CN201476292U - Vertical multi-purpose hot water boiler - Google Patents

Vertical multi-purpose hot water boiler Download PDF

Info

Publication number
CN201476292U
CN201476292U CN2009201617408U CN200920161740U CN201476292U CN 201476292 U CN201476292 U CN 201476292U CN 2009201617408 U CN2009201617408 U CN 2009201617408U CN 200920161740 U CN200920161740 U CN 200920161740U CN 201476292 U CN201476292 U CN 201476292U
Authority
CN
China
Prior art keywords
pipe
courage
water
combustion chamber
furnace body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201617408U
Other languages
Chinese (zh)
Inventor
刘茂盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009201617408U priority Critical patent/CN201476292U/en
Application granted granted Critical
Publication of CN201476292U publication Critical patent/CN201476292U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a vertical multi-purpose hot water boiler which comprises an upper boiler body and a lower boiler body, wherein the top part of the lower boiler body is connected with the bottom end of the upper boiler body; a water storage cavity is arranged in the upper boiler body; a combustion chamber is arranged in the lower boiler body; a fire grate subassembly is arranged at the bottom end of the combustion chamber; a fire door is arranged at the front side of the combustion chamber; a refractory material layer is arranged on the side wall of the combustion chamber; a heat exchange inner container made of metal section is installed at the top part of the opening of the combustion chamber; the heat exchange inner container extends upwards into the water storage cavity and comprises an annular underpan fixed at the top part of the combustion chamber; the inner side of the upper surface of the underpan is connected with the bottom end of the inner container cylinder through welding; an inner container top cover is connected at the top end of the inner container cylinder through welding; the edge of the central hole of the inner container top cover is connected with the bottom end of a central vertical pipe through welding; the top end of the central vertical pipe is communicated with the bottom of a smoke box; and the edge of each through hole of the inner container top cover is respectively connected with the bottom of a vertical peripheral pipe through welding. The utility model aims to provide a vertical multi-purpose hot water boiler which is high in thermal efficiency and low in dust content in the exhausted smoke, and can be used for supplying hot water and heat.

