CN106120584B - A kind of box culvert slip form construction device and method - Google Patents
A kind of box culvert slip form construction device and method Download PDFInfo
- Publication number
- CN106120584B CN106120584B CN201610745540.1A CN201610745540A CN106120584B CN 106120584 B CN106120584 B CN 106120584B CN 201610745540 A CN201610745540 A CN 201610745540A CN 106120584 B CN106120584 B CN 106120584B
- Authority
- CN
- China
- Prior art keywords
- external mold
- internal model
- track
- full framing
- box culvert
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009751 slip forming Methods 0.000 title claims abstract description 10
- 238000009432 framing Methods 0.000 claims abstract description 40
- 239000004567 concrete Substances 0.000 claims abstract description 22
- 238000009434 installation Methods 0.000 claims abstract description 15
- 238000010276 construction Methods 0.000 claims abstract description 13
- 238000000465 moulding Methods 0.000 claims abstract description 10
- 210000004279 Orbit Anatomy 0.000 claims abstract description 4
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 20
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 20
- 241001330002 Bambuseae Species 0.000 claims description 20
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 20
- 239000011425 bamboo Substances 0.000 claims description 20
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 241001272996 Polyphylla fullo Species 0.000 claims description 9
- 239000000203 mixture Substances 0.000 claims 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims 1
- 210000004087 Cornea Anatomy 0.000 description 3
- 238000009415 formwork Methods 0.000 description 3
- 238000000926 separation method Methods 0.000 description 3
- 241000013987 Colletes Species 0.000 description 2
- 241001669679 Eleotris Species 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- 210000001138 Tears Anatomy 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000001808 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002452 interceptive Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 230000001131 transforming Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F5/00—Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
- E01F5/005—Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
Abstract
The invention discloses a kind of box culvert slip form construction device and method, including external mold, internal model, full framing, external mold draws realization sliding in orbit by external mold trailer system, and internal model and full framing are constituted whole in interior mode pulling system traction lower slider.Basis is first carried out when use and contains body construction, then the integrally dragging sliding that full framing and internal model are constituted is in place, is adjusted internal model position and is completed internal model installation;Later in place by external mold sliding, external mold installation is completed;Wall is poured between external mold and internal model again and covers concrete;Moulding/demoulding and outer moulding/demoulding in finally carrying out, the entirety for finally constituting internal model and full framing, that external mold slides into next section box culvert is in place.The whole sliding that the present invention can be realized internal model and full framing is constituted, and external mold integral slipping, avoid template, bracket from repeating to install and be very easy to operation, the workload for reducing template installation and removing, mechanization degree is high, speed of application is fast, and the duration shortens dramatically.
Description
Technical field
The present invention relates to culvert construction technical fields, and in particular to a kind of highway box culvert slip form construction device and method.
Background technique
Culvert is the important component of Con struction in Roadbed, is mainly used for excluding the surface water of Highways ' rapidly, protect
Demonstrate,prove roadbed safety.Box culvert is a kind of culvert type being commonly used, and refers to that barrel is built with reinforced concrete box shaped tube coupling
Culvert, box culvert may include one or more sections, and the section of each section is rectangular or rectangle, generally by armored concrete or bricklaying
It is made, wherein armored concrete application is wider.Cover board, culvert body and the basis of box culvert are one poured with armored concrete
A entirety can be used to drain, remarkable and vehicle passage.
In the prior art, the main construction method of box culvert is raft support method, but this method need to be set up repeatedly and tear open
Bracket, template are unloaded, process is more, and time-consuming, large labor intensity, working efficiency is low, especially for the case that long range, duration are tight
Contain for construction, tends not to meet construction demand.
Summary of the invention
Technical problem solved by the invention is to overcome the deficiencies of the prior art and provide a kind of box culvert slip form construction device
And method, the integral mold plate of the overall movement and external mold that can be realized internal model full framing is mobile, and template, bracket is avoided to repeat
It installs and operation is easy, reduce the workload of template installation and dismounting, mechanization degree is high, speed of application is fast, substantially reduces
Duration.
