CN201703997U - 履带起重机风电专用臂头装置 - Google Patents
履带起重机风电专用臂头装置 Download PDFInfo
- Publication number
- CN201703997U CN201703997U CN2010201923213U CN201020192321U CN201703997U CN 201703997 U CN201703997 U CN 201703997U CN 2010201923213 U CN2010201923213 U CN 2010201923213U CN 201020192321 U CN201020192321 U CN 201020192321U CN 201703997 U CN201703997 U CN 201703997U
- Authority
- CN
- China
- Prior art keywords
- special
- arm head
- node
- transitional
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
本实用新型涉及一种用于吊装风力发电机组的履带起重机风电专用臂头装置,该装置由过渡节和专用臂头两部分组成,过渡节是一个空间桁架,后端与主臂中间节相连接,前端的上部通过两个铰链与专用臂头后端铰接,下部有两个销轴;专用臂头后端的下部有两个叉头,该两叉头与过渡节上的销轴相对应。过渡节上面有主臂拉索连接耳板和导向滑轮架;专用臂头的前端安装吊重滑轮组。导向滑轮架铰接在过渡节上,在组装时能够翻转到过渡节内部。专用臂头的前端下部安装溜放滚轮,在组装时使专用臂头落地而不受损伤。对比使用主臂吊装和固定副臂吊装,本实用新型工作可靠,结构简单实用,重量轻,提高了整机吊装能力,减少了安装步骤,提高了生产效率。
Description
一.技术领域
本实用新型涉及履带起重机吊装臂头装置,特别是用于吊装大型风电设备的专用臂头装置。
二.背景技术
目前,使用履带起重机吊装风力发电机组等大型设备,普遍采用的作法是使用主臂吊装或固定副臂吊装。使用主臂吊装方式在吊装较大物件时,容易出现被吊物件与臂架刮碰现象,因而必须增大作业半径、增加臂架长度,由于风电吊装工况都是采用超长臂架,整机吊装能力由整机稳定性决定,增大作业半径及增加臂架长度大幅度削减了整机吊装能力;使用固定副臂吊装方式,在安装臂架时,需要在主臂头上安装副臂、撑杆、前后拉索等部件,步骤特别繁琐,吊装过程中,撑杆、拉索等附加部件的重量、附加动载、迎风面积等不利因素对整机吊装能力产生不利影响。
三.发明内容
本实用新型的目的是提供一种履带起重机风电专用臂头装置,以解决使用主臂吊装或固定副臂吊装风力发电机组时产生的问题,从而节省安装时间,提高吊装能力,可靠稳定工作,提高生产效率。
本实用新型采用的技术方案是:履带起重机风电专用臂头装置由过渡节和专用臂头两部分组成,过渡节是一个空间桁架,后端与主臂中间节相连接,前端的上部通过两个铰链与专用臂头上部铰接,下部有两个销轴;专用臂头与过渡节连接端的下部有两个叉头,该两叉头与过渡节上的销轴相对应。过渡节上面有主臂拉索连接耳板和导向滑轮架;专用臂头的前端安装吊重滑轮组。导向滑轮架铰接在过渡节上,在组装时能够翻转到过渡节内部。专用臂头的前端下部安装溜放滚轮,在组装时使专用臂头落地而不受损伤。
本实用新型设计合理,工作可靠,结构简单实用,重量轻。对比使用主臂吊装,在相同吊高、相同作业半径、吊装同一物件时,避免了被吊物件与主臂的刮碰现象,也不必因增大作业半径及增加臂架长度而削减整机吊装能力;对比使用固定副臂吊装,省去了连接副臂、撑杆、撑杆前后拉索的步骤,又消除了由撑杆、拉索等附加部件的重量、附加动载、迎风面积等不利因素对整机吊装能力的影响。同时能够减少安装步骤,提高生产效率。特别适合履带起重机使用。
四.附图说明
图1为使用主臂吊装大型物件的工作状态示意图;
图2为使用固定副臂吊装大型物件的工作状态示意图;
图3为本实用新型吊装大型物件的工作状态示意图;
图4为本实用新型的结构示意图;
图5为本实用新型组装时的状态示意图。
五.具体实施方式
在现有技术中,使用主臂吊装大型物件时,是在臂架中间节2上连接臂头1,工作中容易产生被吊物件与吊装臂架刮碰现象,而增大作业半径及增加臂架长度会大幅度削减整机吊装能力;采用固定副臂吊装,是在臂头1上连接副臂3,还要安装撑杆5、前后拉索4、6等部件,步骤特别繁琐,吊装过程中,撑杆5、拉索4、6等附加部件的重量、附加动载、迎风面积等不利因素对整机吊装能力产生不利影响。
本实用新型的履带起重机风电专用臂头装置由过渡节7和专用臂头8组成,过渡节7采用空间桁架高强钢管焊接结构,后端采用锻造臂架接头连接主臂中间节2,前端采用钢板拼接臂架接头连接风电机组吊装专用臂头8,中间节7上面有主臂拉索连接耳板7-1和导向滑轮架7-2;风电吊装专用臂头8采用空间桁架高强钢管焊接结构,前端部安装吊重滑轮组8-3及溜放滚轮8-4;
这两部分通过四对钢板拼接臂架接头依靠销轴连接,上侧面两对臂架接头7-3、8-1采用销轴铰接,下侧面两对臂架接头采用叉式接头7-4、8-2连接,其中过渡节前端下侧面两个接头7-4的双耳板之间预先焊接了销轴,风电专用臂头后方下侧面两个接头为叉形,这种连接方式可以使风电专用臂头在组装整体臂架时下侧面两对叉式连接接头脱开,使过渡节着地,便于连接臂架、穿绳等工作;起臂后两对叉式连接接头自动对正,省去了穿销轴的步骤;过渡节上的导向滑轮架7-2可以折叠转入过渡节内部,这样在运输时可以降低部件运输高度;溜放滚轮位于风电专用臂头前部8-4,在起臂及落臂时,使风电专用臂头在地面上滑动,既避免了使用辅助起重机的麻烦又可以保护臂头前端部的吊重滑轮组。
Claims (3)
