CN201695391U - 管桩法兰式接头及其拼接工具 - Google Patents

管桩法兰式接头及其拼接工具 Download PDF

Info

Publication number
CN201695391U
CN201695391U CN200920200115XU CN200920200115U CN201695391U CN 201695391 U CN201695391 U CN 201695391U CN 200920200115X U CN200920200115X U CN 200920200115XU CN 200920200115 U CN200920200115 U CN 200920200115U CN 201695391 U CN201695391 U CN 201695391U
Authority
CN
China
Prior art keywords
flange
end plate
splicing
lower flange
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN200920200115XU
Other languages
English (en)
Inventor
史美鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Communication Engineering Construction Group Co Ltd
Original Assignee
NINGBO HARBOUR ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO HARBOUR ENGINEERING Co Ltd filed Critical NINGBO HARBOUR ENGINEERING Co Ltd
Priority to CN200920200115XU priority Critical patent/CN201695391U/zh
Application granted granted Critical
Publication of CN201695391U publication Critical patent/CN201695391U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

一种管桩法兰式接头及其拼接工具,该接头包括上接桩底端的上端板以及下接桩顶端的下端板,所述的上端板下方固定有一上法兰,该上法兰的端面上均布有多个张拉孔,所述的下端板上方固定有一下法兰,该下法兰的端面上均布有与每个张拉孔相对的通配孔,螺栓穿过张拉孔和对应的通配孔后与螺母相连。所述的上法兰与上端板之间以及下法兰与下端板之间分别焊接有上、下抗弯管。所述的上法兰与上端板之间以及下法兰与下端板之间均焊接有多块呈环形均布的加强肋板。本实用新型用于多段PHC管桩拼接,只要使用拼接工具将上法兰与下法兰贴合,再用螺栓和螺母将上法兰和下法兰紧固即完成了拼接,可以在任意工地现场进行操作,具有拼接方便,联接可靠的优点。

Description

管桩法兰式接头及其拼接工具
技术领域:
本实用新型涉及一种将多段管桩联接成为整桩的接头,具体的说是一种预应力高强混凝土管桩(简称PHC管桩)上的联接接头。
背景技术:
由于PHC管桩具有应用范围广、单桩承载力高、工程造价低等鲜明特点,因此在绝大多数的工程中,都会PHC管桩作为工程桩,主要承受竖向作用。PHC管桩整桩较长,因此需要分段制造后再进行联接。传统的PHC管桩拼接一直采用端板焊接联接,管节成型后进行拼接时在坡口内用环向焊缝将两片端板联接成一体。管节拼接时必需全部在拼桩滚轮架上进行,边旋转管节,边进行焊接作业。端板间直接焊接由于间距小,焊缝较窄,不仅影响管桩的强度,而且对焊缝检测也带来困难,留下很大的事故隐患。另外在水上打桩时,受到打桩船架高和水深的限制而无法进行整桩沉设、吊打桩、维修补桩、电焊接桩等操作。中国专利局2004年8月11日公开的,授权公告号为“CN2632148Y”的“预应力高强混凝土管桩的碗形端头”,在端板的圆环形端面上均布有钢筋拉伸沉头孔,端板的上端面上焊接一个圆筒形的端头,端头的焊接端呈由外向里的斜切面,端板的焊接端呈由外向里的斜切面,该斜切面并以圆弧形延伸到端板的端面,端头与端板相对端面之间有间隙,焊条焊接在端板与端头相对的缺口和间隙中,并在端板的端面与端头内壁之间均布焊接有加劲板。这种结构在两段桩体拼接时还是需要焊接操作,不适于在水上接桩。
实用新型内容:
本实用新型的目的在于针对上述现有技术的缺陷和不足,为PHC管桩提供一种拼接方便,联接可靠的接头。
为实现上述目的本实用新型所采取的技术方案是:该管桩法兰式接头包括上接桩底端的上端板以及下接桩顶端的下端板,所述的上端板下方固定有一上法兰,该上法兰的端面上均布有多个张拉孔,所述的下端板上方固定有一下法兰,该下法兰的端面上均布有与每个张拉孔相对的通配孔,螺栓穿过张拉孔和对应的通配孔后与螺母相连。
所述的上法兰与上端板之间焊接有上抗弯管,所述的下法兰与下端板之间焊接有下抗弯管。
所述的上法兰与上端板之间焊接有多块呈环形均布的加强肋板,所述的下法兰与下端板之间焊接有多块呈环形均布的加强肋板。
所述的上法兰和下法兰之间衬有石棉板。
一种用于所述的管桩法兰式接头的拼接工具,它包括与上法兰和下法兰的侧壁相匹配的弧形侧板,所述的弧形侧板上设置有定位块,该定位块伸入相邻两加强肋板之间。
定位块为两个或两个以上。
本实用新型用于多段PHC管桩拼接,只要使用拼接工具将上法兰与下法兰贴合,再用螺栓和螺母将上法兰和下法兰紧固即完成了拼接,可以在任意工地现场进行操作,具有拼接方便,联接可靠的优点。
附图说明:
图1为本实用新型的结构示意图。
图2为图1的A-A视图。
图3为图1的B-B视图。
图4为拼接工具结构示意图。
图5为拼接工具另一结构示意图。
图6为使用拼接工具时的结构示意图。
具体实施方式:
如图1、图2、图3所示,本实用新型为一种管桩法兰式接头,它包括固定在上接桩1底端的上端板2以及固在定下接桩8顶端的下端板7。所述的上端板2下方固定有一上法兰4,该上法兰4的端面上均布有多个张拉孔4.1,在上法兰4与上端板2之间焊接有上抗弯管9,在上抗弯管9的外侧设置有多块加强肋板12,呈环形均布,且该加强肋板12的上、下端分别与上端板2、上法兰4焊接。所述的下端板7上方固定有一下法兰5,该下法兰5的端面上均布有与每个张拉孔4.1相对的通配孔5.1,在下法兰5与下端板7之间焊接有下抗弯管11,在下抗弯管11的外侧设置有多块加强肋板12,呈环形均布,且该加强肋板12的上、下端分别与下法兰5、下端板7焊接。当上法兰4放置于下法兰5上方,并且使上法兰4的张拉孔4.1与下法兰5的通配孔5.1相对时,螺栓6穿过张拉孔4.1和对应的通配孔5.1后与螺母3相连即将上法兰4与下法兰5锁定,实现上接桩1与下接桩8拼接。在上法兰4和下法兰5之间还可以衬垫一层石棉板10,使螺栓6与螺母3连接后不容易松动。上、下抗弯管9、11和加强肋板12的设置可以增强接头处的承载能力。
如图4、图5、图6所示,本实用新型管桩法兰式接头的拼接工具,它包括与上法兰4和下法兰5的侧壁相匹配的弧形侧板13,所述的弧形侧板13上设置有定位块14,该定位块14伸入相邻两加强肋板12之间,所述的定位块14为两个或两个以上,且两个或两个以上的定位块14可以紧贴在一起或间隔一定的距离。定位块14的位置及大小可以根据现场条件定制。拼接工具可以方便调节上、下接桩的位置,使上法兰和下法兰完全拼合。
上接桩1和下接桩8拼接时,先将拼接工具的定位块14塞入下法兰5和下端板7之间的相邻两加强肋板12的空间内,并确保弧形侧板13与下法兰5和下端板7的侧壁贴合。然后用吊车吊起上接桩1,使上法兰4的侧壁与弧形侧板13相贴合,然后在该拼接工具的相对一侧同样安装另一拼接工具,两拼接工具的弧形侧板13将上法兰4侧壁包裹,使上法兰4只能沿两弧形侧板13之间的通道内上、下竖直移动,此时可慢慢放下上接桩1,直至上法兰4和下法兰5完全拼合。最后安装好螺栓6和螺母3,并取下拼接工具即完成了拼接。