To achieve the above object, The technical solution adopted by the invention is as follows:
A kind of box culvert slip form construction device, including external mold, internal model, full framing, the external mold are led by external mold trailer system
Draw realization sliding in orbit, the full framing bottom is equipped with sliding equipment, and the entirety for constituting internal model and full framing exists
Internal model trailer system draws lower slider.
The track includes the first track and the second track, and first track is mutually perpendicular to the second track.
The sliding equipment includes the adjustable pulley that full framing bottom is arranged in.
Support with adjustable is arranged in the full framing lower part, and full framing top is equipped with adjustable shore.
The external mold is supported by hydraulic stem, and the hydraulic stem includes oblique hydraulic stem and horizontal hydraulic pressure bar, the oblique liquid
Compression bar, horizontal hydraulic pressure bar one end pass through support and be connected with the second track, the other end is connected to external mold, described oblique hydraulic
Bar, horizontal hydraulic pressure bar and external mold form triangular structure, and oblique hydraulic stem and horizontal hydraulic pressure bar are longitudinally arranged along the second track.
The internal model uses combined steel, and the combined steel includes side form, angle mould and bamboo slab rubber bed die, is assembled in respectively
Full framing two sides, corner and top.
At the top of pulley walker, pulley walker bottom is equipped with longitudinal movement and slides second track installation
Wheel, external mold trailer system driving longitudinal movement pulley slide on the first track, and transverse shifting pulley is arranged in the external mold, horizontal
The flexible driving transverse shifting pulley of hydraulic stem is slided in the second track.
A kind of box culvert slding form operation method, comprising the following steps:
A. body construction is contained in basis and part;
B. in place according to the culvert of the surveying and locating integrally dragging sliding that line constitutes full framing and internal model at one's side, and internally
Mould position is adjusted, and completes internal model installation;
C. according to the culvert of surveying and locating, line lays external mold sliding rail at one's side, in place by the sliding of two sides external mold, and to external mold
Position is adjusted, and completes external mold installation;
D. wall is poured between external mold and internal model and covers concrete;
E. after concrete strength reaches hardening requirement, outer moulding/demoulding and interior moulding/demoulding are carried out, later by internal model and Man Tang
Entirety that bracket is constituted, that external mold respectively slides to next section box culvert is in place;
F. step b, c, d, e are repeated and completes lower box culvert construction.
Internal model includes angle mould, bamboo slab rubber bed die and side form in the step e, and interior moulding/demoulding and sliding are specific real in step e
It is existing are as follows:
First adjust be located at angle mould at it is adjustable shore, separate angle mould with slab culvert concrete, complete angle mould demould;
Adjust at bamboo slab rubber bed die again it is adjustable shore, separate bamboo slab rubber bed die with box culvert cover board concrete,
Complete bed die demoulding;
Then adjust be located at side form at it is adjustable shore, make side form with contain body concrete separate, complete side form demould;
The adjustable pulley for finally putting down the installation of full framing bottom, packs up whole support with adjustable, by internal model and Man Tang
The whole slide that bracket is constituted is in place to next section box culvert.
In the step b, support is adjusted by adjustable shore in internal model position, after internal model is installed, is adjusted
Pulley is packed up, and support with adjustable is put down.
The invention has the following advantages:
1, it can be realized internal model and full framing constitute whole sliding, template, bracket is avoided to repeat to install and hold very much
Workload easy to operate, reducing template installation and remove, mechanization degree is high, speed of application is fast, and the duration shortens dramatically.
2, the adjustable setting shored of internal model can ensure that the support of template is separated with contraction, and die-filling and demoulding is time saving and energy saving.
3, it realizes external mold integral mold plate horizontal sliding, and can realize that external mold is generally longitudinally slided and slid laterally, avoid
The repetition of template assembles.
4, external mold is ensured using the rock-steady structure that two sets of hydraulic stem supports form triangle with external mold when template slides
Stablize.