Description

The vertical multipurpose hot-water boiler
Technical field
The utility model relates to a kind of vertical heat supply homogeneous solution-type reactor that does not have pressure.
Background technology
Existing various vertical boiler, storage chamber in its boiler just transmits heat at base section, because the heating surface area of heated water is less, this project organization defective causes the thermal efficiency of boiler lower, not only waste energy, and strengthened pollution environment.
The utility model content
The purpose of this utility model is to provide a kind of thermal efficiency height, and Dust Capacity seldom can be used for the vertical multipurpose hot-water boiler of heat supply water, heating simultaneously in the discharged flue gas.
Vertical multipurpose hot-water boiler of the present utility model, comprise upper furnace body and lower furnace body, the top of lower furnace body links to each other with the bottom of upper furnace body, has storage chamber in the upper furnace body, the top of upper furnace body is provided with chimney, the middle part of chimney is in series with cyclone dust collectors, be provided with the combustion chamber in the described lower furnace body, the bottom of combustion chamber is provided with the fire grate assembly, the front of combustion chamber is provided with vent, side wall of combustion chamber is provided with refractory masses, the open top of combustion chamber is equipped with the heat exchange courage body that shape is made, heat exchange courage body upwards stretches in the described storage chamber, heat exchange courage body comprises the chassis of the annular that is fixed on top of combustion chamber, the bottom of the inboard of chassis upper surface and courage tube is weldingly connected, the top of the courage tube courage top loam cake that has been weldingly connected, the middle part of courage top loam cake is provided with centre bore, the periphery that is positioned at centre bore on the loam cake of courage top is provided with a plurality of through holes, the bottom of the margin and center standpipe of the centre bore of courage top loam cake is weldingly connected, the top of center standpipe communicates with the bottom of smoke box, the edge of each described through hole of described courage top loam cake is weldingly connected with the bottom of a upright bustle pipe respectively, the top of each upright bustle pipe communicates with the bottom of described smoke box respectively, smoke box is positioned at the middle part or the top of described storage chamber, the side of smoke box is provided with and the extraneous cleaning door that communicates, the cleaning door place is provided with shoot door, the top of smoke box is provided with exhaust opening, and exhaust opening links to each other with the mouth that advances of described chimney by smoke exhaust pipe.
The utility model vertical multipurpose hot-water boiler, wherein said cyclone dust collectors advance the scrubber tube that is in series with taper on the mouth pipeline section, the big end of scrubber tube links to each other with the pipeline section that leads to described cyclone dust collectors, in the scrubber tube and the mouth place of advancing of cyclone dust collectors is provided with the spraying head respectively, the atomized water spray direction of spraying head is identical with flowing to of the interior flue gas of scrubber tube, the spraying head links to each other with the delivery port of water circulating pump by water pipe, the water inlet of water circulating pump links to each other with the bottom in left side in the cyclic water tank by water pipe, water is housed in the cyclic water tank, middle part in the cyclic water tank longitudinally is provided with filter septum, the ash hole of described cyclone dust collectors links to each other with the right side of cyclic water tank by pipeline, the bottom on cyclic water tank right side is connected with blow-off pipe, be in series with pipe valve on the blow-off pipe, the top of cyclic water tank is connected with overflow pipe.
The utility model vertical multipurpose hot-water boiler, be in series with the smoke pipe of washing of taper on the smoke evacuation pipeline section of wherein said cyclone dust collectors, the big end of washing smoke pipe links to each other with the mouth pipeline section that advances of second cyclone dust collectors, wash the smoke pipe mouth place of advancing interior and second cyclone dust collectors and be provided with fountain head respectively, the atomized water spray direction of fountain head is with to wash flowing to of flue gas in the smoke pipe identical, fountain head links to each other with the delivery port of described water circulating pump by water pipe, and the ash hole of described second cyclone dust collectors links to each other with the right side of cyclic water tank by pipeline.