Claims (6)

1.一种管桩法兰式接头,它包括上接桩(1)底端的上端板(2)以及下接桩(8)顶端的下端板(7),其特征在于所述的上端板(2)下方固定有一上法兰(4),该上法兰(4)的端面上均布有多个张拉孔(4.1),所述的下端板(7)上方固定有一下法兰(5),该下法兰(5)的端面上均布有与每个张拉孔(4.1)相对的通配孔(5.1),螺栓(6)穿过张拉孔(4.1)和对应的通配孔(5.1)后与螺母(3)相连。
2.根据权利要求1所述的管桩法兰式接头,其特征在于所述的上法兰(4)与上端板(2)之间焊接有上抗弯管(9),所述的下法兰(5)与下端板(7)之间焊接有下抗弯管(11)。
3.根据权利要求1或2所述的管桩法兰式接头,其特征在于所述的上法兰(4)与上端板(2)之间焊接有多块呈环形均布的加强肋板(12),所述的下法兰(5)与下端板(7)之间焊接有多块呈环形均布的加强肋板(12)。
4.根据权利要求3所述的管桩法兰式接头,其特征在于所述的上法兰(4)和下法兰(5)之间衬有石棉板(10)。
5.一种用于权利要求1至4所述的管桩法兰式接头的拼接工具,其特征在于它包括与上法兰(4)和下法兰(5)的侧壁相匹配的弧形侧板(13),所述的弧形侧板(13)上设置有定位块(14),该定位块(14)伸入相邻两加强肋板(12)之间。
6.根据权利要求5所述的管桩法兰式接头的拼接工具,所述的定位块(14)为两个或两个以上。 
CN200920200115XU 2009-11-10 2009-11-10 管桩法兰式接头及其拼接工具 Expired - Lifetime CN201695391U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920200115XU CN201695391U (zh) 2009-11-10 2009-11-10 管桩法兰式接头及其拼接工具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920200115XU CN201695391U (zh) 2009-11-10 2009-11-10 管桩法兰式接头及其拼接工具

Publications (1)

Publication Number Publication Date
CN201695391U true CN201695391U (zh) 2011-01-05

Family

ID=43396631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920200115XU Expired - Lifetime CN201695391U (zh) 2009-11-10 2009-11-10 管桩法兰式接头及其拼接工具

