CN201665303U - Novel ship positioning and shifting system - Google Patents

Novel ship positioning and shifting system Download PDF

Info

Publication number
CN201665303U
CN201665303U CN2009202274814U CN200920227481U CN201665303U CN 201665303 U CN201665303 U CN 201665303U CN 2009202274814 U CN2009202274814 U CN 2009202274814U CN 200920227481 U CN200920227481 U CN 200920227481U CN 201665303 U CN201665303 U CN 201665303U
Authority
CN
China
Prior art keywords
ship
positioning
chassis
piles
work pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202274814U
Other languages
Chinese (zh)
Inventor
程岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN JINDING SHIPBUILDING ENGINEERING DESIGN Co Ltd
Original Assignee
WUHAN JINDING SHIPBUILDING ENGINEERING DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN JINDING SHIPBUILDING ENGINEERING DESIGN Co Ltd filed Critical WUHAN JINDING SHIPBUILDING ENGINEERING DESIGN Co Ltd
Priority to CN2009202274814U priority Critical patent/CN201665303U/en
Application granted granted Critical
Publication of CN201665303U publication Critical patent/CN201665303U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a novel ship positioning and shifting system: two trolley positioning pile systems and one fixing positioning pile system on a ship, and three positioning piles are driven by a hydraulic device to ascend and descend; and the trolley systems are horizontally arranged on a main deck, trolleys can be driven by a hydraulic system and move horizontally together with the positioning piles. When the ship needs to be precisely positioned and constructed, the three or two piles are simultaneously inserted into the sea or the river, a mechanical positioning device and the hydraulic system lock the trolleys at required positions so as to ensure the ship is stably positioned on the sea surface and provide a reliable operation platform for construction equipment. When the ship is horizontally shifted, ship shifting oil cylinders first respectively shift the two trolleys and the positioning piles to required positions; after the positioning piles are inserted into the sea or the river, the two ship shifting oil cylinders are synchronously started, so that the trolley positioning piles and the ship have relative movement so as to realize the horizontal and parallel shifting of the ship.

