CN101397814A - Supporting method of factory building roof system at super large column-removed spacing - Google Patents

Supporting method of factory building roof system at super large column-removed spacing Download PDF

Info

Publication number
CN101397814A
CN101397814A CNA2007101896257A CN200710189625A CN101397814A CN 101397814 A CN101397814 A CN 101397814A CN A2007101896257 A CNA2007101896257 A CN A2007101896257A CN 200710189625 A CN200710189625 A CN 200710189625A CN 101397814 A CN101397814 A CN 101397814A
Authority
CN
China
Prior art keywords
column
factory building
factory
super large
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101896257A
Other languages
Chinese (zh)
Inventor
王飞锐
王晓明
牛保有
金铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nonferrous Metals Processing Technology Co Ltd
Original Assignee
China Nonferrous Metals Processing Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nonferrous Metals Processing Technology Co Ltd filed Critical China Nonferrous Metals Processing Technology Co Ltd
Priority to CNA2007101896257A priority Critical patent/CN101397814A/en
Publication of CN101397814A publication Critical patent/CN101397814A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a method for supporting a factory-building roofing system at a huge pumping column space, which relates to the technical field of construction structure design. According to normal column space (6), an on-beam steel column (2) is added in corresponding position on the top surface of a large box-shaped crane beam (1) at the huge pumping column space (7); the top of the on-beam steel column (2) is articulated with a steel roof truss (3), and the foot of the on-beam steel column (2) is articulated with the large box-shaped crane beam (1). The method effectively solves the problem of how to support a factory-building roofing system at a huge pumping column space and causes the arrangement of the roofs to be more unified and the whole rigidity of the factory buildings to be evener, thereby achieving good technical effect and economic benefits. The method is mainly used for the design of the supporting of a factory-building roofing system at a huge pumping column space.

Description

The method for supporting of super large column-removed spacing factory building roof system
Technical field
The present invention relates to the design of building structures technical field, particularly a kind of method for supporting that is applied in the super large column-removed spacing factory building roof system of individual layer industry steel-structure factory building.
Background technology
General, the basic post of individual layer industry steel-structure factory building apart from how between 6~15m, but continuous expansion along with social demand, needs for the layout that satisfies the ultra-large type production equipment and vanguard technology development, the post distance that needs bigger even super large in the individual layer industry steel-structure factory building, local even reach more than the 40m.In this case, increasing factory building columns will be taken out in the factory building part, and how this place's Roof system supports and also become insoluble problem in the mill construction design gradually.
Conventional way with this type of problem of pre-treatment is: carriage is set promptly is commonly called as beam to support the steel roof truss or the roof girder of relevant position taking out the post place, the carriage two ends place takes out factory building columns top, post both sides.This kind way is more suitable with the lower prop distance for handling 24m, but for the ultra-large type column-removed spacing more than the 30m, if still in this way, the depth of section of carriage can be very big so, steel using amount increases a lot, and, further increasing investment because joist cross section height certainly will cause the lifting of factory building whole height, comprehensive benefit is bad.It is very little to take out outside the upper prop plane of factory building columns of post both sides rigidity simultaneously, is difficult to probably bear the load that carriage transmits, and causes the more structural problem.
Summary of the invention
The object of the present invention is to provide a kind of method for supporting of super large column-removed spacing factory building roof system, can solve the problem how individual layer industry steel-structure factory building ultra-large type column-removed spacing place Roof system supports, reach safe, suitable, economic purpose.
The technical solution adopted for the present invention to solve the technical problems is: on large-scale box-shaped crane girder (1) end face of super large column-removed spacing place (7), increase beam on steel column (2) apart from (6) in its relevant position by normal post, (2) capital of steel column on the beam and steel roof truss (3) are hinged, and suspension column and large-scale box-shaped crane girder (1) are hinged.
The invention has the beneficial effects as follows, the inherent characteristics that utilizes the super large column-removed spacing place is that column section and rigidity are big under the factory building of both sides, box-shaped crane girder cross section is big also mainly to be controlled by amount of deflection, less by the steel roofing load that post transmits to its influence, make force path succinct more, clear and definite, thereby well solved the problem how the super large column-removed spacing factory building roof system supports, and made that the layout of roofing is also more unified, it is even that the factory building integral rigidity more is tending towards.Not only reached good technical effect, favorable economic benefit has also been arranged.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is a kind of structural representation of method for supporting of super large column-removed spacing factory building roof system;
1. box-shaped crane girders among the figure, 2. steel column on the beam, 3. steel roof truss, 4. factory building columns upper prop, 5. capital rigid tie bar, 6. normal post distance, 7. super large column-removed spacing place.
The specific embodiment
In Fig. 1, box-shaped crane girder 1 end face at super large column-removed spacing place 7 is provided with steel column 2 on the beam hinged with it in both sides by normal post distance 6, and capital and steel roof truss 3 are hinged, and suspension column and large-scale box-shaped crane girder 1 are hinged.On the beam steel column 2 with take out post both sides factory building columns upper prop 4 and this and be listed as that intercolumniation all is provided with Force transmission partses such as capital rigid tie bar 5 on other factory buildings with normal mode.

