CN201722615U - Spanning type construction system with large-span box girder - Google Patents
Spanning type construction system with large-span box girder Download PDFInfo
- Publication number
- CN201722615U CN201722615U CN2010202106489U CN201020210648U CN201722615U CN 201722615 U CN201722615 U CN 201722615U CN 2010202106489 U CN2010202106489 U CN 2010202106489U CN 201020210648 U CN201020210648 U CN 201020210648U CN 201722615 U CN201722615 U CN 201722615U
- Authority
- CN
- China
- Prior art keywords
- military
- pier
- piers
- construction system
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
- Revetment (AREA)
Abstract
The utility model discloses a spanning type construction system with a large-span box girder, which comprises a plurality of temporary piers, two military piers and movable die carriers. A concrete support foundation is arranged at the lower part of the temporary pier; a cushion cap and a plurality of pile foundations positioned below the cushion cap are arranged at the lower part of the military pier; the two military piers are respectively arranged in positions close to two sides of an object to be spanned; the temporary piers are symmetrically distributed on two sides of the temporary piers; and the movable die carriers are supported at the upper parts of the temporary piers or the military piers. By adopting the spanning type construction system as a supporting system for the construction of a continuous girder support, not only the limitation to the traditional door opening method by span can be prevented, but also supporting and fencing can be integrated into a whole, therefore, the complexity that two systems are required to be respectively considered originally is avoided; moreover, the adoption of a movable die carrier method as a supporting and fencing system for spanning is easy to be accepted by a spanned property right unit, and provides convenience for the examination and approval of various procedures; and the system is very beneficial to popularization and application.
Description
Technical field
The utility model relates to a kind of construction field of wide-span case beam, particularly relates to a kind of great-leap-forward construction system of wide-span case beam.
Background technology
Often run into Construction of continuous beam in present stage railway, the construction of the highway and cross over the situation of existing railway, highway, if adopt traditional door opening method construction, not only be subjected to the restriction of span, also can influence the operation of existing railway and highway, need to coordinate relevant departments' coordinated time, involve examining of some formalities, and construction speed also is subjected to the restriction of existing railway, road travel, very inconvenient.
The utility model content
The purpose of this utility model is at the problems referred to above, proposes a kind of great-leap-forward construction system of wide-span case beam.
The technical solution of the utility model is: a kind of great-leap-forward construction system of wide-span case beam, comprise several interim piers, two military piers and mobile formwork, and described interim pedestal is the concrete brace foundation; Described military pedestal is provided with cushion cap and is positioned at several pile foundations below the cushion cap, and near the dual-side setting of being crossed over thing, described interim pier is symmetrically distributed in the both sides of military pier to described two military piers respectively; Described mobile formwork is supported on interim pier or military socle.
Described mobile formwork comprises girder and the bed die truss that is fixedly installed togather in length and breadth, is provided with bed die on the bed die truss; Be provided with mobile device below described girder, this mobile device is installed in interim pier and military pier upper end.
The front end of described girder is provided with the girder nose girder of certain-length.
Described mobile device comprises pumping plant, vertical jack, displacement chassis, vertical shift mechanism, transverse-moving mechanism, hook, carriage.
The top of described interim pier and military pier is provided with the two-layer bearing beam of going up of crisscross setting, and the described bearing beam top of going up is provided with crossbeam, and described mobile formwork is installed in crossbeam top; The bottom of described interim pier and military pier is provided with the two-layer down bearing beam of crisscross setting, and described bearing beam down is positioned on the concrete brace foundation or on the cushion cap.
The beneficial effects of the utility model
Adopt the support system of great-leap-forward construction system of the present utility model, both can prevent that traditional door opening method is subjected to the restriction of span as the continuous beam rack construction; Can also support, protection is as one, saved loaded down with trivial details that original two kinds of systems consider respectively; In addition, adopt the mobile formwork method as the supporting protection system of crossing over, the property right unit of being crossed over is acceptant, is the condition of providing convenience of examining of various formalities.
Description of drawings
Fig. 1 is the structural representation of facing of this great-leap-forward construction system
Fig. 2 is the structural representation of facing of the mobile formwork among Fig. 1
Fig. 3 is the plan structure schematic diagram of Fig. 2
Fig. 4 is a military pier place cross-sectional structure schematic diagram among Fig. 1
Fig. 5 is the local enlarged diagram of mounting structure between mobile formwork and the military pier
Fig. 6 is the left TV structure schematic diagram of Fig. 5
Fig. 7 is the structural representation of facing of interim pier or military pier
Fig. 8 is the left TV structure schematic diagram of Fig. 7
Fig. 9 is the structural representation of facing of this great-leap-forward construction system of mobile formwork after putting in place
The specific embodiment
Referring to Fig. 1-Fig. 9,1. wide-span case beams among the figure, 2. mobile formwork, 3. crossed over thing, 4. military pier, 5. cushion cap, 6. pile foundation, 7. interim pier, 8. the concrete brace foundation, 9. descend bearing beam, 10. go up bearing beam, 11. crossbeams, wherein 2-1. girder, 2-2. bed die truss, 2-3. girder nose girder, 2-4. mobile device, 2-5. bed die.