The utility model vertical multipurpose hot-water boiler, wherein said fire grate assembly comprises the fire bars that fire bars hanging scaffold and Duo Gen are provided with along the front and back horizontal direction, the top of fire bars hanging scaffold and the bottom of described combustion chamber are fixedly linked, the below of fire bars hanging scaffold is provided with cinder chamber, before the fire bars hanging scaffold, offer a plurality of mounting grooves on the rear wall, be provided with described fire bars in the mounting groove, the left and right sides of every fire bars and top are respectively equipped with outwardly directed wing plate, the front end of every fire bars stretches out described combustion chamber, the front end of every fire bars is respectively installed with rocking arm, all the axis of the armed lever of rocking arm is parallel to each other, and all the outer end of rocking arm adopts interlock plate to link to each other.
The utility model vertical multipurpose hot-water boiler, the cross section of wherein said courage tube is circular, adopt a plurality of reinforcement gussets to be weldingly connected between the lateral wall of courage tube and the upper surface on chassis, described courage top loam cake is the dome-shaped that upwards arches upward in the middle part, and the cambered inner surface of courage top loam cake radially is welded with a plurality of stiffeners.
The utility model vertical multipurpose hot-water boiler, the cross section of wherein said center standpipe and each described upright bustle pipe is circular, the diameter of upright bustle pipe is greater than the diameter of center standpipe, described courage tube, described courage top loam cake, center standpipe, each upright bustle pipe and described smoke box adopt the red copper material to make, and described reinforcement gusset and described reinforcement gusset adopt red copper material or stainless steel material to make.
The utility model vertical multipurpose hot-water boiler, one side of the smoke inlet end of wherein said chimney can be provided with crank turningly, one end of crank radially passes chimney along described chimney inwards, be positioned on the crank and on the bar section of chimney anneal be installed and renovate, the periphery that anneal is renovated matches with the inwall of chimney.
The utility model vertical multipurpose hot-water boiler, the lateral wall of wherein said upper furnace body is provided with water level meter and thermometer, the top of upper furnace body is provided with blast pipe, inspection hand hole and the manhole that storage chamber is in communication with the outside, check that hand hole and manhole place are provided with capping respectively, the top of upper furnace body sidewall is provided with return pipe, the top that the top of upper furnace body sidewall is positioned at return pipe is provided with overflow pipe, and the middle and lower part of upper furnace body sidewall is provided with the heat supply water pipe, and the bottom of upper furnace body sidewall is provided with the automatic water supplement pipe.
The advantage and the good effect of the utility model vertical multipurpose hot-water boiler are, the open top of its combustion chamber is equipped with the heat exchange courage body that shape is made, heat exchange courage body upwards stretches in the storage chamber, heat exchange courage body comprises the chassis of the annular that is fixed on top of combustion chamber, the bottom of the inboard of chassis upper surface and courage tube is weldingly connected, the top of the courage tube courage top loam cake that has been weldingly connected, the margin and center standpipe bottom of the centre bore of courage top loam cake is weldingly connected, the center riser top ends communicates with the bottom of smoke box, and the edge of each through hole of courage top loam cake is weldingly connected with the bottom of a upright bustle pipe respectively.In use, a large amount of heat energy heat exchange that burning produces are delivered to the water that is used in the storage chamber heat in the storage chamber by chassis, courage tube, courage top loam cake, center standpipe, upright bustle pipe, smoke box respectively, because the heating surface area of the water in the storage chamber is very big, therefore, the thermal efficiency of vertical multipurpose hot-water boiler of the present utility model is high, can reduce energy resource consumption, also reduce pollution thus environment.
Be elaborated below in conjunction with the preferred forms of accompanying drawing to the utility model vertical multipurpose hot-water boiler.
Description of drawings
Fig. 1 is the main pseudosection of the utility model vertical multipurpose hot-water boiler;
Fig. 2 is the vertical view of the upper furnace body of Fig. 1;
Fig. 3 is the main pseudosection of heat exchange courage body;
