CN207089589U - It is distributed widely in the gravity anchor of calcic rock marine site pipe laying barge mooring - Google Patents

It is distributed widely in the gravity anchor of calcic rock marine site pipe laying barge mooring Download PDF

Info

Publication number
CN207089589U
CN207089589U CN201720753425.9U CN201720753425U CN207089589U CN 207089589 U CN207089589 U CN 207089589U CN 201720753425 U CN201720753425 U CN 201720753425U CN 207089589 U CN207089589 U CN 207089589U
Authority
CN
China
Prior art keywords
hanger
anchor
pipe laying
casing
marine site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720753425.9U
Other languages
Chinese (zh)
Inventor
李怀亮
王晓飞
于文太
李飒
黄山田
高嵩
高震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Offshore Oil Engineering Co Ltd
CNOOC Deepwater Development Ltd
Original Assignee
Offshore Oil Engineering Co Ltd
CNOOC Deepwater Development Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Offshore Oil Engineering Co Ltd, CNOOC Deepwater Development Ltd filed Critical Offshore Oil Engineering Co Ltd
Priority to CN201720753425.9U priority Critical patent/CN207089589U/en
Application granted granted Critical
Publication of CN207089589U publication Critical patent/CN207089589U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of gravity anchor for being distributed widely in the pipe laying barge mooring of calcic rock marine site, including:One casing, the main hanger being vertically mounted on roof box and auxiliary hanger, wherein, hanger in place is installed on the flat board of casing surrounding, several shear connectors are equably installed on the bottom plate of casing.The utility model can not only rely on itself anchor weight and provide anchor force with the interaction of anchor subsoil, solve the problems, such as that vertical bearing capacity is poor under the conditions of calcic rock soil matter, substantially increases the anchor force of gravity anchor;Moreover, it can also make coupled whole mooring system held stationary, and repeatable utilization, laid the foundation for the normal work of upper ocean engineering structure.

