CN201671606U - Two-stage supercharging gas production device utilizing injection and compressor - Google Patents

Two-stage supercharging gas production device utilizing injection and compressor Download PDF

Info

Publication number
CN201671606U
CN201671606U CN2010201648201U CN201020164820U CN201671606U CN 201671606 U CN201671606 U CN 201671606U CN 2010201648201 U CN2010201648201 U CN 2010201648201U CN 201020164820 U CN201020164820 U CN 201020164820U CN 201671606 U CN201671606 U CN 201671606U
Authority
CN
China
Prior art keywords
pipeline
compressor
gas
outlet
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201648201U
Other languages
Chinese (zh)
Inventor
刘双全
张书平
吴革生
陈德见
于志刚
汪雄雄
樊莲莲
崔丽春
石斌
黄天虎
王选茹
韩东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN2010201648201U priority Critical patent/CN201671606U/en
Application granted granted Critical
Publication of CN201671606U publication Critical patent/CN201671606U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The gas production device is applied to oil and gas field gas production and utilizes a jet drainage device and a compressor two-stage supercharging gas production device. The outlet of the high-pressure gas well is provided with a high-pressure gas inlet which is connected with the jet drainage device through a pipeline; the outlet of the ultra-low pressure gas well is provided with a low-pressure suction inlet which is connected with a jet drainage device through a pipeline; the outlet of the jet drainage device is provided with a pipeline connected with the inlet of the separator; the outlet of the low-pressure gas well is provided with a pipeline connected with the inlet of the separator; the outlet of the separator is connected with the inlet of the compressor through a pipeline; the outlet of the compressor is provided with an output pipeline. A return pipeline is connected between the external pipeline and the high-pressure gas inlet of the jet drainage device, and a gate valve is arranged on the return pipeline. The effect is as follows: the natural gas in the ultra-low pressure well can be extracted, so that the pressure of the natural gas reaches the inlet pressure range of the compressor. The method can ensure that part of abandoned gas wells are produced from new investment due to low pressure, and improve the recovery ratio of the gas field and the overall development benefit.