5, external mold is supported by hydraulic stem, and hydraulic stem is controlled by oil hydraulic system, after contraction of hydraulic pressure bar with concrete separated demolding,
Formwork after stretching, extension, it is easy to operate.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is Section A-A cross-sectional view in Fig. 1;
Fig. 3 is internal model schematic view of facade structure in Fig. 1;
Fig. 4 is external mold schematic view of facade structure in Fig. 1;
In figure: 1, sleeper, the 2, first track, 3, longitudinal movement pulley, 4, pulley walker, the 5, second track, 6, transverse direction
Mobile pulley, 7, hydraulic stem, 7-1, oblique hydraulic stem, 7-2, horizontal hydraulic pressure bar, 8, Screw arbor with nut at both-ends, 9, external mold, 10, motor,
11, hydraulic jack, 12, adjustable pulley, 13, support with adjustable, 14, full framing, 15, internal model, 15-1, side form, 15-2,
Angle mould, 15-3, bamboo slab rubber bed die, 16, it is adjustable shore, 17, the lumps of wood, 18, hoist engine, 19, wirerope.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples, so that those skilled in the art can be with
It more fully understands the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
A kind of box culvert slip form construction device, as shown in Figure 1 and Figure 2, including external mold 9, internal model 15, full framing 14, external mold 9
It is drawn by external mold trailer system and realizes sliding in orbit, 14 bottom of full framing is equipped with sliding equipment, makes internal model 15 and Man Tang
Bracket 14 is constituted whole in interior mode pulling system traction lower slider.
Internal model 15 uses combined steel, and combined steel includes side form 15-1, cornea 15-2 and bamboo slab rubber bed die 15-3, side form
15-1 is assembled in 14 two sides of full framing, and bamboo slab rubber bed die 15-3 is assembled in 14 top of full framing, and cornea 15-2 is assembled in side
Between mould 15-1 and bamboo slab rubber bed die 15-3.Wherein the lower part of bamboo slab rubber bed die is provided with the lumps of wood 17.
As shown in figure 4, external mold trailer system is driven by motor 10, the power of motor 10 is 5KW.
As shown in figure 3, internal model trailer system is driven by hoist engine 18, hoist engine model JK0.5 low speed winch.
Track includes the first track 2 and the second track 5, and the first track 2 is used for 9 longitudinal sliding motion of external mold, and the second track 5 is used for
External mold 9 slides laterally, and the first track 2 and the second track 5 are all made of the rail of model 38kg/m.The bottom of first track 2 is set
Sleeper 1 is set, hydraulic jack 11, the support for pulley walker 4 is arranged in the top of the first track 2.
As shown in Fig. 2, sliding equipment includes adjustable pulley 12 and support with adjustable 13, adjustable pulley 12 and adjustable
Support 13 is installed in 14 bottom of full framing, and full framing 14, which is equipped with to be adjusted, shores 16, the support for internal model 15;It is adjustable
Section shores the support that can ensure that internal model 15 when 16 stretching, is adjusted when shoring 16 contraction and realizes demoulding separation, makes die-filling and demoulding
It is time saving and energy saving.
Adjustable pulley 12 includes pulley and the first screw rod, diameter of pulley 100mm, and pulley is mounted on the first screw rod bottom
Portion, the adjusting of 12 entire length of adjustable pulley is realized by the first screw rod of rotation, and support with adjustable 13 includes collet and second
Screw rod, collet are mounted on the second screw rod bottom, and the adjusting of 13 entire length of support with adjustable is realized by the second screw rod of rotation;The
One screw rod, the second screw rod diameter be 35mm, length is 500mm;
Adjustable to shore 16 include jacking and third screw rod, and jacking is mounted on third screw rod end, passes through rotation third silk
Bar realizes the adjustable adjusting for shoring 16 entire lengths;The diameter of third screw rod is 35mm, length 500mm;
External mold 9 is supported by hydraulic stem 7, and hydraulic stem 7 includes oblique hydraulic stem 7-1 and horizontal hydraulic pressure bar 7-2, oblique hydraulic stem
7-1, horizontal hydraulic pressure bar 7-2 one end pass through support and be fixedly connected with the second track 5 by bolt, the other end is connected to external mold 9,
Support for external mold 9;
Oblique hydraulic stem 7-1, horizontal hydraulic pressure bar 7-2 and external mold 9 form the rock-steady structure of triangle, it is ensured that sliding in external mold 9
Stabilization when shifting, oblique hydraulic stem 7-1 and horizontal hydraulic pressure bar 7-2 are longitudinally arranged along the second track 5 with 3000mm spacing.