Description

It is distributed widely in the gravity anchor of calcic rock marine site pipe laying barge mooring
Technical field
Gravity anchor is the utility model is related to, more particularly to a kind of gravity for being distributed widely in the pipe laying barge mooring of calcic rock marine site Anchor, belong to Offshore Engineering field.
Background technology
Pipe laying barge is a kind of Large marine equipment for being used to lay submarine oil-transportation, gas transmission and aqueduct.According to operation The depth of water in marine site, pipe laying barge can be divided into deep water pipe laying barge and shallow water pipe laying barge, can be divided into again according to the operational capabilities of pipe laying barge It is divided into self-propulsion type and non-self-propulsion type pipe laying barge.
For the marine site of widely distributed calcic rock, because the depth of water is generally smaller, so use shallow water pipe laying barge more.Shallow water is spread Pipe ship is mostly non-self-propulsion type, is positioned by mooring system, i.e.,:Pipe laying barge is before operation is originated, it is necessary to first pass through anchoring system System by its mooring at sea presumptive area, after the laying of submarine pipeline is completed by loop wheel machine and pipelaying work line etc..Therefore, rationally The anchorage form of ground selection mooring system is pipe laying barge on the basis of the stable operation in this kind of marine site.
At present, conventional shallow water pipe laying barge anchor type is mainly embedded anchor, suction anchor and flat board anchor etc..Wherein, Because construction costs is higher, installation difficulty is larger, relatively low for small-sized anchoring system cost performance for suction anchor and flat board anchor;Towing Embedded anchor is by providing horizontal bearing capacity in anchor insertion soil, still, because its vertical bearing capacity is poor, it is difficult to adapt to heaving pile Operating mode when vertically tension force is larger.
Utility model content
Main purpose of the present utility model is to overcome disadvantages mentioned above existing for prior art, and provides a kind of widely distributed In the gravity anchor of calcic rock marine site pipe laying barge mooring, it can not only rely on itself anchor weight and carry with the interaction of anchor subsoil For anchor force, solve the problems, such as that vertical bearing capacity is poor under the conditions of calcic rock soil matter, substantially increases the anchor of gravity anchor Gu power;Moreover, it can also make coupled whole mooring system held stationary, and repeatable utilization, it is upper ocean work The normal work of journey works lays the foundation.
The purpose of this utility model is realized by following technical scheme:
A kind of gravity anchor for being distributed widely in the pipe laying barge mooring of calcic rock marine site, it is characterised in that:Including:One casing, hang down Straight main hanger and auxiliary hanger on roof box, wherein, hanger in place, casing are installed on the flat board of casing surrounding Bottom plate on several shear connectors are equably installed.
The inside of the casing is provided with reinforcing plate, and both ends and the flat board of reinforcing plate link together.
The main hanger is trapezoidal, and the centre of main hanger, which is provided with, strengthens area, and several run through is symmetrically arranged with area is strengthened The lifting hole(eyelet) of thickness of slab.
The auxiliary hanger is arranged symmetrically on the top plate of main hanger both sides, and perpendicular with the direction of main hanger;Auxiliary Hanger is provided with a lifting hole(eyelet), and is provided with local thickness around lifting hole(eyelet) and strengthens area.
The hanger in place is symmetrically mounted on the both sides of casing;Hanger in place is provided with a lifting hole(eyelet), and around lifting hole(eyelet) There is local thickness to strengthen area.
The section of the shear connector is in inverted trapezoidal, and the thickness direction of length direction and main hanger is parallel to each other.This practicality is new The beneficial effect of type:The utility model due to using above-mentioned technical proposal, its can not only rely on itself anchor weight and with anchor subsoil Interaction anchor force is provided, solve the problems, such as that vertical bearing capacity is poor under the conditions of calcic rock soil matter, carries significantly The high anchor force of gravity anchor;Moreover, it can also make coupled whole mooring system held stationary, and repeatable profit With being laid the foundation for the normal work of upper ocean engineering structure.
Brief description of the drawings
Fig. 1 is the utility model structure schematic top plan view.
Fig. 2 is the utility model elevational schematic view.
Fig. 3 is the utility model gravity anchor substructure top view;
Fig. 4 is that the utility model gravity anchor lifts main hanger detail drawing;
Fig. 5 is the utility model gravity anchor lifting auxiliary hanger detail drawing;
Fig. 6 is the utility model gravity anchor hanger detail drawing in place.
Major Symbol explanation in figure:
1. top plate, 2. main hangers, 3 auxiliary hangers, 4. flat boards, 5. reinforcing plates, 6. hangers in place, 7. bottom plates, 8. shear connectors.
Embodiment
As shown in Fig. 1-Fig. 6, the utility model includes:One casing, roof box 1 is vertically mounted on using welding manner On main hanger 2 and auxiliary hanger 3, wherein, casing is surrounded by flat board 4, is provided with place using welding manner on flat board 4 Hanger 6, the bottom of casing are provided with bottom plate 7 using welding manner, and several cut equably is provided with using welding manner on bottom plate 7 Power key 8.
Above-mentioned hanger 6 in place is symmetrically mounted on the both sides of casing.
Above-mentioned auxiliary hanger 3 is arranged symmetrically on the top plate 1 of the main both sides of hanger 2, and perpendicular with the direction of main hanger 2.
As shown in Fig. 2 the section of above-mentioned shear connector 8 is in inverted trapezoidal, the thickness direction of length direction and main hanger 2 is mutually flat OK, play a part of increasing level, the vertical bearing capacity of gravity anchor structure.
As shown in figure 3, the inside of casing is provided with reinforcing plate 5, the both ends of reinforcing plate 5 are connected with flat board 4 using welding manner Together.
As shown in figure 4, above-mentioned main hanger 2 is trapezoidal, the centre of main hanger 2, which is provided with, strengthens area, is symmetrically set on area is strengthened It is equipped with several lifting hole(eyelet)s through thickness of slab (the present embodiment is 4).
As shown in figure 5, above-mentioned auxiliary hanger 3 is provided with a lifting hole(eyelet), and it is provided with local thickness around lifting hole(eyelet) and strengthens area.
As shown in fig. 6, hanger 6 in place is provided with a lifting hole(eyelet), and it is provided with local thickness around lifting hole(eyelet) and strengthens area.
Operation principle of the present utility model:It is heavy and mutual with anchor subsoil by its own anchor during utility model works Act on to provide horizontal, vertical bearing capacity.The shear connector of gravity anchor bottom by improve anchor bottom with soil the coefficient of sliding friction and Change anchor subsoil body failure mechanism, the sliding failure of anchor and soil is changed into failure by shear in the soil body, to improve the anchoring of gravity anchor Power.
It is described above, only it is preferred embodiment of the present utility model, not the utility model is made any formal Limitation, every any simple modification made according to the technical essence of the utility model to above example, equivalent variations with Modification, in the range of still falling within technical solutions of the utility model.

Claims (6)

  1. A kind of 1. gravity anchor for being distributed widely in the pipe laying barge mooring of calcic rock marine site, it is characterised in that:Including:It is one casing, vertical Main hanger and auxiliary hanger on roof box, wherein, hanger in place is installed on the flat board of casing surrounding, casing Several shear connectors are equably installed on bottom plate.
  2. 2. the gravity anchor according to claim 1 for being distributed widely in the pipe laying barge mooring of calcic rock marine site, it is characterised in that:Institute The inside for stating casing is provided with reinforcing plate, and both ends and the flat board of reinforcing plate link together.
  3. 3. the gravity anchor according to claim 1 for being distributed widely in the pipe laying barge mooring of calcic rock marine site, it is characterised in that:Institute State that main hanger is trapezoidal, the centre of main hanger, which is provided with, strengthens area, and several lifting hole(eyelet)s through thickness of slab are symmetrically arranged with area is strengthened.
  4. 4. the gravity anchor according to claim 1 for being distributed widely in the pipe laying barge mooring of calcic rock marine site, it is characterised in that:Institute Auxiliary hanger is stated to be arranged symmetrically on the top plate of main hanger both sides, and it is perpendicular with the direction of main hanger;Auxiliary hanger is provided with One lifting hole(eyelet), and be provided with local thickness around lifting hole(eyelet) and strengthen area.
  5. 5. the gravity anchor according to claim 1 for being distributed widely in the pipe laying barge mooring of calcic rock marine site, it is characterised in that:Institute State the both sides that hanger in place is symmetrically mounted on casing;Hanger in place is provided with a lifting hole(eyelet), and has local thickness around lifting hole(eyelet) Strengthen area.
  6. 6. the gravity anchor according to claim 1 for being distributed widely in the pipe laying barge mooring of calcic rock marine site, it is characterised in that:Institute The section for stating shear connector is in inverted trapezoidal, and the thickness direction of length direction and main hanger is parallel to each other.
CN201720753425.9U 2017-06-27 2017-06-27 It is distributed widely in the gravity anchor of calcic rock marine site pipe laying barge mooring Active CN207089589U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720753425.9U CN207089589U (en) 2017-06-27 2017-06-27 It is distributed widely in the gravity anchor of calcic rock marine site pipe laying barge mooring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720753425.9U CN207089589U (en) 2017-06-27 2017-06-27 It is distributed widely in the gravity anchor of calcic rock marine site pipe laying barge mooring

