CN201600825U - Simulated floor for practical teaching on architectural electricity and intellectualization - Google Patents

Simulated floor for practical teaching on architectural electricity and intellectualization Download PDF

Info

Publication number
CN201600825U
CN201600825U CN2009202020362U CN200920202036U CN201600825U CN 201600825 U CN201600825 U CN 201600825U CN 2009202020362 U CN2009202020362 U CN 2009202020362U CN 200920202036 U CN200920202036 U CN 200920202036U CN 201600825 U CN201600825 U CN 201600825U
Authority
CN
China
Prior art keywords
metope
mesh plate
unit
floor
room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009202020362U
Other languages
Chinese (zh)
Inventor
陈传周
杨英锐
陈健冬
吴毓凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yalong intelligent equipment group Limited by Share Ltd
Original Assignee
Yalong Science & Technology Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yalong Science & Technology Group filed Critical Yalong Science & Technology Group
Priority to CN2009202020362U priority Critical patent/CN201600825U/en
Application granted granted Critical
Publication of CN201600825U publication Critical patent/CN201600825U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Instructional Devices (AREA)

Abstract

The utility model relates to a simulated floor for practical teaching on architectural electricity and intellectualization. The simulated floor comprises a simulated floor support frame which adopts a two-ply structure formed by profiles; and the simulated floor support frame is at least provided with a computer room unit, a room unit, a first corridor unit, a second corridor unit and a vertical shaft unit, wherein a mesh plate is arranged on at least one wall surface of each unit, and a floor gate is arranged on the back wall surface of the first corridor unit. By adopting the structure, various teaching practices such as top installation, side-wall installation, bottom installation and the like, which are in conformity with the practical installation positions of modern architecture, can be carried out in the simulated floor, and the effect is lifelike and realistic, the structure is simpler, and the requirement of situational teaching is met, so that strong impression is left on students, and good teaching effect is achieved; and the mesh plates are arranged on the wall surfaces, so that the installation of the constituent equipment of each system is convenient, and the generality and the expandability are strong.

