CN205077079U - Cooling wall for "bosh of blast furnace - Google Patents
Cooling wall for "bosh of blast furnace Download PDFInfo
- Publication number
- CN205077079U CN205077079U CN201520852384.XU CN201520852384U CN205077079U CN 205077079 U CN205077079 U CN 205077079U CN 201520852384 U CN201520852384 U CN 201520852384U CN 205077079 U CN205077079 U CN 205077079U
- Authority
- CN
- China
- Prior art keywords
- stave
- inlaid
- boss
- bricks
- hot surface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Blast Furnaces (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
本实用新型公开了一种高炉炉腹用冷却壁,以解决目前冷却壁热面底部易被煤气流烧损的问题。它主要由内部埋有冷却水管的冷却壁本体和镶嵌在冷却壁本体热面的镶砖组成,冷却壁本体热面底部设有凸台,镶砖底面支撑在凸台上,凸台内部埋有冷却水管,凸台外立面与镶砖外立面平齐。本实用新型底部增设的凸台可以对上部镶砖提供支撑,避免镶砖受热应力作用断裂后脱落,有效延长镶砖对冷却壁的保护期限;当冷却壁镶砖侵蚀殆尽后,凸台可以对冷却壁热面凝结的渣皮给予支撑,有效防止渣皮的脱落,从而增强对冷却壁本体的保护;同时,内部埋有冷却水管的凸台可以加强对下面风口段铸铁冷却壁热面风口组合砖的冷却,延长风口段铸铁冷却壁的寿命。
The utility model discloses a cooling wall for a blast furnace bosh, which solves the problem that the bottom of the hot surface of the cooling wall is easily burned by the gas flow at present. It is mainly composed of the stave body with cooling water pipes buried inside and the inlaid bricks inlaid on the hot surface of the stave body. There is a boss at the bottom of the hot surface of the stave body, and the bottom surface of the inlaid brick is supported on the boss. For the cooling water pipe, the outer surface of the boss is flush with the outer surface of the brick. The bosses added at the bottom of the utility model can provide support for the upper inlaid bricks, prevent the inlaid bricks from falling off after being broken by thermal stress, and effectively prolong the protection period of the inlaid bricks on the cooling wall; when the inlaid bricks in the cooling wall are completely eroded, the bosses can Provide support to the condensed slag skin on the hot surface of the stave, effectively prevent the slag skin from falling off, thereby enhancing the protection of the stave body; at the same time, the boss with the cooling water pipe buried inside can strengthen the air outlet on the hot surface of the cast iron stave at the lower air outlet section Combined brick cooling prolongs the life of the cast iron stave in the tuyere section.
Description
技术领域 technical field
本实用新型涉及一种高炉炉腹用冷却壁。 The utility model relates to a cooling wall for a blast furnace bosh.
背景技术 Background technique
冷却壁是炼铁高炉上的主要设备之一。根据高炉的不同部位,冷却壁具有不同的的材质和结构。其中,高炉炉腹、炉腰和炉身下部区域,由于热流强度高,多采用镶砖铜冷却壁。高炉开炉2~3年后,镶砖侵蚀殆尽,在后续服役过程中,冷却壁主要依靠表面覆盖的渣皮进行自我保护,但在实际生产中,由于高炉原燃料条件波动,操作制度调整或其它不可控因素,都会造成渣皮的脱落,导致冷却壁表面直接暴露在高温煤气流、渣铁流或高温熔融物料中,从而造成冷却壁表面温度急剧升高,加速其侵蚀破损过程。尤其是炉腹下部和炉缸衔接处的铜冷却壁,时常出现铜冷却壁热面底部被煤气流烧损的现象。上述现象说明现有炉腹段铜冷却壁结构设计上存在不足,需对其进行改进优化,延长冷却壁服役寿命。 The stave is one of the main equipment on the ironmaking blast furnace. According to different parts of the blast furnace, staves have different materials and structures. Among them, brick-inlaid copper staves are mostly used in the blast furnace bosh, furnace waist and lower part of the furnace shaft due to the high heat flow intensity. Two to three years after the blast furnace was opened, the inlaid bricks were completely eroded. During the subsequent service process, the cooling wall mainly relied on the slag skin covering the surface for self-protection. Or other uncontrollable factors will cause the slag skin to fall off, causing the surface of the stave to be directly exposed to the high-temperature gas flow, slag-iron flow or high-temperature molten material, resulting in a sharp rise in the temperature of the stave surface and accelerating its erosion and damage process. Especially for the copper stave at the junction of the lower part of the bosh and the furnace hearth, the bottom of the hot surface of the copper stave is often burned by the gas flow. The above phenomenon shows that there are deficiencies in the existing copper stave structure design in the bosh section, and it needs to be improved and optimized to prolong the service life of the stave.