Second track 5 is mounted on 4 top of pulley walker, and 4 bottom of pulley walker is equipped with longitudinal movement pulley 3, outside
Mode pulling system is driven longitudinal movement pulley 3 to slide on the first track 2 by motor 10 after gearbox speed change, to drive cunning
It takes turns the entirety that walker 4, the second track 5, hydraulic stem 7 and external mold 9 form to vertically move along the first track 2, vertically moves pulley 3
Diameter is 200mm;
Transverse shifting pulley 6, the flexible driving branch of horizontal hydraulic pressure bar 7-2 are installed in 9 lower part erection support of external mold, support lower part
Seat is mobile, so that transverse shifting pulley 6 be made to slide in the second track 5, and then drives external mold 9 along 5 transverse shifting of the second track.
In the present embodiment, full framing 14 is arranged by multiple diameter 48mm, the steel pipe of wall thickness 3.5mm, and horizon bar is vertical
To spacing 800mm, horizontal spacing 600mm, the vertical step pitch 800mm of cross bar, upright bar longitudinal pitch 800mm, horizontal spacing 600mm,
Bridging is longitudinally arranged by 1800mm spacing along box culvert.
In the present embodiment, side form 15-1 and angle mould 15-2 are typified form, the high 55mm of thickness 4mm, rib, rib thickness 4mm, cornea
15-2 is typified form, and angle mould 15-2 is processed into two sides that 45 degree of oblique angles are easy to disassemble, and every block length of bamboo slab rubber bed die 15-3 is
2440mm, width 1220mm, with a thickness of 25mm, external mold is typified form, thickness 4mm, the high 55mm of rib, rib thickness 4mm.
In the present embodiment, internal model trailer system includes hoist engine 18 and wirerope 19, and the one ends wound of wirerope 19 is being rolled up
It raises on machine 18, the other end is fixed on full framing 14, starts hoist engine 18, so that it may realize that full framing 14 and internal model 15 are constituted
Whole movement, when the overall movement that full framing 14 and internal model 15 are constituted, adjustable pulley 12 is put down, support with adjustable 13
It packs up, when sliding into target position, adjustable pulley 12 is all packed up, and support with adjustable 13 is all put down, by support with adjustable
13 play a supporting role.By adjustable pulley 12 and this exchange of support with adjustable 13, support and demoulding when formwork are realized
When whole slide.
The steel that can will be welded in concrete foundation and pulley walker 4 with expansion bolt after external mold 9 is in place in the present embodiment
Plate connection, prevents external mold 9 from turning on one's side during hydraulic stem 7 supports.
In the present embodiment, hydraulic stem 7 by HYDRAULIC CONTROL SYSTEM, hydraulic stem 7 shrink after with concrete separated demolding, after stretching, extension
Formwork, easy to operate, hydraulic system includes hydraulic power unit motor, gear pump etc..
In the present embodiment oblique hydraulic stem specification be 63 × 35 × 2000mm, horizontal hydraulic pressure bar gauge lattice be 63 × 35 ×
1000mm, hydraulic power unit motor P=5.5KW, rated pressure P=16MPa, gear pump discharge Q=40L/min.
A kind of highway box culvert slding form operation method, comprising the following steps:
A. body construction is contained in basis and part, contains the setting-up of construction joint of body in 1/5 position for containing height degree.