Fig. 4 is the structural representation of the chimney another kind of embodiment partly of the utility model vertical multipurpose hot-water boiler;
Fig. 5 is the front view of fire grate components;
Fig. 6 is the vertical view of Fig. 5.
The specific embodiment
As Fig. 1, Fig. 2 and shown in Figure 3, the utility model vertical multipurpose hot-water boiler, comprise upper furnace body 2 and lower furnace body 1, the top of lower furnace body 1 links to each other with the bottom of upper furnace body 2, has storage chamber 22 in the upper furnace body 2, the top of upper furnace body 2 is provided with chimney 3, one side of the smoke inlet end of chimney 3 can be provided with crank 46 turningly, one end of crank 46 radially passes chimney 3 along chimney 3 inwards, be positioned on the crank 46 and on the bar section of chimney 3 anneal be installed and renovate 45, anneal is renovated 45 periphery and is matched with the inwall of chimney 3.In use, rotate anneal by crank 46 and renovate 45, just can change the switching state of chimney 3.The middle part of chimney 3 is in series with cyclone dust collectors 16, be provided with combustion chamber 4 in the lower furnace body 1, the bottom of combustion chamber 4 is provided with fire grate assembly 5, the front of combustion chamber 4 is provided with vent 6, the sidewall of combustion chamber 4 is provided with refractory masses 48, the open top of combustion chamber 4 is equipped with the heat exchange courage body 7 that shape is made, heat exchange courage body 7 upwards stretches in the storage chamber 22, heat exchange courage body 7 comprises the chassis 8 of the annular that is fixed on 4 tops, combustion chamber, the inboard of chassis 8 upper surfaces and the bottom of courage tube 9 are weldingly connected, the top of the courage tube 9 courage top loam cake 10 that has been weldingly connected, the cross section of courage tube 9 is circular, adopt a plurality of reinforcement gussets 34 to be weldingly connected between the upper surface on the lateral wall of courage tube 9 and chassis 8, the dome-shaped that courage top loam cake 10 upwards arches upward for the middle part, the cambered inner surface of courage top loam cake 10 radially is welded with a plurality of stiffeners 35, strengthens gusset 34 and reinforcement gusset 34 employing red copper materials or stainless steel material and makes.The middle part of courage top loam cake 10 is provided with centre bore 11, the periphery that is positioned at centre bore on the courage top loam cake 10 is provided with a plurality of through holes, the bottom of the margin and center standpipe 12 of the centre bore 11 of courage top loam cake 10 is weldingly connected, the top of center standpipe 12 communicates with the bottom of smoke box 13, the edge of each through hole of courage top loam cake 10 is weldingly connected with the bottom of a upright bustle pipe 49 respectively, the top of each upright bustle pipe 49 communicates with the bottom of smoke box 13 respectively, the cross section of center standpipe 12 and each upright bustle pipe 49 is circular, the diameter of upright bustle pipe 49 is greater than the diameter of center standpipe 12, courage tube 9, courage top loam cake 10, center standpipe 12, each upright bustle pipe 49 and smoke box 13 adopt the red copper material to make.Smoke box 13 is positioned at the middle part or the top of storage chamber 22, and the side of smoke box 13 is provided with and the extraneous cleaning door that communicates, and the cleaning door place is provided with shoot door 15, and the top of smoke box 13 is provided with exhaust opening, and exhaust opening links to each other with the mouth that advances of chimney 3 by smoke exhaust pipe 14.On the lateral wall of upper furnace body 2, be provided with water level meter 25 and thermometer 26, the top of upper furnace body 2 is provided with blast pipe 27, inspection hand hole 28 and the manhole 29 that storage chamber 22 is in communication with the outside, check that hand hole 28 and manhole 29 places are provided with capping respectively, the top of upper furnace body 2 sidewalls is provided with return pipe 30, the top that the top of upper furnace body 2 sidewalls is positioned at return pipe 30 is provided with overflow pipe 31, the middle and lower part of upper furnace body 2 sidewalls is provided with heat supply water pipe 32, and the bottom of upper furnace body 2 sidewalls is provided with automatic water supplement pipe 33.