Publications (1)

Publication Number Publication Date
CN207089589U true CN207089589U (en) 2018-03-13

Family

ID=61552615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720753425.9U Active CN207089589U (en) 2017-06-27 2017-06-27 It is distributed widely in the gravity anchor of calcic rock marine site pipe laying barge mooring

Country Status (1)

Country Link
CN (1) CN207089589U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108959765A (en) * 2018-07-02 2018-12-07 天津大学 Cantilevered gravity anchor and jib-length design method for carbonate ground sea area
CN109625181A (en) * 2019-01-21 2019-04-16 深圳市海斯比浮岛科技开发有限公司 A kind of gravity anchor convenient for mooring force enhancing
CN113772017A (en) * 2021-08-26 2021-12-10 海洋石油工程股份有限公司 Design method of deep-sea gravity type apron anchor
CN114379713A (en) * 2021-12-24 2022-04-22 天津大学 Reduce split type gravity anchor of retrieving the degree of difficulty

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108959765A (en) * 2018-07-02 2018-12-07 天津大学 Cantilevered gravity anchor and jib-length design method for carbonate ground sea area
CN108959765B (en) * 2018-07-02 2023-02-17 天津大学 Cantilever type gravity anchor for carbonate rock-soil sea area and cantilever length design method
CN109625181A (en) * 2019-01-21 2019-04-16 深圳市海斯比浮岛科技开发有限公司 A kind of gravity anchor convenient for mooring force enhancing
CN113772017A (en) * 2021-08-26 2021-12-10 海洋石油工程股份有限公司 Design method of deep-sea gravity type apron anchor
CN113772017B (en) * 2021-08-26 2023-12-22 海洋石油工程股份有限公司 Design method of deep sea gravity type apron plate anchor
CN114379713A (en) * 2021-12-24 2022-04-22 天津大学 Reduce split type gravity anchor of retrieving the degree of difficulty

Similar Documents

Publication Publication Date Title
CN207089589U (en) It is distributed widely in the gravity anchor of calcic rock marine site pipe laying barge mooring
CN103967031B (en) A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof
CN108867688A (en) A kind of offshore wind turbine gravity type foundation and its installation method
CN102312442A (en) Construction method of trestle steel pipe pile foundation
CN112627222B (en) Novel offshore wind power foundation applicable to shallow covering layer and construction method thereof
CN206234474U (en) A kind of seabed HDPE pipeline saddle weights
CN105532549A (en) Assembled type anchoring system comprising grasping anchor hooks
CN102296629B (en) Tower-drum structure suitable for ocean engineering and installation method thereof
WO2022127466A1 (en) Novel offshore wind turbine foundation suitable for shallow covering layer and construction method therefor
CN107663865A (en) A kind of cable-stayed type immersed tube tunnel structure and method
CN106558862A (en) Assembled cable duct bank mounting structure
CN102912811B (en) Multi-base gravity type base structure
KR101383159B1 (en) Gravity type slab foundation for offshore wind power
CN203010098U (en) Mud mat type underwater foundation
CN208917861U (en) A kind of offshore wind turbine gravity type foundation
CN102080369B (en) Shallow sea novel floating type oil storage platform structure
CN216515566U (en) Tension type single-point mooring combined anchorage structure based on spiral anchor
CN105297763A (en) Assembled type flexible half-excavation foundation for electric transmission lines in mountainous areas
CN206512609U (en) A kind of cordless tower lifting construction of bridge cable system
CN202090262U (en) Bearing buoyancy tank for construction in mudflat and swamp areas
CN212715000U (en) Steel cofferdam positioning system in deep water
CN208996069U (en) A kind of offshore wind turbine single-pile foundation with suction caisson and tension type anchoring system
CN207405657U (en) A kind of cable-stayed type immersed tube tunnel structure
CN203836378U (en) Stable type pipeline
CN108505531A (en) The embedding rock of offshore wind farm mixes pile foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant