CN201655539U - Ct线圈装配工装 - Google Patents

Ct线圈装配工装 Download PDF

Info

Publication number
CN201655539U
CN201655539U CN 201020301994 CN201020301994U CN201655539U CN 201655539 U CN201655539 U CN 201655539U CN 201020301994 CN201020301994 CN 201020301994 CN 201020301994 U CN201020301994 U CN 201020301994U CN 201655539 U CN201655539 U CN 201655539U
Authority
CN
China
Prior art keywords
coil
roller
assembly tooling
base
carrier shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201020301994
Other languages
English (en)
Inventor
王昕�
陈帅兵
周凯
岳光华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan high General Electric Co., Ltd.
Pinggao Group Co Ltd
Original Assignee
Pinggao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pinggao Group Co Ltd filed Critical Pinggao Group Co Ltd
Priority to CN 201020301994 priority Critical patent/CN201655539U/zh
Application granted granted Critical
Publication of CN201655539U publication Critical patent/CN201655539U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Winding, Rewinding, Material Storage Devices (AREA)

Abstract

本实用新型涉及CT线圈装配工装,该工装包括底座和设置在底座上的托辊支架,该托辊支架具有至少三个呈星形布设在同一水平面上的托辊轴,各托辊轴上转动装配有托辊;本实用新型在装配绕制CT线圈时,不需移动CT线圈自身,只需轻轻转动CT线圈下面的托辊即可满足绕制线圈要求,大大的提高了工作效率,降低了劳动强度,而且降低了装配中绝缘材料的磨损,提高了产品质量。

Description

CT线圈装配工装 
技术领域
本实用新型涉及CT线圈装配工装。 
背景技术
目前随着电力系统的快速发展,对CT线圈的需求越来越大,尤其高电压等级CT线圈也越来越多,高电压等级CT线圈重量重,搬运费事,装配员工在现有的装配工装上绕制绝缘材料和电磁线时需反复移动,造成工作效率低下、劳动强度大,易磨坏绝缘材料,产品试验时需用其它运输工具。 
实用新型内容
本实用新型的目的是提供一种CT线圈装配工装,以解决现有的CT线圈绕制时因缺乏专有工装造成的工作效率低下、劳动强度大的问题。 
本实用新型的CT线圈装配工装包括底座和设置在底座上的托辊支架,该工装包括底座和设置在底座上的托辊支架,该托辊支架具有至少三个呈星形布设在同一水平面上的托辊轴,各托辊轴上转动装配有托辊。 
所述托辊由间隔装配在托辊轴上的一组轴承构成。 
所述底座上设有万向轮。 
所述底座与托辊支架通过螺纹升降结构连接成一体。 
本实用新型的CT线圈装配工装包括底座和设置在底座上的托辊支架,该托辊支架具有至少三个呈星形布设在同一水平面上的托辊轴,各托辊轴上转动装配有托辊,这种结构在装配绕制CT线圈时,不需移动CT线圈自身,只需轻轻转动CT线圈下面的托辊即可满足绕制线圈要求,大大的提高了工作效率,降低了劳动强度,而且降低了装配中绝缘材料的磨损,提高了产品质量。 
底座上万向轮的设置使得在CT线圈调试时,也不需搬动CT线圈,推动装配台即可满足运 输要求,实现装配台和运输车统一的功能,该工装降低了搬运的劳动强度。 
底座与托辊支架通过螺纹升降结构连接成一体,可根据需要来调整工装高度,适应不同使用者的需要。 
附图说明
图1是本实用新型装配工装的结构示意图。 
具体实施方式
如图1所示的本实用新型的CT线圈装配工装,该工装包括底座2和设置在底座2上的托辊支架1,该托辊支架1具有至少三个呈星形布设在同一水平面上的托辊轴3,各托辊轴3上转动装配有托辊4,托辊4由间隔装配在托辊轴3上的一组轴承构成,底座2上设有万向轮5,并且底座2与托辊支架1通过螺纹升降结构连接成一体,该螺纹升降结构是通过顶丝6锁紧的。 
本实用新型的CT线圈装配工装包括底座和设置在底座上的托辊支架,该托辊支架具有至少三个呈星形布设在同一水平面上的托辊轴,各托辊轴上转动装配有托辊,这种结构在装配绕制CT线圈时,不需移动CT线圈自身,只需轻轻转动CT线圈下面的托辊即可满足绕制线圈要求,大大的提高了工作效率,降低了劳动强度,而且降低了装配中绝缘材料的磨损,提高了产品质量;底座下车轮的设置使得在产品调试时,也不需搬动产品,推动装配台即可满足运输要求,实现装配台和运输车统一的功能,该工装降低搬运的劳动强度;底座与托辊支架通过螺纹升降结构连接成一体,可根据需要来调整工装高度,适应不同使用者的需要。 

