CN201620828U - Jet drainage device for cluster wells - Google Patents

Jet drainage device for cluster wells Download PDF

Info

Publication number
CN201620828U
CN201620828U CN2010200469098U CN201020046909U CN201620828U CN 201620828 U CN201620828 U CN 201620828U CN 2010200469098 U CN2010200469098 U CN 2010200469098U CN 201020046909 U CN201020046909 U CN 201020046909U CN 201620828 U CN201620828 U CN 201620828U
Authority
CN
China
Prior art keywords
gas
well
pipeline
pressure
outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010200469098U
Other languages
Chinese (zh)
Inventor
李莲明
李强
晁琼萧
胡均志
刘小江
侯亚龙
芦造华
许晓伟
周玉荣
史福军
张玉华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN2010200469098U priority Critical patent/CN201620828U/en
Application granted granted Critical
Publication of CN201620828U publication Critical patent/CN201620828U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Pipeline Systems (AREA)

Abstract

The utility model relates to a jet drainage device for cluster wells, which is used for multiple gas wells of oil-gas field cluster wells to simultaneously, continuously and stably collect gas. In natural gas wells, an outlet of a wellhead valve bank of each natural gas well is connected with a pipeline, and an outlet pipeline of the wellhead valve bank of one high pressure gas well is connected with an inlet of a gas jetting device; an outlet of the gas jetting device is provided with a pipeline connected with a natural gas external pipeline, and a gate valve is respectively arranged on the inlet pipeline and the outlet pipeline of the gas jetting device; and a suction inlet of the gas jetting device is provided with a pipeline connected with an outlet of a wellhead valve bank of a lower pressure gas well, and a gate valve is arranged on a pipeline from an outlet of the wellhead valve bank of the lower pressure gas well to the suction inlet of the gas ejector. The utility model has the beneficial effects that the high pressure and lower pressure gas wells can simultaneously produce, and the well opening time efficiency of the gas wells of the cluster wells is improved, the efficient development for the gas wells is realized, and the safety factor of pipeline operation is increased.

