CN201633875U - Double-layer step bridge structure of hold deck of liquid cargo transport ship - Google Patents

Double-layer step bridge structure of hold deck of liquid cargo transport ship Download PDF

Info

Publication number
CN201633875U
CN201633875U CN200920286615XU CN200920286615U CN201633875U CN 201633875 U CN201633875 U CN 201633875U CN 200920286615X U CN200920286615X U CN 200920286615XU CN 200920286615 U CN200920286615 U CN 200920286615U CN 201633875 U CN201633875 U CN 201633875U
Authority
CN
China
Prior art keywords
deck
fore
double
hold
aft gangway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN200920286615XU
Other languages
Chinese (zh)
Inventor
郑汉英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou OPY Ocean Engineering Co.,Ltd.
Original Assignee
SHANGHAI JINGRONG MERCHANT SHIP DESIGN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JINGRONG MERCHANT SHIP DESIGN CO Ltd filed Critical SHANGHAI JINGRONG MERCHANT SHIP DESIGN CO Ltd
Priority to CN200920286615XU priority Critical patent/CN201633875U/en
Application granted granted Critical
Publication of CN201633875U publication Critical patent/CN201633875U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Pipeline Systems (AREA)

Abstract

The utility model relates to a double-layer step bridge structure of a hold deck of a liquid cargo transport ship, comprising a pipeline channel plate rack arranged on a hold upper deck, wherein a pipeline channel space for laying pipelines is formed between the pipeline channel plate rack and the hold upper deck, a lower-layer step bridge grating is arranged in the pipeline channel space, and an upper-layer step bridge grating is arranged above the pipeline channel plate rack. The double-layer step bridge structure is convenient for the maintenance of pipeline systems in deck regions and the detection of instruments, and although sudden sea conditions occur, boaters can rapidly evacuate by using the pipeline channel space; and 2 the double-layer step bridge structure can carry out hoisting services on hold deep-well pumps or deep and shallow pumps, temperature regulation of liquid cargo hold heating systems, detection and control of cargo loading and unloading, region control of deck fire fighting systems and spraying systems and the like by effectively utilizing the pipeline channel space.

