CN201526325U - Mold plate trolley for tunnel lining - Google Patents
Mold plate trolley for tunnel lining Download PDFInfo
- Publication number
- CN201526325U CN201526325U CN2009202198670U CN200920219867U CN201526325U CN 201526325 U CN201526325 U CN 201526325U CN 2009202198670 U CN2009202198670 U CN 2009202198670U CN 200920219867 U CN200920219867 U CN 200920219867U CN 201526325 U CN201526325 U CN 201526325U
- Authority
- CN
- China
- Prior art keywords
- tunnel lining
- door type
- backform
- cylinder
- jacking cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to a mold plate trolley for tunnel lining, which comprises a walking system, a door type rack, a mechanical support system, a side mold, a top mold, a jacking cylinder, a hydraulic system, an electrical system, a translational system and a bottom longitudinal beam; the walking system is connected with the bottom longitudinal beam; the door type rack is connected with the mechanical support system through the side mold; and the top mold system is connected with door type rack through the translational system and the jacking cylinder. The utility model has the advantages of high degree of lining surface finishment, quick lining and high efficacy, and is widely applied to the construction of railroad, highroad, diversion tunnels and other projects.
Description
Technical field
The utility model relates to a kind of chassis, relates in particular to a kind of working jumbo for tunnel lining.
Background technology
At present, raising along with the construction quality standard, tunnel lining all adopts formwork jumbo to carry out concrete casting and constructing, in construction, behind tunnel (culvert) excavation, carry out first lining cutting, clear up tunnel bottom dregs (picking up the end) then by concrete and steel mesh sheet etc., use the concrete pouring tunnel floor, and according to the short abutment wall in constructing tunnel drawing cast both sides.By the time after base plate and short abutment wall had certain intensity, the rigging chassis carried out lining cutting.Now the jacking cylinder in the formwork jumbo hydraulic system used of society adopts basically is to be placed on the door type frame bottom or on door type frame top, but concrete when equally all adopting the hydraulic lock locking type to bear lining cutting and template pressure, this mode is unscientific.
At first, the structure that links to each other as 4 jacking cylinders of formwork jumbo is a rigidity, but when practice of construction, often be the single-point action, like this, certainly will cause jacking cylinder when knee-action, increased bigger lateral force, aggravated the wearing and tearing of hydraulic seal, if adopt the hydraulic lock sealing again, unload in being easy to cause, and then make just to sink in the template of lining cutting.
Secondly, if below jacking cylinder was placed on, this mode was more defective, this layout not only causes whole formwork jumbo overall structure shakiness, simultaneously, the weight that also makes jacking cylinder not only bear masterplate is also born total weights such as formwork jumbo skeleton and support system simultaneously.
At last, because formwork jumbo is in construction, environment of living in is more mixed and disorderly, and the plug-in hydraulic lock of oil cylinder, careless slightly will being bruised caused thrashing.
The utility model content
The purpose of this utility model is the problem that exists at the jacking cylinder in the formwork jumbo hydraulic system of present society use, a kind of new working jumbo for tunnel lining is provided, this formwork jumbo is by changing the structure of jacking cylinder, thereby make oil cylinder when stressed, by the trapezoidal thread and the nut of cylinder sleeve outer wall, realize mechanical interlocking.
The utility model purpose is achieved through the following technical solutions:
A kind of working jumbo for tunnel lining comprises running gear, door type frame, mechanical support system, limit mould, backform, jacking cylinder, hydraulic system, electrical system, also comprises translation system, bottom girder; Running gear is connected with bottom girder, and door type frame is connected by mechanical support system with the limit mould, the backform system by translation system, rise the top oil cylinder and be connected with door type frame.
Backform is one group, and the limit mould is two groups, and Bian Mo and backform are formed the template system of this chassis; Backform is connected by hinge with the limit mould.
Running gear comprises road wheel, motor, speed changer, and road wheel places on the track.
Jacking cylinder is an one-way cylinder, form by upper flange, lower flange, cylinder sleeve, locking nut, guiding support set, piston, combination sealing, upper flange is fixedly connected on the piston termination, the guiding support set is sleeved on the outside of cylinder sleeve, fixedly connected with upper flange in the upper end of guiding support set, locking nut is sleeved on the cylinder sleeve outside, is positioned at the below of guiding support set; On the oil steel bushing outer wall trapezoidal thread is arranged.
Have oil-in on the lower flange, the oil-in place is provided with the buffering step.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.Wherein:
Fig. 1 is a cross-sectional drawing of the present utility model.
Fig. 2 is a skiagraph of the present utility model.
Fig. 3 is a jacking cylinder structural representation of the present utility model.