Description

Boat system is located and moved to a kind of novel ship
Technical field
The utility model designs a kind of later-model ship's fix and moves boat system, and present technique can be used for inland river and coastal nonpower driven vessel, does not rely on the accurate location of anchoring equipment realization boats and ships and laterally moves ship.
Background technology
At present, more non-motor-driven auxiliary vessel adopts anchoring system to position and moves ship, because the defective of system itself, under the bigger condition of operating water depth and stormy waves, boats and ships drift with the tide, sometimes even " dragging of anchor " phenomenon takes place, boats and ships are difficult to realize location exactly, therefore, can only be chosen in stormy waves and carry out operation less period, shipping work efficient reduces greatly, and construction quality also can not get guaranteeing.On the other hand, carry out boats and ships when displacement by anchoring system, mobile distance is difficult to accurate control, simultaneously, must rely on anchor boat when spread is cast anchor in the construction area operation and " guards the emperor " for it entering, thereby increase construction cost.
In order to improve the accuracy of positioning of boats and ships, stability when improving operation, part marine engineering ship has adopted the form of jack-up platform, four work piles are set, boats and ships rely on the ability of self can lift away from the water surface, boats and ships base fixed, operation are not influenced by stormy waves, can be than carrying out operation under the harsh conditions.But, adopt jack-up platform, to move ship at every turn and need fall ship and rise ship again, consume a lot of non-cutting time, and operating efficiency reduces.Moving ship time also need be auxiliary by means of the anchoring system or the power driven vessel of routine.
Summary of the invention
For overcome existing anchoring location and move location that boat system exists, to move ship inaccurate, and the too low deficiency of jack-up platform work efficiency, the utility model provides a kind of three to locate and move ship's case, can not only realize the accurate location of boats and ships, and can carry out the boats and ships lateral offset easily by self, and the distance that moves is accurate, controlled.
The technical scheme that its technical matters that solves the utility model adopts is: two cover chassis work pile systems and a cover stationary positioned stake system aboard ship are set, and three work piles drive by hydraulic efficiency gear to be realized rising and descending; On table system horizontally set and the main deck, chassis can be driven by hydraulic efficiency pressure system, with the work pile side travel.When boats and ships need accurately location construction, (river) end, sea, inserted in three (or two) stake simultaneously, chassis is locked in the position that requires by mechanical positioner and hydraulic efficiency pressure system, can guarantee that this ship is steadily due to the sea, for preparation of construction provides a failure-free job platform.When needs carry out lateral offset to boats and ships, move the position that the ship oil cylinder moves to two chassis and work pile requirement at first respectively, work pile is inserted sea (river) at the end, start two more synchronously and move the ship oil cylinder, make between chassis work pile and boats and ships and produce relative motion, thus the horizontal parallel shifted of realization boats and ships.
The beneficial effects of the utility model are: the accurate location that relies on present technique can realize boats and ships, and the lateral offset of boats and ships, mobile distance is accurate, controlled.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is a kind of novel ship location and moves the boat system birds-eye view
Fig. 2 is a kind of novel ship location and moves the boat system lateral plan
Among the figure: 1. the chassis work pile, 2. chassis, 3. the work pile jacking system, 4. the chassis guide rail, 5. move ship oil cylinder, 6. cylinder support, 7. stationary positioned stake
The specific embodiment
In Fig. 1, at boats and ships bow, stern one cover chassis work pile system is set respectively, at midships section one cover stationary positioned stake system is set, chassis work pile system by chassis work pile (1), chassis (2), work pile jacking system (3), chassis guide rail (4), move ship oil cylinder (5), cylinder support (6) is formed, stationary positioned stake system is made up of stationary positioned stake (7), work pile jacking system (3).
When needs position boats and ships, (river) end, sea, inserted in three (or two) stake simultaneously, by mechanical positioner and hydraulic efficiency pressure system chassis is locked, all do not have relative motion between chassis work pile (1), chassis (2) and the chassis guide rail (4), can guarantee the mooring stability location that links with chassis guide rail (4).The size of work pile (diameter, wall thickness) should be according to the accuracy of positioning of the wind of shipping work, unrestrained condition, job requirements and the material of work pile, the employing finite element method is chosen, therefore, adopt present technique, the accuracy of positioning of boats and ships can satisfy the requirement of construction operation.
When three piles insert sea (river) during the end simultaneously, adopt following steps, can realize displacement to boats and ships:
1, passes through the work pile jacking system (3) of a chassis work pile system, chassis work pile (1) is pulled up (at this moment, other two work piles still insert the end, sea (river), can guarantee that boats and ships are not shifted), start and move the distance that ship oil cylinder (5) makes chassis (2) movement requirement, again work pile is inserted at (river) end, sea, utilize mechanical positioner and hydraulic efficiency pressure system chassis to be locked in this position.
2, adopt above-mentioned identical step, make the work pile mobile phase distance together of another chassis work pile system, again work pile is inserted at (river) end, sea, and chassis is locked.
3, stationary positioned stake (7) is pulled up, what start synchronously two chassis work pile systems moves ship oil cylinder (5), because chassis work pile this moment (1) is fixed in the end, sea (river), chassis (2) is fixing thereupon, cylinder support (6) will drive the horizontal parallel shifted of hull, and the stroke of oil cylinder is the miles of relative movement of boats and ships.
4, when boats and ships need be shifted next time, repeat said process.

Claims (1)

1. boat system is located and moved to a novel ship, form by two cover chassis work pile systems and a cover stationary positioned stake system, chassis work pile system comprises chassis work pile, chassis, work pile jacking system, chassis guide rail, moves ship oil cylinder, cylinder support, stationary positioned stake system comprises stationary positioned stake, work pile jacking system, it is characterized in that: the table system lateral arrangement is on main deck.
CN2009202274814U 2009-08-18 2009-08-18 Novel ship positioning and shifting system Expired - Fee Related CN201665303U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202274814U CN201665303U (en) 2009-08-18 2009-08-18 Novel ship positioning and shifting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202274814U CN201665303U (en) 2009-08-18 2009-08-18 Novel ship positioning and shifting system

Publications (1)

Publication Number Publication Date
CN201665303U true CN201665303U (en) 2010-12-08

