CN201764674U - Glowing gasification civil boiler with double fire holes - Google Patents

Glowing gasification civil boiler with double fire holes Download PDF

Info

Publication number
CN201764674U
CN201764674U CN2010205104485U CN201020510448U CN201764674U CN 201764674 U CN201764674 U CN 201764674U CN 2010205104485 U CN2010205104485 U CN 2010205104485U CN 201020510448 U CN201020510448 U CN 201020510448U CN 201764674 U CN201764674 U CN 201764674U
Authority
CN
China
Prior art keywords
combustion chamber
chamber
heat
combustion
gas outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205104485U
Other languages
Chinese (zh)
Inventor
张际新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chaoyang Yanmei Energy Saving Product Development Co Ltd
Original Assignee
Chaoyang Yanmei Energy Saving Product Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chaoyang Yanmei Energy Saving Product Development Co Ltd filed Critical Chaoyang Yanmei Energy Saving Product Development Co Ltd
Priority to CN2010205104485U priority Critical patent/CN201764674U/en
Application granted granted Critical
Publication of CN201764674U publication Critical patent/CN201764674U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The utility model discloses a glowing gasification civil boiler with double fire holes. The civil boiler comprises a combustion chamber, an exhaust hole, a feed door and an oxygen supply combustion and heat absorbing circulation mechanism, a feed inlet is arranged at the top of the combustion chamber, an ash chamber is arranged at the bottom of a fire grate below the combustion chamber, an oxygen supply hole leading to the combustion chamber is arranged on the fire grate on the lower portion of the boiler body, the combustion chamber is arranged beside a heat absorbing mechanism, an upper fire hole and an lower fire hole are respectively arranged on the upper portion and the lower portion of the combustion chamber, an upper gas outlet and a lower gas outlet are respectively arranged at the tail ends of the upper fire hole and the lower fire hole and arranged on an end face of the heat absorbing mechanism on the side, the heat absorbing mechanism is a boiler body jacket encircling to form an arc, the bottom of the water jacket is provided with a small ash bin adjacent to the ash chamber, and a partitioning water jacket is arranged between the ash chamber and the small ash bin. The boiler can realize combustion sufficiently, has fuel energy conversion rate capable of reaching 98%, saves energy by 60%-70%, and is free of extra dust removing purification device. In addition, the boiler has advanced heat absorption structure, and is fierce in combustion, high in heat dissipation, fast in temperature rise, wide in flue range and easy to be popularized and used.

Description

The two burner civil boilers of white heat gasification
Technical field
It is the normal-pressure boiler of fuel with fire coal and living beings that the utility model relates to a kind of, and fuel can fully be burnt, and thermal efficiency height, heat transfer, endotherm area are big, the two burner civil boilers of the white heat of fuel saving gasification.
Background technology
The boiler that existing market is sold all is to adopt traditional combustion method, and structure is that body of heater is arranged mostly, and the space forms the combustion chamber in the body of heater, and ventilating opening, fire grate, ashes chamber and fire door are arranged under the combustion chamber, and linking to each other with the combustion chamber is connected to smoke exhaust pipe; In the body of heater upper end fuel inlet is arranged, the stove inner combustion chamber is placed with water pipe, is connected to water return outlet and hot water outlet with water pipe.During use, by fuel inlet coal is inserted, the flue gas that coal combustion produced (heat) is to the water pipe heating, and the hot water in the water pipe enters heating system from hot water outlet, and heat radiation is after the water of return pipe turns back to the combustion chamber heating, as circulation repeatedly a bit.But the present following problem of boiler ubiquity in application: it is insufficient 1. to burn, and the discharging flue dust is big, because crater up, fuel is in the bottom, and the flue gas of generation burns insufficient to top; 2. fuel will go up that burning zone and fuel gas are isolated to be lost combustible gas in vain, also contain SO in the loss flue gas 2Deng oxious component and pollute; 3. the terminal outlet of large-sized boiler all connects purifier at present, and involves great expense, and has increased the user installation production cost, consequently can only reduce discharging, can not be energy-conservation; 4. heat utilization ratio is low, makes heating surface area less relatively, if reach desirable heating effect, a large amount of fire coal of essential burning causes to waste energy.200920013391.5 number patent, 200920012920.X patent are applicant's development technology in recent years, but its heat-absorbing structure and combustion chamber still exist unreasonable part aspect structural design.
Summary of the invention
The utility model purpose is in order to solve many defectives that prior art exists, to provide the white heat gasification that a kind of sufficient combustion, heat-absorbing structure advanced person and heat transfer rate are fast, the thermal efficiency is high, fuel saving need not cleaner again two burner civil boilers.
The technical solution of the utility model is for achieving the above object: the two burner civil boilers of a kind of white heat gasification, comprise body of heater, the gas outlet, charge door, fire grate, the ash chamber, combuster, transfer the wind oxygen supply port, crater, the oxygen supply combustion mechanism of forming, water jacket is arranged, the heat-absorbing body that intake-outlet is formed, top of combustion chamber is provided with charge door, fire grate bottom below the combustion chamber is grey chamber, on the fire grate of body of heater bottom, lead to the combustion chamber and be provided with oxygen supply port, it is characterized in that: the combustion chamber is positioned at the heat-absorbing body sidepiece, be respectively equipped with crater in the upper and lower, combustion chamber and reach crater down, on, the end of following crater is respectively to go up the gas outlet to reach gas outlet down, on, following gas outlet is positioned at the end face of sidepiece heat-absorbing body; Described heat-absorbing body is to surround arc furnace water jacket, at the adjacent small ash chamber that is provided with grey chamber of bottom water jacket, is provided with the partition water jacket between grey chamber and the small ash chamber.
Utilize the utility model can make fuel reach secondary up to thorough burning: the main gas component that burning first produces is carbonaceous gas, carbon monoxide, hydrogen; Burning for the second time, with regard to thorough all combustibles of after-flame of energy, the utility model compared with prior art has the following advantages:
1, energy-saving and emission-reduction.Fuel combustion is abundant, and energy transformation ratio can reach 98%, and more energy-conservation 60~70% than conventional boiler fuel saving more, the airborne release flue dust reduces discharging more than 95% than conventional method, reaches direct reduction of discharging, need not to install additional dedusting and purifying device;
2, burning, heat-absorbing structure advanced person.Adopt double-fire channel to help adjusting flue gas and prevent excessive; The oxygen supply equilibrium can be adjusted oxygen supply automatically; Burning is fierce, and thermal discharge is big, and temperature rises fast;
3, the fuel utilization is extensive.This boiler is mainly made fuel with living beings such as straw briquetting, firewood, excrement of animals, coal and solid-state combustible, its project organization is simple, volume is little, cost is low, be easy to promote the use of, be applicable to uses such as the dual-purpose family of villages and towns in rural areas a heatable brick bed, radiator, the heating of group unit, cooking, bathing.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 be among Fig. 1 along A-A to cutaway view.
Fig. 3 be among Fig. 2 along B-B to cutaway view.
The specific embodiment
Below in conjunction with accompanying drawing the utility model specific embodiments is described in detail.
Shown in Fig. 1~3: combustion chamber 1 is positioned at the heat-absorbing body sidepiece, 1 top, combustion chamber is provided with charge door 8, fire grate 15 bottoms below the combustion chamber are grey chambers 12, the ash chamber outer wall is provided with shoot door 4, on the fire grate 15 of body of heater bottom, lead to the combustion chamber and be provided with oxygen supply port 3, be respectively equipped with crater 2 in the upper and lower, combustion chamber and reach crater 10 down, the end of last crater 2 is to go up gas outlet 9, the end of following crater 10 is following gas outlets 13, on, following gas outlet is positioned at the end face of sidepiece heat-absorbing body, is provided with to regulate plate 7 in the jacket pipe of gas outlet 9 is led on last crater 2 opposites; Whole body of heater is surrounded by the heat absorption water jacket, and this furnace water jacket 6 is arc; At bottom water jacket and the grey chamber 12 adjacent small ash chambers 11 that are provided with, be provided with partition water jacket 14 between grey chamber 12 and the small ash chamber 11, small ash chamber 11 sides are provided with air register 5.
When fuel is sent to from charge door 8 after combustion chamber 1 lights, flame enters the exhaust passage from following crater 10, enter a heatable brick bed from the gas outlet again, oxygen in the combustion process enters from oxygen supply port 3, charge door 8, shoot door 4, abundant to guarantee oxygen supply, can regulate three places oxygen supply ratio as required, so that the control combustion intensity reaches optimum efficiency; Flame enters in a heatable brick bed a heatable brick bed is burnt heat, and the heat of water jacket absorption on every side makes the water circulation heating.When closing air-introduced machine, because draft is too big, flue gas leaks easily, can open the adjusting plate 7 at crater 2 places, makes unnecessary flue gas enter the flue of a kang, utilizes top, combustion chamber heat as need, also can open plate; Can suitably adjust the intake of air register 5 according to combustion position,, control burning velocity with regulation and control discharge duct draft, but the also shoot door of double as small ash chamber of air register.

Claims (2)

1. two burner civil boilers of white heat gasification, comprise body of heater, the gas outlet, charge door, fire grate, the ash chamber, combuster, transfer the wind oxygen supply port, crater, the oxygen supply combustion mechanism of forming, water jacket is arranged, the heat-absorbing body that intake-outlet is formed, top of combustion chamber is provided with charge door, fire grate bottom below the combustion chamber is grey chamber, on the fire grate of body of heater bottom, lead to the combustion chamber and be provided with oxygen supply port, it is characterized in that: the combustion chamber is positioned at the heat-absorbing body sidepiece, be respectively equipped with crater in the upper and lower, combustion chamber and reach crater down, on, the end of following crater is respectively to go up the gas outlet to reach gas outlet down, on, following gas outlet is positioned at the end face of sidepiece heat-absorbing body; Described heat-absorbing body is to surround arc furnace water jacket, at the adjacent small ash chamber that is provided with grey chamber of bottom water jacket, is provided with the partition water jacket between grey chamber and the small ash chamber.
2. according to the two burner civil boilers of the described white heat of claim 1 gasification, it is characterized in that in the jacket pipe of gas outlet is led on last crater opposite, being provided with the adjusting plate.
CN2010205104485U 2010-08-24 2010-08-24 Glowing gasification civil boiler with double fire holes Expired - Fee Related CN201764674U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205104485U CN201764674U (en) 2010-08-24 2010-08-24 Glowing gasification civil boiler with double fire holes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205104485U CN201764674U (en) 2010-08-24 2010-08-24 Glowing gasification civil boiler with double fire holes

Publications (1)

Publication Number Publication Date
CN201764674U true CN201764674U (en) 2011-03-16

Family

ID=43717282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205104485U Expired - Fee Related CN201764674U (en) 2010-08-24 2010-08-24 Glowing gasification civil boiler with double fire holes

Country Status (1)

Country Link
CN (1) CN201764674U (en)

Similar Documents

Publication Publication Date Title
CN204648325U (en) A kind of bi-fuel type clean burning environmental protection and energy saving cooking heating stove and accessory
CN201281371Y (en) Double suction type biomass heating and cooking furnace
CN2879022Y (en) Biomass vaporization boiler
CN201764676U (en) Carbonized gas mixed-combustion normal pressure boiler
CN201680417U (en) Biomass energy-saving environment-protection cooking-heating furnace
CN201066195Y (en) Horizontal type reverse-combusting coal-firing boiler
CN202835457U (en) Multiple combustion type civilian heating furnace provided with internal air duct system
CN201636841U (en) Biomass bath-heating non-pressure boiler
CN205957231U (en) Energy -efficient type cooking of environmental protection, heating, hot for heatable brick bed living beings cleanness fire burning furnace utensil
CN201636898U (en) Biomass steamed bread non-pressure boiler
CN201513880U (en) Integral gasifying combination burning boiler
CN201772617U (en) Carbon and hydrogen co-combustion pressure boiler
CN201764674U (en) Glowing gasification civil boiler with double fire holes
CN203628695U (en) Gas inlet system of biomass half-gasification boiler
CN201637092U (en) Biomass bath-heating smoke-eliminating dust-removing normal-pressure boiler
CN205137544U (en) Cooking heating stove with water pipe heat exchanger
CN201764675U (en) Carbon-hydrogen mixed combustion dual-burner boiler
CN204787216U (en) Horizontal gasification is returned and is burnt boiler with flue gas postcombustion function
CN201764682U (en) Carbon-hydrogen mixed-burning single-fire-hole boiler
CN210153865U (en) Energy-saving environment-friendly heating stove
CN202613759U (en) Multifunctional energy-saving environment-friendly water-heating and air-heating gasification boiler
CN2476720Y (en) Coal gasified atmospheric combustion furnace
CN201688555U (en) Reversal-combustion type hot air boiler
CN202769721U (en) Civilian multifunctional efficient heating stove
CN201636840U (en) Negative-pressure reversed two-layer combustion baking oven

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110316

Termination date: 20110824