CN201722626U - Steel-concrete beam stand - Google Patents

Steel-concrete beam stand Download PDF

Info

Publication number
CN201722626U
CN201722626U CN2010202498201U CN201020249820U CN201722626U CN 201722626 U CN201722626 U CN 201722626U CN 2010202498201 U CN2010202498201 U CN 2010202498201U CN 201020249820 U CN201020249820 U CN 201020249820U CN 201722626 U CN201722626 U CN 201722626U
Authority
CN
China
Prior art keywords
steel
longeron
concrete
steel work
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202498201U
Other languages
Chinese (zh)
Inventor
梁超
聂江华
张宏斌
刘玉波
李彬
郭振亮
刘崇钰
王选举
宁明阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of CTCE Group
Original Assignee
First Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of CTCE Group filed Critical First Engineering Co Ltd of CTCE Group
Priority to CN2010202498201U priority Critical patent/CN201722626U/en
Application granted granted Critical
Publication of CN201722626U publication Critical patent/CN201722626U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a steel-concrete beam stand, which adopts a concrete base, and is characterized in that a longitudinal beam with a steel structure is arranged on the concrete base along the length direction of a prefab box girder. By virtue of a steel-concrete structure, the template consumption is reduced, the assembly structural style simplifies the production process greatly, the execution is quick and convenient, and the construction period is short; and the longitudinal beam with the steel structure can be used repeatedly, thereby avoiding waste.

