CN201581311U - Mine mucker temporary track - Google Patents
Mine mucker temporary track Download PDFInfo
- Publication number
- CN201581311U CN201581311U CN2009202584473U CN200920258447U CN201581311U CN 201581311 U CN201581311 U CN 201581311U CN 2009202584473 U CN2009202584473 U CN 2009202584473U CN 200920258447 U CN200920258447 U CN 200920258447U CN 201581311 U CN201581311 U CN 201581311U
- Authority
- CN
- China
- Prior art keywords
- mine
- track
- temporary track
- mucker
- temporary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a mine mucker temporary track, which comprises two rails disposed in parallel. Steel slabs are perpendicularly fixed between the two rails. The mine mucker temporary track guarantees a mucker to be not easily off the rails, is convenient in use, and increases working efficiency.
Description
Technical field
The utility model relates to mine haulage system, relates in particular to the use of dirt loader temporary track.
Background technology
The mine dirt loader generally uses the trapped orbit transportation, but trapped orbit length standardization, need continue in the place of not enough trapped orbit full-length and to set up temporary track, it is around one of key factor of dirt loader operating efficiency that the temporary track of mine dirt loader work plane uses always.Temporary track originally adopts two 15kg light rails directly is layered on the ground, and fixing insecure, dirt loader slides down easily, and dirt loader itself is too heavy, lifts the chronic of once cost, seriously restricts manufacturing schedule.
The utility model content
The purpose of this utility model provides and a kind ofly is difficult for making that dirt loader slides down, easy to use, the temporary track of increasing work efficiency.
For achieving the above object, the utility model adopts following technical scheme: a kind of mine dirt loader temporary track, comprise two tracks that be arranged in parallel, and be installed with the steel plate bar between vertical two tracks.
Described track one is held level with both hands together, holds the 100mm place to be provided with the hole together at anomaly.
Described two track lengths do not wait.
The beneficial effects of the utility model are: set firmly the steel plate bar between vertical two tracks, can make two track fixations, be difficult for making dirt loader to slide down, and easy to use, increase work efficiency.During work, temporary track and trapped orbit side are provided with clamping plate, clamping plate one side is fixed in trapped orbit, opposite side is fixing by the hole bolt is connected in temporary track, finishes docking of temporary track and trapped orbit.Two track lengths do not wait can be convenient to have gap one end to be connected with other changed course tracks at track length, is convenient to turn or changed course.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
Comprise two tracks 1 that be arranged in parallel by mine dirt loader temporary track shown in Figure 1, described track 1 is the light rail of 15kg, be installed with the thick steel plate bar 2 of 3mm between vertical two tracks 1, steel plate bar 2 two ends are welded in respectively on two tracks 1, described two tracks 1 are uneven in length, the right-hand end alignment is equipped with hole 3 at distance right-hand end 100mm place.Track 1 is pressed actual needs length customized, is generally 1000-2500mm, can be made as rectangle cross section or trapezoid cross section.
During work, temporary track 1 and trapped orbit 6 sides are provided with clamping plate 5, clamping plate 5 one sides are fixed in trapped orbit 6, opposite side is fixing to be fixed in track 1 by hole 3 is screwed in bolts 4, finishes docking of temporary track and trapped orbit 6.
Claims (3)
1. a mine dirt loader temporary track comprises two tracks that be arranged in parallel, it is characterized in that: be installed with the steel plate bar between vertical two tracks.
2. mine as claimed in claim 1 dirt loader temporary track is characterized in that: described track one is held level with both hands together, holds the 100mm place to be provided with the hole together at anomaly.
3. mine as claimed in claim 1 or 2 dirt loader temporary track is characterized in that: described two track lengths do not wait.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202584473U CN201581311U (en) | 2009-11-14 | 2009-11-14 | Mine mucker temporary track |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202584473U CN201581311U (en) | 2009-11-14 | 2009-11-14 | Mine mucker temporary track |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201581311U true CN201581311U (en) | 2010-09-15 |
Family
ID=42723308
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202584473U Expired - Fee Related CN201581311U (en) | 2009-11-14 | 2009-11-14 | Mine mucker temporary track |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201581311U (en) |
-
2009
- 2009-11-14 CN CN2009202584473U patent/CN201581311U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203947375U (en) | A kind of shield machine chassis and battery truck composite sleeper | |
CN204715147U (en) | A kind of assembling temporary pavement | |
CN203593944U (en) | Connecting structure for steel bar hanging rod and concrete | |
CN203559354U (en) | Stay cable anchoring structure applied to prestressed concrete partially cable-stayed bridge | |
CN201581311U (en) | Mine mucker temporary track | |
CN202954271U (en) | Mining reconstituted bamboo sleeper | |
CN202247557U (en) | Orbit space regulator | |
CN202687787U (en) | Gantry crane rail transfer device for heavy haul railway beam yard | |
CN201671025U (en) | Connecting device for solid concrete roadbed of in-plant railway track | |
CN202089083U (en) | Derailer mounting device | |
CN201027289Y (en) | Novel concrete sleeper for coal mine | |
CN102979570A (en) | Underground transporting track ground roll | |
CN201933366U (en) | Connecting unit for monorail crane rails | |
CN203007744U (en) | Rail fixing device steel rail sleeper | |
CN203559314U (en) | Track fixing device of thickener | |
CN203334144U (en) | Nail-free sleeper | |
CN203160067U (en) | Sleeper connecting and fastening device | |
CN202831450U (en) | Reinforced structure for railing and handrail of existing stair | |
CN204508508U (en) | A kind of machine room counterweight fag end device | |
CN204173708U (en) | A kind of towing machine fag end fixed support | |
CN202848831U (en) | Towing vehicle towing plate of mining rope towing remote control auxiliary transportation device | |
CN204847839U (en) | From taking spacing hoist girder and connection structure of end beam | |
CN202930052U (en) | Stainless steel pool bottom plate welding rail | |
CN2892941Y (en) | Mine groove shape narrow rail sleeper with metal structure | |
CN202530714U (en) | Workshop anti-cracking structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100915 Termination date: 20111114 |