Description

Utilize and spray and compressor two-stage supercharging gas producing device
Technical field
The utility model relates to oil gas field production gas technology field, be particularly related to and utilize the compressor boost gas production, drainage system and compressor two-stage supercharging gas producing device are sprayed in the utilization that is gas gathering station field special use, make full use of the high-pressure gas well stratum energy, realization ultralow pressure gas well (≤2.0MPa) two-stage supercharging is stablized the device of gas production.
Background technology
The middle and later periods of gas field exploitation, the subject matter that faces is the steady production problem of a large amount of low-voltage and low-yield gas wells.Because the formation heterogeneity influence factor, cause the natural gas well pressure drop in same gas gathering station asynchronous: the pressure of the part natural gas well is higher, needs throttling step-down gas production to produce; And the oldish well of another part can't enter gathering system and produce continuously because pressure is lower.At present, the gas field exploitation middle and later periods is mainly adopted the oldish well of compressor boost exploitation low pressure.There is some difference because of the defeated requirement of the collection in gas field for the design parameters of compressor boost.Generally selecting the compressor design inlet pressure for use is 2.0MPa, and outlet pressure is designed to about 5.8MPa.
In the oldish well process of compressor boost exploitation low pressure, stratum energy is still constantly depleted, and the remaining problem of compressor horsepower will appear in the continuous reduction of gas well deliverability.The compressor horsepower surplus can cause compressor to adopt the single-cylinder single-acting mode of operation, is in underrun state (actual power is less than 30% of rated power) for a long time.Problems such as compressor underrun meeting extraction system insufficient lubrication, combustion chamber deposit cause compressor fault frequent.In addition, because the natural gas well pressure drop of same pressurization system is unbalanced, the pressure of part well is higher than the outlet pressure of compressor, the pressure wretched insufficiency of part well.(pressure≤2.0MPa) can not satisfy the service condition of compressor inlet pressure 2MPa to the oldish well of part ultralow pressure.And the hypertonia of part well makes the inlet pressure of compressor be further improved, and influences effective performance of compressor boost effect.
The utility model content
The purpose of this utility model is: a kind of utilization injection and compressor two-stage supercharging gas producing device are provided, (the natural gas extraction in the P≤2.0MPa) makes the gas pressure after the drainage reach the Compressor Inlet Pressure scope with the ultralow pressure gas well by spraying drainage method.
The technical solution adopted in the utility model is: utilize and spray and compressor two-stage supercharging gas producing device, mainly be made up of eliminator, compressor, external transport pipeline, reflux pipeline, injection drainage system and pipeline, it is characterized in that:
The high pressure gas that the outlet of high-pressure gas well has pipeline to connect and sprays drainage system enters the mouth; The outlet of ultralow pressure gas well has pipeline to connect the low pressure intake that sprays drainage system; The outlet of spraying drainage system has pipeline to connect the inlet of eliminator; The outlet of low-pressure gas well has pipeline to connect the inlet of eliminator; The outlet of eliminator has pipeline to connect the inlet of compressor; The outlet of compressor has external transport pipeline.Between the high pressure gas inlet of external transport pipeline and injection drainage system, be connected with reflux pipeline, slide valve is arranged on the reflux pipeline.
Summary utilization is sprayed the operating principle with compressor two-stage supercharging gas producing device.Consult Fig. 1.
Scheme one: (5~10MPa) the high pressure gas inlets from injection drainage system 8 enter and spray drainage system 8 high pressure gas of high-pressure gas well 1 output; (1~2.0MPa) enters the low pressure intake that sprays drainage system 8 to ultralow the calming the anger of ultralow pressure gas well 2 outputs; Mixed natural gas enters compressor 5 from outlet outflow of spraying drainage system 8 and the inlet that flows into eliminator 4 through the natural gas after eliminator 4 separation, enters external transport pipeline 6 through the natural gas after compressor 5 superchargings.(1.4~5.0MPa) flow directly into the inlet of eliminator 4 to the low pressure gas of low-pressure gas well 3 outputs.
Scheme two: open the slide valve on the reflux pipeline 7, the gases at high pressure of compressed machine 5 superchargings enter the high pressure gas inlet that sprays drainage system 8 through reflux pipeline 7; (1~2.0MPa) enters the low pressure intake that sprays drainage system 8 to ultralow the calming the anger of ultralow pressure gas well 2 outputs; Mixed natural gas flows out and flows into the inlet of eliminator 4 from the outlet of spraying drainage system 8.Enter compressor 5 through the natural gas after eliminator 4 separation, enter external transport pipeline 6 through the natural gas after compressor 5 superchargings.
The beneficial effects of the utility model: the utility model utilization injection and compressor two-stage supercharging gas producing device, be applied to the gas field gas production and produce the middle and later periods, realize the two-stage supercharging of ultralow pressure gas well, regulate compressor load simultaneously.Can (the natural gas extraction in the P≤2.0MPa) makes the gas pressure after the drainage reach the Compressor Inlet Pressure scope with the ultralow pressure gas well.Can make part because the low and discarded gas well of pressure from new input gas production, improves gas field recovery ratio and whole development benefit.
Description of drawings
Fig. 1 is the utility model utilization injection and compressor two-stage supercharging gas producing device structural representation.
Among the figure, 1. high-pressure gas well, 2. ultralow pressure gas well, 3. low-pressure gas well, 4. eliminator, 5. compressor, 6. external transport pipeline, 7. reflux pipeline 8. sprays drainage system.
The specific embodiment
Embodiment 1: utilizing injection and compressor two-stage supercharging gas producing device with one is example, and the utility model is described in further detail.
Consult Fig. 1.The utility model utilization injection and compressor two-stage supercharging gas producing device mainly are made up of eliminator 4, compressor 5, external transport pipeline 6, reflux pipeline 7, injection drainage system 8 and pipeline.
The high pressure gas that the outlet of a high-pressure gas well 1 has pipeline to connect and sprays drainage system 8 enters the mouth; Connect the low pressure intake that sprays drainage system 8 after the outlet line parallel connection of two mouthfuls of ultralow pressure gas wells 2; The outlet of spraying drainage system 8 has pipeline to connect the inlet of eliminator 4; The inlet that connects eliminator 4 after the outlet line parallel connection of three mouthfuls of low-pressure gas wells 3; The outlet of eliminator 4 has pipeline to connect the inlet of compressor 5; The outlet of compressor 5 has external transport pipeline 6.Between the high pressure gas inlet of external transport pipeline 6 and injection drainage system 8, be connected with a reflux pipeline 7, a slide valve is arranged on reflux pipeline 7.

Claims (1)

1. one kind is utilized injection and compressor two-stage supercharging gas producing device, mainly is made up of eliminator (4), compressor (5), external transport pipeline (6), reflux pipeline (7), injection drainage system (8) and pipeline, it is characterized in that:
The high pressure gas that the outlet of high-pressure gas well (1) has pipeline to connect and sprays drainage system (8) enters the mouth; The outlet of ultralow pressure gas well (2) has pipeline to connect the low pressure intake that sprays drainage system (8); The outlet of spraying drainage system (8) has pipeline to connect the inlet of eliminator (4); The outlet of low-pressure gas well (3) has pipeline to connect the inlet of eliminator (4); The outlet of eliminator (4) has pipeline to connect the inlet of compressor (5); The outlet of compressor (5) has external transport pipeline (6); Be connected with reflux pipeline (7) between the high pressure gas inlet of external transport pipeline (6) and injection drainage system (8), reflux pipeline has slide valve on (7).
CN2010201648201U 2010-04-16 2010-04-16 Two-stage supercharging gas production device utilizing injection and compressor Expired - Lifetime CN201671606U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201648201U CN201671606U (en) 2010-04-16 2010-04-16 Two-stage supercharging gas production device utilizing injection and compressor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201648201U CN201671606U (en) 2010-04-16 2010-04-16 Two-stage supercharging gas production device utilizing injection and compressor

Publications (1)

Publication Number Publication Date
CN201671606U true CN201671606U (en) 2010-12-15

Family

ID=43329018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201648201U Expired - Lifetime CN201671606U (en) 2010-04-16 2010-04-16 Two-stage supercharging gas production device utilizing injection and compressor

Country Status (1)

Country Link
CN (1) CN201671606U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912253A (en) * 2014-03-20 2014-07-09 西安长庆科技工程有限责任公司 Gas well single well gas recovery system and low-pressure recovery method thereof
CN104763403A (en) * 2015-03-26 2015-07-08 西安长庆科技工程有限责任公司 Ground high-low pressure mixed gas-liquid separation system based on multi-reservoir commingling production gas field
CN111520108A (en) * 2020-04-30 2020-08-11 成都百胜野牛科技有限公司 Well group energy management method
CN112682700A (en) * 2020-12-23 2021-04-20 中国石油大学(华东) Gas field low pressure gathering and transportation multifunctional pressurizing pry
CN115405858A (en) * 2021-05-27 2022-11-29 中国石油化工股份有限公司 Energy-saving pressurization system of multi-pressure system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912253A (en) * 2014-03-20 2014-07-09 西安长庆科技工程有限责任公司 Gas well single well gas recovery system and low-pressure recovery method thereof
CN104763403A (en) * 2015-03-26 2015-07-08 西安长庆科技工程有限责任公司 Ground high-low pressure mixed gas-liquid separation system based on multi-reservoir commingling production gas field
CN104763403B (en) * 2015-03-26 2017-07-25 西安长庆科技工程有限责任公司 A kind of ground high-low pressure gas-liquid mixture piece-rate system that gas production field is closed based on multi-reservoir
CN111520108A (en) * 2020-04-30 2020-08-11 成都百胜野牛科技有限公司 Well group energy management method
CN112682700A (en) * 2020-12-23 2021-04-20 中国石油大学(华东) Gas field low pressure gathering and transportation multifunctional pressurizing pry
CN112682700B (en) * 2020-12-23 2022-06-24 中国石油大学(华东) Gas field low pressure gathering and transportation multifunctional pressurizing pry
CN115405858A (en) * 2021-05-27 2022-11-29 中国石油化工股份有限公司 Energy-saving pressurization system of multi-pressure system

Similar Documents

Publication Publication Date Title
CN101864934B (en) Two-stage ejector supercharging gas production method for gas field
CN201671606U (en) Two-stage supercharging gas production device utilizing injection and compressor
CN201963276U (en) Pressurized gas lift drainage gas production device
CN202064905U (en) Gas lift liquid drainage device of vehicle-mounted natural gas compressor
CN104329164B (en) Free piston engine
CN201884015U (en) Liquid drainage and gas production device for natural gas well
CN107489467B (en) Compressed air pumping energy storage system
CN204457684U (en) Centralized pressurization gas lift drainage gas production system for low-pressure high-yield water and gas wells
CN205592136U (en) Pumping system, Vacuum pumping system and vacuum refining system
CN104295269B (en) Integrated well group pressurization integrated device
CN202746938U (en) Skid-mounted gas collecting, metering and pipe cleaning device
CN202791338U (en) Pipeline gas pressure energy recovery device
WO2003102351A8 (en) Oil and gas production with downhole separation and reinjection of gas
CN104533598A (en) Switchable successive/secondary boosting structure and control method
CN109854214B (en) Synchronous rotation water drainage gas production device
CN202561438U (en) Gas pipeline system for natural gas pressure regulation device
CN105507860B (en) A kind of skid-mounted gas field individual well constant entropy supercharging integrated device
CN203463092U (en) Novel manifold truck/pry with self-pressurization perfusion function for industrial large-scale fracturing
CN202031548U (en) Device for recovering gas in wellhead and well group casing of oilfield
CN202674831U (en) Wellhead supercharger special for exploitation of coal bed gas
CN201705316U (en) Two-stage ejector supercharging gas production device for gas field
CN201620828U (en) A jet drainage device for cluster well group
CN207420643U (en) Compressed air water pumping energy storage system
CN208222082U (en) Single screw rod synchronous revolving mixes defeated integrated device
CN201080819Y (en) Offshore platform natural gas ultra-high pressure reinjection system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20101215