CN204343701U - A kind of special-shaped leg post supports installation structure - Google Patents
A kind of special-shaped leg post supports installation structure Download PDFInfo
- Publication number
- CN204343701U CN204343701U CN201420700299.7U CN201420700299U CN204343701U CN 204343701 U CN204343701 U CN 204343701U CN 201420700299 U CN201420700299 U CN 201420700299U CN 204343701 U CN204343701 U CN 204343701U
- Authority
- CN
- China
- Prior art keywords
- support
- fixedly connected
- columns
- layer
- main frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Revetment (AREA)
Abstract
本实用新型公开了一种异形腿柱支撑安装施工结构,它包括安装在承台的桩基顶端的承台垫层上的多层底部受力钢筋和多套支撑墩,多套支撑墩与多层底部受力钢筋相交处焊接相连,在每套支撑墩上均沿竖直方向固定有的承台门式钢劲性主骨架,相邻的主骨架下部以及中部之间分别采用沿水平方向设置的底层连系梁、中间受力钢筋固定连接,在承台垫层到中间受力钢筋之上的间距内浇筑有混凝土,相邻的主骨架的顶部之间采用沿水平方向设置的顶层连系梁固定连接,在顶层连系梁上固定连接有多层顶部受力钢筋,在主骨架上安装有支座。本结构构成了一整套有足够的承载力的受力体系。
The utility model discloses a special-shaped leg column supporting installation construction structure, which comprises multi-layer bottom stress steel bars and multiple sets of supporting piers installed on the bearing platform cushion layer at the top of the pile foundation of the bearing platform, multiple sets of supporting piers and multiple sets of supporting piers. The intersecting parts of the stressed steel bars at the bottom of the storey are welded and connected. On each set of supporting piers, a portal-type steel-stiffened main frame is fixed along the vertical direction. The lower and middle parts of the adjacent main frames are respectively arranged along the horizontal direction The bottom connecting beam and the middle reinforced steel bar are fixedly connected, and concrete is poured in the distance between the platform cushion and the middle stressed steel bar, and the top of the adjacent main frame is connected with the top layer along the horizontal direction. The beams are fixedly connected, and the top-level connecting beams are fixedly connected with multi-layer top stress reinforcement, and the main frame is equipped with a support. This structure constitutes a whole set of bearing system with sufficient bearing capacity.
Description
技术领域technical field
本实用新型涉及支撑施工结构,尤其涉及一种异形腿柱支撑安装施工结构。The utility model relates to a support construction structure, in particular to a special-shaped leg column support installation construction structure.
背景技术Background technique
用于支撑无轴式大吨位摩天轮的异形腿柱必须有足够的承载力和稳固的着陆支撑点。申请号为:CN201310583286.6的中国专利公开了“双排四斜腿钢结构门式墩”,具体涉及一种双排四斜腿钢结构门式墩。它包括0号块和钢盖梁,所述钢盖梁底部两端分别连接有左徘墩柱和右排墩柱,所述左徘墩柱和右排墩柱底部分别设有左承台和右承台,所述左徘墩柱包括第一左墩柱和第二左墩柱,所述第一左墩柱和第二左墩柱顶部相交于钢盖梁底部一端、底部分别与左承台两端连接;所述右排墩柱包括第一右墩柱和第二右墩柱,所述第一右墩柱和第二右墩柱顶部相交于钢盖梁底部另一端、底部分别与右承台两端连接。此专利的斜腿是用来支撑0号块的,而且此专利的左排墩柱和右排墩柱与承台的连接是靠预埋螺栓连接的,容易形成受力薄弱点。The special-shaped leg column used to support the shaftless large-tonnage ferris wheel must have sufficient bearing capacity and a stable landing support point. The Chinese patent with the application number CN201310583286.6 discloses a "double-row four-slant-leg steel structure portal pier", which specifically relates to a double-row four-slant-leg steel structure portal pier. It includes block No. 0 and a steel cover beam. The two ends of the bottom of the steel cover beam are respectively connected with a left pier column and a right row of pier columns. The right cap, the left pier includes a first left pier and a second left pier, the tops of the first left pier and the second left pier intersect at the bottom end of the steel cap beam, and the bottom is respectively connected to the left The two ends of the platform are connected; the right row of pier columns includes the first right pier column and the second right pier column, and the tops of the first right pier column and the second right pier column intersect at the other end of the bottom of the steel cover beam, and the bottom is respectively connected with the The two ends of the right platform are connected. The oblique legs of this patent are used to support the No. 0 block, and the connection between the left row of pier columns and the right row of pier columns and the cap is connected by pre-embedded bolts, which is easy to form a weak point of force.