B. it is first led according to the culvert of the surveying and locating entirety that line constitutes full framing 14 and internal model 15 at one's side with hoist engine 18
Draw sliding in place, support with adjustable 13 is all put down, adjustable pulley 12 is all packed up;
Adjust it is adjustable shore 16 and keep internal model 15 in place, complete the installation of internal model 15;
C. wall, cover board reinforcing bar are bound;
D. according to the culvert of surveying and locating, line lays the sliding rail of external mold 9 at one's side, starts motor 10 for two sides external mold 9 successively
In place, adjusting hydraulic stem 7 keeps two sides external mold 9 in place for sliding, completes the installation of external mold 9;
E., wall Screw arbor with nut at both-ends 8 is installed;
F. wall is poured between internal model and external mold and covers concrete, carries out concrete moisture retention maintenance;
G. it when concrete strength reaches design strength 75%, carries out the demoulding of external mold 9 and internal model 15 demoulds,
Internal model 15 demould when, first adjusting angle mould 15-2 at it is adjustable shore 16, make angle mould 15-2 and slab culvert concrete
Angle mould 15-2 demoulding is completed in separation;,
Then adjust bamboo slab rubber bed die 15-3 at it is adjustable shore 16, make bamboo slab rubber bed die 15-3 and box culvert cover board coagulation
Bamboo slab rubber bed die 15-3 demoulding is completed in soil separation;
Adjustable at adjusting side mould 15-1 shores 16 again, separates side form 15-1 with body concrete is contained, complete in side form
Demoulding;
Adjustable pulley 12 is finally put down, whole support with adjustable 13 are packed up, internal model 15 and full framing 14 are constituted
Whole slide is in place to next section box culvert, and after external mold 9 demoulds, it is in place that two sides external mold 9 slid into next section box culvert by motor 10;
H. step B, C, D, E, F, G are repeated and completes lower box culvert construction.
In this example when interior moulding/demoulding, according to the demoulding sequence of angle mould, bamboo slab rubber bed die, side form, it is ensured that smoothly de-
Mould prevents angle mould, bamboo slab rubber bed die, side form from interfering during demoulding, guarantees enough demoulding spaces.
Embodiment described above is only to absolutely prove preferred embodiment that is of the invention and being lifted, protection model of the invention
It encloses without being limited thereto.Those skilled in the art's made equivalent substitute or transformation on the basis of the present invention, in the present invention
Protection scope within.Protection scope of the present invention is subject to claims.
Claims (6)
1. a kind of box culvert slip form construction device, including external mold, internal model, full framing, characterized in that the external mold is by outer mode pulling
Sliding is realized in system traction in orbit, and the full framing bottom is equipped with sliding equipment, constitutes internal model and full framing
It is whole to draw lower slider in interior mode pulling system;The track includes the first track and the second track, first track and the
Two tracks are mutually perpendicular to, and the internal model uses combined steel, and the combined steel includes side form, angle mould and bamboo slab rubber bed die, are divided
It is not assembled in full framing two sides, corner and top, second track installation is at the top of pulley walker, the pulley walking
Frame bottom is equipped with longitudinal movement pulley, and external mold trailer system driving longitudinal movement pulley slides on the first track, described outer
Transverse shifting pulley is arranged in mould, and the flexible driving transverse shifting pulley of horizontal hydraulic pressure bar slides in the second track, the external mold by
Hydraulic stem support, the hydraulic stem includes oblique hydraulic stem and horizontal hydraulic pressure bar, and the one of the oblique hydraulic stem, horizontal hydraulic pressure bar
End is connected by support with the second track, and the other end is connected to external mold, the oblique hydraulic stem, horizontal hydraulic pressure bar and external mold
Triangular structure is formed, oblique hydraulic stem and horizontal hydraulic pressure bar are longitudinally arranged along the second track.
2. box culvert slip form construction device as described in claim 1, characterized in that the sliding equipment includes being arranged in Man Tangzhi
The adjustable pulley of frame bottom.
3. box culvert slip form construction device as described in claim 1, characterized in that the adjustable branch of full framing lower part setting
Seat, full framing top are equipped with adjustable shore.
