Steel ladle baking device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: PINGDINGSHAN HANGXING REFRACTORY MATERIAL CO., LTD

Free format text: FORMER OWNER: TANG LIZHONG

Effective date: 20110811

Free format text: FORMER OWNER: NIU TIANCANG WANG QUNDE LI ZHONGWEI

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430000 WUHAN, HUBEI PROVINCE TO: 467300 PINGDINGSHAN, HENAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110811

Address after: Let he Xiang Hong Gang Cun Lushan Mountain County of Pingdingshan City, Henan province 467300

Patentee after: Pingdingshan Hangxing Refractories Co.

Address before: 430000 Hubei Province, Wuhan City Qingshan District Road No. 3 45 Ye

Co-patentee before: Niu Tiancang

Patentee before: Tang Lizhong

Co-patentee before: Wang Qunde

Co-patentee before: Li Zhongwei

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110413

Termination date: 20150917

EXPY Termination of patent right or utility model