发明内容Contents of the invention
本实用新型的目的在于克服已有技术的特点,提供一种支撑稳固、安全可靠,具备支撑大吨位摩天轮承载力的异形腿柱支撑安装施工结构。The purpose of the utility model is to overcome the characteristics of the prior art, to provide a support installation and construction structure with stable, safe and reliable support, and a special-shaped leg column supporting the bearing capacity of a large-tonnage Ferris wheel.
本实用新型的一种异形腿柱支撑安装施工结构,它包括安装在承台的桩基顶端的承台垫层上的多层底部受力钢筋和多套支撑墩,所述的多套支撑墩与多层底部受力钢筋相交处焊接相连,在每套支撑墩上均沿竖直方向固定有的承台门式钢劲性主骨架,相邻的主骨架下部以及中部之间分别采用沿水平方向设置的底层连系梁、中间受力钢筋固定连接,在承台垫层到中间受力钢筋之上的间距内浇筑有混凝土,相邻的主骨架的顶部之间采用沿水平方向设置的顶层连系梁固定连接,在所述的顶层连系梁上固定连接有多层顶部受力钢筋,在主骨架上安装有支座,所述的支座包括多列间隔设置的斜腿柱,相邻列的斜腿柱之间分别通过多道联系梁固定相连,在所述的多列斜腿柱围成的区域的顶面中间位置上固定有中间块体,在所述的中间块体两侧的斜腿柱上分别固定有两侧块体,中间块体和两侧块体固定相连。The utility model relates to a special-shaped leg column support installation construction structure, which includes multi-layer bottom stressed steel bars and multiple sets of supporting piers installed on the cap cushion at the top of the pile foundation of the cap, and the multiple sets of supporting piers It is welded and connected to the intersection of the multi-layer bottom reinforced steel bars, and each set of supporting piers is fixed along the vertical direction with a platform-type steel-stiffened main frame. The bottom connecting beams set in the direction and the intermediate reinforced steel bars are fixedly connected. Concrete is poured in the distance between the cap cushion and the intermediate stressed steel bars. The connecting beams are fixedly connected, and the top-layer connecting beams are fixedly connected with multi-layer top stress-bearing steel bars, and a support is installed on the main frame, and the support includes multiple rows of inclined-leg columns arranged at intervals. The adjacent rows of slanted leg columns are fixedly connected by multiple connecting beams, and an intermediate block is fixed on the middle position of the top surface of the area surrounded by the multiple rows of slanted leg columns. Blocks on both sides are respectively fixed on the oblique leg columns on the side, and the middle block is fixedly connected with the blocks on both sides.
本实用新型用于支撑无轴式大吨位摩天轮的异形腿柱,支撑安全稳定,承载力高。承台门式钢劲性主骨架可靠地与支撑墩、受力钢筋、底层连系梁连接为整体,桁片式劲性骨架又和钢劲性主骨架、多道联系梁连接成整体,整个体系构成了一整套有足够的承载力和安全稳固的着陆支撑点受力体系。The utility model is used for supporting the special-shaped leg column of the shaftless large-tonnage ferris wheel, and the support is safe and stable, and the bearing capacity is high. The portal-type steel-strength main frame of the platform is reliably connected with the supporting pier, the stressed steel bar, and the bottom connecting beam as a whole. The system constitutes a complete set of force-bearing system with sufficient bearing capacity and safe and stable landing support point.