Embodiment: a kind of great-leap-forward construction system of wide-span case beam, comprise several interim piers, two military piers and mobile formwork, described interim pedestal is the concrete brace foundation; Described military pedestal is provided with cushion cap and is positioned at several pile foundations below the cushion cap, and near the dual-side setting of being crossed over thing, described interim pier is symmetrically distributed in the both sides of military pier to described two military piers respectively; Described mobile formwork is supported on interim pier or military socle.
Described mobile formwork comprises girder and the bed die truss that is fixedly installed togather in length and breadth, is provided with bed die on the bed die truss; Be provided with mobile device below described girder, this mobile device is installed in interim pier and military pier upper end.
The front end of described girder is provided with the girder nose girder of certain-length.
Described mobile device comprises pumping plant, vertical jack, displacement chassis, vertical shift mechanism, transverse-moving mechanism, hook, carriage.
The top of described interim pier and military pier is provided with the two-layer bearing beam of going up of crisscross setting, and the described bearing beam top of going up is provided with crossbeam, and described mobile formwork is installed in crossbeam top; The bottom of described interim pier and military pier is provided with the two-layer down bearing beam of crisscross setting, and described bearing beam down is positioned on the concrete brace foundation or on the cushion cap.
The construction initial stage is handled concrete brace foundation and pile foundation earlier, and cushion cap, interim pier and military pier are installed then, then the mobile formwork after the assembly unit is lifted on the top of interim pier and military pier, after the leveling, start this mobile formwork of mobile device translation, after the girder of mobile formwork crosses by the leap thing fully, locate.
Claims (5)
1. the great-leap-forward construction system of a wide-span case beam comprises several interim piers, two military piers and mobile formwork, and it is characterized in that: described interim pedestal is the concrete brace foundation; Described military pedestal is provided with cushion cap and is positioned at several pile foundations below the cushion cap, and near the dual-side setting of being crossed over thing, described interim pier is symmetrically distributed in the both sides of military pier to described two military piers respectively; Described mobile formwork is supported on interim pier or military socle.
2. the great-leap-forward construction system of wide-span case beam according to claim 1, it is characterized in that: described mobile formwork comprises girder and the bed die truss that is fixedly installed togather in length and breadth, is provided with bed die on the bed die truss; Be provided with mobile device below described girder, this mobile device is installed in interim pier and military pier upper end.
3. the great-leap-forward construction system of wide-span case beam according to claim 2, it is characterized in that: the front end of described girder is provided with the girder nose girder of certain-length.
4. the great-leap-forward construction system of wide-span case beam according to claim 2 is characterized in that: described mobile device comprises pumping plant, vertical jack, displacement chassis, vertical shift mechanism, transverse-moving mechanism, hook, carriage.
5. the great-leap-forward construction system of wide-span case beam according to claim 1, it is characterized in that: the top of described interim pier and military pier is provided with the two-layer bearing beam of going up of crisscross setting, the described bearing beam top of going up is provided with crossbeam, and described mobile formwork is installed in crossbeam top; The bottom of described interim pier and military pier is provided with the two-layer down bearing beam of crisscross setting, and described bearing beam down is positioned on the concrete brace foundation or on the cushion cap.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202106489U CN201722615U (en) | 2010-06-01 | 2010-06-01 | Spanning type construction system with large-span box girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202106489U CN201722615U (en) | 2010-06-01 | 2010-06-01 | Spanning type construction system with large-span box girder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201722615U true CN201722615U (en) | 2011-01-26 |
Family
ID=43490930
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202106489U Expired - Fee Related CN201722615U (en) | 2010-06-01 | 2010-06-01 | Spanning type construction system with large-span box girder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201722615U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103321159A (en) * | 2013-07-09 | 2013-09-25 | 中铁十五局集团第六工程有限公司 | Construction method capable of improving girder erection speed of large double-track T-girder bridge |
CN105133497A (en) * | 2015-07-21 | 2015-12-09 | 杭州江润科技有限公司 | Construction method for diagonal-span low-clearance road-on-duty multi-azimuth adjustable cast-in-place box beam support system |
