CN201590633U - Bus-suspending simple bracket - Google Patents

Bus-suspending simple bracket Download PDF

Info

Publication number
CN201590633U
CN201590633U CN2009203184355U CN200920318435U CN201590633U CN 201590633 U CN201590633 U CN 201590633U CN 2009203184355 U CN2009203184355 U CN 2009203184355U CN 200920318435 U CN200920318435 U CN 200920318435U CN 201590633 U CN201590633 U CN 201590633U
Authority
CN
China
Prior art keywords
bus
suspending
steel
main
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203184355U
Other languages
Chinese (zh)
Inventor
武惠杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2009203184355U priority Critical patent/CN201590633U/en
Application granted granted Critical
Publication of CN201590633U publication Critical patent/CN201590633U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Railway Tracks (AREA)

Abstract

The utility model discloses a bus-suspending simple bracket, which includes support column insulators (4) for supporting a bus (1), wherein the support column insulators (4) are mounted on main support steel beams (2), and suspending rods (3) capable of being welded on pre-embedded steel plates (5) of a floor (7) are connected on the main support steel beams (2). The bus-suspending simple bracket can reduce the procedures for design and construction of civil-engineering concrete pillars, can be electrically constructed, and has the advantages of simple and fast procedures, low investment and space economization. Compared with the prior art, the bus-suspending simple bracket has the advantages of simple structure, easy manufacture, safe and reliable use, no occupation of mill floor, no manufacture of concrete pillars, low manufacturing cost, and the like.

Description

Simple and easy bus suspension bracket
Technical field
The utility model relates to the simple and easy bus suspension bracket that a kind of bus that is used to transmit electricity supports usefulness, belongs to transmission of electricity bus structure technical field.
Background technology
In the workshop that adopts bussed supply, the mounting means of bus has a variety of, wherein adopting maximum installation methods is to do base rack in advance by civil engineering earlier, and promptly the civil engineering specialty is carried out the sub-bracing frame of concrete pier in advance, and bus is installed on block of wood by supporting insulator more then.This mounting means is used in supply current when big, and power supply buses is very heavy, and it is comparatively safe to adopt the basis to construct to do support at big concrete block of wood on the ground.But it is less at some supply currents, when power supply buses is low weight, concrete block of wood supports just unnecessary, and concrete block of wood needs to propose money, design in advance mutually by electric and the cooperation of civil engineering specialty, if in construction, run into special circumstances then do over again the comparison difficulty, waste time, and repeat construction and cause waste; In addition, available coagulation knoll minor structure also exist floor space big, take the more problem of workshop floor space.Therefore, existing bus structure result of use still is not ideal enough.
The utility model content
The purpose of this utility model is: provide a kind of simple in structure, make easy, safe and reliable, to take mill floor less and do not need to make the simple and easy bus suspension bracket of concrete block of wood, to overcome the deficiencies in the prior art.
The utility model is to constitute like this: simple and easy bus suspension bracket of the present utility model comprises the post insulator that is used to support bus, post insulator is installed in main the support on the girder steel, at the main suspension rod that is connected with on the girder steel on the pre-embedded steel slab that can be welded on floor that supports.
Also be provided with supporting steel plate on the wall that can be supported on the wall hole that bus passes in the above-mentioned main girder steel bottom of supporting.
Above-mentioned main support girder steel is the channel-section steel structure.
Above-mentioned suspension rod is straight steel pole structure or is the channel-section steel structure.
Owing to adopted technique scheme, use the utility model can reduce the design and the construction link of civil engineering concrete block of wood, the utility model can be all by electrical construction, and the construction simple and fast, and small investment is saved the space.So the utility model compared with prior art the utlity model has advantages such as simple in structure, that making is easy, safe and reliable, do not take mill floor, do not need to make concrete block of wood, cost of manufacture is cheap.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Embodiment:
Embodiment of the present utility model: structure of the present utility model as shown in Figure 1, during making, adopt No. 20 channel-section steels as the main girder steel 2 that supports, adopt No. 8 channel-section steels as suspension rod 3 (also can adopt straight steel pole) as suspension rod 3, end with suspension rod 3 is welded on main the support on the girder steel 2 then, its other end is welded on the pre-embedded steel slab 5 of floor 7, the spacing distance that is welded between the main suspension rod 3 that supports on the girder steel 2 can be adjusted according to on-site actual situations, the post insulator 4 that will be used to support bus 1 is installed in the main girder steel 2 that supports, in order to make support more reliable, main support girder steel 2 near the bottom of an end of the wall that is provided with the wall hole 8 that bus 1 can pass on welding upper support steel plate 6, so just can utilize wall hole 8 and supporting steel plate 6 as supplemental support, at last bus 1 is installed on the post insulator 4.

