CN201762693U - Combined type steep slope traction slope-cutting equipment - Google Patents
Combined type steep slope traction slope-cutting equipment Download PDFInfo
- Publication number
- CN201762693U CN201762693U CN2010202426241U CN201020242624U CN201762693U CN 201762693 U CN201762693 U CN 201762693U CN 2010202426241 U CN2010202426241 U CN 2010202426241U CN 201020242624 U CN201020242624 U CN 201020242624U CN 201762693 U CN201762693 U CN 201762693U
- Authority
- CN
- China
- Prior art keywords
- slope
- traction
- combined type
- cutting equipment
- cut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
- Operation Control Of Excavators (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202426241U CN201762693U (en) | 2010-06-30 | 2010-06-30 | Combined type steep slope traction slope-cutting equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202426241U CN201762693U (en) | 2010-06-30 | 2010-06-30 | Combined type steep slope traction slope-cutting equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201762693U true CN201762693U (en) | 2011-03-16 |
Family
ID=43715304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202426241U Expired - Fee Related CN201762693U (en) | 2010-06-30 | 2010-06-30 | Combined type steep slope traction slope-cutting equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201762693U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107299639A (en) * | 2017-08-09 | 2017-10-27 | 西南交通大学 | Suitable for the full landform modularization shaping device of high steep rock soil-slope |
CN110158683A (en) * | 2019-05-24 | 2019-08-23 | 重庆建工第二建设有限公司 | Foundation pit excavation device |
CN114808856A (en) * | 2022-05-18 | 2022-07-29 | 中交水利水电建设有限公司 | Construction method for curve of traction type channel forming machine |
-
2010
- 2010-06-30 CN CN2010202426241U patent/CN201762693U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107299639A (en) * | 2017-08-09 | 2017-10-27 | 西南交通大学 | Suitable for the full landform modularization shaping device of high steep rock soil-slope |
CN110158683A (en) * | 2019-05-24 | 2019-08-23 | 重庆建工第二建设有限公司 | Foundation pit excavation device |
CN114808856A (en) * | 2022-05-18 | 2022-07-29 | 中交水利水电建设有限公司 | Construction method for curve of traction type channel forming machine |
CN114808856B (en) * | 2022-05-18 | 2024-01-19 | 中交水利水电建设有限公司 | Bend construction method of traction type channel forming machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205116185U (en) | A supporting construction for weak soil foundation ditch | |
CN209397587U (en) | A kind of single pile protection against erosion river bottom protection | |
CN101666083A (en) | Soft soil foundation treatment reinforcement method and device thereof | |
CN102733401A (en) | Method for treating dump slope of surface mine | |
CN201762693U (en) | Combined type steep slope traction slope-cutting equipment | |
CN206503117U (en) | A kind of hydraulic engineering ecological protection slope net | |
CN204875687U (en) | Chain preformed block of river course bank protection | |
CN105019425A (en) | Construction method of drainage body and solidified layer combined foundation structure | |
CN103628898B (en) | A kind of for preventing the diaphragm wall supporting method of Floor Heave in Roadway | |
CN201695398U (en) | Stepped top-down pit excavation trestle | |
CN206127986U (en) | A protection system for hydraulic and hydroelectric engineering side slope | |
CN202610677U (en) | Auxiliary tool for soft soil earthwork construction | |
CN202124863U (en) | Screw anchor excavated composite foundation | |
CN202194152U (en) | Power steel pipe tower base | |
CN208455647U (en) | Soft Rock Slope ecological safeguard structure | |
CN110029635A (en) | A kind of rock-fill dams spillway based on concrete-pile support | |
CN104762951A (en) | Construction method of new hydraulic fill muck reclamation by twice straight-line vacuum prepressing treatment | |
CN109098191A (en) | A kind of depth cheats method for reinforcing side slope of paddling suddenly | |
CN203808025U (en) | Intercepting ditch structure for steeper terrain | |
CN208899515U (en) | A kind of T-type wing plate offshore wind turbine steel pipe pile foundation | |
CN207092031U (en) | A kind of dam | |
CN208201895U (en) | A kind of shallow water soft base jumbo bag cofferdam | |
CN206205031U (en) | A kind of excavator silt removing device | |
CN208009435U (en) | A kind of microtidal range marine site breakwater jackstone auxiliary device | |
CN207047790U (en) | A kind of protection slope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: SINOHYDRO BUREAU 11 CO., LTD. Effective date: 20140327 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20140327 Address after: 610000, No. 8, East Fourth Ring Road, Chengdu, Sichuan Patentee after: Sinohydro Bureau 5 Co., Ltd. Patentee after: SINOHYDRO Bureau 11 Co., Ltd. Address before: 610000, No. 8, East Fourth Ring Road, Chengdu, Sichuan Patentee before: Sinohydro Bureau 5 Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110316 Termination date: 20180630 |
|
CF01 | Termination of patent right due to non-payment of annual fee |