CN105908629A (en) * | 2016-04-27 | 2016-08-31 | 中铁大桥局集团有限公司 | Descending movable framework for highway box girder at highway and railway combined construction section and application method of descending movable framework |
CN107245953A (en) * | 2017-07-14 | 2017-10-13 | 北京市市政建设工程有限责任公司 | The bent device and crossed construction method of a kind of multilayer bridge structure |
CN107841953A (en) * | 2017-11-30 | 2018-03-27 | 中铁二十局集团第工程有限公司 | Across the cast-in-place section construction support in high-altitude obliquely-intersected beams abrupt slope side and construction method |
CN111021251A (en) * | 2019-12-04 | 2020-04-17 | 中铁上海工程局集团有限公司 | Construction method for assembling steel box girder above tramcar |
CN112746564A (en) * | 2020-12-31 | 2021-05-04 | 中铁二十局集团第六工程有限公司 | Movable formwork assembling method |
-
2010
- 2010-06-01 CN CN2010202106489U patent/CN201722615U/en not_active Expired - Fee Related
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103321159A (en) * | 2013-07-09 | 2013-09-25 | 中铁十五局集团第六工程有限公司 | Construction method capable of improving girder erection speed of large double-track T-girder bridge |
CN103321159B (en) * | 2013-07-09 | 2015-03-18 | 中铁十五局集团有限公司 | Construction method capable of improving girder erection speed of large double-track T-girder bridge |
CN105133497A (en) * | 2015-07-21 | 2015-12-09 | 杭州江润科技有限公司 | Construction method for diagonal-span low-clearance road-on-duty multi-azimuth adjustable cast-in-place box beam support system |
CN105908629A (en) * | 2016-04-27 | 2016-08-31 | 中铁大桥局集团有限公司 | Descending movable framework for highway box girder at highway and railway combined construction section and application method of descending movable framework |
CN105908629B (en) * | 2016-04-27 | 2018-03-30 | 中铁大桥局集团有限公司 | Downlink movable mould frame and its application method for combined highway and metro section highway box beam |
CN107245953A (en) * | 2017-07-14 | 2017-10-13 | 北京市市政建设工程有限责任公司 | The bent device and crossed construction method of a kind of multilayer bridge structure |
CN107245953B (en) * | 2017-07-14 | 2018-12-28 | 北京市市政一建设工程有限责任公司 | A kind of crossed construction method of multilayer bridge structure |
CN107841953A (en) * | 2017-11-30 | 2018-03-27 | 中铁二十局集团第工程有限公司 | Across the cast-in-place section construction support in high-altitude obliquely-intersected beams abrupt slope side and construction method |
CN107841953B (en) * | 2017-11-30 | 2024-02-27 | 中铁二十局集团第一工程有限公司 | High-altitude oblique crossing Liang Doupo side span cast-in-situ section construction support and construction method |
CN111021251A (en) * | 2019-12-04 | 2020-04-17 | 中铁上海工程局集团有限公司 | Construction method for assembling steel box girder above tramcar |
CN111021251B (en) * | 2019-12-04 | 2021-11-16 | 中铁上海工程局集团有限公司 | Construction method for assembling steel box girder above tramcar |
CN112746564A (en) * | 2020-12-31 | 2021-05-04 | 中铁二十局集团第六工程有限公司 | Movable formwork assembling method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201722615U (en) | Spanning type construction system with large-span box girder | |
CN203256761U (en) | Tower crane foundation arranged on top plate of basement | |
CN107044090A (en) | A kind of construction method of dual deck bridge | |
CN206513104U (en) | A kind of only pillar overhead station structure of urban track traffic | |
CN105386411A (en) | Multifunctional portal device of suspension bridge pillar top | |
CN102249137B (en) | Renewal method of elevator | |
CN103437304B (en) | A kind of method increasing pier section replacing pot bearing | |
CN103485280B (en) | Quick constructing method of cross-line bridge | |
JP4796411B2 (en) | Bridge removal method | |
CN104775363B (en) | The spelling method of upper king-post strut reinforcing bar sections | |
CN207714155U (en) | A kind of bent cap holder | |
CN205741942U (en) | A kind of great cantilever chooses arm pier cap beam segmental timbering | |
CN206800220U (en) | One kind is used for across highway old bridge removal Fast Installation adjustable support | |
CN107724247B (en) | A kind of box bridge tunnel face changes the outfit technique | |
CN202899639U (en) | Concrete column structure | |
CN206034271U (en) | Novel shelter bridge concrete foundation structure | |
CN204343701U (en) | A kind of special-shaped leg post supports installation structure | |
CN105970988B (en) | The construction method of elevator sidewall reinforcing bar is installed in raft foundation | |
JP2016142097A (en) | Portable hoist unit and horizontal member dismantling method | |
CN210104781U (en) | Tower crane foundation and structure of supporting sharing stand pile that links to each other | |
CN104314316B (en) | A kind of special-shaped leg post supports construction method of installation | |
CN202848875U (en) | Portal crane main beam structure | |
CN202388183U (en) | Lifting equipment for H-shaped steel numerical control cutting machine | |
CN107237251B (en) | A kind of access bridge flat stacking sets up the construction method of interim steel bridge | |
CN205382428U (en) | Whole cast -in -place roof beam formwork support frame of falling triangle in hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110126 Termination date: 20190601 |