CN201671102U - 大载荷工业建筑的地基结构 - Google Patents
大载荷工业建筑的地基结构 Download PDFInfo
- Publication number
- CN201671102U CN201671102U CN2010202101894U CN201020210189U CN201671102U CN 201671102 U CN201671102 U CN 201671102U CN 2010202101894 U CN2010202101894 U CN 2010202101894U CN 201020210189 U CN201020210189 U CN 201020210189U CN 201671102 U CN201671102 U CN 201671102U
- Authority
- CN
- China
- Prior art keywords
- foundation
- wall
- cylinder
- broken stone
- stone pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Foundations (AREA)
Abstract
本实用新型涉及的是一种工业建筑物、构筑物的地基技术领域,特别是涉及一种大载荷工业建筑的地基结构,墙体基础由均匀分布的2-4排墙体碎石桩、墙体褥垫层、墙体基础垫层所组成,柱体基础由均匀分布的方阵形排列的柱体碎石桩、柱体褥垫层、柱体基础垫层所组成,墙体基础垫层与墙体相连接,柱体基础垫层与柱体相连接,碎石桩插入天然地基中。碎石桩为水泥、粉煤灰或尾矿沙、碎石灌注桩件。本实用新型不仅能够提高复合地基承载力,减小地基变形,而且可降低工程造价,减少了施工工期,尤其适用于冶金工业载荷较大的建筑物、构筑物、贮料仓等在天然地基承载力达不到设计要求的情形。
Description
技术领域
本实用新型涉及的是一种工业建筑物、构筑物的地基技术领域,特别是涉及一种大载荷工业建筑的地基结构,尤其适用于冶金工业载荷较大的建筑物、构筑物、贮料仓等在天然地基承载力达不到设计要求或地基沉降量超标时的情形。
背景技术
在进行较大载荷建筑物地基基础设计过程中,天然地基能够达到设计要求时,首先考虑采用浅基础结构形式进行地基基础设计,这样施工周期、工程投资能够大大降低。由于冶金行业中的原料仓、成品仓、原矿仓、精矿过滤厂房、精矿仓等结构物载荷较大,天然地基承载力或计算地基沉降量通常达不到浅基础设计要求,建筑物必须采取其它的基础结构形式。
对于大载荷工业建筑地基基础,在以往设计中常采用天然地基土挖至承载力较高的持力层后灌注毛石砼来解决天然地基承载力及沉降量不足问题,或采用钢筋砼人工挖孔桩、钢筋砼长螺旋钻孔桩等桩基础形式进行地基基础设计。这种地基基础的施工时周期长、工程投资高、施工安全危险性增大。
发明内容
本实用新型的目的是提供一种大载荷工业建筑的地基结构。
本实用新型的目的是通过下述技术方案来实现的。
本实用新型的大载荷工业建筑的地基结构,包括墙体基础、柱体基础,其特征在于所述的墙体基础由均匀分布的2-4排墙体碎石桩,穿入这些墙体碎石桩上端的墙体褥垫层,设在此墙体褥垫层上的墙体基础垫层所组成,所述的柱体基础由均匀分布的方阵形排列的柱体碎石桩,穿入这些柱体碎石桩上部的柱体褥垫层,设在此柱体褥垫层上的、穿入这些柱体碎石桩上端的柱体基础垫层所组成,所述的墙体基础垫层与所述的工业建筑物的墙体相连接,所述的柱体基础垫层与所述的工业建筑物的柱体相连接,所述的墙体碎石桩和所述的柱体碎石桩插入天然地基中的机械成型孔中。
所述的墙体碎石桩、所述的柱体碎石桩为水泥、粉煤灰或尾矿沙、碎石灌注桩件。
本实用新型对较大载荷建筑物的地基基础进行优化设计,用“水泥、粉煤灰(尾矿沙)、碎石桩复合地基”的形式进行大载荷建筑物工程设计,不仅能够提高复合地基承载力,减小地基变形,而且桩身利用工业废料粉煤灰(尾矿沙)作为添加料且不用配筋,在降低工程造价的同时也减少了施工工期,节约工程投资,上部结构仍采用计算简单、施工难度小的浅基础结构形式,既可保证上部建筑在生产中的安全性、可靠性,又能达到施工简便,节约投资的目的。
本实用新型的特点是:
1、有利于保证施工质量:
由于采用机械成型孔、桩身不用钢筋、地下浇注桩身砼技术,使用粉煤灰(尾矿沙)作为桩体材料,使砼具有良好的流动性与和易性,灌注方便易于控制施工质量,可以较好地保证桩身完整性要求,达到保证地基处理的整体施工质量的目的。
2、有利于保护生态环境:
采用粉煤灰或尾矿沙等工业废料作为砼的添加剂,可使工业废料得到利用、生态环境得到保护。
3、施工安全得到保证:
由于桩体施工过程均在地面以上进行,可避免类似人工挖孔桩施工中存在的安全隐患,施工安全得到保证。
附图说明
图1本实用新型的碎石桩布置示意图。
图2本实用新型的复合地基结构示意图。
具体实施方式
下面结合附图详细说明本实用新型的具体实施方式。
如图1、2所示,本实用新型的大载荷工业建筑的地基结构,包括墙体基础1、柱体基础2,其特征在于所述的墙体基础1由均匀分布的2-4排墙体碎石桩3,穿入这些墙体碎石桩3上端的墙体褥垫层6,设在此墙体褥垫层6上的墙体基础垫层4所组成,所述的柱体基础2由均匀分布的方阵形排列的柱体碎石桩8,穿入这些柱体碎石桩8上部的柱体褥垫层,设在此柱体褥垫层上的、穿入这些柱体碎石桩上端的柱体基础垫层所组成,所述的墙体基础垫层4与所述的工业建筑物的墙体5相连接,所述的柱体基础垫层与所述的工业建筑物的柱体相连接,所述的墙体碎石桩3和所述的柱体碎石桩8插入天然地基7中的机械成型孔中。
所述的墙体碎石桩3、所述的柱体碎石桩8为水泥、粉煤灰或尾矿沙、碎石灌注桩件。
Claims (2)
1.一种大载荷工业建筑的地基结构,包括墙体基础、柱体基础,其特征在于所述的墙体基础由均匀分布的2-4排墙体碎石桩,穿入这些墙体碎石桩上端的墙体褥垫层,设在此墙体褥垫层上的墙体基础垫层所组成,所述的柱体基础由均匀分布的方阵形排列的柱体碎石桩,穿入这些柱体碎石桩上部的柱体褥垫层,设在此柱体褥垫层上的、穿入这些柱体碎石桩上端的柱体基础垫层所组成,所述的墙体基础垫层与所述的工业建筑物的墙体相连接,所述的柱体基础垫层与所述的工业建筑物的柱体相连接,所述的墙体碎石桩和所述的柱体碎石桩插入天然地基中的机械成型孔中。
2.根据权利要求1所述的大载荷工业建筑的地基结构,其特征在于所述的墙体碎石桩、所述的柱体碎石桩为水泥、粉煤灰或尾矿沙、碎石灌注桩件。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202101894U CN201671102U (zh) | 2010-06-01 | 2010-06-01 | 大载荷工业建筑的地基结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202101894U CN201671102U (zh) | 2010-06-01 | 2010-06-01 | 大载荷工业建筑的地基结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201671102U true CN201671102U (zh) | 2010-12-15 |
Family
ID=43328514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202101894U Expired - Lifetime CN201671102U (zh) | 2010-06-01 | 2010-06-01 | 大载荷工业建筑的地基结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201671102U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102747854A (zh) * | 2012-07-26 | 2012-10-24 | 中国神华能源股份有限公司 | 筒仓底部结构的施工方法 |
CN102747740A (zh) * | 2012-07-26 | 2012-10-24 | 中国神华能源股份有限公司 | 筒仓地基的施工方法 |
-
2010
- 2010-06-01 CN CN2010202101894U patent/CN201671102U/zh not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102747854A (zh) * | 2012-07-26 | 2012-10-24 | 中国神华能源股份有限公司 | 筒仓底部结构的施工方法 |
CN102747740A (zh) * | 2012-07-26 | 2012-10-24 | 中国神华能源股份有限公司 | 筒仓地基的施工方法 |
CN102747854B (zh) * | 2012-07-26 | 2014-10-22 | 中国神华能源股份有限公司 | 筒仓底部结构的施工方法 |
CN102747740B (zh) * | 2012-07-26 | 2015-05-06 | 中国神华能源股份有限公司 | 筒仓地基的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101343874B (zh) | 在盐渍土地区用裹体桩进行地基处理的方法 | |
CN203821412U (zh) | 一种疏排桩连续墙支护结构 | |
CN210288333U (zh) | 深层地基处理结构 | |
CN101748715B (zh) | 一种地基处理方法 | |
CN201843135U (zh) | 送电线路复合基础桩 | |
CN202787222U (zh) | 深层加固夯锤 | |
CN201671102U (zh) | 大载荷工业建筑的地基结构 | |
CN202124863U (zh) | 螺旋锚掏挖复合基础 | |
CN201502065U (zh) | 一种锚杆联合开挖类复合基础 | |
CN216689341U (zh) | 一种土挤密桩与cfg桩组合作用的复合地基处理结构 | |
CN202865863U (zh) | 一种重件吊装架基础结构 | |
CN202830994U (zh) | 顺层边坡桥梁敦台防护结构 | |
CN203049570U (zh) | 深埋圆形薄壁空心阻滑桩 | |
CN201588222U (zh) | 叠合式掏嵌基础 | |
CN201254728Y (zh) | 桩与土工格室复合地基 | |
CN204530685U (zh) | 一种水泥土劲性复合桩 | |
CN1891913A (zh) | 重锤冲扩置换法 | |
CN204703176U (zh) | 软土地区坑中坑钢砼沉井 | |
CN107190724A (zh) | 一种自动强夯机料仓焊接体 | |
CN103981863B (zh) | 一种散体材料桩与混凝土桩上下同体组合桩的施工方法 | |
CN202830951U (zh) | 一种型钢-干硬性混凝土置换单墩结构 | |
CN201598646U (zh) | 掏挖式杆塔基础 | |
CN203129163U (zh) | 一种坝基加固框架结构 | |
CN208152061U (zh) | 适用于软土地质的单向进占法钢管桩围堰结构 | |
CN101205714A (zh) | 大块石填筑地基强夯处理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 114225 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong Patentee after: Anshan Iron and Steel Group Mining Co., Ltd. Address before: 114225 Anshan District, Liaoning, No. 219 Road, No. 39, Tiedong Patentee before: Angang Group Mine Company |
|
CX01 | Expiry of patent term |
Granted publication date: 20101215 |
|
CX01 | Expiry of patent term |