The scrubber tube 17 that is in series with taper on the mouth pipeline section in advancing of cyclone dust collectors 16, the big end of scrubber tube 17 links to each other with the pipeline section that leads to cyclone dust collectors 16, in the scrubber tube 17 and mouth place of advancing of cyclone dust collectors 16 is provided with spraying head 18 respectively, the atomized water spray direction of spraying head 18 is identical with flowing to of scrubber tube 17 interior flue gases, spraying head 18 links to each other by the delivery port of water pipe with water circulating pump 19, the water inlet of water circulating pump 19 links to each other with the bottom in left side in the cyclic water tank 20 by water pipe, in the cyclic water tank 20 water is housed, middle part in the cyclic water tank 20 longitudinally is provided with filter septum 21, the ash hole of cyclone dust collectors 16 links to each other by the right side of pipeline with cyclic water tank 20, the bottom on cyclic water tank 20 right sides is connected with blow-off pipe 23, be in series with pipe valve on the blow-off pipe 23, the top of cyclic water tank 20 is connected with overflow pipe 24.In use, start water circulating pump 19, just the water in left side in the cyclic water tank 20 can be delivered to each spraying head 18 places by pipeline, then water be injected in the scrubber tube 17 again and cyclone dust collectors 16 enter the mouth place, to in the scrubber tube 17 and cyclone dust collectors 16 flue gas that enters the mouth place carry out the water smoke wet dedusting, after water smoke falls, can flow to the ash hole of cyclone dust collectors 16, flow to the right side of cyclic water tank 20 again by pipeline, grey branch in the water is deposited to the bottom on cyclic water tank 20 right sides, the water on cyclic water tank 20 right sides can flow to left side in the cyclic water tank 20 after dividing plate 21 filters after filtration again, is continued to recycle.
In order to improve dust removing effects, as shown in Figure 5, that can connect a taper again on the smoke evacuation pipeline section 47 of cyclone dust collectors 16 washes smoke pipe 37, the big end of washing smoke pipe 37 links to each other with the mouth pipeline section that advances of second cyclone dust collectors 36, wash the smoke pipe 37 mouth places of advancing interior and second cyclone dust collectors 36 and be provided with fountain head 38 respectively, the atomized water spray direction of fountain head 38 with wash smoke pipe 37 in flue gases flow to identical, fountain head 38 links to each other by the delivery port of water pipe with water circulating pump 19, and the ash hole of second cyclone dust collectors 36 links to each other by the right side of pipeline with cyclic water tank 20.In the process of above-mentioned water smoke wet dedusting of washing the smoke pipe 37 and second cyclone dust collectors 36 and the scrubber tube of front 17 and cyclone dust collectors 16 similar.
As shown in Figure 6 and Figure 7, fire grate assembly 5 comprises the fire bars 39 that fire bars hanging scaffold 40 and Duo Gen are provided with along the front and back horizontal direction, the bottom of the top of fire bars hanging scaffold 40 and combustion chamber 4 is fixedly linked, the below of fire bars hanging scaffold 40 is provided with cinder chamber's 42 (see figure 1)s, before the fire bars hanging scaffold 40, offer a plurality of mounting grooves on the rear wall, be provided with fire bars 39 in the mounting groove, the left and right sides of every fire bars 39 and top are respectively equipped with outwardly directed wing plate 41, the front end of every fire bars 39 stretches out combustion chamber 4, the front end of every fire bars 39 is respectively installed with Rocker arm 43, all the axis of the armed lever of Rocker arm 43 is parallel to each other, and all the outer end of Rocker arm 43 adopts interlock plate 44 to link to each other.In use, clear up the lime-ash of fire bars 39 tops if desired, can allow whole Rocker arm 4s 3 swing by interlock plate 44, the angle of swing be to get final product about 60 °.
The vertical multipurpose hot-water boiler course of work of the present utility model is: allow coal or fuel such as firewood or the agricultural crop straw fire bars 39 in combustion chamber 4 above the burning, the lime-ash that burning produces passes fire bars 39 by means of gravity and falls into cinder chamber 42, is eliminated from the ash hole of cinder chamber 42.A large amount of heat energy heat exchange that burning produces are delivered to the water that is used in the storage chamber 22 heat in the storage chamber 22 by chassis 8, courage tube 9, courage top loam cake 10, center standpipe 12, upright bustle pipe 49, smoke box 13 respectively, the heating surface area of the water in the storage chamber 22 is very big, therefore, the thermal efficiency of vertical multipurpose hot-water boiler of the present utility model is high, can reduce energy resource consumption, also reduce pollution thus environment.
Embodiment recited above is described preferred implementation of the present utility model; be not that the utility model scope is limited; design under the spiritual prerequisite not breaking away from the utility model; various distortion and improvement that the common engineers and technicians in this area make the technical solution of the utility model all should fall in the definite protection domain of claims of the present utility model.