发明内容 Contents of the invention
本实用新型的目的在于克服现有技术缺陷,提供一种结构合理的炉腹用冷却壁,有效避免炉腹段冷却壁的侵蚀破损,延长冷却壁服役寿命。 The purpose of the utility model is to overcome the defects of the prior art, provide a bosh stave with reasonable structure, effectively avoid erosion and damage of the bosh stave, and prolong the service life of the stave.
本实用新型的技术方案是这样实现的:一种高炉炉腹用冷却壁,主要由内部埋有冷却水管的冷却壁本体和镶嵌在冷却壁本体热面的镶砖组成,其在于,冷却壁本体热面底部设有凸台,镶砖底面支撑在凸台上。 The technical scheme of the utility model is realized in the following way: a cooling stave for a blast furnace bosh is mainly composed of a cooling stave body with cooling water pipes buried inside and inlaid bricks inlaid on the hot surface of the stave body. Bosses are provided at the bottom of the hot surface, and the bottom surface of the inlaid bricks is supported on the bosses.
优选的,凸台内部埋有冷却水管。 Preferably, cooling water pipes are buried inside the boss.
优选的,凸台外立面与镶砖外立面平齐。 Preferably, the outer facade of the boss is flush with the outer facade of the bricks.
本实用新型底部增设的凸台可以对上部镶砖提供支撑,避免镶砖受热应力作用断裂后脱落,有效延长镶砖对冷却壁的保护期限;当冷却壁镶砖侵蚀殆尽后,凸台可以对冷却壁热面凝结的渣皮给予支撑,有效防止渣皮的脱落,从而增强对冷却壁本体的保护;同时,内部埋有冷却水管的凸台可以加强对下面风口段铸铁冷却壁热面风口组合砖的冷却,延长风口段铸铁冷却壁的寿命。 The bosses added at the bottom of the utility model can provide support for the upper inlaid bricks, prevent the inlaid bricks from falling off after being broken by thermal stress, and effectively prolong the protection period of the inlaid bricks on the cooling wall; when the inlaid bricks in the cooling wall are completely eroded, the bosses can Provide support for the condensed slag skin on the hot surface of the stave, effectively prevent the slag skin from falling off, thereby enhancing the protection of the stave body; at the same time, the boss with the cooling water pipe buried inside can strengthen the air outlet on the hot surface of the cast iron stave at the lower air outlet section Combined brick cooling prolongs the life of the cast iron stave in the tuyere section.
附图说明 Description of drawings
图1是本实用新型结构主视图。 Fig. 1 is a front view of the structure of the utility model.
图2是本实用新型结构侧视图。 Fig. 2 is a side view of the structure of the utility model.
图中,1-冷却壁本体;2-冷却水管;3-凸台;4-镶砖。 In the figure, 1-stave body; 2-cooling water pipe; 3-boss; 4-inlaid bricks.
具体实施方式 detailed description
下面结合附图作进一步描述: Further describe below in conjunction with accompanying drawing:
如图1、图2所示,一种高炉炉腹用冷却壁,主要由内部埋有冷却水管2的冷却壁本体1和镶嵌在冷却壁本体热面的镶砖4组成,高导热SiC镶砖4通过燕尾槽镶嵌在冷却壁本体1热面,冷却壁本体1热面底部设有凸台,镶砖4底面支撑在凸台3上,凸台内部埋有水平布置的冷却水管2,对凸台3进行冷却,凸台3外立面与镶砖4外立面平齐,可有效对镶砖4进行支撑,并避免过度凸出烧损过快。 As shown in Figure 1 and Figure 2, a stave for a blast furnace bosh is mainly composed of a stave body 1 with a cooling water pipe 2 buried inside and a brick inlaid 4 inlaid on the hot surface of the stave body, and the SiC inlaid brick with high thermal conductivity 4 is inlaid on the hot surface of the stave body 1 through the dovetail groove, the bottom of the hot surface of the stave body 1 is provided with a boss, the bottom surface of the inlaid brick 4 is supported on the boss 3, and the cooling water pipe 2 arranged horizontally is embedded in the boss, and the convex The platform 3 is cooled, and the outer facade of the boss 3 is flush with the outer facade of the inlaid brick 4, which can effectively support the inlaid brick 4, and avoid excessive protrusion and excessive burning.