1.一种履带起重机风电专用臂头装置,其特征是:它由过渡节(7)和专用臂头(8)两部分组成,过渡节(7)是一个空间桁架,后端与主臂中间节(2)相连接,前端的上部与专用臂头(8)上部铰接,下部有两个销轴(7-4);专用臂头(8)与过渡节(7)连接端的下部有两个叉头(8-2),该两叉头(8-2)与过渡节(7)上的销轴(7-4)相对应;过渡节(7)上面有主臂拉索连接耳板(7-1)和导向滑轮架(7-2);专用臂头(8)的前端安装吊重滑轮组(8-3)。
2.根据权利要求1所述的履带起重机风电专用臂头装置,其特征是:导向滑轮架(7-2)铰接在过渡节(7)上。
3.根据权利要求1所述的履带起重机风电专用臂头装置,其特征是:专用臂头(8)的前端下部安装溜放滚轮(8-4)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201923213U CN201703997U (zh) | 2010-05-13 | 2010-05-13 | 履带起重机风电专用臂头装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201923213U CN201703997U (zh) | 2010-05-13 | 2010-05-13 | 履带起重机风电专用臂头装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201703997U true CN201703997U (zh) | 2011-01-12 |
Family
ID=43441153
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201923213U Expired - Lifetime CN201703997U (zh) | 2010-05-13 | 2010-05-13 | 履带起重机风电专用臂头装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201703997U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102092646A (zh) * | 2011-03-08 | 2011-06-15 | 上海三一科技有限公司 | 一种起重机多功用臂头 |
CN103342301A (zh) * | 2013-07-24 | 2013-10-09 | 徐州重型机械有限公司 | 风电专用独立臂头 |
-
2010
- 2010-05-13 CN CN2010201923213U patent/CN201703997U/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102092646A (zh) * | 2011-03-08 | 2011-06-15 | 上海三一科技有限公司 | 一种起重机多功用臂头 |
CN103342301A (zh) * | 2013-07-24 | 2013-10-09 | 徐州重型机械有限公司 | 风电专用独立臂头 |
CN103342301B (zh) * | 2013-07-24 | 2015-08-19 | 徐州重型机械有限公司 | 风电专用独立臂头 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101830404A (zh) | 履带起重机风电专用臂头装置 | |
CN102659029B (zh) | 一种组合型移动吊架 | |
CN101734560B (zh) | 高耸构筑物施工内爬塔吊高空拆除工法 | |
CN105417403B (zh) | 一种在船坞内安装超高超大型浮式起重机的方法 | |
CN102190255B (zh) | 一种起重机 | |
CN102267670A (zh) | 一种连接架及具有该连接架的臂架系统和起重机械 | |
CN201176370Y (zh) | 发电机定子组合吊具 | |
CN108821138B (zh) | 用于海上风电机组关键零部件的吊装设备 | |
CN201087083Y (zh) | 带有自拆装机构的起重机 | |
CN111017695A (zh) | 履带吊配合吊排系统吊装大型船体总段的工艺 | |
CN101357743B (zh) | 动臂变幅起重机的吊钩换倍率机构 | |
CN201703997U (zh) | 履带起重机风电专用臂头装置 | |
CN201901515U (zh) | 船舶清仓机械专用吊具 | |
CN202265344U (zh) | 一种连接架及具有该连接架的臂架系统和起重机械 | |
CN204324760U (zh) | 一种独立臂头及起重机 | |
CN202245815U (zh) | 一种安装在火炬塔顶部用于拆装火炬头的自升降吊机 | |
CN202704895U (zh) | 一种履带起重机折叠臂 | |
CN204211393U (zh) | 一种风电吊装专用臂头 | |
CN205241086U (zh) | 模板吊装和安拆用炮车 | |
CN208378182U (zh) | 风力发电机组主轴吊装工具 | |
CN105584939B (zh) | 一种风电吊装专用臂头 | |
CN106049896A (zh) | 抵抗高空悬挑钢结构平台拆除过程中冲击荷载的拆除方法 | |
CN202529744U (zh) | 一种固定桅杆辅助吊结构及包括该结构的履带起重机 | |
CN214456342U (zh) | 一种用于起重机的一体化超起变幅装置 | |
CN202098670U (zh) | 风电塔筒运输、吊立辅助装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20110112 |