CN201724199U - Boiler tube bank supporting and hanging structure - Google Patents

Boiler tube bank supporting and hanging structure Download PDF

Info

Publication number
CN201724199U
CN201724199U CN201020154867XU CN201020154867U CN201724199U CN 201724199 U CN201724199 U CN 201724199U CN 201020154867X U CN201020154867X U CN 201020154867XU CN 201020154867 U CN201020154867 U CN 201020154867U CN 201724199 U CN201724199 U CN 201724199U
Authority
CN
China
Prior art keywords
boatswain chair
boiler tube
props
suspension rod
joint hinge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201020154867XU
Other languages
Chinese (zh)
Inventor
赵沈慧
徐艳霞
李星罡
周曙光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Boiler Works Co Ltd
Original Assignee
Shanghai Boiler Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Boiler Works Co Ltd filed Critical Shanghai Boiler Works Co Ltd
Priority to CN201020154867XU priority Critical patent/CN201724199U/en
Application granted granted Critical
Publication of CN201724199U publication Critical patent/CN201724199U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a boiler tube bank supporting and hanging structure, which comprises a hanging plate welded on a tube bank, a large hanging plate is welded on the hanging plate, the large hanging plate is connected with a lifting hook via a pin and a pin shaft, the lifting hook is connected with one end of a hanger rod, and the other end of the hanger rod is connected on a supporting and hanging plane of a pressed part. The utility model has the advantages of simple welding process, convenient welding assembly, safety, reliability and convenient power plant installation, can ensure the installation quality, and can effectively reduce the cost and improve the manufacturing quality.

Description

A kind of boiler tube row props up and hangs structure
Technical field
The utility model provides a kind of boiler tube row to prop up and has hung structure, is used for propping up of boiler tube row hung, and guarantees that the safety of boiler is normally moved.
Background technology
As shown in Figure 1, for traditional boiler tube row hangs structural front view, Fig. 2 be its side view, and described boiler tube row hangs structure and comprises the boatswain chair 2 that is welded in the tube bank 1, and boatswain chair 2 links to each other with bearing pin 6 by pin 5 with joint hinge 3, joint hinge 3 connection suspension rods 4.The upper end connection pressure containing part of suspension rod 4 props up and hangs the plane.So just boiler tube row's load being delivered to pressure containing part by this structure props up and has hung on the plane.The characteristics of this type structure are: suspension rod quantity is many, the cost height; Hang space requirement than higher to propping up; The building site lifting is trouble.
Summary of the invention
The purpose of this utility model provides a kind of boiler tube row and hangs structure, with convenient transportation, reduces the difficulty that install in the building site, reduces cost, and guarantees safe operation of the boiler.
In order to achieve the above object, the technical solution of the utility model provides a kind of boiler tube row and hangs structure, comprise the boatswain chair that is welded on the pipe row, be welded with big boatswain chair on the boatswain chair, big boatswain chair is connected joint hinge by pin with bearing pin, joint hinge links to each other with an end of suspension rod, and the other end of suspension rod is connected to pressure containing part and props up and hang on the plane.
Further, have groove on the described joint hinge, an end of suspension rod is located in the groove and with joint hinge and is welded together.
One end of described joint hinge and suspension rod adopts thread connecting mode.
The utility model has the advantages that:
A. welding procedure is simple, welds easy to assembly.
B. safe and reliable.
C. Installation in Plant is convenient, can guarantee installation quality.
D. can effectively reduce cost, improve workmanship.
Description of drawings
Fig. 1 hangs structural front view for traditional boiler tube row props up;
Fig. 2 hangs the structure side view for traditional boiler tube row props up;
Fig. 3 hangs structural front view for a kind of boiler tube row props up;
Fig. 4 hangs the structure side view for a kind of boiler tube row props up;
Fig. 5 hangs structural front view for another kind of boiler tube row props up;
Fig. 6 hangs the structure side view for another kind of boiler tube row props up.
The specific embodiment
Specify the utility model below in conjunction with embodiment.
Embodiment 1
As shown in Figure 3, for a kind of boiler tube row hangs structural front view, Fig. 4 be its side view, and described boiler tube row hangs structure by pipe row 1, pin 5, bearing pin 6, boatswain chair 7, boatswain chair 8, joint hinge 9 and suspension rod 10 are formed greatly.
This type props up and hangs structure is welding boatswain chair 7 on pipe row 1, bigger boatswain chair 8 is welded on the polylith boatswain chair 7, is about to polylith boatswain chair 7 suffered load and is delivered on the big boatswain chair 8.Have a hole on the big boatswain chair 8, the size in hole is consistent with the perforate on the joint hinge 9, guarantees that bearing pin 6 can penetrate wherein.Have groove on two joint hinges 9, with in suspension rod 10 insertion grooves and integrally welded with it, the other end of suspension rod 10 is connected to pressure containing part and props up and hang on the plane.Connection by bearing pin 6 just is delivered to pressure containing part to pipe row 1 load by this structure and props up and hung on the plane like this.
The characteristics of this type structure are: whole to hang form more complete, and the building site is easy for installation; Power plate 9 is that install in the building site with suspension rod 10, convenient transportation, and whole to hang structure not fragile; Help the building site lifting; Connect polylith boatswain chair 7 by a big boatswain chair 8, reduced suspension rod 10 quantity, reduced cost, suspension rod 10 spaces are no longer intensive, and fitting operation is easier.
Big boatswain chair 8 and boatswain chair 7 and pipe row 1 have welded in manufactory and have finished and integral body is dispatched from the factory, and joint hinge 9 has also welded in manufactory with suspension rod 10 and finished, and forms a derrick rig.On-the-spot only the need penetrate bearing pin 5 in the hole of big boatswain chair 8 and joint hinge 9, pin 5 inserted in the hole of bearing pins 6 again, and the other end of suspension rod 10 is connected to pressure containing part and props up and hang the plane and get final product.
Embodiment 2
As shown in Figure 5, hang structural front view for another kind of boiler tube row props up, Fig. 6 is its side view.Described boiler tube row hangs structure and is made up of pipe row 1, pin 5, bearing pin 6, boatswain chair 7, big boatswain chair 8, joint hinge 9 and suspension rod 10.
This type props up and hangs structure is welding boatswain chair 7 on pipe row 1, bigger boatswain chair 8 is welded on the polylith boatswain chair 7, is about to polylith boatswain chair 7 suffered load and is delivered on the big boatswain chair 8.Have a hole on the big boatswain chair 8, the size in hole is consistent with the perforate on the joint hinge 9, guarantees that bearing pin 6 can penetrate wherein.Joint hinge 9 upper ends have screwed hole, and suspension rod 10 is the stud suspension rod, and an end of suspension rod 10 is screwed in the screwed hole of joint hinge 9 upper ends, and the other end is connected to pressure containing part and props up and hang on the plane.Connection by bearing pin 6 just is delivered to pressure containing part to pipe row 1 load by this structure and props up and hung on the plane like this.
The characteristics of this type structure are: whole to hang form more complete, and the building site is easy for installation; Joint hinge 9 is that install in the building site with suspension rod 10, convenient transportation, and whole to hang structure not fragile; The welding job amount is low, has reduced potential safety hazard; Being articulated and connected of 9 of boatswain chair 8 and joint hinges, making whole, to hang structural safety reliable.
Big boatswain chair 8 and boatswain chair 7 and pipe row 1 have welded in manufactory and have finished and integral body is dispatched from the factory, on-the-spot only the need penetrates bearing pin 6 in the hole of big boatswain chair 8 and joint hinge 9, again pin 5 is inserted in the pin-and-hole of bearing pin 6, one end of suspension rod 10 is screwed in the screwed hole of joint hinge 9, and the other end is connected to pressure containing part and props up and hang the plane and get final product.

Claims (3)

1. a boiler tube row props up and hangs structure, comprise the boatswain chair (7) that is welded on the pipe row (1), be welded with big boatswain chair (8) on the boatswain chair (7), big boatswain chair (8) is connected joint hinge (9) by pin (5) with bearing pin (6), joint hinge (9) links to each other with an end of suspension rod (10), and the other end of suspension rod (10) is connected to pressure containing part and props up and hang on the plane.
2. boiler tube row as claimed in claim 1 props up and hangs structure, it is characterized in that described joint hinge has groove on (9), and an end of suspension rod (10) is located in the groove and with joint hinge (9) and is welded together.
3. boiler tube row as claimed in claim 1 props up and hangs structure, it is characterized in that, described joint hinge (9) adopts thread connecting mode with an end of suspension rod (10).
CN201020154867XU 2010-04-09 2010-04-09 Boiler tube bank supporting and hanging structure Expired - Lifetime CN201724199U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020154867XU CN201724199U (en) 2010-04-09 2010-04-09 Boiler tube bank supporting and hanging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020154867XU CN201724199U (en) 2010-04-09 2010-04-09 Boiler tube bank supporting and hanging structure

Publications (1)

Publication Number Publication Date
CN201724199U true CN201724199U (en) 2011-01-26

Family

ID=43492534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020154867XU Expired - Lifetime CN201724199U (en) 2010-04-09 2010-04-09 Boiler tube bank supporting and hanging structure

Country Status (1)

Country Link
CN (1) CN201724199U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103350947A (en) * 2013-07-18 2013-10-16 中国五冶集团有限公司 Suspension system and suspension method both special for boiler heating surface pipe rack
CN104534451A (en) * 2015-01-26 2015-04-22 河北大唐国际丰润热电有限责任公司 Novel coal economizer for denitrification system of boiler unit
CN104942516A (en) * 2015-07-28 2015-09-30 上海锅炉厂有限公司 Longitudinal tube bank hoisting device
CN105937778A (en) * 2016-06-08 2016-09-14 无锡华光锅炉股份有限公司 Burner supporting and lifting structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103350947A (en) * 2013-07-18 2013-10-16 中国五冶集团有限公司 Suspension system and suspension method both special for boiler heating surface pipe rack
CN103350947B (en) * 2013-07-18 2015-04-08 中国五冶集团有限公司 Suspension system and suspension method both special for boiler heating surface pipe rack
CN104534451A (en) * 2015-01-26 2015-04-22 河北大唐国际丰润热电有限责任公司 Novel coal economizer for denitrification system of boiler unit
CN104534451B (en) * 2015-01-26 2016-03-23 河北大唐国际丰润热电有限责任公司 Boiler controller system denitrating system economizer
CN104942516A (en) * 2015-07-28 2015-09-30 上海锅炉厂有限公司 Longitudinal tube bank hoisting device
CN104942516B (en) * 2015-07-28 2016-08-24 上海锅炉厂有限公司 A kind of longitudinal pipe queues device for hoisting
CN105937778A (en) * 2016-06-08 2016-09-14 无锡华光锅炉股份有限公司 Burner supporting and lifting structure

Similar Documents

Publication Publication Date Title
CN201724199U (en) Boiler tube bank supporting and hanging structure
CN202248845U (en) Socket and spigot joint type connecting piece for mortise and tenon joint self-locking steel tube scaffold
CN104925680B (en) A kind of method of stabilizer tower crane body
CN103043543A (en) Device for reinforcing tower crane in coastal zone
CN203856082U (en) Large-pulling-force integrated support joint suitable for large-cantilever pipe truss structure
CN203603824U (en) Double-slip type well mouth coiled tubing hanging device
CN106276630A (en) A kind of internal-climbing tower crane supporting construction of band shearing frame
CN101694112A (en) Connecting piece and platform thereof
CN206016222U (en) A kind of pin type attaching scaffold truss structure device
CN202172962U (en) Novel crutch
CN204059909U (en) With the horizontal truss of avoiding structure
CN203428795U (en) Wall attaching frame structure for self-elevating tower crane
CN102587633B (en) Space truss type attached lifting scaffold
CN205772772U (en) A kind of Elements of Space Grid Truss suspender
CN201539090U (en) Movable and adjustable operation frame
CN205590111U (en) Construction elevator attaches wall structure
CN201605089U (en) Special lifting appliance for rolling mill
CN205841386U (en) A kind of connector connecting circle and square part
CN106223613B (en) The installation and positioning structure of mould bases upright bar
CN206476671U (en) Attachment device of tower crane
CN205990755U (en) A kind of masonry panel no scaffold eye constructing device
CN204152192U (en) A kind of scaffold fastenings
CN205224557U (en) Lift scaffold pole setting connection structure
CN103912065B (en) Be applicable to integrated support node of the large pull out force of large cantilever tube truss structure and preparation method thereof
CN204916772U (en) A saddle support that is used for large -scale tower class container

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110126