Claims (5)

1.CT线圈装配工装,其特征在于:该工装包括底座和设置在底座上的托辊支架,该托辊支架具有至少三个呈星形布设在同一水平面上的托辊轴,各托辊轴上转动装配有托辊。
2.根据权利要求1所述的CT线圈装配工装,其特征在于:所述托辊由间隔装配在托辊轴上的一组轴承构成。
3.根据权利要求1或2所述的CT线圈装配工装,其特征在于:所述底座上设有万向轮。
4.根据权利要求1或2所述的CT线圈装配工装,其特征在于:所述底座与托辊支架通过螺纹升降结构连接成一体。
5.根据权利要求3所述的CT线圈装配工装,其特征在于:所述底座与托辊支架通过螺纹升降结构连接成一体。
CN 201020301994 2010-01-29 2010-01-29 Ct线圈装配工装 Expired - Fee Related CN201655539U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201020301994 CN201655539U (zh) 2010-01-29 2010-01-29 Ct线圈装配工装

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201020301994 CN201655539U (zh) 2010-01-29 2010-01-29 Ct线圈装配工装

Publications (1)

Publication Number Publication Date
CN201655539U true CN201655539U (zh) 2010-11-24

Family

ID=43120783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201020301994 Expired - Fee Related CN201655539U (zh) 2010-01-29 2010-01-29 Ct线圈装配工装

Country Status (1)

Country Link
CN (1) CN201655539U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102428776A (zh) * 2011-09-16 2012-05-02 田锋 一种旋耕机装卸辅具
CN110660580A (zh) * 2018-06-30 2020-01-07 河南平高通用电气有限公司 一种线圈包绕工装

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102428776A (zh) * 2011-09-16 2012-05-02 田锋 一种旋耕机装卸辅具
CN110660580A (zh) * 2018-06-30 2020-01-07 河南平高通用电气有限公司 一种线圈包绕工装

Similar Documents

Publication Publication Date Title
CN105173924A (zh) 电力用自动收线装置
CN202529650U (zh) 电缆绕线卷盘支架
CN203294840U (zh) 一种钢带卷放置输送架
CN201655539U (zh) Ct线圈装配工装
CN202279641U (zh) 一种曲轴小吊车
CN203306710U (zh) 一种顶升移栽机
CN201437467U (zh) 伸缩式滚动输送装置
CN203955767U (zh) 气动自动控制v型盘倒立式收线装置
CN104319090A (zh) 全自动无线充电线圈四轴绕线机及其拉线机构
CN203461613U (zh) 一种盘丝装置
CN202072340U (zh) 电线放线架
CN205150904U (zh) 一种新型辊轮辊子组辊床
CN204289086U (zh) 全自动无线充电线圈四轴绕线机及其拉线机构
CN203333031U (zh) 地毯自动收卷装置
CN205253727U (zh) 一种轧机硬空过时的应急装置
CN201760531U (zh) 直线机的转轴机构
CN206088785U (zh) 一种天车系统
CN212953546U (zh) 一种移动式抗拉镀锌钢丝生产用收卷装置
CN204020946U (zh) 一种车圈接收中转装置
CN202671084U (zh) 用于起重机的卷筒机构
CN201860228U (zh) 定子绕线工作台
CN201732678U (zh) 一种原地旋转捯线车
CN202829829U (zh) 一种不规则的玻璃传输装置
CN201956131U (zh) 用于编织机装卸线轴的辅助工具
CN203082481U (zh) 移动式空压机底座

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151231

Address after: South East of Pingdingshan city in Henan province 467001 No. 22

Patentee after: Pinggao Group Co., Ltd.

Patentee after: Henan high General Electric Co., Ltd.

Address before: South East of Pingdingshan city in Henan province 467001 No. 22

Patentee before: Pinggao Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101124

Termination date: 20180129

CF01 Termination of patent right due to non-payment of annual fee