CN201990947U - Overall bracket for capping beam - Google Patents

Overall bracket for capping beam Download PDF

Info

Publication number
CN201990947U
CN201990947U CN2011200305887U CN201120030588U CN201990947U CN 201990947 U CN201990947 U CN 201990947U CN 2011200305887 U CN2011200305887 U CN 2011200305887U CN 201120030588 U CN201120030588 U CN 201120030588U CN 201990947 U CN201990947 U CN 201990947U
Authority
CN
China
Prior art keywords
wire rope
capping beam
bracket
steel wire
bent cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200305887U
Other languages
Chinese (zh)
Inventor
陈亚光
田树林
史铁桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longjian Road and Bridge Co Ltd
Original Assignee
Longjian Road and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longjian Road and Bridge Co Ltd filed Critical Longjian Road and Bridge Co Ltd
Priority to CN2011200305887U priority Critical patent/CN201990947U/en
Application granted granted Critical
Publication of CN201990947U publication Critical patent/CN201990947U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to an overall bracket for a capping beam. The overall bracket aims at the problems that a pier body of a high-pier capping beam to be constructed is high, is hard to construct and has higher construction cost and lower safety when being constructed by adopting a conventional large tonnage crane method and a full framing scaffolding method. The overall bracket comprises a capping beam bracket (1); one end of the capping beam bracket is connected with one end of a left steel wire rope (2); the left steel wire rope is connected with one side of a herringbone derrick (3); the other end of the left steel wire rope is connected with a left winch (5) through a left roller wheel (4); the other end of the capping beam bracket is connected with one end of a right steel wire rope (6); and the right steel wire rope is connected with the other side of the herringbone derrick; and the other end of the right steel wire rope is connected with a right winch (8) through a right roller wheel (7). The overall bracket is used for buildings.

Description

The bent cap integral bracket
Technical field:
The utility model relates to a kind of high pier capping beam construction equipment, is specifically related to a kind of bent cap integral bracket.
Background technology:
At high pier capping beam construction pier shaft height, difficulty is big, adopts conventional large tonnage crane method construction, and the construction of full hall scaffold method, and the construction cost height is higher, and safety is lower.
Summary of the invention:
The purpose of this utility model provides a kind of high pier capping beam construction equipment, and is simple in structure, and the safety factor height is practical.
Above-mentioned purpose realizes by following technical scheme:
A kind of bent cap integral bracket, its composition comprises: the bent cap carriage, described bent cap carriage one end connects left side wire rope one end, described left side wire rope connects A-frame one side, the described left side wire rope other end connects the left side hoist engine by the left side roller, the described bent cap carriage other end connects right side wire rope one end, and described right side wire rope connects the A-frame opposite side, and the described right side wire rope other end connects the right side hoist engine by the right side roller.
Beneficial effect:
1. the utility model adopts the shaped steel assembly unit, and assembly unit is efficient and convenient, and security performance is higher in the use, is applicable to site operation, simple installation.
The utility model is set up the bent cap integral bracket with shaped steel, and construct required facility, material etc. of bent cap are lifted together and put in place, avoids the job safety hidden danger of vertically reporting to the leadship after accomplishing a task.
The utility model is simple in structure, and the safety factor height is practical.
Description of drawings:
Accompanying drawing 1 is a structural representation of the present utility model.
Accompanying drawing 2 is vertical views of accompanying drawing 1.
Accompanying drawing 3 is lateral views of accompanying drawing 1.
The specific embodiment:
Embodiment 1:
A kind of bent cap integral bracket, its composition comprises: bent cap carriage 1, described bent cap carriage 1 one ends connect left side wire rope 2 one ends, described left side wire rope 2 connects A-frame 3 one sides, described left side wire rope 2 other ends connect left side hoist engine 5 by left side roller 4, described bent cap carriage 1 other end connects right side wire rope 6 one ends, and described right side wire rope 6 connects A-frame 3 opposite sides, and described right side wire rope 6 other ends connect right side hoist engine 8 by right side roller 7.
Embodiment 2:
Embodiment 1 described bent cap integral bracket, A-frame, wire rope, roller, hoist engine is when described bent cap integral bracket is specifically used, set up the bent cap integral bracket with shaped steel, and construct required facility, material etc. of bent cap are lifted together and put in place, avoid the job safety hidden danger of vertically reporting to the leadship after accomplishing a task.

Claims (1)

1. bent cap integral bracket, its composition comprises: the bent cap carriage, it is characterized in that: described bent cap carriage one end connects left side wire rope one end, described left side wire rope connects A-frame one side, the described left side wire rope other end connects the left side hoist engine by the left side roller, the described bent cap carriage other end connects right side wire rope one end, and described right side wire rope connects the A-frame opposite side, and the described right side wire rope other end connects the right side hoist engine by the right side roller.
CN2011200305887U 2011-01-28 2011-01-28 Overall bracket for capping beam Expired - Fee Related CN201990947U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200305887U CN201990947U (en) 2011-01-28 2011-01-28 Overall bracket for capping beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200305887U CN201990947U (en) 2011-01-28 2011-01-28 Overall bracket for capping beam

Publications (1)

Publication Number Publication Date
CN201990947U true CN201990947U (en) 2011-09-28

Family

ID=44667436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200305887U Expired - Fee Related CN201990947U (en) 2011-01-28 2011-01-28 Overall bracket for capping beam

Country Status (1)

Country Link
CN (1) CN201990947U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106087754A (en) * 2016-07-26 2016-11-09 中铁建大桥工程局集团第五工程有限公司 The integral bracket construction method of bent cap
CN106758845A (en) * 2017-01-09 2017-05-31 中铁十局集团有限公司 Concrete structure falls beam joist device and the beam construction method that falls using it

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106087754A (en) * 2016-07-26 2016-11-09 中铁建大桥工程局集团第五工程有限公司 The integral bracket construction method of bent cap
CN106087754B (en) * 2016-07-26 2018-01-19 中铁建大桥工程局集团第五工程有限公司 The integral bracket construction method of bent cap
CN106758845A (en) * 2017-01-09 2017-05-31 中铁十局集团有限公司 Concrete structure falls beam joist device and the beam construction method that falls using it

Similar Documents

Publication Publication Date Title
CN102900021B (en) Split mounting type bridge wet joint construction method
CN201990947U (en) Overall bracket for capping beam
CN203593556U (en) High safety tower crane
CN202429889U (en) Crane travel mechanism for bridge crane
CN204139627U (en) The anti-wear cover cage of wire rope
CN203461720U (en) Simple cantilever hoisting machine
CN202967922U (en) Simple hoisting device for mounting steel structural bridge
CN201722935U (en) Steel column cable wind rope correction structure
CN202322116U (en) Inverted triangular arm and moving balancing weight hoisting machinery
CN205132950U (en) Be applied to electric single beam crane of mechanical workshop
CN204588545U (en) Fixed type hawser mast crane
CN204569238U (en) Omnipotent bracing or strutting arrangement bottom a kind of tower crane
CN203288976U (en) Isolating switch hoisting device
CN203938396U (en) A kind of engineering hanging device
CN203248599U (en) Counterweight self-detached structure of rotary drilling rig and rotary drilling rig
CN102733612B (en) Mounting method of electric hoist orbit
CN203284098U (en) Disassembled and assembled part self-lifting device for tower crane
CN203112385U (en) Large movable arm tower crane introduction mechanism
CN202657875U (en) Novel porcelain insulator displacement device
CN203345888U (en) Hydraulic jacking device for high-rise reinforced concrete building house
CN201792418U (en) Device for lifting, rotating and hoisting prefabricated top cover of cement tub
CN204691205U (en) Elevator shaft mouth sizing steel plate operating platform
CN203143965U (en) Hydraulic cage hoisting device
CN202415063U (en) Pulley type hanging bracket
CN202945797U (en) Outdoor operating platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110928

Termination date: 20170128