Claims (8)

1. vertical multipurpose hot-water boiler, comprise upper furnace body (2) and lower furnace body (1), the top of lower furnace body (1) links to each other with the bottom of upper furnace body (2), has storage chamber (22) in the upper furnace body (2), the top of upper furnace body (2) is provided with chimney (3), the middle part of chimney (3) is in series with cyclone dust collectors (16), it is characterized in that being provided with in the described lower furnace body (1) combustion chamber (4), the bottom of combustion chamber (4) is provided with fire grate assembly (5), the front of combustion chamber (4) is provided with vent (6), the sidewall of combustion chamber (4) is provided with refractory masses (48), the open top of combustion chamber (4) is equipped with the heat exchange courage body (7) that shape is made, heat exchange courage body (7) upwards stretches in the described storage chamber (22), heat exchange courage body (7) comprises the chassis (8) of the annular that is fixed on top, combustion chamber (4), the inboard of chassis (8) upper surface and the bottom of courage tube (9) are weldingly connected, the top of courage tube (9) the courage top loam cake (10) that has been weldingly connected, the middle part of courage top loam cake (10) is provided with centre bore (11), the periphery that is positioned at centre bore on the courage top loam cake (10) is provided with a plurality of through holes, the bottom of the margin and center standpipe (12) of the centre bore (11) of courage top loam cake (10) is weldingly connected, the top of center standpipe (12) communicates with the bottom of smoke box (13), the edge of each described through hole of described courage top loam cake (10) is weldingly connected with the bottom of a upright bustle pipe (49) respectively, the top of each upright bustle pipe (49) communicates with the bottom of described smoke box (13) respectively, smoke box (13) is positioned at the middle part or the top of described storage chamber (22), the side of smoke box (13) is provided with and the extraneous cleaning door that communicates, the cleaning door place is provided with shoot door (15), the top of smoke box (13) is provided with exhaust opening, and exhaust opening links to each other by the mouth that advances of smoke exhaust pipe (14) with described chimney (3).
2. vertical multipurpose hot-water boiler according to claim 1, it is characterized in that advancing of described cyclone dust collectors (16) is in series with taper on the mouth pipeline section scrubber tube (17), the big end of scrubber tube (17) links to each other with the pipeline section that leads to described cyclone dust collectors (16), in the scrubber tube (17) and the mouth place of advancing of cyclone dust collectors (16) is provided with spraying head (18) respectively, the atomized water spray direction of spraying head (18) is identical with flowing to of the interior flue gas of scrubber tube (17), spraying head (18) links to each other by the delivery port of water pipe with water circulating pump (19), the water inlet of water circulating pump (19) links to each other with the bottom in left side in the cyclic water tank (20) by water pipe, cyclic water tank is equipped with water in (20), middle part in the cyclic water tank (20) longitudinally is provided with filter septum (21), the ash hole of described cyclone dust collectors (16) links to each other by the right side of pipeline with cyclic water tank (20), the bottom on cyclic water tank (20) right side is connected with blow-off pipe (23), blow-off pipe is in series with pipe valve on (23), and the top of cyclic water tank (20) is connected with overflow pipe (24).
3. vertical multipurpose hot-water boiler according to claim 2, what it is characterized in that being in series with on the smoke evacuation pipeline section of described cyclone dust collectors (16) taper washes smoke pipe (37), the big end of washing smoke pipe (37) links to each other with the mouth pipeline section that advances of second cyclone dust collectors (36), wash smoke pipe (37) the mouth place of advancing interior and second cyclone dust collectors (36) and be provided with fountain head (38) respectively, the atomized water spray direction of fountain head (38) is with to wash flowing to of the interior flue gas of smoke pipe (37) identical, fountain head (38) links to each other by the delivery port of water pipe with described water circulating pump (19), and the ash hole of described second cyclone dust collectors (36) links to each other by the right side of pipeline with cyclic water tank (20).
4. vertical multipurpose hot-water boiler according to claim 3, it is characterized in that described fire grate assembly (5) comprises fire bars hanging scaffold (40) and the many fire bars (39) that are provided with along the front and back horizontal direction, the bottom of the top of fire bars hanging scaffold (40) and described combustion chamber (4) is fixedly linked, the below of fire bars hanging scaffold (40) is provided with cinder chamber (42), before the fire bars hanging scaffold (40), offer a plurality of mounting grooves on the rear wall, be provided with described fire bars (39) in the mounting groove, the left and right sides of every fire bars (39) and top are respectively equipped with outwardly directed wing plate (41), the front end of every fire bars (39) stretches out described combustion chamber (4), the front end of every fire bars (39) is respectively installed with rocking arm (43), all the axis of the armed lever of rocking arm (43) is parallel to each other, and all the outer end of rocking arm (43) adopts interlock plate (44) to link to each other.
5. vertical multipurpose hot-water boiler according to claim 4, the cross section that it is characterized in that described courage tube (9) is for circular, adopt a plurality of reinforcement gussets (34) to be weldingly connected between the upper surface of the lateral wall of courage tube (9) and chassis (8), the dome-shaped that described courage top loam cake (10) upwards arches upward for the middle part, the cambered inner surface of courage top loam cake (10) radially is welded with a plurality of stiffeners (35).
6. vertical multipurpose hot-water boiler according to claim 5, the cross section that it is characterized in that described center standpipe (12) and each described upright bustle pipe (49) is for circular, the diameter of upright bustle pipe (49) is greater than the diameter of center standpipe (12), described courage tube (9), described courage top loam cake (10), center standpipe (12), each upright bustle pipe (49) and described smoke box (13) adopt the red copper material to make, and described reinforcement gusset (34) and described stiffener (35) adopt red copper material or stainless steel material to make.
7. vertical multipurpose hot-water boiler according to claim 6, a side that it is characterized in that the smoke inlet end of described chimney (3) can be provided with crank (46) turningly, one end of crank (46) radially passes chimney (3) along described chimney (3) inwards, be positioned on the crank (46) and on the bar section of chimney (3) anneal be installed and renovate (45), the periphery that (45) are renovated in anneal matches with the inwall of chimney (3).
8. vertical multipurpose hot-water boiler according to claim 7, the lateral wall that it is characterized in that described upper furnace body (2) is provided with water level meter (25) and thermometer (26), the top of upper furnace body (2) is provided with the blast pipe (27) that storage chamber (22) is in communication with the outside, check hand hole (28) and manhole (29), inspection hand hole (28) and manhole (29) locate to be provided with respectively capping, the top of upper furnace body (2) sidewall is provided with return pipe (30), the top that the top of upper furnace body (2) sidewall is positioned at return pipe (30) is provided with overflow pipe (31), the middle and lower part of upper furnace body (2) sidewall is provided with heat supply water pipe (32), and the bottom of upper furnace body (2) sidewall is provided with automatic water supplement pipe (33).
CN2009201617408U 2008-11-10 2009-07-23 Vertical multi-purpose hot water boiler Expired - Fee Related CN201476292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201617408U CN201476292U (en) 2008-11-10 2009-07-23 Vertical multi-purpose hot water boiler