Description

The double-deck fore-and-aft gangway structure of liquid goods class carrier hold deck
Technical field
The utility model relates to the waterborne traffic transport field, relates in particular to a kind of double-deck fore-and-aft gangway structure of liquid goods class carrier hold deck.
Background technology
Liquid goods class carrier has pipeline and system maintenance some routines or unconventional main hold zone when normal navigation, also comprise the detection and the adjusting of some instrument and meters.
Liquid goods class carrier deck is generally adopted and is turned over structure on the rib, and fore-and-aft gangway is arranged above deck.Be illustrated in figure 1 as the individual layer fore-and-aft gangway structure of traditional form, pipeline 3 is installed on the upper deck 4, fore-and-aft gangway grid 1 is arranged on the upper deck 4 by pillar 2, the pipeline of the fore-and-aft gangway grid below of this structure is laid the space and is not fully used, be unfavorable for pipeline is safeguarded and detected, particularly, all the more so for sea situation condition of severe or the weather area of severe cold comparatively comparatively.Some main navigating areas are in Northern Europe or the ship of north America region, working environment is in the high latitude low temp area throughout the year, deck working environment very severe is safeguarded and testing with regard to need a kind ofly providing comparatively safe hemi-closure space to carry out deck area especially in this case.
The utility model content
At the problems referred to above, the utility model provides a kind of double-deck fore-and-aft gangway structure of liquid goods class carrier hold deck, with the problem that is unfavorable in the solution prior art pipeline is safeguarded and detected.
To achieve these goals, the technical solution of the utility model is as follows:
The double-deck fore-and-aft gangway structure of liquid goods class carrier hold deck, it is characterized in that, comprise that one is arranged on the pipe passage grillage on the cargo hold upper deck, surround a pipe passage space that is used to lay pipeline between described pipe passage grillage and the cargo hold upper deck, be provided with lower floor's fore-and-aft gangway grid in the described pipe passage space, the top of described pipe passage grillage is provided with upper strata fore-and-aft gangway grid.
Further, in the utility model, described pipe passage grillage is formed by the steel plate assembly welding.
Further, in the utility model, described upper strata fore-and-aft gangway grid is provided with accommodation rail.
Further, in the utility model, described lower floor fore-and-aft gangway grid is provided with accommodation rail.
Further, in the utility model, the width of described lower floor fore-and-aft gangway grid is greater than 0.95m, and the distance between described lower floor fore-and-aft gangway grid and the pipe passage grillage end face is greater than 2.1m.
Further, in the utility model, the section shape of described pipe passage grillage is an arch.
Main liquid goods pipe and various bigbore decks pipeline are laid in the pipe passage space, enter in the pipe passage space by lower floor's fore-and-aft gangway grid pipeline is safeguarded, detected or simple valve operation.
The beneficial effects of the utility model are:
1, the utility model is convenient to the testing of maintenance of deck area pipeline system and instrument and meter.Even if run into the burst sea situation, also can withdraw fast by the pipe passage space.
2, the utility model can effectively utilize the pipe passage space to carry out such as the lifting service of cargo hold deep well pump or depth pump, the adjustment of cargo tank heating system the detection control of cargo handing goods and the Zone control of deck fire-fighting system and drenching system etc.
The utility model is particularly useful for being arranged on the hold deck of oil carrier, chemical carrier.
Description of drawings
Describe the utility model in detail below in conjunction with the drawings and specific embodiments:
Fig. 1 is the fore-and-aft gangway structural representation of traditional form.
Fig. 2 is a scheme drawing of the present utility model.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and effect is easy to understand, below in conjunction with concrete diagram, further set forth the utility model.
Referring to Fig. 1,2, the double-deck fore-and-aft gangway structure of a kind of hold deck of 6500DWT oil carrier/chemical carrier comprises that one is arranged on the pipe passage grillage 50 on the cargo hold upper deck 60, and pipe passage grillage 50 is formed by the steel plate assembly welding.In the present embodiment, the section shape of this pipe passage grillage 50 is an arch.Surround a pipe passage space 80 between pipe passage grillage 50 and the cargo hold upper deck 60, this pipe passage space 80 is used to lay main liquid goods pipe and various bigbore decks pipeline (as deck pipeline of main fire main, washing of tanks pipeline, drenching system pipeline, cargo hold heating piping etc.), as shown in Figure 2, main fire main 20, washing of tanks pipeline, drenching system pipeline are installed in the top of pipe passage grillage, main liquid goods pipeline 40 is installed in the both sides of pipe passage grillage, and the deck pipeline 30 of cargo hold heating piping is installed in pipe passage grillage inside.
Entering the pipe passage space for the ease of the crewman safeguards, detects individual pipeline or simple valve operation, in pipe passage space 80, be provided with lower floor's fore-and-aft gangway grid 70, and the width of lower floor's fore-and-aft gangway grid is greater than 0.95m, and the distance between lower floor's fore-and-aft gangway grid and the pipe passage grillage end face is greater than 2.1m.The both sides of lower floor's fore-and-aft gangway grid 70 are provided with steel accommodation rail 71.In the present embodiment, lower floor's fore-and-aft gangway grid is installed in the centre in pipe passage space, lower floor's fore-and-aft gangway grid the right and left has the space that is enough to lift and safeguard deep well pump or depth pump, concrete size is decided by the main line size, promptly arranging captain's direction, laterally and behind the big or small pipeline of vertical direction, be at least the deep well pump of vertical installation or the space of safeguarding that depth pump leaves 0.6m.
Be provided with upper strata fore-and-aft gangway grid 10 above pipe passage grillage 50, the width of upper strata fore-and-aft gangway grid 10 is 1.2m.The both sides of upper strata fore-and-aft gangway grid 10 are provided with steel accommodation rail 11.
The double-deck fore-and-aft gangway structure of liquid goods class carrier hold deck of the present utility model is convenient to the testing of maintenance of deck area pipeline system and instrument and meter.
More than show and described groundwork of the present utility model, principal character and advantage of the present utility model.The technical personnel of the industry should be understood; the utility model is not restricted to the described embodiments; what describe in the foregoing description and the specification sheets is principle of the present utility model; the utility model also has various changes and modifications under the prerequisite that does not break away from the utility model spirit and scope, and these changes and improvements all fall in the claimed scope of the present utility model.The protection domain that the utility model requires is defined by appending claims and equivalent thereof.

Claims (6)

1. the double-deck fore-and-aft gangway structure of liquid goods class carrier hold deck, it is characterized in that, comprise that one is arranged on the pipe passage grillage on the cargo hold upper deck, surround a pipe passage space that is used to lay pipeline between described pipe passage grillage and the cargo hold upper deck, be provided with lower floor's fore-and-aft gangway grid in the described pipe passage space, the top of described pipe passage grillage is provided with upper strata fore-and-aft gangway grid.
2. the double-deck fore-and-aft gangway structure of liquid goods class carrier hold deck according to claim 1 is characterized in that described pipe passage grillage is formed by the steel plate assembly welding.
3. the double-deck fore-and-aft gangway structure of liquid goods class carrier hold deck according to claim 1 is characterized in that described upper strata fore-and-aft gangway grid is provided with accommodation rail.
4. the double-deck fore-and-aft gangway structure of liquid goods class carrier hold deck according to claim 1 is characterized in that described lower floor fore-and-aft gangway grid is provided with accommodation rail.
5. the double-deck fore-and-aft gangway structure of liquid goods class carrier hold deck according to claim 1 is characterized in that, the width of described lower floor fore-and-aft gangway grid is greater than 0.95m, and the distance between described lower floor fore-and-aft gangway grid and the pipe passage grillage end face is greater than 2.1m.
6. the double-deck fore-and-aft gangway structure of liquid goods class carrier hold deck according to claim 1 is characterized in that the section shape of described pipe passage grillage is an arch.
CN200920286615XU 2009-12-29 2009-12-29 Double-layer step bridge structure of hold deck of liquid cargo transport ship Expired - Lifetime CN201633875U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920286615XU CN201633875U (en) 2009-12-29 2009-12-29 Double-layer step bridge structure of hold deck of liquid cargo transport ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920286615XU CN201633875U (en) 2009-12-29 2009-12-29 Double-layer step bridge structure of hold deck of liquid cargo transport ship

Publications (1)

Publication Number Publication Date
CN201633875U true CN201633875U (en) 2010-11-17

Family

ID=43078358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920286615XU Expired - Lifetime CN201633875U (en) 2009-12-29 2009-12-29 Double-layer step bridge structure of hold deck of liquid cargo transport ship

Country Status (1)

Country Link
CN (1) CN201633875U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102556281A (en) * 2011-12-01 2012-07-11 大连中远船务工程有限公司 Multifunctional passage for drilling ship
CN105539723A (en) * 2015-12-23 2016-05-04 江苏现代造船技术有限公司 Construction method for chemical carrier deck outfitting unit
CN105730621A (en) * 2016-02-03 2016-07-06 上海船舶研究设计院 Marine wood protection upright column
CN110284416A (en) * 2019-06-26 2019-09-27 中船黄埔文冲船舶有限公司 One kind is flexible to pass a bridge
CN114379734A (en) * 2021-12-16 2022-04-22 沪东中华造船(集团)有限公司 Modular ventilating tower structure of chemical ship cargo hold and installation method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102556281A (en) * 2011-12-01 2012-07-11 大连中远船务工程有限公司 Multifunctional passage for drilling ship
CN102556281B (en) * 2011-12-01 2014-06-25 大连中远船务工程有限公司 Multifunctional passage for drilling ship
CN105539723A (en) * 2015-12-23 2016-05-04 江苏现代造船技术有限公司 Construction method for chemical carrier deck outfitting unit
CN105730621A (en) * 2016-02-03 2016-07-06 上海船舶研究设计院 Marine wood protection upright column
CN110284416A (en) * 2019-06-26 2019-09-27 中船黄埔文冲船舶有限公司 One kind is flexible to pass a bridge
CN114379734A (en) * 2021-12-16 2022-04-22 沪东中华造船(集团)有限公司 Modular ventilating tower structure of chemical ship cargo hold and installation method thereof
CN114379734B (en) * 2021-12-16 2024-01-02 沪东中华造船(集团)有限公司 Modularized ventilating tower structure of cargo hold of chemical carrier and installation method thereof

Similar Documents

Publication Publication Date Title
CN201633875U (en) Double-layer step bridge structure of hold deck of liquid cargo transport ship
EP3640158B1 (en) High-performance flexible submarine oil storage system
CN102650122A (en) Anti-freezing and de-icing mechanism for lock gate or arc gate
CN104802930A (en) Main seawater pipe system applied auxiliary vessel of oceanographic engineering
WO2018218752A1 (en) Deck carrier used in polar region
CN104747908A (en) Online drawable immersed pump system for deep-cooling storage tank
CN202734904U (en) Multi-layer underground water level observing device for hydrogeological borehole
CN205131567U (en) Pipeline arrangement structure of ballast for cruising system
CN111232145A (en) Overall layout of deepwater semi-submersible production platform
CN106232468B (en) Outer capstan head with steering framing wheel
CN204606131U (en) A kind of seawater main system being applied to ocean engineering auxiliary vessel
WO2017186284A1 (en) Offshore vessel for production and storage of petroleum products
KR20130142513A (en) Bilge treatment device
CN205776125U (en) Spillway gate recess ice breaker in winter
CN204629083U (en) The online drawing out type immersed pump system of a kind of cryogenic storage tank
CN204980735U (en) Jacket platform elevator that floats
CN207664552U (en) Petrochemical pier cable testing bridge laying structure
CN204895834U (en) A gauged orifice device for boats and ships are inspectd under water
CN105586851B (en) A kind of beach Fuel Tanking Unit and its method of construction
CN203176724U (en) Whole plant torch pipeline system
CN207274936U (en) Small-sized semi-submersible type produces oil storage platform
CN107178342A (en) Subsea manifold device
CN106088157A (en) Eclipsed form arranges recirculated water concrete duct manhole shaft and inspection method thereof
EP2988990B1 (en) Offshore supply vessel
CN206297714U (en) A kind of floating on water floating platform and the inversion boosting mechanism with the floating platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HANGZHOU OPR OFFSHORE ENGINEERING CO., LTD..

Free format text: FORMER OWNER: SHANGHAI JINGRONG MERCHANT SHIP DESIGN CO., LTD.

Effective date: 20121106

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200032 JIADING, SHANGHAI TO: 311121 HANGZHOU, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20121106

Address after: Yuhang District of Hangzhou in West Zhejiang province 311121 No. 1500 Building No. 2 room 111

Patentee after: Hangzhou OPY Ocean Engineering Co.,Ltd.

Address before: 200032 Shanghai City, Jiading District Anting Town, Moyu Road No. 185

Patentee before: Shanghai Jingrong Merchant Ship Design Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20101117

CX01 Expiry of patent term