冷却壁本体高度、厚度、燕尾槽等其它部位的尺寸可根据不同高炉炉型要求灵活设计。采用上述带凸台结构的新型铜冷却壁,可以对镶砖和渣皮提供支撑,延缓冷却壁镶砖和渣皮的脱落;此外,还能对风口段组合砖起到冷却和保护作用,有效延缓风口段铸铁冷却壁的破损,从而减少高炉冷却壁检修费用,保障高炉稳定顺行。 The height, thickness, dovetail groove and other dimensions of stave body can be flexibly designed according to the requirements of different blast furnace types. The above-mentioned new copper stave with boss structure can provide support for the inlaid bricks and slag skin, and delay the shedding of the inlaid bricks and slag skin of the stave; in addition, it can also cool and protect the combined bricks of the tuyere section, effectively Delay the breakage of the cast iron stave in the tuyere section, thereby reducing the maintenance cost of the blast furnace stave and ensuring the smooth running of the blast furnace.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520852384.XU CN205077079U (en) | 2015-10-30 | 2015-10-30 | Cooling wall for "bosh of blast furnace |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520852384.XU CN205077079U (en) | 2015-10-30 | 2015-10-30 | Cooling wall for "bosh of blast furnace |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205077079U true CN205077079U (en) | 2016-03-09 |
Family
ID=55429497
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520852384.XU Expired - Lifetime CN205077079U (en) | 2015-10-30 | 2015-10-30 | Cooling wall for "bosh of blast furnace |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205077079U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107794324A (en) * | 2016-08-31 | 2018-03-13 | 鞍钢股份有限公司 | High-wear-resistance blast furnace copper cooling wall and manufacturing method thereof |
| CN108034782A (en) * | 2017-09-28 | 2018-05-15 | 中冶华天南京工程技术有限公司 | A kind of new throat armour |
| CN112831620A (en) * | 2019-11-22 | 2021-05-25 | 中冶京诚工程技术有限公司 | A cooling wall structure |
-
2015
- 2015-10-30 CN CN201520852384.XU patent/CN205077079U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107794324A (en) * | 2016-08-31 | 2018-03-13 | 鞍钢股份有限公司 | High-wear-resistance blast furnace copper cooling wall and manufacturing method thereof |
| CN108034782A (en) * | 2017-09-28 | 2018-05-15 | 中冶华天南京工程技术有限公司 | A kind of new throat armour |
| CN112831620A (en) * | 2019-11-22 | 2021-05-25 | 中冶京诚工程技术有限公司 | A cooling wall structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103736985B (en) | A kind of ladle working lining and slag lining thereof build by laying method | |
| CN202214370U (en) | Copper cooling wall inlaid with steel bricks | |
| CN205077079U (en) | Cooling wall for "bosh of blast furnace | |
| CN205205161U (en) | Enhanced heat transfer's blast furnace stave | |
| CN201265017Y (en) | Blast furnace hearth furnace bottom lining structure | |
| CN205077080U (en) | Copper -steel compound type blast furnace cooling wall | |
| CN205099706U (en) | Abnormal shape cooling wall | |
| CN204918636U (en) | Cooling wall of blast furnace | |
| CN101693931A (en) | Cooling device at tuyere part of blast furnace | |
| CN205576184U (en) | Good blast furnace crucibe of heat conduction | |
| CN203704662U (en) | Ferrochrome smelting furnace lining | |
| CN205077081U (en) | Novel "bosh of blast furnace hearth cooling wall links up structure | |
| CN202530098U (en) | Cast-iron cooling wall for blast furnace body | |
| CN206173373U (en) | Copper cooling wall and blast furnace stave structure | |
| CN202989192U (en) | Blast-furnace tuyere small sleeve | |
| CN205205162U (en) | Brick cooling wall is inlayed to blast furnace | |
| CN205223273U (en) | Composite cooling wall | |
| CN203845930U (en) | Flat glass melting furnace tank wall structure | |
| CN2461931Y (en) | Long service energy saving type copper cooling wall for blast furnace | |
| CN204185505U (en) | A kind of blast furnace props up iron runner cover plate | |
| CN203021586U (en) | Blast furnace main iron runner steel shell structure | |
| CN203258993U (en) | Chute supporting structure of sinter cooling furnace | |
| CN101619368B (en) | Cooling process of blast furnace bosh | |
| CN201560196U (en) | Blast furnace new tuyere with cooling wall | |
| CN203820813U (en) | Cooling wall structure of joint part of bosh and hearth of blast furnace |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20170717 Address after: 430083, Gate No. 2, Qingshan District, Hubei, Wuhan Patentee after: WUHAN IRON AND STEEL Co.,Ltd. Address before: 430080 Wuhan, Hubei Friendship Road, No. 999, Wuchang Patentee before: WUHAN IRON AND STEEL (GROUP) Corp. |
|
| TR01 | Transfer of patent right | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160309 |
|
| CX01 | Expiry of patent term |