Claims (4)

1. simple and easy bus suspension bracket, comprise the post insulator (4) that is used to support bus (1), it is characterized in that: post insulator (4) is installed in main the support on the girder steel (2), at the main suspension rod (3) that is connected with on the girder steel (2) on the pre-embedded steel slab (5) that can be welded on floor (7) that supports.
2. simple and easy bus suspension bracket according to claim 1 is characterized in that: be provided with the supporting steel plate (6) that can be supported on the wall that is provided with the wall hole (8) that bus (1) can pass in main girder steel (2) bottom of supporting.
3. simple and easy bus suspension bracket according to claim 1 is characterized in that: main support girder steel (2) is the channel-section steel structure.
4. simple and easy bus suspension bracket according to claim 1 is characterized in that: suspension rod (3) is straight steel pole structure or is the channel-section steel structure.
CN2009203184355U 2009-12-24 2009-12-24 Bus-suspending simple bracket Expired - Fee Related CN201590633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203184355U CN201590633U (en) 2009-12-24 2009-12-24 Bus-suspending simple bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203184355U CN201590633U (en) 2009-12-24 2009-12-24 Bus-suspending simple bracket

Publications (1)

Publication Number Publication Date
CN201590633U true CN201590633U (en) 2010-09-22

Family

ID=42750427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203184355U Expired - Fee Related CN201590633U (en) 2009-12-24 2009-12-24 Bus-suspending simple bracket

Country Status (1)

Country Link
CN (1) CN201590633U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102231500A (en) * 2011-04-02 2011-11-02 成都振中电气有限公司 Method for installing intensive plug-in type bus duct
CN102231505A (en) * 2011-04-02 2011-11-02 成都振中电气有限公司 Intensive plug-in type busbar
CN103910306A (en) * 2014-03-21 2014-07-09 江苏江城电气有限公司 Hanging bracket for mounting buses
CN111577980A (en) * 2020-04-17 2020-08-25 中建五局第三建设有限公司 Nondestructive protection construction method and structure for foundation pit excavation pipeline of linear engineering in old city

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102231500A (en) * 2011-04-02 2011-11-02 成都振中电气有限公司 Method for installing intensive plug-in type bus duct
CN102231505A (en) * 2011-04-02 2011-11-02 成都振中电气有限公司 Intensive plug-in type busbar
CN103910306A (en) * 2014-03-21 2014-07-09 江苏江城电气有限公司 Hanging bracket for mounting buses
CN103910306B (en) * 2014-03-21 2017-01-18 江苏江城电气有限公司 Hanging bracket for mounting buses
CN111577980A (en) * 2020-04-17 2020-08-25 中建五局第三建设有限公司 Nondestructive protection construction method and structure for foundation pit excavation pipeline of linear engineering in old city

Similar Documents

Publication Publication Date Title
CN201590633U (en) Bus-suspending simple bracket
CN203617650U (en) Sturdy and durable corner street frame
CN204538469U (en) Diagonal-bracing type line lever switch support
CN201740297U (en) Balcony mounting bracket of flat-panel solar collector
CN201183839Y (en) Direct current convergent current bus bar insulated bracket
CN202766139U (en) Three-dimensional multi-functional movable hoisting platform
CN204038986U (en) For removing the fork truck of inner support steel pipe
CN202948870U (en) Isolating switch support
CN202544426U (en) Combined adjustable support frame for prefabricated beams and slabs
CN201795167U (en) Device for adjusting verticality of stand column of hanger frame
CN204577940U (en) Device simple suspension bracket
CN204633685U (en) A kind of photovoltaic panel suspension arrangement
CN219498895U (en) Convenient to install's cable support
CN102121115A (en) Supporting structure of magnesium electrolytic cell
CN211508526U (en) Bus bridge supporting bracket
CN102646492A (en) Insulator supporting frame for double-telegraph pole
CN202706219U (en) Right-angle wall beam mechanism for steel roof structure
CN217639241U (en) Electric meter box mounting structure in narrow-size electric well
CN202066114U (en) Radiator support
CN203307975U (en) Multi-point supporting mechanism for unit curtain wall plate
CN201747105U (en) Narrow base tower for power transmission
CN202925980U (en) 66kV tubular bus overroad full-connection framework
CN202839639U (en) Inclined beam used for all-aluminum solar support
CN201820441U (en) Movable sound insulation barrier
CN201796053U (en) Movable supporting platform for withstand voltage test of current transformator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110607

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110607

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100922

Termination date: 20141224

EXPY Termination of patent right or utility model