CN201990947U - Overall bracket for capping beam - Google Patents
Overall bracket for capping beam Download PDFInfo
- Publication number
- CN201990947U CN201990947U CN2011200305887U CN201120030588U CN201990947U CN 201990947 U CN201990947 U CN 201990947U CN 2011200305887 U CN2011200305887 U CN 2011200305887U CN 201120030588 U CN201120030588 U CN 201120030588U CN 201990947 U CN201990947 U CN 201990947U
- Authority
- CN
- China
- Prior art keywords
- wire rope
- capping beam
- bracket
- steel wire
- bent cap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to an overall bracket for a capping beam. The overall bracket aims at the problems that a pier body of a high-pier capping beam to be constructed is high, is hard to construct and has higher construction cost and lower safety when being constructed by adopting a conventional large tonnage crane method and a full framing scaffolding method. The overall bracket comprises a capping beam bracket (1); one end of the capping beam bracket is connected with one end of a left steel wire rope (2); the left steel wire rope is connected with one side of a herringbone derrick (3); the other end of the left steel wire rope is connected with a left winch (5) through a left roller wheel (4); the other end of the capping beam bracket is connected with one end of a right steel wire rope (6); and the right steel wire rope is connected with the other side of the herringbone derrick; and the other end of the right steel wire rope is connected with a right winch (8) through a right roller wheel (7). The overall bracket is used for buildings.
Description
Technical field:
The utility model relates to a kind of high pier capping beam construction equipment, is specifically related to a kind of bent cap integral bracket.
Background technology:
At high pier capping beam construction pier shaft height, difficulty is big, adopts conventional large tonnage crane method construction, and the construction of full hall scaffold method, and the construction cost height is higher, and safety is lower.
Summary of the invention:
The purpose of this utility model provides a kind of high pier capping beam construction equipment, and is simple in structure, and the safety factor height is practical.
Above-mentioned purpose realizes by following technical scheme:
A kind of bent cap integral bracket, its composition comprises: the bent cap carriage, described bent cap carriage one end connects left side wire rope one end, described left side wire rope connects A-frame one side, the described left side wire rope other end connects the left side hoist engine by the left side roller, the described bent cap carriage other end connects right side wire rope one end, and described right side wire rope connects the A-frame opposite side, and the described right side wire rope other end connects the right side hoist engine by the right side roller.
Beneficial effect:
1. the utility model adopts the shaped steel assembly unit, and assembly unit is efficient and convenient, and security performance is higher in the use, is applicable to site operation, simple installation.
The utility model is set up the bent cap integral bracket with shaped steel, and construct required facility, material etc. of bent cap are lifted together and put in place, avoids the job safety hidden danger of vertically reporting to the leadship after accomplishing a task.
The utility model is simple in structure, and the safety factor height is practical.
Description of drawings:
Accompanying drawing 1 is a structural representation of the present utility model.
Accompanying drawing 2 is vertical views of accompanying drawing 1.
Accompanying drawing 3 is lateral views of accompanying drawing 1.
The specific embodiment:
Embodiment 1:
A kind of bent cap integral bracket, its composition comprises: bent cap carriage 1, described bent cap carriage 1 one ends connect left side wire rope 2 one ends, described left side wire rope 2 connects A-frame 3 one sides, described left side wire rope 2 other ends connect left side hoist engine 5 by left side roller 4, described bent cap carriage 1 other end connects right side wire rope 6 one ends, and described right side wire rope 6 connects A-frame 3 opposite sides, and described right side wire rope 6 other ends connect right side hoist engine 8 by right side roller 7.
Embodiment 2:
Embodiment 1 described bent cap integral bracket, A-frame, wire rope, roller, hoist engine is when described bent cap integral bracket is specifically used, set up the bent cap integral bracket with shaped steel, and construct required facility, material etc. of bent cap are lifted together and put in place, avoid the job safety hidden danger of vertically reporting to the leadship after accomplishing a task.
Claims (1)
1. bent cap integral bracket, its composition comprises: the bent cap carriage, it is characterized in that: described bent cap carriage one end connects left side wire rope one end, described left side wire rope connects A-frame one side, the described left side wire rope other end connects the left side hoist engine by the left side roller, the described bent cap carriage other end connects right side wire rope one end, and described right side wire rope connects the A-frame opposite side, and the described right side wire rope other end connects the right side hoist engine by the right side roller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200305887U CN201990947U (en) | 2011-01-28 | 2011-01-28 | Overall bracket for capping beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200305887U CN201990947U (en) | 2011-01-28 | 2011-01-28 | Overall bracket for capping beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201990947U true CN201990947U (en) | 2011-09-28 |
Family
ID=44667436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200305887U Expired - Fee Related CN201990947U (en) | 2011-01-28 | 2011-01-28 | Overall bracket for capping beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201990947U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106087754A (en) * | 2016-07-26 | 2016-11-09 | 中铁建大桥工程局集团第五工程有限公司 | The integral bracket construction method of bent cap |
CN106758845A (en) * | 2017-01-09 | 2017-05-31 | 中铁十局集团有限公司 | Concrete structure falls beam joist device and the beam construction method that falls using it |
-
2011
- 2011-01-28 CN CN2011200305887U patent/CN201990947U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106087754A (en) * | 2016-07-26 | 2016-11-09 | 中铁建大桥工程局集团第五工程有限公司 | The integral bracket construction method of bent cap |
CN106087754B (en) * | 2016-07-26 | 2018-01-19 | 中铁建大桥工程局集团第五工程有限公司 | The integral bracket construction method of bent cap |
CN106758845A (en) * | 2017-01-09 | 2017-05-31 | 中铁十局集团有限公司 | Concrete structure falls beam joist device and the beam construction method that falls using it |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102900021B (en) | Split mounting type bridge wet joint construction method | |
CN201990947U (en) | Overall bracket for capping beam | |
CN203593556U (en) | High safety tower crane | |
CN202429889U (en) | Crane travel mechanism for bridge crane | |
CN204139627U (en) | The anti-wear cover cage of wire rope | |
CN203461720U (en) | Simple cantilever hoisting machine | |
CN202967922U (en) | Simple hoisting device for mounting steel structural bridge | |
CN201722935U (en) | Steel column cable wind rope correction structure | |
CN202322116U (en) | Inverted triangular arm and moving balancing weight hoisting machinery | |
CN205132950U (en) | Be applied to electric single beam crane of mechanical workshop | |
CN204588545U (en) | Fixed type hawser mast crane | |
CN204569238U (en) | Omnipotent bracing or strutting arrangement bottom a kind of tower crane | |
CN203288976U (en) | Isolating switch hoisting device | |
CN203938396U (en) | A kind of engineering hanging device | |
CN203248599U (en) | Counterweight self-detached structure of rotary drilling rig and rotary drilling rig | |
CN102733612B (en) | Mounting method of electric hoist orbit | |
CN203284098U (en) | Disassembled and assembled part self-lifting device for tower crane | |
CN203112385U (en) | Large movable arm tower crane introduction mechanism | |
CN202657875U (en) | Novel porcelain insulator displacement device | |
CN203345888U (en) | Hydraulic jacking device for high-rise reinforced concrete building house | |
CN201792418U (en) | Device for lifting, rotating and hoisting prefabricated top cover of cement tub | |
CN204691205U (en) | Elevator shaft mouth sizing steel plate operating platform | |
CN203143965U (en) | Hydraulic cage hoisting device | |
CN202415063U (en) | Pulley type hanging bracket | |
CN202945797U (en) | Outdoor operating platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110928 Termination date: 20170128 |