Description

A kind of injection drainage system that is used for the cluster well group
Technical field
The utility model relates to oil gas field production gas technology field, and particularly many implications of gas field cluster well group well can continue simultaneously, stablize and carry out the device that gas production is produced.
Background technology
At present, the gas production of cluster well group is taked in some gas fields, enters the station, measures, separates, fails outward after promptly the next natural gas via main line manifold of many implications well well head closes.Owing in the natural gas well in the cluster well group, the gas well that is higher than system pressure is arranged, needs to throw in underground throttle device, controlled pressure; Also have the stratum energy deficiency, pressure is lower than the low-pressure gas well of system pressure, can't ordinary production.The recovery percent of each gas well and reservoir properties difference, the pressure of each gas well, tolerance there are differences in the well group, cause after same main line manifold closes phase mutual interference between each well.For avoiding phase mutual interference between well, can only take intermittently, production model is exploited by turns.Rate when influence drives a well has like this limited the performance of each gas well deliverability of cluster well group.In addition, exist in the cluster well group and drive gas well between low pressure, pressure descends rapidly during production, is difficult to continuous, steady production, and exploitation is difficulty comparatively.
The utility model content
The purpose of this utility model is: a kind of injection drainage system that is used for the cluster well group is provided, utilize other gas well of a bite high-pressure gas well injection in the cluster well group, make each gas well of cluster well group can be continuously, steady production, rate when improving the gas well gas production is to reach the purpose of the reasonable high-efficiency mining of cluster well group gas well.
The technical solution adopted in the utility model is: the injection drainage system that is used for the cluster well group, mainly form by high-pressure gas well, low-pressure gas well, gas ejector, slide valve and pipeline, in the natural gas well group, the outlet of the head valve group of each natural gas well is connected with pipeline.It is characterized in that: the outlet line of the head valve group of a bite high-pressure gas well connects the import of gas ejector, has pipeline to connect gas external transport pipeline in the outlet of gas ejector, on the suction line of gas ejector and outlet line slide valve is arranged.On the intake of gas ejector, there is pipeline to connect the outlet of the head valve group of low-pressure gas well.On the pipeline that exports to the gas ejector intake of the head valve group of low-pressure gas well, slide valve is arranged.High pressure, high gas rate well offer the continuous production of low-pressure gas well institute energy requirement.
If in a plurality of low-pressure gas wells, there is the pressure of other gas well to be higher than system pressure, can in pressure is higher than the gas well of system pressure, underground throttle device be installed, on the pipeline that exports to the gas ejector intake of the head valve group of the gas well that is higher than system pressure, slide valve be arranged.Other gas pressure that is higher than the gas well extraction of system pressure is reduced, can cooperate with other low-pressure gas wells.Make by drainage gas well pressure and all be lower than system pressure.
Convenient, easy to maintenance for gas production, the outlet line of the head valve group of high-pressure gas well connects gas external transport pipeline; The outlet line of the head valve group of low-pressure gas well connects gas external transport pipeline; The outlet line of head valve group that is higher than the gas well of system pressure connects gas external transport pipeline.
What underground throttle device adopted is the adjustable gas testing body of EJT ejector.There is sale in market.
The beneficial effects of the utility model: the utility model is used for the injection drainage system of cluster well group, has the following advantages:
1, cluster well group, high pressure, low-pressure gas well can be produced simultaneously.After the cluster well group use to be sprayed drainage system, gas well can drive a well simultaneously, and natural gas enters main after mixing, rate when having improved the driving a well of cluster well group gas well, and gas well is realized efficient exploitation.
2, utilize in the high-pressure gas well injection cluster well group between drive gas well, make gas well can be under lower pressure continuously, steady production, the rate during gas production of driving gas well between raising.
3, improve the pipeline operating safety factor.It is 5.2MPa that natural gas mixes back pressure, and the pipeline operating pressure reduces greatly, has improved the safety factor of pipeline operation.
4, reduce the methyl alcohol injection rate.When gas well is produced, stop up, need to inject methyl alcohol for preventing hydrate, use this device after, pressure reduces, and has reduced the hydrate formation condition, minimizing hydrate blocking pipeline is guaranteed the gas well continuous and stable production.
Description of drawings
Fig. 1 is the injection drainage system structural representation that the utility model is used for the cluster well group.
Among the figure, 1. high-pressure gas well, 2. gas ejector, 3. slide valve 4. is higher than the gas well of system pressure, 5. underground throttle device, 6. low-pressure gas well.
The specific embodiment
Embodiment 1: with one the gas well group of three implication wells being arranged is example, and the injection drainage system that the utility model is used for the cluster well group is described in further detail.
Consult Fig. 1.The utility model is used for the injection drainage system of cluster well group, mainly is made up of high-pressure gas well 1, low-pressure gas well, gas ejector 2, slide valve 3 and pipeline.
In the natural gas well group, the outlet of the head valve group of three each natural gas well of implication well is connected with pipeline.The outlet line of the head valve group of a bite high-pressure gas well 1 connects the import of the adjustable gas testing body of EJT ejector 2, there is pipeline to connect gas external transport pipeline 7 in the outlet of the adjustable gas testing body of EJT ejector 2, on the suction line of the adjustable gas testing body of EJT ejector 2 and outlet line, DN65 slide valve 3 arranged.On the intake of gas ejector 2, there is pipeline to connect the outlet of the head valve group of low-pressure gas well 6.On the pipeline that exports to the adjustable gas testing body of EJT ejector 2 intakes of the head valve group of low-pressure gas well 6, a DN65 slide valve 3 is arranged.
Be higher than at pressure underground throttle device 5 is installed in the gas well 4 of system pressure, on the pipeline that exports to gas ejector 2 intakes of the head valve group of the gas well 4 that is higher than system pressure, a DN65 slide valve 3 is arranged.
The outlet line of the head valve group of high-pressure gas well 1 connects gas external transport pipeline 7; The outlet line of the head valve group of low-pressure gas well 6 connects gas external transport pipeline 7; The outlet line of head valve group that is higher than the gas well 4 of system pressure connects gas external transport pipeline 7.

Claims (4)

1. an injection drainage system that is used for the cluster well group mainly is made up of high-pressure gas well (1), low-pressure gas well, gas ejector (2), slide valve (3) and pipeline, and in the natural gas well group, the outlet of the head valve group of each natural gas well is connected with pipeline; It is characterized in that: the outlet line of the head valve group of a bite high-pressure gas well (1) connects the import of gas ejector (2), outlet at gas ejector (2) has pipeline to connect gas external transport pipeline (7), on the suction line of gas ejector (2) and outlet line, slide valve (3) is arranged, on the intake of gas ejector (2), there is pipeline to connect the outlet of the head valve group of low-pressure gas well (6), on the pipeline that exports to gas ejector (2) intake of the head valve group of low-pressure gas well (6), slide valve (3) arranged.
2. the injection drainage system that is used for the cluster well group according to claim 1, it is characterized in that: be higher than at pressure underground throttle device (5) is installed in the gas well (4) of system pressure, on the pipeline that exports to gas ejector (2) intake of the head valve group that is higher than the gas well of system pressure (4), slide valve (3) is arranged.
3. the injection drainage system that is used for the cluster well group according to claim 1 is characterized in that: the outlet line of the head valve group of high-pressure gas well (1) connects gas external transport pipeline (7); The outlet line of the head valve group of low-pressure gas well (6) connects gas external transport pipeline (7); The outlet line of head valve group that is higher than the gas well (4) of system pressure connects gas external transport pipeline (7).
4. the injection drainage system that is used for the cluster well group according to claim 1 is characterized in that: what described underground throttle device (5) adopted is the adjustable gas testing body of EJT ejector.
CN2010200469098U 2010-01-14 2010-01-14 Jet drainage device for cluster wells Expired - Lifetime CN201620828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010200469098U CN201620828U (en) 2010-01-14 2010-01-14 Jet drainage device for cluster wells

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010200469098U CN201620828U (en) 2010-01-14 2010-01-14 Jet drainage device for cluster wells

Publications (1)

Publication Number Publication Date
CN201620828U true CN201620828U (en) 2010-11-03

Family

ID=43024284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010200469098U Expired - Lifetime CN201620828U (en) 2010-01-14 2010-01-14 Jet drainage device for cluster wells

Country Status (1)

Country Link
CN (1) CN201620828U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317392A (en) * 2015-07-06 2016-02-10 中国石油天然气股份有限公司 Wellhead technological module for gas recovery well, gas recovery well joint exploitation system, and method adopting gas recovery well joint exploitation system
CN111520108A (en) * 2020-04-30 2020-08-11 成都百胜野牛科技有限公司 Well group energy management method
CN112647908A (en) * 2021-01-08 2021-04-13 重庆科技学院 Combined drainage gas production system and method and underground atomization drainage gas production structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317392A (en) * 2015-07-06 2016-02-10 中国石油天然气股份有限公司 Wellhead technological module for gas recovery well, gas recovery well joint exploitation system, and method adopting gas recovery well joint exploitation system
CN105317392B (en) * 2015-07-06 2018-01-05 中国石油天然气股份有限公司 Well head technical module, gas recovery well for gas recovery well close extraction system and use its method
CN111520108A (en) * 2020-04-30 2020-08-11 成都百胜野牛科技有限公司 Well group energy management method
CN111520108B (en) * 2020-04-30 2022-05-24 成都百胜野牛科技有限公司 Well group energy management method
CN112647908A (en) * 2021-01-08 2021-04-13 重庆科技学院 Combined drainage gas production system and method and underground atomization drainage gas production structure

Similar Documents

Publication Publication Date Title
CN201963276U (en) Device for pressurized gas lift water pumping gas production
CN102174882B (en) Medium-pressure gas collection technique based on cluster well
CN204457684U (en) Pressurized gas lift water pumping gas production system concentrated by a kind of low pressure high yield water gas well
CN101864934B (en) Supercharging gas recovery method for two-stage ejector of gas field
CN202064905U (en) Gas lifting and liquid discharging device for vehicle natural gas compressor
CN201884015U (en) Liquid drainage and gas production system for gas wells
CN102031949B (en) Gas lift method of combined ball plug for drainage and gas production of oil and gas well
CN103912253A (en) Gas well single well gas recovery system and low-pressure recovery method thereof
CN203531876U (en) Fracturing manifold
CN201620828U (en) Jet drainage device for cluster wells
CN203559876U (en) Closed gas-lift liquid discharge combined tubing string for low-pressure oil and gas well
CN211692422U (en) Carbon dioxide injection huff and puff oil extraction ground device for oil field
CN104018813A (en) Coal bed gas exploitation method
CN203463092U (en) Novel manifold truck/pry with self-pressurization perfusion function for industrial large-scale fracturing
CN103114837A (en) Composite heat carrier crude oil thermal-recovery system and oil recovery process thereof
CN102562023A (en) System for improving air permeability of coal by using warm-pressing inert gas
CN201671606U (en) Secondary pressurizing gas production device by aid of jet apparatus and compressor
CN105507860A (en) Skid-mounted gas field single-well isentropic pressurization integrated device
CN201620836U (en) Exploiting device using high-pressure gas well to inject intermittent on-off gas well
CN206571473U (en) A kind of girdle extraction system based on microorganism gasification principle
CN203201741U (en) Pump combination of movable type water injection system
CN205415845U (en) Two pressure boost high pressure synchronous generator wares of water sword
CN102373906A (en) Interwell continuous gas lift water pumping gas production method and device of high-pressure air source well
CN202001836U (en) Medium-pressure gas collection device based on cluster well
CN116241217A (en) Coal bed fracturing and heat injection combined synchronous gas extraction device and method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20101103

CX01 Expiry of patent term