CN201598831U - Chucking appliance used for construction moulds - Google Patents

Chucking appliance used for construction moulds Download PDF

Info

Publication number
CN201598831U
CN201598831U CN2009202736512U CN200920273651U CN201598831U CN 201598831 U CN201598831 U CN 201598831U CN 2009202736512 U CN2009202736512 U CN 2009202736512U CN 200920273651 U CN200920273651 U CN 200920273651U CN 201598831 U CN201598831 U CN 201598831U
Authority
CN
China
Prior art keywords
construction
connecting rod
chucking
pin
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202736512U
Other languages
Chinese (zh)
Inventor
王嘉奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009202736512U priority Critical patent/CN201598831U/en
Application granted granted Critical
Publication of CN201598831U publication Critical patent/CN201598831U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the technical field of constructional engineering equipment, and particularly relates to a chucking appliance used for construction moulds, which aims to solve the problems that at present, during the pouring construction of various beam columns in construction industry, construction moulds are needed to be supported by pre-buried wooden sticks and fixed by using a lot of boards, bar reinforcements, etc., so that the time and labor are wasted; and when being dismantled, the materials like boards for supporting and fixing the construction moulds are damaged and can not be reused, resulting in waste and lower construction efficiency. The utility model adopts the technical scheme that the chucking appliance comprises chucking bodies, a connecting rod, a lock nut and a positioning pin, wherein a connection hole is formed at the middle part of each chucking body; a pin hole is formed at the upper end as well as the lower end of each chucking body; the connecting rod penetrates through the connection holes so as to connect the two chucking bodies; the lock nut is assembled at one end of the connecting rod, and a plurality of pin holes are formed at the other end thereof; and the positioning pin is inserted in one pin hole of the connecting rod. The chucking appliance provided by the utility model has the advantages of simple structure, low manufacturing cost, and convenient and fast construction, and further improves the speed of mould fixing during the construction, and reduces construction cost.

Description

The building mould jig
Technical field
The utility model relates to the building engineering equipment technical field, a kind of specifically building mould jig.
Background technology
At present building trade is in the construction of the various beam columns of cast, needs to support building mould at pre-buried wooden stick within the walls, and with a large amount of planks, reinforcing bar etc. building mould fixed, and the disassembly process complexity wastes time and energy.Materials such as the plank of these supports and fixed building mould and reinforcing bar usually are damaged in the process of dismounting, can not reuse, and not only cause a large amount of wastes of materials such as timber, and efficiency of construction are low.
Summary of the invention
The purpose of this utility model provides a kind of building mould jig, can reuse, the speed of fixed mould when having improved construction.
The technical solution of the utility model is made up of card body, connecting rod, locking nut, alignment pin; Card body middle part has connecting hole, and respectively there is a nail hole upper end of card body and lower end; Two card bodies pass connecting hole by connecting rod and connect; Connecting rod one end is equipped with locking nut, has several pin-and-holes on the other end; Alignment pin is inserted in the pin-and-hole of connecting rod.
The utility model has the advantages that simple in structurely, cost of manufacture is low, and convenient and quick construction is reusable, and the speed of fixed mould has reduced operating expenses when having improved construction.
Description of drawings
Schematic diagram when Fig. 1 uses for the utility model
The specific embodiment
1 card body, 2 nail holes, 3 connecting rods, 4 pin-and-holes, 5 locking nuts, 6 alignment pins, 7 bodies of wall, 8 construction formworks among the figure.
Embodiment 1
As can be seen from Figure 1, the utility model is made up of card body 1, connecting rod 3, locking nut 5, alignment pin 6; Card body 1 middle part has connecting hole, and the card body respectively has a nail hole 2 in two ends about in the of 1; Two card bodies 1 pass connecting hole by connecting rod 3 and connect; Connecting rod 3 one ends are equipped with locking nut 5, and the other end has several pin-and-holes 4, are used for cooperating the body of wall 7 of different-thickness; In a pin-and-hole 4 of connecting rod 3, be fitted with alignment pin 6.
When the utility model uses, connecting rod 3 is penetrated the preformed hole of body of wall 7, body of wall 7 is stretched out at two ends; End at connecting rod 3 penetrates card body 1, and inserts alignment pin 6 location in a pin-and-hole 4 of connecting rod 3; Put on another sheet card body 1, fixing and locking nut 5 at the other end of connecting rod 3.Repeat aforesaid operations, array card body 1 is connected by connecting rod 3 and be fixed on the body of wall 7, the construction formwork 8 that pouring construction is used is inserted in respectively between card body 1 and the body of wall 7, and then construction formwork 8 surrounds the groove shape on body of wall 7 tops, can carry out pouring construction.
When building overarm, can will block body 1 and fixedly connected by the nail hole 2 at card body two ends about in the of 1 with bracing or strutting arrangement, between two row's card bodies 1, put into construction formwork 8, make construction formwork 8 surround the groove shape, can build overarm.

Claims (1)

1. a building mould jig is characterized in that: be made up of card body (1), connecting rod (3), locking nut (5), alignment pin (6); Card body (1) middle part has connecting hole, and respectively there is a nail hole (2) card body (1) upper end and lower end; Two card bodies (1) pass connecting hole by connecting rod (3) and connect; Connecting rod (3) one ends are equipped with locking nut (5), have several pin-and-holes (4) on the other end; Alignment pin (6) is inserted in the pin-and-hole (4) of connecting rod (3).
CN2009202736512U 2009-11-22 2009-11-22 Chucking appliance used for construction moulds Expired - Fee Related CN201598831U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202736512U CN201598831U (en) 2009-11-22 2009-11-22 Chucking appliance used for construction moulds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202736512U CN201598831U (en) 2009-11-22 2009-11-22 Chucking appliance used for construction moulds

Publications (1)

Publication Number Publication Date
CN201598831U true CN201598831U (en) 2010-10-06

Family

ID=42809884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202736512U Expired - Fee Related CN201598831U (en) 2009-11-22 2009-11-22 Chucking appliance used for construction moulds

Country Status (1)

Country Link
CN (1) CN201598831U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131702A (en) * 2014-03-28 2014-11-05 熊静 Through-wall circular rod rapidly-fixing fastener

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131702A (en) * 2014-03-28 2014-11-05 熊静 Through-wall circular rod rapidly-fixing fastener

Similar Documents

Publication Publication Date Title
CN205100544U (en) Early system of tearing open of steel framework built -up plate
CN203007846U (en) Y-type block template and support system
CN201428249Y (en) Building template supporting structure
CN106499173A (en) Based on the aluminum alloy mould plate mechanism that BIM technology is used for building floor construction
CN102061806B (en) Building template
CN104131700A (en) Method and formwork for pouring door and window cast-in-place beam
CN201598831U (en) Chucking appliance used for construction moulds
CN201730330U (en) Beam formwork for building
CN102071802B (en) Template for construction
CN102116081A (en) Template for building
CN216587693U (en) Floor skeleton and floor
CN105625708B (en) A kind of aluminum wood composite shuttering system for building
CN102268921A (en) Beam template for construction
CN201714085U (en) Shear wall door opening side molding plate reinforcing device
CN218170798U (en) Universal beam column die auxiliary tool
CN213674677U (en) Assembly type building box girder forming die
CN204899218U (en) Superimposed sheet support frame
CN102191859A (en) Beam template for building
CN217494635U (en) Concrete top beam forming die
CN220267206U (en) Reinforcing tool for outer vertical face corner constructional column
CN216196149U (en) Prefabricated reinforced concrete slab stair component
CN220868835U (en) Quick-dismantling support frame for templates
CN102061748B (en) High-strength concrete facade cross node constrained by steel mould containing steel reinforcement framework
CN201730329U (en) Beam template for building
CN218346817U (en) Cavity water injection template capable of constructing section column and maintenance system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101006

Termination date: 20101122