Country Status (1)

Country Link
CN (1) CN201695391U (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102199919A (zh) * 2011-06-03 2011-09-28 广东三和管桩有限公司 预应力混凝土管桩防腐接头
CN103273437A (zh) * 2012-11-10 2013-09-04 上海中远川崎重工钢结构有限公司 钢结构隧道衬环精度控制的定位装置
CN103628474A (zh) * 2012-08-27 2014-03-12 上海中技桩业股份有限公司 螺栓连接预应力空心方桩的制备方法
CN104099926A (zh) * 2013-04-10 2014-10-15 斯马泰克工程技术株式会社 高强度中空混凝土桩的连结装置及利用其的连结构造
CN108661045A (zh) * 2018-07-20 2018-10-16 东北大学 一种预制gfrp管混凝土拼接桩
CN110158587A (zh) * 2019-06-24 2019-08-23 南京工业大学 预制能源管桩的连接接头及其连接方法
CN116557216A (zh) * 2023-07-07 2023-08-08 山西天宝集团有限公司 一种新能源风力发电分片式法兰及连接方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102199919A (zh) * 2011-06-03 2011-09-28 广东三和管桩有限公司 预应力混凝土管桩防腐接头
CN103628474A (zh) * 2012-08-27 2014-03-12 上海中技桩业股份有限公司 螺栓连接预应力空心方桩的制备方法
CN103273437A (zh) * 2012-11-10 2013-09-04 上海中远川崎重工钢结构有限公司 钢结构隧道衬环精度控制的定位装置
CN104099926A (zh) * 2013-04-10 2014-10-15 斯马泰克工程技术株式会社 高强度中空混凝土桩的连结装置及利用其的连结构造
CN108661045A (zh) * 2018-07-20 2018-10-16 东北大学 一种预制gfrp管混凝土拼接桩
CN108661045B (zh) * 2018-07-20 2023-11-24 东北大学 一种预制gfrp管混凝土拼接桩
CN110158587A (zh) * 2019-06-24 2019-08-23 南京工业大学 预制能源管桩的连接接头及其连接方法
CN116557216A (zh) * 2023-07-07 2023-08-08 山西天宝集团有限公司 一种新能源风力发电分片式法兰及连接方法

Similar Documents

Publication Publication Date Title
CN201695391U (zh) 管桩法兰式接头及其拼接工具
CN102409864B (zh) 一种钢桁架的施工方法及其吊装时使用的临时加固装置
CN105484514A (zh) 一种加固钢筋混凝土圆形墩柱的方法
CN104925705B (zh) 用于叉车的门架组件和具有其的叉车
CN105569368A (zh) 一种用于钢筋混凝土圆形截面柱的环形钢板加固装置
CN209941691U (zh) 一种电动式模板支撑加固设备
CN212612011U (zh) 一种圆柱桥墩抱箍支架
CN107152182A (zh) 不锈钢复合板储罐斜罐底外立抱杆安装结构及安装方法
CN111055115B (zh) 一种分块式盾构机工厂组装方法
CN107268447A (zh) 一种整体安拆式放射型轮状钢护筒内置接高施工平台
CN2878509Y (zh) Phc管桩
CN210164055U (zh) 钢砼组合管上下层快速对接微调装置
CN201362860Y (zh) 建筑砼桩检测装置
CN108820594B (zh) 大型油储罐顶板制作工具、顶板制作方法及罐顶安装方法
CN206829350U (zh) 用于地铁站的钢结构支架系统
CN105464151A (zh) 一种预制桩抗拔检测装置
CN206296394U (zh) 钢筋接地跨接线机械加工装置
CN201738311U (zh) 一种用于抗拔桩基的法兰盘
CN201434768Y (zh) 通用反力架
CN111622120A (zh) 一种桥墩抱箍支架及桥梁模架架托搭建方法
CN211340773U (zh) 一种卡扣式预应力桩连接结构
CN219838686U (zh) 一种船舶分段临时加强结构
CN214364994U (zh) 预埋钢板调平装置
CN208455670U (zh) 一种使用方便的高强度波纹钢检查井
CN221318940U (zh) 一种导管架吊装结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NINGBO TRAFFIC ENGINEERING CONSTRUCTION GROUP CO.,

Free format text: FORMER OWNER: NINGBO HARBOUR ENGINEERING CO., LTD.

Effective date: 20110128

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 315020 15/F, RIHU NATIONAL TRADE CENTER, NO.312, LANE 645, RENMIN ROAD, NINGBO CITY, ZHEJIANG PROVINCE TO: 315010 NO.32-2, YINFENG ROAD, NINGBO CITY, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110128

Address after: 315010 Zhejiang city in Ningbo Province, Yin Feng Road, No. 32-2

Patentee after: Ningbo Communication Engineering Construction Group Co.,Ltd.

Address before: 15, 312 floor, Lake China World Trade Center center, 645 lane, Renmin Road, Ningbo, Zhejiang, 315020

Patentee before: Ningbo Harbour Engineering Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110105