Description

Architectural electricity and intelligent practical teaching simulation floor
Technical field
The utility model relates to a kind of actual training device, particularly a kind of architectural electricity and intelligent practical teaching simulation floor.
Background technology
Continuous development along with science and technology, people are more and more higher to the intelligentized requirement of architectural electricity, in order to allow the student before walking out of school, the architectural electricity intellectuality just be had deep understanding and application, cultivate the architectural electricity intelligentized design and the operation talent, architectural electricity intelligent training device also will grow with each passing hour, the development of keeping pace with the times, Chinese patent ZL200820163312.4 discloses a kind of general building practical traning platform, it is mainly by the real training frame, pallet, desktop, control flow, universal wheel and mesh plate are formed, can only carry out simple real training, not enough lifelike image carry out talk back entrance guard and indoor safety-protection system, closed-circuit TV monitoring system etc. " situation " teaching, teaching efficiency is bad.
Summary of the invention
Technical problem to be solved in the utility model is, a kind of architectural electricity and intelligent practical teaching simulation floor that can carry out " situation " teaching is provided.
For solving the problems of the technologies described above, the utility model is by the following technical solutions: a kind of architectural electricity and intelligent practical teaching simulation floor, include the double-layer structure simulation floor bracing frame that constitutes by section bar, described simulation floor bracing frame is provided with the machine room unit at least, room unit, one deck corridor unit, unit, two floor roads, vertical vertical shaft unit, described vertical vertical shaft unit is positioned at described architectural electricity and intelligent practical teaching simulation floor centre position, unit, described two floor road, one deck corridor unit top-bottom layout is arranged on vertical vertical shaft unit one side, described room unit, machine room unit top-bottom layout is arranged on vertical vertical shaft unit opposite side, described machine room unit, room unit, one deck corridor unit, unit, two floor roads, at least one respectively metope in vertical vertical shaft unit is provided with mesh plate, and metope is provided with the floor gate behind described one deck corridor unit.
The utility model architectural electricity and intelligent practical teaching simulation floor utilize section bar and mesh plate to construct architectural electricity and the intelligent teaching simulation floor of putting into practice usefulness, the machine room unit is set, room unit, one deck corridor unit, unit, two floor roads, the metope mesh plate that vertical vertical shaft unit and above-mentioned each unit matching are installed, basic structure with high building building, can carry out the various tops that are consistent with modern architecture actual installation position installs, sidewall is installed, install the bottom, lifelike image, structure is simple relatively, meet the requirement of " situation " teaching, the student is with deep impression, and teaching efficiency is good; Metope is a mesh plate, and the component devices that each system is installed is convenient, and versatility and extendibility are strong.
The utility model will be further described below in conjunction with the drawings and specific embodiments.
Description of drawings
Fig. 1 is the structural representation of the utility model architectural electricity and intelligent practical teaching simulation floor;
Fig. 2 is the front view of the utility model parts expansion fixture;
Fig. 3 is the vertical view of the utility model parts expansion fixture;
Fig. 4 is the left view of the utility model parts expansion fixture;
Fig. 5 is the synoptic diagram of the another kind of embodiment of the utility model parts expansion fixture.
Embodiment
As Fig. 1, Fig. 2, Fig. 3, shown in Figure 4, a kind of architectural electricity and intelligent practical teaching simulation floor, include the double-layer structure simulation floor bracing frame that constitutes by section bar 1, described simulation floor bracing frame is provided with machine room unit 2, room unit 3, one deck corridor unit 4, unit, two floor roads 5, vertical vertical shaft unit 7, the said units structural similarity, for having the rectangular parallelepiped of four crossbeams and four longerons, described vertical vertical shaft unit 7 is positioned at described architectural electricity and intelligent practical teaching simulation floor centre position, unit, described two floor road 5, one deck corridor unit 4 top-bottom layout are arranged on vertical vertical shaft unit 7 one sides, described room unit 3, machine room unit 2 top-bottom layout are arranged on vertical vertical shaft unit 7 opposite sides, the location layout of each unit meets the high building buildings' features, can allow the student produce " presence ", meet the requirement of " situation " teaching, the student is with deep impression, teaching efficiency is good, the linking part crossbeam of each unit or longeron are if overlap, for saving material, can save, described machine room unit 2, room unit 3, one deck corridor unit 4, unit, two floor roads 5, vertical