附图说明Description of drawings
图1是本实用新型的一种异形腿柱支撑安装施工结构的安装示意图;Fig. 1 is the installation schematic diagram of a kind of special-shaped leg post support installation construction structure of the present utility model;
图2是本实用新型的一种异形腿柱支撑安装施工结构的第一块体、第二块体、第三块体安装平面示意图。Fig. 2 is a schematic diagram of the installation plane of the first block, the second block and the third block of a special-shaped leg post support installation construction structure of the present invention.
具体实施方式Detailed ways
下面结合附图和具体实施例对本实用新型作以详细描述。Below in conjunction with accompanying drawing and specific embodiment the utility model is described in detail.
如附图所示的本实用新型的一种异形腿柱支撑安装施工结构,它包括安装在承台的桩基顶端的承台垫层上的多层底部受力钢筋和多套支撑墩,所述的多套支撑墩与多层底部受力钢筋相交处焊接相连,在每套支撑墩上均沿竖直方向固定有承台门式钢劲性主骨架1,相邻的主骨架下部以及中部之间分别采用沿水平方向设置的底层连系梁2、中间受力钢筋固定连接,在承台垫层到中间受力钢筋之上的间距内浇筑有混凝土,混凝土位于中间受力钢筋之上的位置通常高于中间受力钢筋,既可稳固已安装完的受力钢筋和局部钢劲性主骨架,又可以使后续施工有安全的操作面。相邻的主骨架的顶部之间采用沿水平方向设置的顶层连系梁3固定连接,在所述的顶层连系梁上固定连接有多层顶部受力钢筋,在主骨架上安装有支座,所述的支座包括多列间隔设置的桁片式劲性骨架4-1、4-2、4-3、4-4作为斜腿柱,斜腿柱的底部与主骨架1固定连接,相邻列的斜腿柱之间分别通过多道联系梁5-1、5-2、5-3固定相连,在所述的多列斜腿柱围成的区域的顶面中间位置上固定有中间块体6-2,在所述的中间块体两侧的多个斜腿柱上分别固定有两侧块体6-1、6-3,中间块体和两侧块体固定相连。As shown in the accompanying drawings, a special-shaped leg column support installation construction structure of the present utility model includes multi-layer bottom stressed steel bars and multiple sets of supporting piers installed on the cap cushion at the top of the pile foundation of the cap. The multiple sets of support piers described above are connected by welding at the intersections of the multi-layer bottom stressed steel bars, and each set of support piers is fixed with a platform-type steel-stiff main frame 1 along the vertical direction, and the lower and middle parts of the adjacent main frames are The ground floor connecting beam 2 and the middle reinforced steel bars arranged along the horizontal direction are fixedly connected between them, and concrete is poured in the distance between the platform cushion and the middle stressed steel bars, and the concrete is located on the middle stressed steel bars. The position is usually higher than the intermediate stressed steel bars, which can not only stabilize the installed stressed steel bars and the local steel-strength main frame, but also provide a safe operating surface for subsequent construction. The tops of adjacent main skeletons are fixedly connected by top-layer connecting beams 3 arranged in the horizontal direction, and multi-layer top stress-bearing steel bars are fixedly connected on the top-layer connecting beams, and bearings are installed on the main skeletons. , the support includes multiple rows of truss-type rigid frameworks 4-1, 4-2, 4-3, 4-4 arranged at intervals as oblique leg columns, and the bottom of the oblique leg columns is fixedly connected to the main framework 1, The slanted leg columns of adjacent columns are respectively fixed and connected by multiple connecting beams 5-1, 5-2, 5-3, and a In the middle block 6-2, two side blocks 6-1 and 6-3 are respectively fixed on a plurality of slanted leg columns on both sides of the middle block, and the middle block and the two side blocks are fixedly connected.
作为本实用新型的一种实施方式,每一套所述的支撑墩包括四根支撑立柱,所述的四根支撑立柱围成的区域的横截面为矩形,在四根支撑立柱顶部安装有四根立柱联系梁。所述的支撑墩的立柱联系梁安装在多层底部受力钢筋的顶部,所述的主骨架1安装在支撑墩的立柱联系梁上。As an embodiment of the present invention, each set of supporting piers includes four supporting columns, the cross section of the area surrounded by the four supporting columns is rectangular, and four supporting columns are installed on the top of the four supporting columns. The root column connects the beam. The column connection beam of the support pier is installed on the top of the multi-layer bottom stress reinforcement, and the main frame 1 is installed on the column connection beam of the support pier.