Description

A kind of steel reinforced concrete beam making bench
Technical field
The utility model relates to a kind of beam making bench, more specifically say so a kind ofly be applied in the railroad bridge engineering, for finishing the indispensable tooling device of prefabricated case beam, for prefabricated case beam provides the place.
Background technology
In China, classification of rail has increased " Line for Passenger Transportation " grade again except that I, II, III level at present, and speed per hour 200 is to 350km/h, is referred to as Line for Passenger Transportation based on the speed rail of passenger traffic.Line for Passenger Transportation is support with high speed and rapid technology, and train running speed has been realized historical leap.The Line for Passenger Transportation freight volume is big, usefulness is high, and economic results in society are remarkable.
I, II, III level railway, especially Line for Passenger Transportation circuit major part is made up of bridge, the case beam is the main ingredient of bridge, the case beam is divided into cast-in-situ box girder and prefabricated case beam, wherein the production of prefabricated case beam need be carried out centralized production by special beam making field, and beam making bench is the indispensable tooling device of beam making field.
At present, being applied in the beam making bench of railway box in beam prefabricated is the whole concrete structure, is made up of basis, end, end longeron, basis, middle part and waist longeron.In the construction, at first carry out foundation excavation and processing, tie up basis, end and middle part reinforcement foundation again, and the pre-buried muscle of longeron, formwork erection construction end and basis, middle part are tied up longeron poker muscle and pre-buried steel member again, and formwork erection carries out the longeron concrete construction again.There is following problem in this form of structure in practice of construction:
1, at this whole concrete structure, work progress comprises: formwork erection, concrete construction, concrete curing, form removal etc., manufacturing process take a lot of work, time-consuming, and the cycle is long, and colligation welding quantity is big.
2, the whole concrete structure not only can not reuse, and the later stage reclaims in place time dismounting man-hour is big, expense is high.
3, to adopt a large amount of templates in the construction, reinforcing bar and concrete, the cost height, the consumption of mould material is big, and steel concrete expends many.
4, adopt the concrete longeron, when stream curing case beam underplate concrete, steam only can carry out cold and hot exchange from the pedestal end in the concrete longeron spatial dimension, and the steam between each bar concrete longeron can not exchange, so just make in the concrete longeron space and all there are temperature contrast in outside steam and the steam between each concrete longeron space, to compare the surplus position of case Liangqi not prompt enough in the health of case beam underplate concrete thus, and base plate strength rises slack-off thereupon.
The utility model content
The utility model is for avoiding above-mentioned existing in prior technology weak point, a kind of steel reinforced concrete beam making bench is provided, giving up with simplification work progress, the raw-material consumption of minimizing.
The utility model technical solution problem adopts following technical scheme:
The utility model steel reinforced concrete beam making bench adopts concrete foundation, its design feature to be, at the length direction of pedestal upper edge, the middle part of described concrete foundation prefabricated case beam the steel work longeron is set.
The utility model steel reinforced concrete beam making bench, its design feature also is:
Described steel work longeron is three roads that be arranged in parallel, is fixedly connected with the steel work crossbeam between the adjacent twice steel work longeron, forms steel truss structure.
Each column is set between described steel work longeron and middle part pedestal at interval, and described steel work longeron is supported on each column that is provided with at interval.
Described steel work longeron is set at the fixed structure on the pedestal of the middle part of concrete foundation is: in the pedestal of described middle part the pre-embedded steel slab composite member is set, connect steel pipe post with bolt on described pre-embedded steel slab composite member, described steel work longeron is connected and fixed with bolt and is supported on the described steel pipe post.
Described steel work longeron is set at the fixed structure on the pedestal of the middle part of concrete foundation is: each concrete column is set on the pedestal of described middle part at interval, in described each concrete column the pre-embedded steel slab composite member is set, described steel work longeron is connected and fixed with bolt and is supported on the described pre-embedded steel slab composite member.
Compared with the prior art, the utility model beneficial effect is embodied in:
1, the utility model adopts steel and concrete structure, has significantly reduced the use amount of template, and the form of structure of its assembly unit has been simplified production process greatly, and quick construction is convenient, effectively the reduction of erection time; Its steel work longeron and crossbeam can be reused, and have avoided waste; The type of attachment easy accessibility of its bolt.
2, the utility model can be eliminated the construction error of pedestal well by adjusting steel pipe post.
3, the utility model has good rigidity and stability by the steel truss structure that steel work longeron and steel work crossbeam constitute.
4, the spacing that the utility model can be by changing steel pipe post and the width of soffit formwork are effectively realized general between case beam that bottom width differs greatly, as single line case beam and double line box girder.
5, the utility model replaces the concrete longeron with the steel work longeron, can effectively arrange steam pipeline in the steel work longeron, makes the beam physical efficiency reach good maintenance effect rapidly easily.