vertical shaft unit 7 structures are similar substantially, if under the situation that does not change cellular construction, just each cell position simply being replaced, also is the scope of the utility model protection; Described machine room unit 2, room unit 3, one deck corridor unit 4, unit, two floor roads 5, at least one respectively metope in vertical vertical shaft unit 7 is provided with mesh plate 8, a kind of preferred version, described room unit 3 is provided with a left side, the room metope mesh plate that cooperates installation with section bar 1, the right metope mesh plate in room, metope mesh plate on the room, metope mesh plate behind the room, machine room unit 2 is provided with the machine room left side metope mesh plate that cooperates installation with section bar 1, the right metope mesh plate of machine room, metope mesh plate behind the machine room, one deck corridor unit 4 is provided with one deck corridor left side metope mesh plate that cooperates installation with section bar 1, the right metope mesh plate of one deck corridor, metope mesh plate behind one deck corridor, unit, described two floor road 5 is provided with a left side, the two floor roads metope mesh plate that cooperates installation with section bar 1, the right metope mesh plate in two floor roads, metope mesh plate on the two floor roads, metope mesh plate behind the two floor roads, a plurality of different metopes are provided with mesh plate and can install at the real training top, sidewall is installed, install the bottom, meets engineering reality; A kind of preferred version, the last metope mesh plate area of described room unit 3 is less than the described area of going up room unit plane, metope mesh plate place, the described metope mesh plate of going up is provided with passive section bar 1 on every side, can reach the requirement of practice teaching after adopting said structure to structure, save material simultaneously, it is firm, reasonable in design to install; Described one deck corridor unit 4 back metopes are provided with floor gate 9, floor gate 9 is provided with and can real training practises the talk back entrance guard system with installation, adopt the architectural electricity and the intelligent practical teaching simulation floor of said structure, utilize two-layer construction platform, each ingredient with skyscraper, meet the requirement of " situation " teaching, can realize the installation and the operation of intelligent building sorts of systems, as " talk back entrance guard and indoor security protection subsystem " and " cctv surveillance and peripheral security protection subsystem " etc.
As a kind of improvement, as shown in Figure 1, metope is penetrating before described architectural electricity and the intelligent practical teaching simulation floor, the height of described machine room unit 2, one deck corridor unit 4 is greater than the height of room unit 3, unit, two floor roads 5, unmatched metope design helps the observation of student to experimentation and result, the height of machine room unit 2, one deck corridor unit 4 is higher, turnover architectural electricity and intelligent practical teaching simulation floor are convenient, to the not influence of teaching efficiency of " situation " teaching, save material.
As a kind of improvement, as Fig. 2, Fig. 3, shown in Figure 4, present embodiment also includes the expansion fixture 6 that is used with mesh plate 8, described expansion fixture 6 includes connecting portion 61, rubber-like first bulge 62, rubber-like second bulge 63, described first bulge 62, second bulge 63 is connected with connecting portion 61, described first bulge 62, second bulge 63 be arranged in parallel, as shown in Figure 5, also can first bulge, 62 mating surfaces, second bulge, 63 mating surfaces are slightly outward-dipping, self-produced tension force when slightly outward-dipping setting can be in expansion fixture 6 be packed mesh into, described first bulge, 62 movable ends are provided with first flange 64, described second bulge, 63 movable ends are provided with second flange 65, first flange 64, the front of second flange 65 is used for supporting device, the back is used to increase the surface of contact of expansion fixture 6 and metope mesh plate 8, installs more firm.The use of expansion fixture 6 makes device mounting mode and actual engineering approaching, use self-tapping screw and 6 combinations of expansion fixture, self-tapping screw is embedded between first bulge 62 and second bulge 63, along with tightening of self-tapping screw, first bulge 62 and second bulge 63 outwards expand and aggravate, and install firmly; Expansion fixture 6 matches with the metope that mesh plate 8 constitutes, and wire laying mode is flexible, can select to manage wire loop at mesh plate reverse side cloth concealed wire by wire casing in positive open wiring of mesh plate or general special use, meets the engineering actual conditions, and teaching efficiency is good.The mesh plate 8 of present embodiment is provided with a plurality of strip holes, mesh plate 8 is provided with a plurality of strip holes, and laterally strip hole is arranged alternately with vertical strip hole, and device spare is installed on the strip hole, the relative position that only need be adjusted on the strip hole during location change gets final product, and the adjustment mode is flexible; As long as have living space on the mesh plate 8, element all can be installed on the mesh plate 8, the space availability ratio height.

