CN201704671U - Parapet wall - Google Patents

Parapet wall Download PDF

Info

Publication number
CN201704671U
CN201704671U CN201020121747XU CN201020121747U CN201704671U CN 201704671 U CN201704671 U CN 201704671U CN 201020121747X U CN201020121747X U CN 201020121747XU CN 201020121747 U CN201020121747 U CN 201020121747U CN 201704671 U CN201704671 U CN 201704671U
Authority
CN
China
Prior art keywords
wave wall
wave
parapet wall
wall
epimere
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201020121747XU
Other languages
Chinese (zh)
Inventor
沈迪州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC FHDI Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201020121747XU priority Critical patent/CN201704671U/en
Application granted granted Critical
Publication of CN201704671U publication Critical patent/CN201704671U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

A parapet wall comprises a lower section parapet wall (1) and an upper section parapet wall (2), wherein the lower section parapet wall (1) is fixed at the front edge of a wharf to resist waves; the upper section parapet wall (2) can be mounted on the lower section parapet wall (1) to be integrated with the lower section parapet wall (1) to resist waves, and can also be dismounted for reservation; and the upper section parapet wall (2) is inserted into insertion holes (4) of the lower section parapet wall (1) through inserted links (9), and is fixed with tensioners (16) in a stretching way through guy cables (15). Therefore, the top elevation of a gravity type wharf or a sheet pile wharf and a dockland can be reduced; the backfilling volume and the total height of the wharf are lowered. Besides, so long as the tensioners (16) are loosened and lifting hooks (17) and the guy cables (15) are demounted, the upper section parapet wall (2) can be lifted away, so as to reduce the influence on the production and the appearance of the wharf.

