CN201785868U - 一种新型钢筋砼预制整浇房屋结构体系 - Google Patents
一种新型钢筋砼预制整浇房屋结构体系 Download PDFInfo
- Publication number
- CN201785868U CN201785868U CN 201020553611 CN201020553611U CN201785868U CN 201785868 U CN201785868 U CN 201785868U CN 201020553611 CN201020553611 CN 201020553611 CN 201020553611 U CN201020553611 U CN 201020553611U CN 201785868 U CN201785868 U CN 201785868U
- Authority
- CN
- China
- Prior art keywords
- girder
- precast
- secondary beam
- beam body
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201020553611 CN201785868U (zh) | 2010-09-28 | 2010-09-28 | 一种新型钢筋砼预制整浇房屋结构体系 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201020553611 CN201785868U (zh) | 2010-09-28 | 2010-09-28 | 一种新型钢筋砼预制整浇房屋结构体系 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201785868U true CN201785868U (zh) | 2011-04-06 |
Family
ID=43817839
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201020553611 Expired - Fee Related CN201785868U (zh) | 2010-09-28 | 2010-09-28 | 一种新型钢筋砼预制整浇房屋结构体系 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201785868U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102418386A (zh) * | 2010-09-28 | 2012-04-18 | 杨峰 | 一种新型钢筋砼预制整浇房屋结构体系及其施工方法 |
-
2010
- 2010-09-28 CN CN 201020553611 patent/CN201785868U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102418386A (zh) * | 2010-09-28 | 2012-04-18 | 杨峰 | 一种新型钢筋砼预制整浇房屋结构体系及其施工方法 |
CN102418386B (zh) * | 2010-09-28 | 2014-03-12 | 杨峰 | 一种新型钢筋砼预制整浇房屋结构体系及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102418386B (zh) | 一种新型钢筋砼预制整浇房屋结构体系及其施工方法 | |
CN102418385B (zh) | 一种新型钢筋砼预制整浇房屋结构体系及施工方法 | |
CN102418401B (zh) | 一种先张法预应力钢筋砼预制梁 | |
CN102418425B (zh) | 现浇加腋梁的预制整浇房屋结构体系及其施工方法 | |
CN201785865U (zh) | 一种后张法体外预应力钢梁和先张法预应力叠合梁结合的房屋结构体系 | |
CN201794217U (zh) | 一种先张法预应力钢筋砼预制梁 | |
CN201794161U (zh) | 现浇加腋梁的预制整浇房屋结构体系 | |
CN105113389A (zh) | 装配式钢-混凝土组合结构桥墩柱构件 | |
CN201785940U (zh) | 一种钢筋砼预制梁 | |
CN101787733A (zh) | 一种预制立式构件 | |
CN102418381B (zh) | 钢梁与先张法预应力叠合梁相结合的房屋结构体系及其施工方法 | |
CN102418387B (zh) | 一种后张法体外预应力钢梁和先张法预应力叠合梁结合的房屋结构体系及其施工工艺 | |
CN201794214U (zh) | 一种带有空腔的预制梁 | |
CN104947603A (zh) | 一种钢筋混凝土梁桥主梁加固构造及加固方法 | |
CN105350458A (zh) | 一种桥梁y型墩施工用组合结构平台的施工方法 | |
CN201785867U (zh) | 一种新型钢筋砼预制整浇房屋结构体系 | |
CN201786045U (zh) | 钢梁与先张法预应力叠合梁相结合的房屋结构体系 | |
CN103088962A (zh) | 一种先张法预应力钢筋砼预制梁 | |
CN102418400B (zh) | 一种先张法预应力钢筋砼预制梁 | |
CN201785941U (zh) | 一种先张法预应力钢筋砼预制梁 | |
CN201794215U (zh) | 一种先张法预应力钢筋砼预制梁 | |
CN202520017U (zh) | 一种看台变截面预应力悬挑式折梁施工结构 | |
CN201785868U (zh) | 一种新型钢筋砼预制整浇房屋结构体系 | |
CN204780635U (zh) | 一种超宽变截面连续梁0#块固结及解除施工结构 | |
CN201843257U (zh) | 一种先张法预应力钢筋砼预制梁 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: HUAHUI ENGINEERING DESIGN GROUP SHARES CO., LTD. Free format text: FORMER OWNER: YANG FENG Effective date: 20120730 Free format text: FORMER OWNER: HUAHUI ENGINEERING DESIGN GROUP CO., LTD. Effective date: 20120730 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20120730 Address after: 312000 Zhejiang Province, Shaoxing Zhongxing Road No. 339 building Huahui Changan Patentee after: Huahui Engineering Design Group Co., Ltd. Address before: 312000 Zhejiang Province, Shaoxing Zhongxing Road No. 339 building Huahui Changan Co-patentee before: Huahui Engineering Design Group Co., Ltd. Patentee before: Yang Feng |
|
ASS | Succession or assignment of patent right |
Owner name: ZHEJIANG ZHONGWEI BUILDING ENGINEERING CO., LTD. Free format text: FORMER OWNER: HUAHUI ENGINEERING DESIGN GROUP SHARES CO., LTD. Effective date: 20150901 |
|
C41 | Transfer of patent application or patent right or utility model | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: ZHEJIANG ZHONGWEI CONSTRUCTION ENGINEERING DESIGN CO., LTD. Assignor: Huahui Engineering Design Group Co., Ltd. Contract record no.: 2015330000214 Denomination of utility model: Novel reinforced concrete prefabricated whole-poured building structure system and construction method thereof Granted publication date: 20110406 License type: Exclusive License Record date: 20150731 |
|
LICC | Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20150901 Address after: 325000, Zhejiang Wenzhou hi tech Industrial Development Zone, Wenzhou entrepreneurial Service Center incubator incubator building six, 618 Patentee after: ZHEJIANG ZHONGWEI CONSTRUCTION ENGINEERING DESIGN CO., LTD. Address before: 312000 Zhejiang Province, Shaoxing Zhongxing Road No. 339 building Huahui Changan Patentee before: Huahui Engineering Design Group Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110406 Termination date: 20170928 |