Claims (10)

1. an architectural electricity and intelligent practical teaching are simulated floor, it is characterized in that including the double-layer structure simulation floor bracing frame that constitutes by section bar (1), described simulation floor bracing frame is provided with machine room unit (2) at least, room unit (3), one deck corridor unit (4), unit, two floor roads (5), vertical vertical shaft unit (7), described vertical vertical shaft unit (7) is positioned at described architectural electricity and intelligent practical teaching simulation floor centre position, described unit, two floor roads (5), one deck corridor unit (4) top-bottom layout is arranged on vertical vertical shaft unit (7) one sides, described room unit (3), machine room unit (2) top-bottom layout is arranged on vertical vertical shaft unit (7) opposite side, described machine room unit (2), room unit (3), one deck corridor unit (4), unit, two floor roads (5), at least one respectively metope in vertical vertical shaft unit (7) is provided with mesh plate (8), and back, described one deck corridor unit (4) metope is provided with floor gate (9).
2. architectural electricity according to claim 1 and intelligent practical teaching simulation floor, metope is penetrating before it is characterized in that described architectural electricity and intelligent practical teaching simulation floor, and the height of described machine room unit (2), one deck corridor unit (4) is greater than the height of room unit (3), unit, two floor roads (5).
3. architectural electricity according to claim 1 and 2 and intelligent practical teaching simulation floor, it is characterized in that also including the expansion fixture (6) that is used with mesh plate (8), described expansion fixture (6) includes connecting portion (61), rubber-like first bulge (62), rubber-like second bulge (63), described first bulge (62) is connected with connecting portion (61) one ends, described second bulge (63) is connected with connecting portion (61) other end, described first bulge (62) movable end is provided with first flange (64), and described second bulge (63) movable end is provided with second flange (65).
4. architectural electricity according to claim 3 and intelligent practical teaching simulation floor is characterized in that described first bulge (62) mating surface, second bulge (63) mating surface are slightly outward-dipping.
5. architectural electricity according to claim 1 and 2 and intelligent practical teaching simulation floor, it is characterized in that described room unit (3) is provided with a left side, the room metope mesh plate that cooperates installation with section bar (1), the right metope mesh plate in room, metope mesh plate on the room, metope mesh plate behind the room, machine room unit (2) is provided with the machine room left side metope mesh plate that cooperates installation with section bar (1), the right metope mesh plate of machine room, metope mesh plate behind the machine room, one deck corridor unit (4) is provided with one deck corridor left side metope mesh plate that cooperates installation with section bar (1), the right metope mesh plate of one deck corridor, metope mesh plate behind one deck corridor, described unit, two floor roads (5) are provided with a left side, the two floor roads metope mesh plate that cooperates installation with section bar (1), the right metope mesh plate in two floor roads, metope mesh plate on the two floor roads, metope mesh plate behind the two floor roads.
6. architectural electricity according to claim 3 and intelligent practical teaching simulation floor, it is characterized in that described room unit (3) is provided with a left side, the room metope mesh plate that cooperates installation with section bar (1), the right metope mesh plate in room, metope mesh plate on the room, metope mesh plate behind the room, machine room unit (2) is provided with the machine room left side metope mesh plate that cooperates installation with section bar (1), the right metope mesh plate of machine room, metope mesh plate behind the machine room, one deck corridor unit (4) is provided with one deck corridor left side metope mesh plate that cooperates installation with section bar (1), the right metope mesh plate of one deck corridor, metope mesh plate behind one deck corridor, described unit, two floor roads (5) are provided with a left side, the two floor roads metope mesh plate that cooperates installation with section bar (1), the right metope mesh plate in two floor roads, metope mesh plate on the two floor roads, metope mesh plate behind the two floor roads.
7. architectural electricity according to claim 4 and intelligent practical teaching simulation floor, it is characterized in that described room unit (3) is provided with a left side, the room metope mesh plate that cooperates installation with section bar (1), the right metope mesh plate in room, metope mesh plate on the room, metope mesh plate behind the room, machine room unit (2) is provided with the machine room left side metope mesh plate that cooperates installation with section bar (1), the right metope mesh plate of machine room, metope mesh plate behind the machine room, one deck corridor unit (4) is provided with one deck corridor left side metope mesh plate that cooperates installation with section bar (1), the right metope mesh plate of one deck corridor, metope mesh plate behind one deck corridor, described unit, two floor roads (5) are provided with a left side, the two floor roads metope mesh plate that cooperates installation with section bar (1), the right metope mesh plate in two floor roads, metope mesh plate on the two floor roads, metope mesh plate behind the two floor roads.
8. architectural electricity according to claim 5 and intelligent practical teaching simulation floor, the last metope mesh plate area that it is characterized in that described room unit (3) is less than the described area of going up room unit plane, metope mesh plate place, and the described metope mesh plate of going up is provided with passive section bar (1) on every side.
9. architectural electricity according to claim 6 and intelligent practical teaching simulation floor, the last metope mesh plate area that it is characterized in that described room unit (3) is less than the described area of going up room unit plane, metope mesh plate place, and the described metope mesh plate of going up is provided with passive section bar (1) on every side.
10. architectural electricity according to claim 7 and intelligent practical teaching simulation floor, the last metope mesh plate area that it is characterized in that described room unit (3) is less than the described area of going up room unit plane, metope mesh plate place, and the described metope mesh plate of going up is provided with passive section bar (1) on every side.
CN2009202020362U 2009-12-04 2009-12-04 Simulated floor for practical teaching on architectural electricity and intellectualization Expired - Lifetime CN201600825U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202020362U CN201600825U (en) 2009-12-04 2009-12-04 Simulated floor for practical teaching on architectural electricity and intellectualization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202020362U CN201600825U (en) 2009-12-04 2009-12-04 Simulated floor for practical teaching on architectural electricity and intellectualization

Publications (1)

Publication Number Publication Date
CN201600825U true CN201600825U (en) 2010-10-06

Family

ID=42811888

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202020362U Expired - Lifetime CN201600825U (en) 2009-12-04 2009-12-04 Simulated floor for practical teaching on architectural electricity and intellectualization

Country Status (1)

Country Link
CN (1) CN201600825U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102542899A (en) * 2012-02-23 2012-07-04 上海锐势投资发展有限公司 Simulation system and evaluation method used for housing unit
CN102750864A (en) * 2012-06-08 2012-10-24 西安开元电子实业有限公司 Teaching and practical training device arranged on equipment
CN108335617A (en) * 2018-04-17 2018-07-27 广西城市建设学校 Shear wall and raft foundation construction teaching facilities
CN113674573A (en) * 2019-12-16 2021-11-19 浙江建设职业技术学院 Practical training classroom for engineering building electrical construction technology training

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102542899A (en) * 2012-02-23 2012-07-04 上海锐势投资发展有限公司 Simulation system and evaluation method used for housing unit
CN102750864A (en) * 2012-06-08 2012-10-24 西安开元电子实业有限公司 Teaching and practical training device arranged on equipment
CN108335617A (en) * 2018-04-17 2018-07-27 广西城市建设学校 Shear wall and raft foundation construction teaching facilities
CN113674573A (en) * 2019-12-16 2021-11-19 浙江建设职业技术学院 Practical training classroom for engineering building electrical construction technology training
CN113674573B (en) * 2019-12-16 2023-08-01 浙江建设职业技术学院 Practical training classroom for engineering building electrical construction technical training

Similar Documents

Publication Publication Date Title
CN201600825U (en) Simulated floor for practical teaching on architectural electricity and intellectualization
US8763314B2 (en) Container-type system booth for an indoor/outdoor exhibition or event
CN203036197U (en) Modular mounting bracket of light-emitting diode (LED) display unit box
CN102444206B (en) Prefabricated modular building supporting overlapping and combination
CN105735611A (en) Composite assembly floor
CN201812416U (en) Power distribution training system for electricians
CN109403663A (en) A kind of removable module fire-fighting Support Equipment on duty
CN209308470U (en) A kind of removable module fire-fighting Support Equipment on duty
CN203977910U (en) Novel performing art show field
CN201514723U (en) Simulation room frame for self-controlled teaching and practical training of intelligent building
CN201673614U (en) Comprehensive wiring training simulation building and component unit thereof
CN202134151U (en) Typhoon/storm experience system
CN202887551U (en) Electrical installation and practical training examine platform
CN209703936U (en) A kind of floor ground structure suitable for information system computer floor in building
CN202736341U (en) Novel electrical mounting and building practical training examination device
CN105544732A (en) Foldable portable house
CN201689562U (en) Indoor electric installation and assessment device
CN107740511B (en) Module wall system
CN215369123U (en) Corner assembled encloses fender
CN210895945U (en) Building intelligent engineering training device
CN205024953U (en) Novel side fascia
CN214541149U (en) Environmental simulation device that combat training used
CN104851350A (en) Installation and debugging training device for air conditioner
CN205637458U (en) Compound floor of assembling
CN203659344U (en) Police combination-type mobile tactic training square cabin

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHEJIANG YALONG EDUCATION EQUIPMENT CO., LTD.

Free format text: FORMER OWNER: YALONG SCIENCE + TECHNOLOGY GROUP

Effective date: 20130813

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 325105 WENZHOU, ZHEJIANG PROVINCE TO: 325000 WENZHOU, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130813

Address after: Oubei town of Yongjia County Wenzhou city Zhejiang province 325000 Fort Industrial Park two industrial zone Yalong

Patentee after: Zhejiang Yalong Education Equipment Co., Ltd.

Address before: 325105 Zhejiang province Yongjia County Oubei Town Industrial Park (Fort Yalong ordinances of the two industrial zone)

Patentee before: Yalong Science & Technology Group

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Simulated floor for practical teaching on architectural electricity and intellectualization

Effective date of registration: 20140120

Granted publication date: 20101006

Pledgee: Bank of Communications Ltd Wenzhou Yongjia branch

Pledgor: Zhejiang Yalong Education Equipment Co., Ltd.

Registration number: 2014990000049

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20160331

Granted publication date: 20101006

Pledgee: Bank of Communications Ltd Wenzhou Yongjia branch

Pledgor: Zhejiang Yalong Education Equipment Co., Ltd.

Registration number: 2014990000049

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 325000 Yalong Industrial Park, two industrial zone, Ou Bei Town, Yongjia County, Wenzhou, Zhejiang, China

Patentee after: Yalong intelligent equipment group Limited by Share Ltd

Address before: 325000 Yalong Industrial Park, two industrial zone, Ou Bei Town, Yongjia County, Wenzhou, Zhejiang, China

Patentee before: Zhejiang Yalong Education Equipment Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20101006

CX01 Expiry of patent term