Claims (1)

1. the method for supporting of a super large column-removed spacing factory building roof system, it is characterized in that: on large-scale box-shaped crane girder (1) end face of super large column-removed spacing place (7), increase beam on steel column (2) apart from (6) in its relevant position by normal post, (2) capital of steel column on the beam and steel roof truss (3) are hinged, and suspension column and large-scale box-shaped crane girder (1) are hinged.
CNA2007101896257A 2007-09-25 2007-09-25 Supporting method of factory building roof system at super large column-removed spacing Pending CN101397814A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101896257A CN101397814A (en) 2007-09-25 2007-09-25 Supporting method of factory building roof system at super large column-removed spacing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101896257A CN101397814A (en) 2007-09-25 2007-09-25 Supporting method of factory building roof system at super large column-removed spacing

Publications (1)

Publication Number Publication Date
CN101397814A true CN101397814A (en) 2009-04-01

Family

ID=40516637

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101896257A Pending CN101397814A (en) 2007-09-25 2007-09-25 Supporting method of factory building roof system at super large column-removed spacing

Country Status (1)

Country Link
CN (1) CN101397814A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101913753A (en) * 2010-07-31 2010-12-15 中国洛阳浮法玻璃集团有限责任公司 Supporting method of large arch tyre of large and medium-size glass furnace
CN102140849A (en) * 2011-01-24 2011-08-03 中冶赛迪工程技术股份有限公司 Method for underpinning roof structure and expanding column space of steel structure factory building
CN102242569A (en) * 2010-05-11 2011-11-16 五冶集团上海有限公司 Method for drawing columns and enlarging distances after replacing beams at high altitude in industrial factory building
CN102561593A (en) * 2010-12-27 2012-07-11 贵阳铝镁设计研究院有限公司 Structure at column removing position of steel-structure single-story workshop
CN106088640A (en) * 2016-06-03 2016-11-09 河海大学 The method that existing frame structure is carried out demolishing columns
CN107169178A (en) * 2017-04-28 2017-09-15 西安建筑科技大学 A kind of possible ways for obtaining crane load modeling sample
CN110056218A (en) * 2019-05-16 2019-07-26 中冶东方工程技术有限公司 A kind of single-storey factory building pumping column steel-frame structure

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102242569A (en) * 2010-05-11 2011-11-16 五冶集团上海有限公司 Method for drawing columns and enlarging distances after replacing beams at high altitude in industrial factory building
CN102242569B (en) * 2010-05-11 2015-09-02 五冶集团上海有限公司 Industrial premises high vacancy takes out post expansion method after changing beam
CN101913753A (en) * 2010-07-31 2010-12-15 中国洛阳浮法玻璃集团有限责任公司 Supporting method of large arch tyre of large and medium-size glass furnace
CN101913753B (en) * 2010-07-31 2012-08-15 中国洛阳浮法玻璃集团有限责任公司 Supporting method of large arch tyre of large and medium-size glass furnace
CN102561593A (en) * 2010-12-27 2012-07-11 贵阳铝镁设计研究院有限公司 Structure at column removing position of steel-structure single-story workshop
CN102561593B (en) * 2010-12-27 2014-08-13 贵阳铝镁设计研究院有限公司 Structure at column removing position of steel-structure single-story workshop
CN102140849A (en) * 2011-01-24 2011-08-03 中冶赛迪工程技术股份有限公司 Method for underpinning roof structure and expanding column space of steel structure factory building
CN106088640A (en) * 2016-06-03 2016-11-09 河海大学 The method that existing frame structure is carried out demolishing columns
CN107169178A (en) * 2017-04-28 2017-09-15 西安建筑科技大学 A kind of possible ways for obtaining crane load modeling sample
CN110056218A (en) * 2019-05-16 2019-07-26 中冶东方工程技术有限公司 A kind of single-storey factory building pumping column steel-frame structure

Similar Documents

Publication Publication Date Title
CN101397814A (en) Supporting method of factory building roof system at super large column-removed spacing
CN103452311B (en) A kind of erection method of shaped steel suspended structural support frame
CN101748796B (en) Large-span mill construction with super heavy-duty steel structure and design method thereof
CN202324340U (en) Combined type large steel-pipe truss
CN102061742B (en) Shockproof reinforced concrete pseudo-classic building structural system
CN106759909B (en) Bearing structure system and its construction method are hung up under one kind
CN202090433U (en) Rectangular structure using prestress metal plate roof
CN202202410U (en) Cross-shaped abnormal joint formed by connection of steel structure box column, box beam and I beam
CN102733320B (en) Pier annular bracket type column embracing beam for jacking bridge
CN203247868U (en) Large-span steel structure construction temporary supporting frame
CN216042835U (en) Layer adding device with light wall board for raising frame structure
CN101633483B (en) Integral lifting apparatus for steel structure net rack
CN108049666A (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN207160223U (en) A kind of fulcrum-variable pin joint formula steel girder platform
CN203034345U (en) Coal transporting trestle of integral continuous steel truss
CN202644415U (en) Annular bracket type column embrace beam used for jacking bridge
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN102094456A (en) Connecting method and structure for corridor and twin towers
CN202202411U (en) T-shaped abnormal joint formed by rigid connection of steel structure variable-section box column and I beam
CN109138272B (en) Super high-rise steel bar group connection fixing device and method
CN202249004U (en) Improved steel structure plant structure
CN209066742U (en) A kind of superelevation daughter wall construction
CN113914456A (en) Large-span integrated bracket structure for supporting complex load
CN203475317U (en) Bracket for high pier collar beam construction
CN203546900U (en) Building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090401