Family

ID=43266257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202274814U Expired - Fee Related CN201665303U (en) 2009-08-18 2009-08-18 Novel ship positioning and shifting system

Country Status (1)

Country Link
CN (1) CN201665303U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103910041A (en) * 2014-04-03 2014-07-09 上海振华重工启东海洋工程股份有限公司 High-precision offshore wind turbine hoisting and mounting ship
CN104058067A (en) * 2013-11-27 2014-09-24 卜建余 Water surface positioning device for underwater sludge suction dredging boat
CN104724265A (en) * 2013-12-20 2015-06-24 广州中船黄埔造船有限公司 Double-line side-by-side opposite-pull boat moving method
CN105151234A (en) * 2015-10-08 2015-12-16 宁波市鄞州发辉机械科技有限公司 Pole lifting device of positioning pole
CN105256857A (en) * 2015-07-13 2016-01-20 南通港闸船舶制造有限公司 Reasonable-structure hydraulic system of self-propulsion steel rake grab dredger

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104058067A (en) * 2013-11-27 2014-09-24 卜建余 Water surface positioning device for underwater sludge suction dredging boat
CN104724265A (en) * 2013-12-20 2015-06-24 广州中船黄埔造船有限公司 Double-line side-by-side opposite-pull boat moving method
CN104724265B (en) * 2013-12-20 2017-06-27 广州中船黄埔造船有限公司 A kind of two-wire is side by side to drawing shifting ship's method
CN103910041A (en) * 2014-04-03 2014-07-09 上海振华重工启东海洋工程股份有限公司 High-precision offshore wind turbine hoisting and mounting ship
CN105256857A (en) * 2015-07-13 2016-01-20 南通港闸船舶制造有限公司 Reasonable-structure hydraulic system of self-propulsion steel rake grab dredger
CN105256857B (en) * 2015-07-13 2017-08-22 南通港闸船舶制造有限公司 Rational in infrastructure harrows grab boat hydraulic system from boat steel
CN105151234A (en) * 2015-10-08 2015-12-16 宁波市鄞州发辉机械科技有限公司 Pole lifting device of positioning pole

Similar Documents

Publication Publication Date Title
CN102278291B (en) Construction method and special transport and installation ship for marine transport and installation of wind-driven generator
CN201665303U (en) Novel ship positioning and shifting system
CN111762287B (en) Method for securing and transferring loads between a vessel and an offshore installation and apparatus therefor
CN101774422B (en) Novel offshore installation construction resource-combined type pontoon barge
CN102107720B (en) Marine fan integrated setting system
CN103910044B (en) A kind of large-scale the floating structures semi-submersible type lifting platform and application process thereof
CN201334105Y (en) Moorage positioning draw-off equipment of marine device
CN201962661U (en) Offshore movable lifting multifunctional working platform
CN103910041A (en) High-precision offshore wind turbine hoisting and mounting ship
CN108626078B (en) Auxiliary transportation and erection process for offshore wind turbine Spar type floating foundation barge
CN201268389Y (en) Multifunctional construction platform
CN103661801A (en) Auxiliary installation system and installation method of ocean engineering underwater propeller
KR101399933B1 (en) Floating structure
CN102530189A (en) Catamaran for ocean engineering
CN102409650A (en) Method for mounting shallow water ocean jacket platform
CN101781887A (en) Overhang installation method for upper structure of offshore platform
CN103074878A (en) Construction method for artificial island platform
CN203064175U (en) Artificial island platform
CN102206938A (en) Novel method for installing upper part block of offshore platform
KR20130128545A (en) Wind turbine installation vessel
WO2017204656A1 (en) A vessel and method of employing a vessel, e.g. in a process of maintaining or assembling an offshore windmill, and a related assembly
CN201526043U (en) Movable platform
CN104802950A (en) Self-elevating type underwater floater tension leg platform and establishing method thereof
CN204023502U (en) On track, choose formula floating mooring dolphin
CN202213698U (en) Transport installation ship special for offshore aerogenerator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Cheng Yan

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Cheng Yan

Document name: Notification of Termination of Patent Right

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101208

Termination date: 20110818