Description

A kind of wave wall
Affiliated technical field
The utility model relates to a kind of wave wall.
Background technology
Reasonably the harbour elevation of top surface is convenient working, avoids wave or tidewater to harbour facilities and the damnous important measures of goods.At present, when the wharf apron design wave is big, adopts and improve the harbour elevation of top surface, to reduce wave action power and to reduce unrestrained more amount.The harbour elevation of top surface of formula generally adopts design high-water to add to run in 5 years one the design wave peak face height of meeting in 15 years in flakes, and reserves certain superelevation and determine.Under the less situation of wave, the harbour elevation of Que Dinging is rational thus.But, development along with port construction, build harbour through the place that the shielding condition of being everlasting is poor, the design wave that ran into 15 years one chances in 5 years one of these wharf aprons reaches more than 3 meters, if this wave positive effect will produce vertical wave in gravity type quay or sheet-pile wharf in flakes, the height of crest face more than waterline is just above 3 meters, the harbour elevation of top surface of Que Dinging is just than higher like this, connect into integral body at harbour and harbor district, under the bigger situation of harbor district depth of terrain, will bring the harbour height big, harbor district backfill height, the backfill amount increases, shortcomings such as boats and ships heaving pile inconvenience.
Common wave wall generally is used for engineerings such as mole, shore protection.
At present, typhoon forecast is reliable, and the harbour possesses lifting, transportation, erectility, and the fate of the effect number of times of annual typhoon and harbour normal operation relatively is seldom, and this just provides implementation condition for wave wall is set on harbour.
Summary of the invention
The low wave action of harbour elevation of top surface is big in order to overcome, the contradiction of the high backfill amount of harbour elevation of top surface large resource waste, the utility model provides a kind of wave wall, make harbour end face absolute altitude can be chosen in lower position, reach the minimizing of harbor district backfill amount, aim of saving.
In order to achieve the above object, the technical solution used in the present invention is in the wharf apron wave wall to be set, and wave wall is made of for two sections epimere wave wall and hypomere wave wall.The hypomere wave wall is fixed on the wharf apron, can resist wave action.The epimere wave wall can be installed on the hypomere wave wall, forms whole opposing wave action with the hypomere wave wall, can pull down also that to deposit in harbor district standby.Wave wall is arranged continuously on the line direction of wharf apron and is carried out segmentation, about 3 meters of every segment length.In harbour segmentation place, wave wall also is provided with the segmentation seam.
After adopting wave wall of the present invention, wave wall opposing wave also reduces unrestrained more amount, can positive bear wave action, not have the harbour of the wave lift effect of long piled wharf for gravity type quay or this class of sheet-pile wharf, the elevation of top surface of harbour and harbor district can reduce.In the little situation of wave, the hypomere wave wall just can be resisted, and the epimere wave wall needn't be installed, and reduces anti-platform workload, makes things convenient for the harbour to produce and management.When running into the big situation of wave, the epimere wave wall is installed, with the hypomere wave wall opposing wave that forms a whole, wave is pulled down the epimere wave wall later, and to deposit in harbor district standby, and reducing influences harbour production and attractive in appearance.
The beneficial effects of the utility model, can reduce wave larger area gravity or sheet-pile wharf and harbor district land-based area elevation of top surface, therefore, harbor district backfill amount reduces, reduced the difficulty of handling for the project that needs treatment of soft foundation, the harbour overall height also reduces, and this can reduce the cost of gravity type quay or sheet-pile wharf.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further specified.
Fig. 1 is the wave wall profile;
Fig. 2 is the wave wall floor map;
Fig. 3 is a hypomere wave wall elevation;
Fig. 4 is a hypomere wave wall sectional drawing;
Fig. 5 is an epimere wave wall elevation;
Fig. 6 is the sectional drawing of epimere wave wall and harbour.
Among the figure: 1. hypomere wave wall, 2. epimere wave wall, 3. hypomere wave wall body of wall, 4. jack, 5. bearing 6. supports backing plate, 7. epimere wave wall body of wall, 8. girder, 9. inserted link, 10. secondary beam, 11. panels, 12. seal plates, 13. hook on hole, 14. lifting hole(eyelet)s, 15. drag-lines, 16. stretchers, 17. suspension hook, 18. harbour end faces, 19. wharf apron lines, 20. the anchoring ring, 21. Socket covers, 22. harbours.
The specific embodiment
In Fig. 1, wave wall of the present invention is arranged on the position of the upward close wharf apron line (19) of harbour end face (18) of harbour (22).Wave wall is made up of hypomere wave wall (1), epimere wave wall (2).Hypomere wave wall (1) is connected with harbour (22).Epimere wave wall (2) inserts the interior anchoring of jack (4) of hypomere wave wall (1) by inserted link (9), and, the installation and removal of epimere wave wall (2) are convenient in the slit of the bearing (5) in the bearing (5) on the inserted link (9) of epimere wave wall (2) and the jack (4) of hypomere wave wall (1) between 5 millimeters to 10 millimeters.By drag-line (15) and stretcher (16) stretch-draw epimere wave wall (2), bearing (5) in bearing (5) on the inserted link (9) and the jack (4) just closely contacts, epimere wave wall (2) just is fixed, and avoids epimere wave wall (2) to seesaw under wave action and causes damaging.Like this, epimere wave wall (2) and hypomere wave wall (1) the opposing wave action that just forms a whole.It is preceding to remove epimere wave wall (2), and stretcher (16) is loosened, and unloads suspension hook (17) and drag-line (15), just can hang out epimere wave wall (2).
In Fig. 2, the plane situation of a segmentation of expression wave wall, about 3 meters of every segment length.
Fig. 3 and Fig. 4 represent the structure of hypomere wave wall (1).The hypomere wave wall body of wall (3) of hypomere wave wall (1) has 2 jacks (4), jack (4) adds that than the width of inserted link (9) height of 2 times of bearings (5) is bigger, the degree of depth is slightly larger than the length of inserted link (9), fixes so that inserted link (9) can inject jack (4).Jack (4) is provided with 1 bearing (5) in extra large side inwall bottom, jack (4) is provided with 1 bearing (5) in land side upper inside wall, above-mentioned 2 bearings (5) are given prominence to inwall 5 millimeter, with the active force that 2 bearings (5) of should bear inserted link (9) are transmitted, and the wave force of making a concerted effort to resist epimere wave wall (2) of formation horizontal force and moment.At the end face of hypomere wave wall body of wall (3), be provided with and support backing plate (6), leak with the tight contact preventing of seal plate (12).
Fig. 5 and Fig. 6 represent the structure of epimere wave wall (2).The epimere wave wall body of wall (7) of epimere wave wall (2) has 2 girders (8), the lower end of girder (8) links to each other with inserted link (9) upper end, inserted link (9) is provided with 1 bearing (5) at extra large side lower part, inserted link (9) is provided with 1 bearing (5) at the land upper lateral part, the position of above-mentioned 2 bearings (5) is corresponding with 2 bearings (5) position in the jack (4), forms the transmission of power.Secondary beam (10) is connected on 2 girders (8), and panel (11) is connected on the every secondary beam (10).Below nethermost secondary beam (10) and 2 sides of epimere wave wall (2), seal plate (12) is set respectively.1 hook on hole (13) and 1 lifting hole(eyelet) (14) are set on the every girder (8), and lifting hole(eyelet) is used for lifting, the installation and removal of epimere wave wall (2).In the middle of the drag-line (15) stretcher (16) is arranged, there is suspension hook (17) at two ends.At harbour end face (18) anchoring ring (20) is set, the position is chosen in hook on hole (13) can form the tension force place.Suspension hook (17) is used for connecting shackle hole (13) and anchoring ring (20).By the stretch-draw of stretcher (16), epimere wave wall (2) is anchored on the hypomere wave wall (1).It is preceding to remove epimere wave wall (2), and stretcher (16) is loosened, and unloads suspension hook (17) and drag-line (15), just can hang out epimere wave wall (2), and Socket cover (21) is placed on upward protection jack (4) of jack (4).

