CN201771529U - 掘进移动支架 - Google Patents

掘进移动支架 Download PDF

Info

Publication number
CN201771529U
CN201771529U CN2010202851123U CN201020285112U CN201771529U CN 201771529 U CN201771529 U CN 201771529U CN 2010202851123 U CN2010202851123 U CN 2010202851123U CN 201020285112 U CN201020285112 U CN 201020285112U CN 201771529 U CN201771529 U CN 201771529U
Authority
CN
China
Prior art keywords
hydraulic
hydraulic support
support
articulated
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202851123U
Other languages
English (en)
Inventor
佟强
刘士金
王保华
刘业兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINWEN MINING GROUP ZHAI TOWN COAL MINE CO Ltd
Original Assignee
XINWEN MINING GROUP ZHAI TOWN COAL MINE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINWEN MINING GROUP ZHAI TOWN COAL MINE CO Ltd filed Critical XINWEN MINING GROUP ZHAI TOWN COAL MINE CO Ltd
Priority to CN2010202851123U priority Critical patent/CN201771529U/zh
Application granted granted Critical
Publication of CN201771529U publication Critical patent/CN201771529U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型提供了一种掘进移动支架,它包括前后两架液压支架,前后液压支架之间用上、下连接件铰接在一起;前液压支架用四根液压立柱铰接上底座和顶梁,前液压支架两侧分别设有四连杆式铰接柱;后液压支架用两根液压立柱和两根斜撑式液压立柱铰接上底座和顶梁,后液压支架两侧分别设有可回折铰接柱;后液压支架的顶梁后端铰接有向后上方摆动的掩护梁,通过液压缸实现摆动动作。由于掘进工作面临时支护时间短,工作人员的所有工作都是在有效支护下进行,支护强度大安全可靠,促进工序间合理平行作业,提高进尺效率。

Description

掘进移动支架
技术领域
本实用新型涉及煤矿掘进工作面用的临时支护装置,尤其涉及掘进工作面空顶区的临时性支护装置。
背景技术
目前,煤矿掘进工作面空顶区用的临时支护装置是吊环和前探梁配合的接顶式临时支护方式,这种支护工艺落后,工序作业时间长,人员仍然要进入空顶区作业,导致了临时支护安全系数低,职工劳动强度大;支护强度低,不利于安全生产,危及临时支护下施工人员的自身安全。
发明内容
为了杜绝现有掘进工作面空顶区支护强度形式的不足,提供一种液压、自移式掘进移动支架。该支架不仅能够满足空顶区支护强度要求,而且能移动前进,移动便捷,支护方便,而且可以实现掘进工作面迎头打眼等工序与后方永久支护、出矸等工序平行作业。
本实用新型解决其技术问题所采用的技术方案是:它包括前后两架液压支架,前后液压支架之间用上、下连接件铰接在一起;前液压支架用四根液压立柱铰接上底座和顶梁,前液压支架两侧分别设有四连杆式铰接柱,后液压支架用两根液压立柱和两根斜撑式液压立柱铰接上底座和顶梁,后液压支架两侧分别设有可回折铰接柱;后液压支架的顶梁后端铰接有向后上方摆动的掩护梁,通过液压缸实现摆动动作。
使用时,通过操作铰接柱,以推前架拉后架的动作形式实现向前自动移架。
本实用新型的有益效果是:由于掘进工作面临时支护时间短,工作人员的所有工作都是在有效支护下进行,支护强度大安全可靠,促进工序间合理平行作业,提高进尺效率。
附图说明
下面结合附图对本实用新型进一步说明。
图1是本实用新型的主视图。
图中:1-前液压支架;2-后液压支架;3-掩护梁;4-液压缸;5、6-底座;7、8-顶梁;9、10、11、12-液压立柱;13-上连接件;14-下连接件;15-可回折铰接柱;16-四连杆式铰接柱。
具体实施方式
如图1所示,本实用新型包括前液压支架1和后液压支架2,前液压支架1和后液压支架2之间用上连接件13和下连接件14铰接在一起;前液压支架1用两根液压立柱11和两根液压立柱12铰接在底座6和顶梁8上,后液压支架2用两根液压立柱9和两根液压立柱10铰接在底座5和顶梁7上,其中液压立柱9为斜撑式;在前液压支架1两侧分别设有四连杆式铰接柱16,后液压支架2的两侧分别设有可回折铰接柱15;后液压支架2的顶梁后端铰接有向后上方摆动的掩护梁3,通过液压缸4实现摆动动作。

