CN201620196U - Connecting structure of supporting beam and buttress of electrolysis bath - Google Patents

Connecting structure of supporting beam and buttress of electrolysis bath Download PDF

Info

Publication number
CN201620196U
CN201620196U CN2009203186914U CN200920318691U CN201620196U CN 201620196 U CN201620196 U CN 201620196U CN 2009203186914 U CN2009203186914 U CN 2009203186914U CN 200920318691 U CN200920318691 U CN 200920318691U CN 201620196 U CN201620196 U CN 201620196U
Authority
CN
China
Prior art keywords
buttress
supporting beam
electrolyzer
arc
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203186914U
Other languages
Chinese (zh)
Inventor
秦海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2009203186914U priority Critical patent/CN201620196U/en
Application granted granted Critical
Publication of CN201620196U publication Critical patent/CN201620196U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a connecting structure of a supporting beam and a buttress of an electrolysis bath, comprising a supporting beam (1) communicating in the end therein with two arc plate supports (2), which is mounted in base supporting pier (5) through an insulting plate (4), the arc plate supports (2) being two parallel arc steel plates. Compared with prior art, the utility model provides a double arc plate supporting in the middle of the insulating plate and the supporting beam, allowing the latter to have horizontal displacement, thereby reducing the arch camber and deformation to a large extent, eventually reducing the horizontal force of the electrolysis bath on the buttress, preventing the buttress from cracking and reducing the sectional dimension and the number of the reinforcing bars of the buttress. The utility model has the advantages of easy making and installation, and stability.

Description

The syndeton of electrolyzer supporting beam and buttress
Technical field
The utility model relates to a kind of syndeton of bearing base, the syndeton of particularly a kind of electrolyzer supporting beam and buttress.
Background technology
Initial electrolyzer basis buttress is in order to solve the Insulation Problems between electrolyzer and the earth, be that 500mm with electrolyzer basis buttress topmost makes plain concrete (promptly not adding reinforcing bar), existing large-scale pre-baked cell temperature in start-up course is very high, the arch camber distortion can take place in supporting beam, to produce very big horizontal force to buttress after the supporting beam arch camber, plain concrete is easy to by drawing crack like this, the electrolyzer buttress appears in the actual engineering often by the accident of drawing crack, for addressing this problem, be that the buttress reinforcing bar is fitted on the buttress top from substrate always at present, and add insulation layer on buttress top, can prevent that like this buttress is by drawing crack.Though this way has solved buttress by the problem of drawing crack, but in the production start-up course, after the supporting beam arch camber bearing is still had very big horizontal force, the reinforcing bar that the buttress sectional dimension need strengthen and dispose is a lot, so not only can increase quantities, prolong the duration, but also can cause the increase of construction costs.Also having a kind of method is exactly to add a single-arc shaped board support such as Fig. 3 in the middle of insulcrete and supporting beam, though can reduce supporting beam to the horizontal force that buttress produces, reduces the sectional dimension and the quantity of reinforcement of buttress, and single-arc shaped board support stability is bad.
The utility model content
Technical problem to be solved in the utility model is, the syndeton of a kind of electrolyzer supporting beam and buttress is provided, this syndeton not only can reduce supporting beam to the horizontal force that buttress produces, and reduces the sectional dimension and the quantity of reinforcement of buttress, and this syndeton has excellent stability.
The technical solution of the utility model: in order to solve the problems of the technologies described above, the syndeton of electrolyzer supporting beam of the present utility model and buttress, comprise the electrolyzer supporting beam, the lower end of electrolyzer supporting beam is connected with the arc bearing, the arc bearing is installed on the buttress of electrolyzer basis by insulcrete, and the arc bearing is two curved plates arranged side by side.
The arc tips of arc bearing is connected with the lower end of electrolyzer supporting beam.
Between insulcrete and arc bearing, also be provided with the bearing steel plate, further increase rigidity, prevent the insulcrete cracking, the rectilinear end welding of bearing steel plate and arc bearing.
Compared with prior art, the utility model adds a two arc bearing in the middle of insulcrete and supporting beam, it allows supporting beam that the displacement of horizontal direction is arranged, therefore can reduce the arch camber distortion of supporting beam to a great extent, finally reach the horizontal force that reduces the basis, prevent the buttress cracking, can reduce the sectional dimension and the quantity of reinforcement of buttress, and making and easy for installation, good stability.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the structural representation that Fig. 1 makes progress at A;
Fig. 3 is a structural representation of the prior art.
Embodiment
Embodiment 1 of the present utility model: the syndeton of electrolyzer supporting beam of the present utility model and buttress, comprise electrolyzer supporting beam 1, the lower end of electrolyzer supporting beam 1 is connected with arc bearing 2 in turn, bearing steel plate 3, insulcrete 4 and electrolyzer basis buttress 5, arc bearing 2 is two curved plates arranged side by side, as shown in Figure 1, only be different from the prior art that Fig. 3 represents the structure that a curved plate forms arc bearing 2.
The upper end of arc bearing 2, promptly arc tips is connected with the lower end of electrolyzer supporting beam 1, and the rectilinear end of lower end is welded on the bearing steel plate 3.See Fig. 2.

Claims (3)

1. the syndeton of electrolyzer supporting beam and buttress, comprise electrolyzer supporting beam (1), the lower end of electrolyzer supporting beam (1) is connected with arc bearing (2), arc bearing (2) is installed on the electrolyzer basis buttress (5) by insulcrete (4), and it is characterized in that: arc bearing (2) is two curved plates arranged side by side.
2. the syndeton of electrolyzer supporting beam according to claim 1 and buttress is characterized in that: the arc tips of arc bearing (2) is connected with the lower end of electrolyzer supporting beam (1).
3. the syndeton of electrolyzer supporting beam according to claim 1 and buttress is characterized in that: also be provided with bearing steel plate (3) between insulcrete (4) and arc bearing (2), bearing steel plate (3) welds with the rectilinear end of arc bearing (2).
CN2009203186914U 2009-12-27 2009-12-27 Connecting structure of supporting beam and buttress of electrolysis bath Expired - Fee Related CN201620196U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203186914U CN201620196U (en) 2009-12-27 2009-12-27 Connecting structure of supporting beam and buttress of electrolysis bath

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203186914U CN201620196U (en) 2009-12-27 2009-12-27 Connecting structure of supporting beam and buttress of electrolysis bath

Publications (1)

Publication Number Publication Date
CN201620196U true CN201620196U (en) 2010-11-03

Family

ID=43023653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203186914U Expired - Fee Related CN201620196U (en) 2009-12-27 2009-12-27 Connecting structure of supporting beam and buttress of electrolysis bath

Country Status (1)

Country Link
CN (1) CN201620196U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103757659A (en) * 2013-07-02 2014-04-30 苏州天华有色金属制品有限公司 Electrolyser with good insulation property

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103757659A (en) * 2013-07-02 2014-04-30 苏州天华有色金属制品有限公司 Electrolyser with good insulation property

Similar Documents

Publication Publication Date Title
CN101255697B (en) Deep building pit trussed-beam inner support integral application pre-stress method
CN102926504B (en) Construction method of steel and concrete overlapped beam combined part
CN201620196U (en) Connecting structure of supporting beam and buttress of electrolysis bath
CN101831869A (en) Connecting structure of combined beam and concrete bearing cross beam
CN101397814A (en) Supporting method of factory building roof system at super large column-removed spacing
CN101988208B (en) Connection structure between aluminum electrolytic tank cathode steel bar and soft belt
CN207160223U (en) A kind of fulcrum-variable pin joint formula steel girder platform
CN213358588U (en) Photovoltaic support foundation filling pile
CN101445943B (en) Supporting beam structure of electrolytic tank
CN201334527Y (en) Connecting structure of supporting beam and buttress of electrolysis bath
CN201590633U (en) Bus-suspending simple bracket
CN202031090U (en) Hollow prestressed concrete square pile
CN201334528Y (en) Connecting structure of buttress and supporting beam of electrolysis bath
CN102108522B (en) Cradle frame device of aluminum reduction cell
CN201158717Y (en) Tank bottom upwarp-proof structure of aluminum cell
CN201515231U (en) High-voltage power capacitor fixing support
CN202576593U (en) Bottom supporting beam and concrete strut connection structure for electrolytic bath
CN101775876A (en) Spacial steel roof truss
CN202401384U (en) Ballasting structure of steel-truss cable-stayed bridge
CN102086523B (en) Prestressing cradle frame of electrolysis bath
CN202645885U (en) Tower of wind-driven generator set
CN201678742U (en) Aluminum electrolytic cell cradle rack device
CN101130874A (en) Method for fixing sacrificial anode of steel pipe pile
CN202000266U (en) Supporting structure of bridge coping template
CN202764004U (en) Hollow slab girder inflatable capsule anti-floating rebar

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101103

Termination date: 20141227

EXPY Termination of patent right or utility model