本实用新型结构施工包括以下步骤:(1)在承台的桩基顶端的承台垫层上安装多层底部受力钢筋,同时在承台垫层上安装多套支撑墩,所述的多套支撑墩与多层底部受力钢筋相交处焊接相连;(2)在每套支撑墩上均固定沿竖直方向设置的承台门式钢劲性主骨架1,然后将相邻的主骨架1下部以及中部之间分别采用沿水平方向设置的底层连系梁2、中间受力钢筋固定连接;(3)在承台垫层到中间受力钢筋之上的间距内浇筑混凝土;(4)将相邻的主骨架1的顶部之间采用沿水平方向设置的顶层连系梁3固定连接;(5)在所述的顶层连系梁3上固定连接多层顶部受力钢筋;(6)在主骨架1上安装支座,所述的支座的具体安装过程为:(a)安装支座的多个斜腿柱,多个斜腿柱的安装步骤为:步骤一、利用龙门吊吊装第一桁片式劲性骨架4-1作为第一列斜腿柱,然后将第一桁片式劲性骨架4-1的底部与主骨架1固定连接,并在第一桁片式劲性骨架4-1侧壁上安装多道第一联系梁5-1;步骤二、吊装第二桁片式劲性骨架作为第二列斜腿柱,然后将第二桁片式劲性骨架4-1的底部与主骨架1固定连接,将第二桁片式劲性骨架4-1的侧壁与多道第一排联系梁5-1固定相连,最后再在第二桁片式劲性骨架侧壁上安装多道第二排联系梁5-2;步骤三、重复所述的步骤二直至完成整个斜腿柱的安装;(b)在所述的多个斜腿柱上安装支座的支承面,所述的支承面的安装步骤为:步骤一、在所述的多个斜腿柱围成的区域的顶面中间位置上固定中间块体;步骤二、在所述的中间块体两侧的多个斜腿柱上同时分别固定两侧块体;步骤三、将中间块体和两侧块体固定相连。The structure construction of the utility model comprises the following steps: (1) installing multi-layer bottom stressed steel bars on the cap cushion at the top of the pile foundation of the cap, and installing multiple sets of supporting piers on the cap cushion at the same time. The sets of support piers are welded and connected to the intersections of the multi-layer bottom stress reinforcement; (2) on each set of support piers, the cap portal type steel stiff main frame 1 arranged in the vertical direction is fixed, and then the adjacent main frame 1 The lower part and the middle part are respectively connected with the ground floor connecting beams arranged in the horizontal direction 2, and the middle reinforced steel bars are fixedly connected; (3) Concrete is poured within the distance between the platform cushion and the middle stressed steel bars; (4) The tops of the adjacent main skeletons 1 are fixedly connected by top-layer tie beams 3 arranged in the horizontal direction; (5) fixedly connecting multi-layer top-loaded steel bars on the top-layer tie beams 3; (6) Install the support on the main frame 1, the specific installation process of the support is: (a) install a plurality of inclined leg columns of the support, the installation steps of the plurality of inclined leg columns are: Step 1, use the gantry crane to hoist the first A truss-type stiff frame 4-1 is used as the first row of oblique leg columns, and then the bottom of the first truss-type stiff frame 4-1 is fixedly connected to the main frame 1, and the first truss-type stiff frame 4-1 Install multiple first connecting beams 5-1 on the side wall; step 2, hoist the second truss-type stiff frame as the second row of oblique leg columns, and then install the second truss-type stiff frame 4-1 The bottom of the truss is fixedly connected with the main frame 1, and the side wall of the second truss type stiff frame 4-1 is fixedly connected with the first row of multiple connecting beams 5-1, and finally on the side of the second truss type stiff frame. Install a plurality of second rows of connecting beams 5-2 on the wall; step 3, repeat the step 2 until the installation of the entire slanted leg column is completed; (b) install the support of the support on the plurality of slanted leg columns On the surface, the installation steps of the supporting surface are as follows: Step 1, fix the middle block on the middle position of the top surface of the area surrounded by the multiple slanted leg columns; Step 2, fix the middle block on the two sides of the middle block The blocks on both sides are respectively fixed on multiple slanted leg columns on the side; step 3, the middle block is fixedly connected to the blocks on both sides.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420700299.7U CN204343701U (en) | 2014-11-20 | 2014-11-20 | A kind of special-shaped leg post supports installation structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420700299.7U CN204343701U (en) | 2014-11-20 | 2014-11-20 | A kind of special-shaped leg post supports installation structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204343701U true CN204343701U (en) | 2015-05-20 |
