CN201580547U - 适用于水面挖掘作业的浮箱 - Google Patents
适用于水面挖掘作业的浮箱 Download PDFInfo
- Publication number
- CN201580547U CN201580547U CN2009201690032U CN200920169003U CN201580547U CN 201580547 U CN201580547 U CN 201580547U CN 2009201690032 U CN2009201690032 U CN 2009201690032U CN 200920169003 U CN200920169003 U CN 200920169003U CN 201580547 U CN201580547 U CN 201580547U
- Authority
- CN
- China
- Prior art keywords
- buoyancy tank
- pontoon
- applicable
- water surface
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
适用于水面挖掘作业的浮箱,涉及油气管道江河穿越水下土石方施工作业的设备制造技术领域,包括一个浮箱,浮箱为船状矩形结构,在浮箱的四角分别设置有桩孔,在浮箱的面上设置有两道防滑带,浮箱的两边设置有挂环,改变了目前管道江河穿越常规的围堰导流或围堰断流的施工方法,采用水面浮体挖掘的方式,设计了一种适用于实施水下管沟水面挖掘作业的浮箱,具有经济适用和缩短施工周期的特点。
Description
技术领域:一种适用于水面挖掘作业的浮箱,用于实施油气管线穿越河流的管沟开挖及铺设工程施工,涉及油气管道江河水下穿越土石方施工作业的设备制造技术领域。
背景技术:为了将地下开采出来的原油、天然气,或者其他物质实施异地的输送,如成品油等,在现有的技术中,采用的方法有铁路,或者公路运输,当数量较大,或者需要不间断运送的状况下,就需要铺设长输管道,特别是涉及民生和国家战略需要的物质的输送,由于数量大、距离远,目前基本上是采用管道运输的方法,因此,在现实的情况下,需要施工的长输管道就越来越多,而且距离也越来越长,在管道路过的地方难免遇到江河需要穿越或者跨越;管道江河跨越的施工方法,适用于水深,流急,而且河面宽的江河,方法是在江河的上面架设管道过江的管桥;另外一种就是在水流较小,水也不太深的江河实施长输管道的施工,就适用管道的江河穿越施工,也就是在河中先开挖管沟,然后将管道埋设在管沟中,穿过遇到的江河;还有一种是在河床下采取非开挖定向钻孔的穿越,使管道从河床下面穿过,非开挖定向钻孔穿越的方法需要河床下面的地质条件能够成孔才能采用;目前,在大口径油气长输管线河流穿越的施工中,为了保证管沟的质量,主要采用的是在需要穿越的江河上先围堰导流,清理出挖管沟的空间,然后挖沟和埋管;也有采用围堰断流的方法,就是短时间将河流截断,然后在穿越的河段挖管沟,然后铺管和埋管,完成后再恢复河流的畅通,目前这些方法的主要问题是:采用常规的围堰导流或围堰断流的方法进行施工,由于先期的围堰导流或围堰断流施工内容多,因此,施工的工期长,而且造价高,在遇到雨季,降水量大时,为了安全的目的,还需要避开雨季才能施工,这样就会造成工期的延长。
发明内容:
本实用新型的目的是针对现有技术的问题,采用水面浮体挖掘的方式,设计了一种适用于实施水下管沟水面挖掘作业的浮箱。
本实用新型是这样实现的:本实用新型包括一个浮箱,其特征在于:所述浮箱为船状矩形结构,在浮箱的四角分别设置有桩孔,在浮箱的面上设置有两道防滑带,浮箱的两边设置有挂环;
所述桩孔是由上到下贯通浮箱的,桩孔穿过浮箱的中间段是不透水的;
所述浮箱面上两道防滑带之间的距离与挖掘机两条履带之间的距离一致;
施工时,将浮箱漂浮固定于水下管沟的水面位置,将挖掘机固定于浮箱之上,然后直接在浮箱上开动挖掘设备,实施带水开挖并在水下形成管沟,然后将管道在岸上组装完成后,由机械牵引至管沟上方位置,注水下沉至设计管沟内,然后固定就完成了江河的管道穿越施工。
本实用新型的有益效果是,由于在河面上飘浮并固定设置挖掘设备的工作平台,所以就无需对江河围堰导流或围堰断流,还可以避免采用大量的水泵排水,可以节省大量的施工时间和设备,提高施工效率,节约围堰和排水的费用,而且设置的浮箱可重复利用,基本不会造成浪费,因此,具有经济适用和缩短施工周期的特点。
附图说明:
图1是本实用新型不带固定桩的俯视结构示意图。
图2是本实用新型带固定桩的侧面示意图。
图3是本实用新型图2的左视结构示意图。
具体实施方式:
下面结合附图给出本实用新型的实施例:本实用新型包括一个浮箱2,浮箱2为船状的矩形结构,在浮箱2的四角分别设置有桩孔1,在浮箱2的面上设置有两道防滑带3;为了固定浮箱2,设置的桩孔1是由上到下贯通浮箱2的,桩孔1穿过浮箱2的中间段是不透水的;在浮箱2的面上设置的两道防滑带3之间的距离与挖掘机两条履带之间的距离一至,为了固定挖掘机,在浮箱2的两边设置有挂环4;
施工前,先由吊车将浮箱2吊下水,然后使其靠拢岸边,挖掘机通过临时的码头自行开上浮箱2,为了防止挖掘机在浮箱2上滑动,将挖掘机停在浮箱2上的防滑带3上,然后由固定缆绳将挖掘机固定在挂环4上,然后,由挖掘机利用其自身的挖掘长臂和挖斗,伸到河底自己将浮箱2撑到指定开挖管沟的位置,然后利用挖掘机斗上的吊钩将桩管5分别插入四个桩孔1中,并用挖掘机将四根桩管5压入河床,使浮箱2固定在工作的位置,然后挖掘机就可以在浮箱2上开挖水下管沟了;当完成一段管沟的挖掘后,使用挖掘机的吊钩拔出浮箱2四边的四根桩管5,然后将挖斗再次伸到河底,将浮箱2移动到下一段挖沟的位置,然后,再次使用挖掘机的吊钩将四根桩管5插入桩孔1中,并由挖掘机将桩管5压入河床,固定好浮箱2后,再次实施挖沟工作,以此类推,重复上述动作,直到完成全部管沟的开挖工作后,最后拔出浮箱2的固定管桩5,由挖掘机自身的挖掘长臂和挖斗,伸到河底自己将浮箱2撑到河边的临时码头,然后解开挂环4上的固定缆绳,自己开到岸上。
Claims (3)
1.一种适用于水面挖掘作业的浮箱,包括一个浮箱,其特征在于:所述浮箱为船状矩形结构,在浮箱的四角分别设置有桩孔,在浮箱的面上设置有两道防滑带,浮箱的两边设置有挂环。
2.根据权利要求1所述的适用于水面挖掘作业的浮箱,其特征在于:所述桩孔是由上到下贯通浮箱的,桩孔穿过浮箱的中间段是不透水的。
3.根据权利要求1所述的适用于水面挖掘作业的浮箱,其特征在于:所述浮箱面上两道防滑带之间的距离与挖掘机两条履带之间的距离一致。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201690032U CN201580547U (zh) | 2009-08-11 | 2009-08-11 | 适用于水面挖掘作业的浮箱 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201690032U CN201580547U (zh) | 2009-08-11 | 2009-08-11 | 适用于水面挖掘作业的浮箱 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201580547U true CN201580547U (zh) | 2010-09-15 |
Family
ID=42722541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201690032U Expired - Lifetime CN201580547U (zh) | 2009-08-11 | 2009-08-11 | 适用于水面挖掘作业的浮箱 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201580547U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102747731A (zh) * | 2011-04-19 | 2012-10-24 | 中交上海航道局有限公司 | 袋装砂充灌平台组合及其施工方法 |
CN102963229A (zh) * | 2012-12-05 | 2013-03-13 | 浙江海洋学院 | 水陆两用江海船 |
CN103213656A (zh) * | 2013-04-20 | 2013-07-24 | 盐城工学院 | 一种四履带式两栖打桩机的浮箱 |
-
2009
- 2009-08-11 CN CN2009201690032U patent/CN201580547U/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102747731A (zh) * | 2011-04-19 | 2012-10-24 | 中交上海航道局有限公司 | 袋装砂充灌平台组合及其施工方法 |
CN102963229A (zh) * | 2012-12-05 | 2013-03-13 | 浙江海洋学院 | 水陆两用江海船 |
CN103213656A (zh) * | 2013-04-20 | 2013-07-24 | 盐城工学院 | 一种四履带式两栖打桩机的浮箱 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102537517B (zh) | 一种向江、河、湖中顶管施工工艺 | |
CN1256531C (zh) | 管道穿越河流施工方法 | |
CN103615010A (zh) | 一种利用水流冲刷挖运深基坑土方的施工方法 | |
CN102605697A (zh) | 软土地基路堤吹填砂施工方法 | |
CN102966072B (zh) | 软弱土地基上堤防加宽加高工程结合面处治的施工方法 | |
CN101851929B (zh) | 黄河河漫滩承台施工用多级轻型井点降水施工工艺 | |
CN104947680A (zh) | 一种流砂地层水上承台基坑开挖施工方法 | |
CN102261519B (zh) | 气囊辅助管道滑移漂浮下沟方法 | |
CN201580547U (zh) | 适用于水面挖掘作业的浮箱 | |
CN109083100B (zh) | 一种吹泥成陆后的河道开挖施工工艺 | |
CN202865796U (zh) | 一种钢筋混凝土预制板桩护岸结构 | |
CN204491693U (zh) | 长距离吹砂系统 | |
CN103243704A (zh) | 一种浅层淤泥地基处理方法 | |
CN102434719A (zh) | 一种分层开挖沉管施工工艺 | |
CN107587497B (zh) | 一种提高吹填平整度的方法 | |
CN104612128A (zh) | 适用于水下淤泥环境的真空预压加固施工方法 | |
CN114855846A (zh) | 一种地下防渗减压抗浮盲管结构及其施工方法 | |
CN204435321U (zh) | 一种火力发电厂取水明渠 | |
CN103775735A (zh) | 管道穿越河流的施工方法 | |
CN209669794U (zh) | 一种渗漏管涌抢险堤坝筑造结构 | |
CN210086182U (zh) | 一种一般工业固体废物贮存、处置场结构 | |
CN202148496U (zh) | 齿墙式箱涵透空进海路结构 | |
CN202451974U (zh) | 一种埋地管道抗浮结构 | |
CN2679245Y (zh) | 管道穿越河流水下挖沟装置 | |
CN106400860B (zh) | 海工块石基床加固方法及设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20100915 |