6, the utility model is supported on the steel work longeron on each column that is provided with at interval, when stream curing, under the steel work longeron between each column steam can enter jointly from pedestal sidepiece and end and accelerate the cold and hot exchange of steam, and can there be the temperature difference in steam yet between each steel work longeron, can make the health of case beam underplate concrete identical like this, accelerate the rising of case beam concrete strength with all the other positions.
7, the utility model steel and concrete structure of finishing assembling can satisfy logical bridge (2008) the 2221A series of 250 kilometers post-stressed simple beams of passenger dedicated railway line of speed per hour, logical bridge (2008) 2224A series, logical bridge (2009) 2229 series; And tens kinds of beam types of series such as logical bridge (2006) 2322 series of 350 kilometers post-stressed simple beams of passenger dedicated railway line of speed per hour, logical bridge (2008) 2322A series.
Description of drawings
Fig. 1 a is the vertical structure schematic diagram of the utility model embodiment 1;
Fig. 1 b is the cross-sectional configuration schematic diagram of the utility model embodiment 1;
Fig. 1 c is the plane structure schematic diagram of the utility model embodiment 1.
Fig. 2 a is the vertical structure schematic diagram of the utility model embodiment 3;
Fig. 2 b is the cross-sectional configuration schematic diagram of the utility model embodiment 3;
Fig. 2 c is the plane structure schematic diagram of the utility model embodiment 3.
Fig. 3 is the utility model embodiment 2 structural representations.
Fig. 4 is the utility model embodiment 4 structural representations.
Number in the figure: 1 middle part pedestal, 2 steel work longerons, 3 steel work crossbeams, 4 pre-embedded steel slab composite membeies, 51 steel pipe posts, 52 concrete columns, 6 end longerons, 7 bed dies.
The specific embodiment
Embodiment 1:
Referring to Fig. 1 a, Fig. 1 b and Fig. 1 c, present embodiment adopts concrete foundation, in the middle part of concrete foundation pedestal 1, pre-embedded steel slab composite member 4 is set, steel pipe post 51 is installed on pre-embedded steel slab composite member 4, steel work longeron 2 is installed on steel pipe post 51, steel work crossbeam 3 is installed between adjacent steel work longeron 2.
In concrete the enforcement,, connect steel work crossbeam 3 between the adjacent twice steel work longeron, to form steel truss structure along the length direction of the prefabricated case beam three road steel work longerons 2 that be arranged in parallel.
In the present embodiment, the fixed structure of steel work longeron 2 on the basis, middle part 1 of beam making bench is: pre-embedded steel slab composite member 4 is set in basis, middle part 1, with bolt connection steel pipe post 51 is installed on pre-embedded steel slab composite member 4, steel work longeron 2 is connected and fixed with bolt and is supported on the steel pipe post 51;
In the present embodiment, steel pipe post 51 has eight covers under steel work longeron 2, press structure shown in Fig. 1 a along evenly being provided with on the length direction of prefabricated case beam, the steel reinforced concrete beam making bench has three road steel work longerons 2, be connected with 12 cover steel work crossbeams, 3 (shown in Fig. 1 c) between the three road steel work longerons 2, steel pipe post 51 is φ 351mm * 10mm.
Shown in Fig. 1 a, end longeron 6 in this enforcement is the concrete longeron, and bed die 7 is logical bridge (2008) 2221A-VII case beam bottom boards, after in case joist steel template production department the case beam bottom board being processed in concrete the enforcement, haul the job site, directly on steel work longeron 2, install.
Work progress:
1, finishes the construction on the basis, middle part 1 of concrete foundation in the beam making bench at first in the usual way, and pre-embedded steel slab composite member 4 is set in basis, middle part 1, pre-embedded steel slab composite member 4 is t12mm * 500mm * 500mm steel plate, when construction, wrapped up the bolt silk mouth of steel plate composite member 4, and the planeness of the steel plate on the requirement assurance pre-embedded steel slab composite member 4, four jiaos of discrepancy in elevation must not be greater than 2mm.
2,20 quadruplet steel pipe posts 51 are connected on the steel plate composite member 4 by the bolt installation, to guarantee the verticality of steel pipe post 51 during connection, by adding apical side height that the 500mm that mat thickness do not wait * 500mm steel plate adjusts steel pipe post 51 at grade, to eliminate the height error of installing before the steel work longeron 4.
3, on the end plate of steel pipe post 51, with the bolted steel structure longeron 2 of M32mm, connect with bolt by steel work crossbeam 3 between the adjacent steel pipe post 51 of horizontally-arranged, form steel truss structure thus.
4, bed die 7 and supporting jackscrew are installed on steel truss, the steel reinforced concrete beam making bench is moulding.
Embodiment 2:
Referring to Fig. 3, different is in the present embodiment, between each adjacent road steel work longeron 2 steel work crossbeam 3 to be set no longer with embodiment 1.This form at the less case beam of specification under the prerequisite of guaranteed strength and soundness one step simplified structure more the time, simplify and make, reduce cost.
Embodiment 3:
Referring to Fig. 2 a, Fig. 2 b and Fig. 2 c, different is for present embodiment and embodiment 1, the fixed structure of steel work longeron 2 on the middle part of concrete foundation pedestal 1 is set is: each concrete column 52 is set on middle part pedestal 1 at interval, in each concrete column 52 pre-embedded steel slab composite member 4 is set, steel work longeron 2 is connected and fixed with bolt and is supported on the pre-embedded steel slab composite member 4.
Compare with embodiment 1, the direct concrete column of present embodiment, under the prerequisite that guarantees the pedestal result of use, owing to reduce the use amount of steel, thereby can save cost.
Embodiment 4:
Referring to Fig. 4, different is in the present embodiment, between each adjacent road steel work longeron 2 steel work crossbeam 3 to be set no longer with embodiment 3.This form at the less case beam of specification under the prerequisite of guaranteed strength and soundness one step simplified structure more the time, simplify and make, reduce cost.