Family
ID=53226978
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420700299.7U Expired - Lifetime CN204343701U (en) | 2014-11-20 | 2014-11-20 | A kind of special-shaped leg post supports installation structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204343701U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105442856A (en) * | 2015-12-29 | 2016-03-30 | 中建六局土木工程有限公司 | Multi-angle large-tonnage box installation construction method |
| CN107761549A (en) * | 2017-09-27 | 2018-03-06 | 中铁十局集团第三建设有限公司 | A kind of battered leg pier stud construction triangular support bracket |
-
2014
- 2014-11-20 CN CN201420700299.7U patent/CN204343701U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105442856A (en) * | 2015-12-29 | 2016-03-30 | 中建六局土木工程有限公司 | Multi-angle large-tonnage box installation construction method |
| CN107761549A (en) * | 2017-09-27 | 2018-03-06 | 中铁十局集团第三建设有限公司 | A kind of battered leg pier stud construction triangular support bracket |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102839678B (en) | Structure for improving rigidity and stability of foundation pit steel support | |
| JP6289046B2 (en) | Temporary stand | |
| CN103366844A (en) | Nuclear power station upper-part in-reactor component mounting method | |
| CN206428986U (en) | A kind of detachable turnover type support jig | |
| CN204325932U (en) | Long-span steel pipe arch bridge assembling construction support system | |
| CN104532749A (en) | Support used for construction of upper beam of main tower of suspension bridge | |
| CN110670483A (en) | A kind of steel pipe concrete composite main tower | |
| CN102777050B (en) | Assembly type jig frame for longspan pipe truss roof girder | |
| CN204780986U (en) | Shaped steel frame reinforcing bar support frame | |
| CN103205927A (en) | Anti-overturning bridge pier supporting mechanism | |
| CN204343701U (en) | A kind of special-shaped leg post supports installation structure | |
| CN202755370U (en) | Structure for improving rigidity and stability of foundation pit steel support | |
| CN205591122U (en) | Simple bridge roof beam bearing structure based on beiLei beam support | |
| CN104314316B (en) | A kind of special-shaped leg post supports construction method of installation | |
| CN106400629A (en) | Round-tunnel double-layer lane frame structure system and full-prefabricated construction method thereof | |
| CN103015627A (en) | Embedded steel-encased high-intensity concrete combined beam with toggle pins | |
| CN202899639U (en) | Concrete column structure | |
| CN204212058U (en) | For the steel truss girder assembling support in the construction of steel concrete composite truss beam | |
| CN205329549U (en) | Corbel frame device is deposited to steel case roof beam temporarily | |
| CN204780601U (en) | Bed -jig is assembled to reinforcing bar festival section | |
| CN202788873U (en) | Combined gantry tunnel lining trolley | |
| RU146202U1 (en) | Dismountable flyovers for the quick arrangement of bridge crossings | |
| CN203546618U (en) | Splayed supporting frame for bridge cast-in-place concrete formwork | |
| CN102660924B (en) | Steel column sectional shelf-unit construction and steel column sectional shelf-unit | |
| CN103485485B (en) | Concrete column with enhanced oblique strength through distributed reinforcing steel bars in local corner areas and manufacturing method of concrete column |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| PP01 | Preservation of patent right | ||
| PP01 | Preservation of patent right |
Effective date of registration: 20180914 Granted publication date: 20150520 |
|
| PD01 | Discharge of preservation of patent | ||
| PD01 | Discharge of preservation of patent |
Date of cancellation: 20190618 Granted publication date: 20150520 |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150520 |