4. a kind of box culvert slding form operation method, characterized in that the following steps are included:
A. body construction is contained in basis and part;
B. in place according to the culvert of the surveying and locating integrally dragging sliding that line constitutes full framing and internal model at one's side, and to internal model position
It sets and is adjusted, complete internal model installation;
C. according to the culvert of surveying and locating, line lays external mold sliding rail at one's side, in place by the sliding of two sides external mold, and to external mold position
It is adjusted, completes external mold installation;The track includes the first track and the second track, and the first track is longitudinally sliding for external mold
Dynamic, the second track slides laterally for external mold;
The external mold is supported by hydraulic stem, and the hydraulic stem includes oblique hydraulic stem and horizontal hydraulic pressure bar, the oblique hydraulic stem,
One end of horizontal hydraulic pressure bar passes through support and is connected with the second track, and the other end is connected to external mold, the oblique hydraulic stem, water
Flat hydraulic stem and external mold form triangular structure, and oblique hydraulic stem and horizontal hydraulic pressure bar are longitudinally arranged along the second track;
D. wall is poured between external mold and internal model and covers concrete;
E. after concrete strength reaches hardening requirement, outer moulding/demoulding and interior moulding/demoulding are carried out, later by internal model and full framing
It is in place that the entirety of composition, external mold respectively slide to next section box culvert;
Internal model uses combined steel, and the combined steel includes side form, angle mould and bamboo slab rubber bed die, is assembled in full framing respectively
Two sides, corner and top when interior moulding/demoulding, first carry out angle mould demoulding, carry out bamboo slab rubber bed die demoulding again, finally carry out side form
Demoulding;
F. step b, c, d, e are repeated and completes lower box culvert construction.
5. a kind of box culvert slding form operation method as claimed in claim 4, characterized in that interior moulding/demoulding and sliding tool in step e
Body is realized are as follows:
First adjust be located at angle mould at it is adjustable shore, separate angle mould with slab culvert concrete, complete angle mould demould;
Adjust at bamboo slab rubber bed die again it is adjustable shore, separate bamboo slab rubber bed die with box culvert cover board concrete, complete
Bed die demoulding;
Then adjust be located at side form at it is adjustable shore, make side form with contain body concrete separate, complete side form demould;
The adjustable pulley for finally putting down the installation of full framing bottom, packs up whole support with adjustable, by internal model and full framing
The whole slide of composition is in place to next section box culvert.
6. a kind of box culvert slding form operation method as claimed in claim 5, characterized in that in the step b, internal model position is by can
Adjusting, which is shored, is adjusted support, and after internal model is installed, adjustable pulley is packed up, and support with adjustable is put down.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610745540.1A CN106120584B (en) | 2016-08-29 | 2016-08-29 | A kind of box culvert slip form construction device and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610745540.1A CN106120584B (en) | 2016-08-29 | 2016-08-29 | A kind of box culvert slip form construction device and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106120584A CN106120584A (en) | 2016-11-16 |
CN106120584B true CN106120584B (en) | 2019-01-01 |
Family
ID=57271909
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610745540.1A Active CN106120584B (en) | 2016-08-29 | 2016-08-29 | A kind of box culvert slip form construction device and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106120584B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107167849B (en) * | 2017-05-04 | 2018-11-30 | 山东大学 | The safety assisting system and forecast system of tunnel working geology radar method advanced prediction |
CN112458936A (en) * | 2020-11-30 | 2021-03-09 | 中铁十六局集团地铁工程有限公司 | Construction method for integrally translating box culvert full-hall support |
CN113622328A (en) * | 2021-08-25 | 2021-11-09 | 新疆路桥建设集团有限公司 | Box culvert construction assembly, application thereof and box culvert construction method |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201367907Y (en) * | 2009-03-04 | 2009-12-23 | 何年保 | Trolley used for concrete pouring |