Claims (5)

1. steel reinforced concrete beam making bench adopts concrete foundation, it is characterized in that, at the length direction of the middle part of described concrete foundation pedestal (1) upper edge prefabricated case beam steel work longeron (2) is set.
2. steel reinforced concrete beam making bench according to claim 1 is characterized in that three roads of described steel work longeron (2) for be arrangeding in parallel, is fixedly connected with steel work crossbeam (3) between the adjacent twice steel work longeron, forms steel truss structure.
3. steel reinforced concrete beam making bench according to claim 1 and 2 is characterized in that each column is set between described steel work longeron (2) and middle part pedestal (1) at interval, and described steel work longeron (2) is supported on each column that is provided with at interval.
4. steel reinforced concrete beam making bench according to claim 1 and 2, it is characterized in that being provided with described steel work longeron (2) at the fixed structure on the middle part of the concrete foundation pedestal (1) is: pre-embedded steel slab composite member (4) is set in described middle part pedestal (1), go up with bolt connection steel pipe post (51) at described pre-embedded steel slab composite member (4), described steel work longeron (2) is connected and fixed with bolt and is supported on the described steel pipe post (5).
5. steel reinforced concrete beam making bench according to claim 1 and 2, it is characterized in that being provided with the fixed structure of described steel work longeron (2) on the middle part of concrete foundation pedestal (1) is: go up at described middle part pedestal (1) each concrete column (52) is set at interval, pre-embedded steel slab composite member (4) is set in described each concrete column (52), and described steel work longeron (2) is connected and fixed with bolt and is supported on the described pre-embedded steel slab composite member (4).
CN2010202498201U 2010-07-07 2010-07-07 Steel-concrete beam stand Expired - Lifetime CN201722626U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202498201U CN201722626U (en) 2010-07-07 2010-07-07 Steel-concrete beam stand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202498201U CN201722626U (en) 2010-07-07 2010-07-07 Steel-concrete beam stand

Publications (1)

Publication Number Publication Date
CN201722626U true CN201722626U (en) 2011-01-26

Family

ID=43490941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202498201U Expired - Lifetime CN201722626U (en) 2010-07-07 2010-07-07 Steel-concrete beam stand

Country Status (1)

Country Link
CN (1) CN201722626U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101890755A (en) * 2010-07-07 2010-11-24 中铁四局集团第一工程有限公司 Steel and concrete beam cast pedestal

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101890755A (en) * 2010-07-07 2010-11-24 中铁四局集团第一工程有限公司 Steel and concrete beam cast pedestal
CN101890755B (en) * 2010-07-07 2012-08-22 中铁四局集团第一工程有限公司 Steel and concrete beam cast pedestal

Similar Documents

Publication Publication Date Title
CN110700105B (en) Synchronous construction method for high pier column and tie beam and template used in same
CN103362069B (en) Steel and concrete combined box girder concrete wing plate formwork and construction method
CN112227218A (en) Stainless steel-wood combined template applied to bare concrete and manufacturing method thereof
CN105780922A (en) Construction method for segmental formwork hoisting system of large-span steel reinforced concrete transfer truss
CN206513015U (en) The aluminum alloy mould plate mechanism that building floor is constructed is used for based on BIM technology
CN101890755B (en) Steel and concrete beam cast pedestal
CN103452350A (en) Fabricated electronic workshop and construction method thereof
CN203475310U (en) Formwork for concrete slabs of composite steel-concrete box girders
CN106499173A (en) Based on the aluminum alloy mould plate mechanism that BIM technology is used for building floor construction
CN103321153A (en) Construction method for medium and small span trough girder bridge
CN106320183A (en) Assembly type bent cap formwork system
CN202097833U (en) Steel-concrete girder fabricating pedestal with small independent concrete foundations
CN201722626U (en) Steel-concrete beam stand
CN201722625U (en) Steel-concrete beam pedestal with transverse beam for steel upright post
CN201720937U (en) Steel upright cross beam-free steel-mixed beam pedestal
CN201722624U (en) Steel-concrete beam manufacturing pedestal of concrete upright post with crossbeam
CN203603542U (en) Fabricated electronic workshop
CN214245382U (en) Stainless steel-wood combined template applied to bare concrete
CN202108296U (en) Assembled segmental water tank tower
CN201722623U (en) Concrete column non-beam steel reinforced beam base
CN203487674U (en) Precast lattice girder
CN202882515U (en) Tower-type steel-structure inner model supporting bracket
CN211229701U (en) Assembled maintenance stand column and train maintenance platform
CN103510703A (en) Method for constructing concrete arch columns with variable cross-sections
CN111809460B (en) Rapid high-precision high-speed rail wall type inspection pit track laying construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110126

Effective date of abandoning: 20120822