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN200820178263.1 2008-11-10
CN2009201617408U CN201476292U (en) 2008-11-10 2009-07-23 Vertical multi-purpose hot water boiler

Publications (1)

Publication Number Publication Date
CN201476292U true CN201476292U (en) 2010-05-19

Family

ID=42412541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201617408U Expired - Fee Related CN201476292U (en) 2008-11-10 2009-07-23 Vertical multi-purpose hot water boiler

Country Status (1)

Country Link
CN (1) CN201476292U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106705093A (en) * 2016-12-23 2017-05-24 广西芮芽科技有限公司 Heat supply equipment with good heat supply effect
CN106765057A (en) * 2016-12-23 2017-05-31 广西芮芽科技有限公司 Using the heating system of biomass combustion
CN106801993A (en) * 2016-12-23 2017-06-06 广西芮芽科技有限公司 Biomass combustion gasification heating installation
CN106838883A (en) * 2016-12-23 2017-06-13 广西芮芽科技有限公司 The no-pollution heat supplying device of non-exhaust emission
CN107062202A (en) * 2016-12-23 2017-08-18 广西芮芽科技有限公司 The high heating plant of heat utilization rate
CN107062203A (en) * 2016-12-23 2017-08-18 广西芮芽科技有限公司 High-efficiency biomass burning furnace heating system