CN202628118U (en) * | 2012-06-07 | 2012-12-26 | 中铁十一局集团第四工程有限公司 | Formwork trolley for long and large box culvert |
CN203583380U (en) * | 2013-12-02 | 2014-05-07 | 葛洲坝集团第五工程有限公司 | Movable cast-in-situ culvert cover plate template support |
CN203855903U (en) * | 2014-05-19 | 2014-10-01 | 中交路桥建设有限公司 | Movable support used for supporting tunnel construction template |
CN203977309U (en) * | 2014-07-18 | 2014-12-03 | 宋仲华 | A kind of shuttle type culvert linear steel form carrier |
CN104674684A (en) * | 2013-12-02 | 2015-06-03 | 葛洲坝集团第五工程有限公司 | Movable cast-in-place culvert cover plate framework support |
CN104894986A (en) * | 2015-06-10 | 2015-09-09 | 中铁五局(集团)有限公司 | Integrated movable box type culvert internal template equipment |
CN105220626A (en) * | 2015-10-27 | 2016-01-06 | 安徽水安建设集团股份有限公司 | Steel form device and the construction method that combines with outer steel mould plate thereof in a kind of self-propelled |
CN205443975U (en) * | 2015-12-14 | 2016-08-10 | 葛世伟 | A sliding template device that is used for box culvert, passageway to be under construction |
-
2016
- 2016-08-29 CN CN201610745540.1A patent/CN106120584B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201367907Y (en) * | 2009-03-04 | 2009-12-23 | 何年保 | Trolley used for concrete pouring |
CN202628118U (en) * | 2012-06-07 | 2012-12-26 | 中铁十一局集团第四工程有限公司 | Formwork trolley for long and large box culvert |
CN203583380U (en) * | 2013-12-02 | 2014-05-07 | 葛洲坝集团第五工程有限公司 | Movable cast-in-situ culvert cover plate template support |
CN104674684A (en) * | 2013-12-02 | 2015-06-03 | 葛洲坝集团第五工程有限公司 | Movable cast-in-place culvert cover plate framework support |
CN203855903U (en) * | 2014-05-19 | 2014-10-01 | 中交路桥建设有限公司 | Movable support used for supporting tunnel construction template |
CN203977309U (en) * | 2014-07-18 | 2014-12-03 | 宋仲华 | A kind of shuttle type culvert linear steel form carrier |
CN104894986A (en) * | 2015-06-10 | 2015-09-09 | 中铁五局(集团)有限公司 | Integrated movable box type culvert internal template equipment |
CN105220626A (en) * | 2015-10-27 | 2016-01-06 | 安徽水安建设集团股份有限公司 | Steel form device and the construction method that combines with outer steel mould plate thereof in a kind of self-propelled |
CN205443975U (en) * | 2015-12-14 | 2016-08-10 | 葛世伟 | A sliding template device that is used for box culvert, passageway to be under construction |
Non-Patent Citations (1)
Title |
---|
"南水北调干渠整体移动箱涵模板的运用";韩伟等;《云南水力发电》;20110331;第27卷(第3期);第81-87页 |
Also Published As
Publication number | Publication date |
---|---|
CN106120584A (en) | 2016-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106120584B (en) | A kind of box culvert slip form construction device and method | |
CN106089253B (en) | A kind of all-hydraulic template system poured for culvert | |
CN104533460B (en) | Support replacement formula formwork jumbo and the construction method of underpass concreting | |
CN202596743U (en) | Formwork trolley for underground tunnel pull-rod-free side wall construction | |
CN107905254A (en) | The construction method of mould trolley in a kind of pipe gallery formwork integrated hydraulic | |
CN104632251A (en) | Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage | |
CN207567810U (en) | A kind of formwork jumbo for pipe gallery cast-in-place concrete slding form operation | |
CN204457802U (en) | Formed by integrally casting formula formwork jumbo | |
CN107326930A (en) | A kind of live rapidform machine of Urban Underground pipe gallery and its method of work | |
CN202250105U (en) | Integral hydraulic steel formwork trolley | |
CN208563380U (en) | A kind of self-propelled pipe gallery plate device | |
CN206386132U (en) | Tunnel casting concrete quick template supporting stripper apparatus | |
CN112265114B (en) | Prefabricated box girder template and construction method applying same | |
CN205936645U (en) | A full liquid die plate system for culvert is pour | |
CN206015540U (en) | A kind of box culvert slip form construction device | |
CN211547804U (en) | Cantilever type retaining wall rapid construction device | |
CN210637087U (en) | Inner and outer mould trolley lining system for open-cut underground canal | |
CN208870380U (en) | Mobile device and removable wall form for wall form | |
CN109505271A (en) | A kind of complete construction of mobile hydraulic trolley arch culvert | |
CN206053965U (en) | A kind of tunnel ditch cable trough construction trolley | |
CN110714480A (en) | Construction method of pipe gallery | |
CN205088625U (en) | Wave wall concrete slipform device | |
CN204457801U (en) | Support replacement formula formwork jumbo | |
CN210917059U (en) | Pull-rod-free culvert trolley construction device | |
CN212104446U (en) | Novel rectangular ditch template of whole set |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |