CN201722935U - Steel column cable wind rope correction structure - Google Patents

Steel column cable wind rope correction structure Download PDF

Info

Publication number
CN201722935U
CN201722935U CN2010202326116U CN201020232611U CN201722935U CN 201722935 U CN201722935 U CN 201722935U CN 2010202326116 U CN2010202326116 U CN 2010202326116U CN 201020232611 U CN201020232611 U CN 201020232611U CN 201722935 U CN201722935 U CN 201722935U
Authority
CN
China
Prior art keywords
steel column
cable wind
groups
hands
wind rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202326116U
Other languages
Chinese (zh)
Inventor
王海山
袁国平
何海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongnan Construction Group Steel Structure Co Ltd
Original Assignee
Zhejiang Zhongnan Construction Group Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongnan Construction Group Steel Structure Co Ltd filed Critical Zhejiang Zhongnan Construction Group Steel Structure Co Ltd
Priority to CN2010202326116U priority Critical patent/CN201722935U/en
Application granted granted Critical
Publication of CN201722935U publication Critical patent/CN201722935U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a steel column cable wind rope correction structure which comprises a theodolite and a cable wind rope. Four groups of chain hoists or winches are arranged in the work plane which takes a tested steel column as the center, and the connection lines of action ends between four groups of chain hoists or winches are cruciform; space from each chain hoist or winch to the center of the bottom end of the tested steel column is equal, one end of four cable wind ropes is respectively connected with the top end of the steel column, and the other end is connected with the chain hoists or winches; two groups of theodolite are respectively arranged on one side of two adjacent groups of chain hoists or winches. The utility model is the safe, economical and efficient steel column correction structure with simple structure, can realize three-dimensional correction construction and is convenient to regulate the verticality of the steel column.

Description

Steel column cable wind rope correcting structure
Technical field
The utility model relates to installation, the correcting structure of steel column in a kind of high-rise steel structure construction and installation process, particularly a kind of steel column cable wind rope correcting structure.
Background technology
In recent years, the domestic construction industry gradually adopts a large amount of steel work, and steel column application quantity in steel work is bigger.When steel column was installed in traditional high-rise steel structure, the method for three-dimensional adjusting was to adopt iron wedge, backing plate, crowbar etc., and technology is relatively backward, and dangerous, and work efficiency is low, and accuracy is not high yet.Summary of the invention
The purpose of this utility model is exactly the weak point in the background technology, and a kind of steel column cable wind rope correcting structure of installing and using be convenient to is provided.
For achieving the above object, the utility model adopts following technical scheme: steel column cable wind rope correcting structure, comprise transit and cable wind rope, be to be provided with four groups of bottle gouards moved by hands or hoist engine in the working face at center with tested steel column, effect end line between four groups of bottle gouards moved by hands or the hoist engine is " ten " font, and each bottle gouard moved by hands or hoist engine to the distance of tested steel column bottom center equates, four cable wind rope difference one ends are connected with the steel column top, the other end is connected with bottle gouard moved by hands or hoist engine, and two groups of transits are placed on a side of two adjacent groups bottle gouard moved by hands or hoist engine respectively.
For a kind of optimization of the present utility model, described bottle gouard moved by hands or hoist engine are fixedlyed connected with working face.
For a kind of optimization of the present utility model, the angle of the effect end line between four groups of bottle gouards moved by hands or the hoist engine is 90 °.
The utility model is compared with background technology, has simple in structure, safety, economy, steel column correcting structure efficiently, and this adjustment structure can realize three-dimensional adjusting construction, the verticality of being convenient to regulate steel column.
Description of drawings
Fig. 1 is the structural representation of steel column cable wind rope correcting structure.
The specific embodiment
Embodiment 1: with reference to Fig. 1.Steel column cable wind rope correcting structure, comprise transit and cable wind rope, be to be provided with four groups of bottle gouards moved by hands or hoist engine in the working face 5 at center with tested steel column, effect end line between four groups of bottle gouards moved by hands or the hoist engine 4 is " ten " font, and each bottle gouard moved by hands or hoist engine 4 to the distance of tested steel column 1 bottom center equates, four cable wind rope 2 one ends are connected with the top of steel column 1 respectively, the other end is connected with bottle gouard moved by hands or hoist engine 4 respectively, and two groups of transits 3 are placed on a side of two adjacent groups bottle gouard moved by hands or hoist engine 4 respectively.Described bottle gouard moved by hands or hoist engine 4 are fixedlyed connected with working face 5.The angle a of the effect end line between four groups of bottle gouards moved by hands or the hoist engine 4 is 90 °.
What need understand is: though present embodiment is to the utility model detailed explanation of contrasting; but these explanations; just to simple declaration of the present utility model; rather than to restriction of the present utility model; any innovation and creation that do not exceed in the utility model connotation all fall in the protection domain of the present utility model.