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106705093A (en) * 2016-12-23 2017-05-24 广西芮芽科技有限公司 Heat supply equipment with good heat supply effect
CN106765057A (en) * 2016-12-23 2017-05-31 广西芮芽科技有限公司 Using the heating system of biomass combustion
CN106801993A (en) * 2016-12-23 2017-06-06 广西芮芽科技有限公司 Biomass combustion gasification heating installation
CN106838883A (en) * 2016-12-23 2017-06-13 广西芮芽科技有限公司 The no-pollution heat supplying device of non-exhaust emission
CN107062202A (en) * 2016-12-23 2017-08-18 广西芮芽科技有限公司 The high heating plant of heat utilization rate
CN107062203A (en) * 2016-12-23 2017-08-18 广西芮芽科技有限公司 High-efficiency biomass burning furnace heating system
CN106705093B (en) * 2016-12-23 2018-10-09 杭州悦山科技有限公司 The good heating equipment of heating effect
CN106765057B (en) * 2016-12-23 2018-12-11 绍兴市亿跃智能科技有限公司 Utilize the heating system of biomass combustion
CN109140423A (en) * 2016-12-23 2019-01-04 惠安县云点网络科技有限公司 A kind of heat supply method
CN109237461A (en) * 2016-12-23 2019-01-18 漳州龙文区炼盛合信息技术有限公司 Heating plant
CN106801993B (en) * 2016-12-23 2019-07-05 山东合一环保科技有限公司 Biomass combustion gasification heating installation
CN109140423B (en) * 2016-12-23 2020-02-11 上海碳索能源服务股份有限公司 Heat supply method

Similar Documents

Publication Publication Date Title
CN201476292U (en) Vertical multi-purpose hot water boiler
CN204816188U (en) Stainless steel water bath dust removal desulfurizing tower
CN104745231B (en) Carbon-gas-heat-electricity cogeneration biomass thermal cracking system
CN105258126B (en) A kind of environment protection garbage incineration stove
CN204285493U (en) Wood fuel boiler exhaust gas energy-conserving and environment-protective treatment system
CN206531075U (en) Field straw environmental protection treatment car
CN107367059A (en) A kind of energy-saving, environmental protection boiler
CN206867983U (en) A kind of chimney exhaust gas processing device
CN206320725U (en) Energy-conservation zero-emission boiler
CN2648300Y (en) Medical refuse incineratnig furnace
CN205279127U (en) Multitube whirlwind dust removal waste heat recovery device
CN106766144A (en) A kind of energy-saving environmental protection boiler and its control method
CN104941365B (en) Purifier for exhaust gas of industrial boiler
CN104456593B (en) Wood fuel boiler tail gas energy-saving environment-friendly treatment system
CN201215384Y (en) Coal boiler without smoke
CN207006199U (en) A kind of processing unit of boiler exhaust gas
CN106178801A (en) A kind of desulfurizer for little Miniature coal-fired boiler and application thereof
CN107081050A (en) A kind of chimney exhaust gas processing device
CN206073047U (en) Energy saving and environment friendly normal-pressure boiler system
CN201615594U (en) High-efficient energy-saving normal pressure hot water boiler
CN201992809U (en) Two-way normal-reverse combustion normal-pressure boiler
CN201875684U (en) Environmentally friendly and highly efficient steam boiler
CN201875880U (en) Condensation-type gas boiler
CN108998051A (en) A kind of control dirt control sulphur system of coke oven list gas collecting tube
CN213790636U (en) Boiling furnace blowing-in flue gas washing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100519

Termination date: 20170723

CF01 Termination of patent right due to non-payment of annual fee