Claims (2)

1. a wave wall is made up of hypomere wave wall and epimere wave wall, and it is characterized in that: the hypomere wave wall is fixed on the wharf apron, and the epimere wave wall can be installed in hypomere wave wall up and down section wave wall and form integral body, also can pull down standby.
2. wave wall according to claim 1 is characterized in that: the epimere wave wall inserts in the jack of hypomere wave wall by inserted link, and fixes by the stretch-draw of drag-line and stretcher.
CN201020121747XU 2010-02-20 2010-02-20 Parapet wall Expired - Lifetime CN201704671U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020121747XU CN201704671U (en) 2010-02-20 2010-02-20 Parapet wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020121747XU CN201704671U (en) 2010-02-20 2010-02-20 Parapet wall

Publications (1)

Publication Number Publication Date
CN201704671U true CN201704671U (en) 2011-01-12

Family

ID=43441825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020121747XU Expired - Lifetime CN201704671U (en) 2010-02-20 2010-02-20 Parapet wall

Country Status (1)

Country Link
CN (1) CN201704671U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535389A (en) * 2012-02-27 2012-07-04 河北农业大学 Self-floating double-layer flood protection wall
CN102619189A (en) * 2012-03-09 2012-08-01 河海大学 Wave wall structure with movable manger board
CN106945793A (en) * 2016-12-12 2017-07-14 杭州跟策科技有限公司 If the semi-submersible offshore platform of telescope
CN107986714A (en) * 2017-12-19 2018-05-04 中冶建筑研究总院有限公司 A kind of sea work wave wall and its construction method
CN108750001A (en) * 2018-06-22 2018-11-06 上海船舶运输科学研究所 Wave Integrated Measurement System when ship's navigation

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535389A (en) * 2012-02-27 2012-07-04 河北农业大学 Self-floating double-layer flood protection wall
CN102619189A (en) * 2012-03-09 2012-08-01 河海大学 Wave wall structure with movable manger board
CN106945793A (en) * 2016-12-12 2017-07-14 杭州跟策科技有限公司 If the semi-submersible offshore platform of telescope
CN107986714A (en) * 2017-12-19 2018-05-04 中冶建筑研究总院有限公司 A kind of sea work wave wall and its construction method
CN107986714B (en) * 2017-12-19 2021-03-19 中冶建筑研究总院有限公司 Wave-blocking wall for maritime work and construction method thereof
CN108750001A (en) * 2018-06-22 2018-11-06 上海船舶运输科学研究所 Wave Integrated Measurement System when ship's navigation
CN108750001B (en) * 2018-06-22 2023-08-15 上海船舶运输科学研究所 Comprehensive wave measurement system for ship navigation

Similar Documents

Publication Publication Date Title
CN201704671U (en) Parapet wall
CN111469993B (en) Self-installation floating type fan foundation anchored by bucket foundation and self-installation method
CN204859088U (en) Connect floating block, be equipped with body subassembly and showy photovoltaic power plant on water of connecting floating block
CN204940320U (en) A kind of taper Blade fence
CN201695381U (en) Three-cylindrical foundation one-legged mooring platform
CN104627331A (en) Wind power generation floating foundation
CN204836054U (en) Body and body subassembly and showy photovoltaic power plant on water of installing said body
CN102957346A (en) Seaborne floating type solar photovoltaic power generation device
CN208235560U (en) A kind of offshore wind turbine single-pile foundation being internally provided with floating drum
CN207089589U (en) It is distributed widely in the gravity anchor of calcic rock marine site pipe laying barge mooring
CN213367238U (en) Booster station
CN202273215U (en) Safety environment-friendly trash floating barrier device
CN212243734U (en) Self-installation floating type fan foundation anchored by bucket foundation
CN205622580U (en) Photovoltaic power generation system's on water flexible fixation device
CN202090262U (en) Bearing buoyancy tank for construction in mudflat and swamp areas
CN102080369B (en) Shallow sea novel floating type oil storage platform structure
CN203486110U (en) Buoyant-tower-type ocean platform
CN202047399U (en) Water storage tank type steel-structured dam
CN205934889U (en) Multi -functional offshore ocean monitoring facilities platform
CN108791738A (en) A kind of Large marine wind turbine entirety floating support mounting method
CN211849250U (en) Hinge type floating breakwater structure
CN211032946U (en) Movable free-rising and sinking storm platform
CN211421149U (en) Self-elevating type water retaining wall embedded in box type cofferdam
CN203498797U (en) Slope type caisson breakwater with supporting piles and downward-inserted boxes
CN207670621U (en) A kind of offshore platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CCCC-FHDI ENGINEERING CO., LTD.

Free format text: FORMER OWNER: SHEN DIZHOU

Effective date: 20110425

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 510280 ROOM 408, NO. 13, JINGHU WEST STREET, HAIZHU DISTRICT, GUANGZHOU CITY, GUANGDONG PROVINCE TO: 510230 NO. 161, QIANJIN ROAD, GUANGZHOU CITY, GUANGDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110425

Address after: 510230 No. 161 Qianjin Road, Guangdong, Guangzhou

Patentee after: CCCC-FHDI Engineering Co., Ltd.

Address before: 510280 room 13, 408 West Street, Haizhuqu District, Guangdong, Guangzhou, Jinghu

Patentee before: Shen Dizhou

CX01 Expiry of patent term

Granted publication date: 20110112

CX01 Expiry of patent term