Claims (3)

1. steel column cable wind rope correcting structure, comprise transit and cable wind rope, it is characterized in that: be to be provided with four groups of bottle gouards moved by hands or hoist engine in the working face at center with tested steel column, effect end line between four groups of bottle gouards moved by hands or the hoist engine is " ten " font, and each bottle gouard moved by hands or hoist engine to the distance of tested steel column bottom center equates, four cable wind rope difference one ends are connected with the steel column top, the other end is connected with bottle gouard moved by hands or hoist engine, and two groups of transits are placed on a side of two adjacent groups bottle gouard moved by hands or hoist engine respectively.
2. steel column cable wind rope correcting structure according to claim 1, it is characterized in that: described bottle gouard moved by hands or hoist engine are fixedlyed connected with working face.
3. steel column cable wind rope correcting structure according to claim 1 is characterized in that: the angle a of the effect end line between four groups of bottle gouards moved by hands or the hoist engine is 90 °.
CN2010202326116U 2010-06-22 2010-06-22 Steel column cable wind rope correction structure Expired - Fee Related CN201722935U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202326116U CN201722935U (en) 2010-06-22 2010-06-22 Steel column cable wind rope correction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202326116U CN201722935U (en) 2010-06-22 2010-06-22 Steel column cable wind rope correction structure

Publications (1)

Publication Number Publication Date
CN201722935U true CN201722935U (en) 2011-01-26

Family

ID=43491253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202326116U Expired - Fee Related CN201722935U (en) 2010-06-22 2010-06-22 Steel column cable wind rope correction structure

Country Status (1)

Country Link
CN (1) CN201722935U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984612A (en) * 2019-12-04 2020-04-10 中建二局第一建筑工程有限公司 Steel column correcting and fixing structure
CN111719872A (en) * 2020-06-16 2020-09-29 中国建筑第八工程局有限公司 Magnetic attraction device and method for temporary fixing and installation correction of section steel component
CN115059077A (en) * 2022-07-28 2022-09-16 安徽送变电工程有限公司 Yangtze river large-span foundation plug-in type steel pipe positioning precision control system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984612A (en) * 2019-12-04 2020-04-10 中建二局第一建筑工程有限公司 Steel column correcting and fixing structure
CN111719872A (en) * 2020-06-16 2020-09-29 中国建筑第八工程局有限公司 Magnetic attraction device and method for temporary fixing and installation correction of section steel component
CN115059077A (en) * 2022-07-28 2022-09-16 安徽送变电工程有限公司 Yangtze river large-span foundation plug-in type steel pipe positioning precision control system and method

Similar Documents

Publication Publication Date Title
CN201722935U (en) Steel column cable wind rope correction structure
CN204038849U (en) A kind of cable drum lifting device
CN203593556U (en) High safety tower crane
CN204139627U (en) The anti-wear cover cage of wire rope
CN204434104U (en) A kind of loop wheel machine test under load frock
CN203461720U (en) Simple cantilever hoisting machine
CN204407790U (en) A kind of insulation gin pole for getting out wire jumper
CN202492845U (en) Ground anchor capable of serially anchoring
CN202245861U (en) Device capable of integrally elevating ultrahigh large-span heavy-duty steel vestibule
CN204385786U (en) Multi-functional prestressed concrete pipe pile antibending shear resistance system
CN201756422U (en) Two-head-suspension tower crane
CN204569238U (en) Omnipotent bracing or strutting arrangement bottom a kind of tower crane
CN203996791U (en) The self-service ferry-boat of a kind of wire rope traction
CN201990947U (en) Overall bracket for capping beam
CN203782575U (en) Stay cable hanging and tension construction device
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN102561201A (en) T-beam installer
CN202704912U (en) Rope guide device applied to well drilling winch
CN204233976U (en) For the device that the lifting of denitrification apparatus catalyst module is installed
CN204475870U (en) Straight support girder prestressing force adjusting device
CN204980842U (en) Crane girder hoist and mount special lifting device
CN203998730U (en) Crane arm pull bar anchor fitting, crane arm and tower crane
CN203359843U (en) Tower base component
CN201506695U (en) Sinking hoist electric control cabinet rainproof apparatus
CN203143965U (en) Hydraulic cage hoisting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110126

Termination date: 20150622

EXPY Termination of patent right or utility model