The specific embodiment
A kind of working jumbo for tunnel lining comprises running gear 1, door type frame 5, mechanical support system 4, limit mould 3, backform 8, rises top oil cylinder 6, hydraulic system, electrical system, also comprises translation system 7, bottom girder 2; Running gear 1 is connected with bottom girder 2, and door type frame 5 is connected by mechanical support system 4 with limit mould 3, backform 8 by translation system 7, rise top oil cylinder 6 and be connected with door type frame 5.
One group of backform 8 and two groups of limit moulds 3 are formed the template system of these chassis, and backform 8 and limit mould 3 are connected by hinge.
Running gear 1 comprises road wheel, motor, speed changer, and road wheel is placed on the track.
Jacking cylinder 6 is made up of upper flange 16, lower flange 10, cylinder sleeve 11, locking nut 12, guiding support set 13, piston 14, combination sealing 15, upper flange 16 is fixedly connected on piston 14 terminations, guiding support set 13 is sleeved on the outside of cylinder sleeve 11, fixedly connected with upper flange 16 in the upper end of guiding support set 13, locking nut 12 is sleeved on cylinder sleeve 11 outsides, is positioned at the below of guiding support set 13; On oil steel bushing 11 outer walls trapezoidal thread is arranged.Jacking cylinder 6 by the trapezoidal thread and the locking nut 12 of cylinder sleeve 11 outer walls, is realized mechanical interlocking when stressed.
Have oil-in on the lower flange 10, the oil-in place is provided with the buffering step, and design can avoid piston to drop to lowermost end like this, and under the condition of loading, oil cylinder can't rise " hydraulic pressure is stuck " phenomenon.
In real work, start movable motor, formwork jumbo is closed movable motor after driving to the lining cutting mileage, transfers rail meter, screws down supporting leg.Starter motor, the operation hydraulic control valve according to the hydraulic operation rules, rises jacking cylinder, to the lining cutting height.And screw locking nut 12 one by one.Again other mechanical support are rotated in place afterwards.
After everything is ready, carry out concrete spouting.
By the time after concrete reaches certain intensity, organize form removal.Tear limit mould mechanical support earlier open, receive limit mould 3 again, remove vertical support then.
At last, starter motor, before unscrewing locking nut 12, fuel feeding in quick fuel feeding, unscrews nut 12 rapidly at first fast, and the reverse operating control valve by the template deadweight, makes jacking cylinder 6 returns.
Claims (5)
1. working jumbo for tunnel lining, comprise running gear (1), door type frame (5), mechanical support system (4), limit mould (3), backform (8), jacking cylinder (6), hydraulic system, electrical system, it is characterized in that: also comprise translation system (7), bottom girder (2); Running gear (1) is connected with bottom girder (2), and door type frame (5) is connected by mechanical support system (4) with limit mould (3), and backform (8) is connected with door type frame (5) by translation system (7), jacking cylinder (6).
2. working jumbo for tunnel lining according to claim 1 is characterized in that: described backform (8) is one group, and limit mould (3) is two groups, forms the template system of this chassis; Backform (8) is connected by hinge with limit mould (3).
3. working jumbo for tunnel lining according to claim 1 is characterized in that: running gear (1) comprises road wheel, motor, speed changer, and road wheel places on the track.
4. working jumbo for tunnel lining according to claim 1, it is characterized in that: jacking cylinder (6) is an one-way cylinder, by upper flange (16), lower flange (10), cylinder sleeve (11), locking nut (12), guiding support set (13), piston (14), combination sealing (15) is formed, upper flange (16) is fixedly connected on piston (14) termination, guiding support set (13) is sleeved on the outside of cylinder sleeve (11), fixedly connected with upper flange (16) in the upper end of guiding support set (13), locking nut (12) is sleeved on cylinder sleeve (11) outside, is positioned at the below of guiding support set (13); On oil steel bushing (11) outer wall trapezoidal thread is arranged.
5. working jumbo for tunnel lining according to claim 4 is characterized in that: lower flange has oil-in on (10), and the oil-in place is provided with the buffering step.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202198670U CN201526325U (en) | 2009-10-21 | 2009-10-21 | Mold plate trolley for tunnel lining |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202198670U CN201526325U (en) | 2009-10-21 | 2009-10-21 | Mold plate trolley for tunnel lining |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201526325U true CN201526325U (en) | 2010-07-14 |
Family
ID=42517613
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202198670U Expired - Fee Related CN201526325U (en) | 2009-10-21 | 2009-10-21 | Mold plate trolley for tunnel lining |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201526325U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102650211A (en) * | 2012-05-22 | 2012-08-29 | 湖南五新重型装备有限公司 | Universal type steel mould lining trolley for linear and curved sectional tunnel |
CN103867215A (en) * | 2014-03-04 | 2014-06-18 | 张进军 | Expressway tunnel groove integral lining trolley |
CN104564099A (en) * | 2014-12-22 | 2015-04-29 | 中铁二十一局集团路桥工程有限公司 | Self-walking mold frame for tunnel construction steel bar binding |
CN104832194A (en) * | 2015-04-14 | 2015-08-12 | 安徽岚岛重工科技股份有限公司 | Full-automatic hydraulic concrete-lining steel-moulding-plate trolley |
CN106437734A (en) * | 2016-11-21 | 2017-02-22 | 中铁工程装备集团有限公司 | Horseshoe-shaped shield excavation device for waterless soft soil tunnel and tunnel excavation method |
CN108343648A (en) * | 2018-04-26 | 2018-07-31 | 中国科学院重庆绿色智能技术研究院 | A kind of engineering mechanical device hydraulic system |
CN109869155A (en) * | 2019-04-02 | 2019-06-11 | 中铁工程服务有限公司 | Tunnel cave processing equipment |
-
2009
- 2009-10-21 CN CN2009202198670U patent/CN201526325U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102650211A (en) * | 2012-05-22 | 2012-08-29 | 湖南五新重型装备有限公司 | Universal type steel mould lining trolley for linear and curved sectional tunnel |
CN102650211B (en) * | 2012-05-22 | 2015-11-25 | 湖南五新隧道智能装备股份有限公司 | Straight line and curved section tunnel general-purpose type punching block lining trolley |
CN103867215A (en) * | 2014-03-04 | 2014-06-18 | 张进军 | Expressway tunnel groove integral lining trolley |
CN103867215B (en) * | 2014-03-04 | 2016-03-16 | 张进军 | The overall lining trolley of a kind of freeway tunnel groove |
CN104564099A (en) * | 2014-12-22 | 2015-04-29 | 中铁二十一局集团路桥工程有限公司 | Self-walking mold frame for tunnel construction steel bar binding |
CN104832194A (en) * | 2015-04-14 | 2015-08-12 | 安徽岚岛重工科技股份有限公司 | Full-automatic hydraulic concrete-lining steel-moulding-plate trolley |
CN106437734A (en) * | 2016-11-21 | 2017-02-22 | 中铁工程装备集团有限公司 | Horseshoe-shaped shield excavation device for waterless soft soil tunnel and tunnel excavation method |
CN108343648A (en) * | 2018-04-26 | 2018-07-31 | 中国科学院重庆绿色智能技术研究院 | A kind of engineering mechanical device hydraulic system |
CN109869155A (en) * | 2019-04-02 | 2019-06-11 | 中铁工程服务有限公司 | Tunnel cave processing equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201526325U (en) | Mold plate trolley for tunnel lining | |
CN2869322Y (en) | Portal frame tunnel lining form trolley | |
CN110905554B (en) | Tunnel inverted arch and filled concrete paver and construction process | |
CN103233687B (en) | Automatic drill pipe assembly and disassembly mechanism of trenchless horizontal directional drilling machine | |
CN106120584B (en) | A kind of box culvert slip form construction device and method | |
CN102587918B (en) | High-strength reducing template for construction of coal mine freezing vertical shaft | |
CN203939018U (en) | Light-duty dynamic compaction machinery for soft groundsill reinforcing | |
CN211314235U (en) | Tunnel inverted arch and filling concrete paver | |
CN106050271B (en) | A kind of tunnel ditch die set device and its construction method | |
CN1710251A (en) | Tunnel-culvert orbital propulsion method and apparatus | |
CN103302723B (en) | Adsorption type precast bridge bed die vibration chassis | |
CN206015540U (en) | A kind of box culvert slip form construction device | |
CN106089257B (en) | A kind of tunnel ditch cable trough construction trolley | |
CN102001127B (en) | Combined box girder hydraulic internal mould | |
CN103147437A (en) | Section steel soil cement mixing pile with longitudinal displacement mechanism | |
CN201816126U (en) | Hydraulic internal model for combined box beam | |
CN104832194A (en) | Full-automatic hydraulic concrete-lining steel-moulding-plate trolley | |
CN201884034U (en) | Trolley for concrete construction of partition wall in steep inclined shaft | |
CN204532374U (en) | The multi-functional chassis of metro station construction | |
CN1793521A (en) | Optimizing frictional resistance bored concrete pile construction equipment and its bored concrete pule and construction method thereof | |
CN202483579U (en) | High-strength reducing template for shaft construction of coal mile freezing vertical shaft | |
CN203700915U (en) | Road roller for highway construction | |
CN207972105U (en) | A kind of prefabricated reinforced concrete stair automatic open-close assembling die | |
CN108755295B (en) | Three-dimensional adjusting device for paving prefabricated plate type ballast bed fine shunting vehicle | |
CN207003199U (en) | A kind of bridge construction applies mud device with pave function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100714 Termination date: 20181021 |