Claims (1)

1.一种掘进移动支架,其特征在于,它包括前后两架液压支架,前后液压支架之间用上、下连接件铰接在一起;前液压支架用四根液压立柱铰接上底座和顶梁,前液压支架两侧分别设有四连杆式铰接柱;后液压支架用两根液压立柱和两根斜撑式液压立柱铰接上底座和顶梁,后液压支架两侧分别设有可回折铰接柱;后液压支架的顶梁后端铰接有向后上方摆动的掩护梁,通过液压缸实现摆动动作。
CN2010202851123U 2010-08-03 2010-08-03 掘进移动支架 Expired - Fee Related CN201771529U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202851123U CN201771529U (zh) 2010-08-03 2010-08-03 掘进移动支架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202851123U CN201771529U (zh) 2010-08-03 2010-08-03 掘进移动支架

Publications (1)

Publication Number Publication Date
CN201771529U true CN201771529U (zh) 2011-03-23

Family

ID=43751374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202851123U Expired - Fee Related CN201771529U (zh) 2010-08-03 2010-08-03 掘进移动支架

Country Status (1)

Country Link
CN (1) CN201771529U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108928780A (zh) * 2018-10-12 2018-12-04 辽宁威跃集团机械制造有限公司 煤矿液压支架分解回收系统

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108928780A (zh) * 2018-10-12 2018-12-04 辽宁威跃集团机械制造有限公司 煤矿液压支架分解回收系统
CN108928780B (zh) * 2018-10-12 2023-08-22 辽宁威跃集团机械制造有限公司 煤矿液压支架分解回收系统

Similar Documents

Publication Publication Date Title
CN204252843U (zh) 新型掘锚支一体机用支护平台与锚杆钻机连接装置
CN104314594A (zh) 快速掘进超前支架
CN201367911Y (zh) 履带行走式液压支架
CN103032091A (zh) 自移式液压支架
CN101644155B (zh) 液压钻装机
CN201486467U (zh) 全液压顶驱车载钻机
CN102322281B (zh) 井巷快掘超前支护综合装置
CN203022776U (zh) 掘进迎头临时支护装置
CN201771529U (zh) 掘进移动支架
CN203050708U (zh) 矿用多功能掘进机
CN102865089B (zh) 全液压自移式超前临时支架及其使用方法
CN101818649B (zh) 综掘工作面液压支护装置
CN204357457U (zh) 履带式锚支机
CN201225163Y (zh) 煤矿短壁开采用自移液压支架
CN202467883U (zh) 双稳定反四连杆机构轻型液压支架
CN102865074B (zh) 滚筒与切割头复合式短臂大采高采煤机
CN201599031U (zh) 一种薄煤层采煤机支撑平衡装置
CN210599053U (zh) 一种两架一组中置式放顶煤端头支架
CN201314238Y (zh) 大采高放顶煤液压支架
CN204327141U (zh) 巷道端头液压支架推夯装置
CN202215263U (zh) 煤矿井下顺槽超前支护支架
CN203531931U (zh) 煤矿井下掘进工作面临时支护设备
CN102327788A (zh) 巷道底鼓液压破碎装置
CN202731961U (zh) 松软煤层掘进超前支护装置
CN203223238U (zh) 巷道用移架机械臂

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110323

Termination date: 20130803