CN201473945U - 一种抗滑桩 - Google Patents
一种抗滑桩 Download PDFInfo
- Publication number
- CN201473945U CN201473945U CN2009201570100U CN200920157010U CN201473945U CN 201473945 U CN201473945 U CN 201473945U CN 2009201570100 U CN2009201570100 U CN 2009201570100U CN 200920157010 U CN200920157010 U CN 200920157010U CN 201473945 U CN201473945 U CN 201473945U
- Authority
- CN
- China
- Prior art keywords
- pile
- sliding
- tensioning
- compression
- piling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
本实用新型公开了一种抗滑桩,包括桩帽、受压桩和受拉桩,受压桩和受拉桩固定连接成为桩身,受压桩和受拉桩的上端与桩帽固定连接,其特征在于:桩身底部设有桩尖,桩身内部设有泄水孔,泄水孔与分布在桩身下部的排水孔连通,泄水孔开口于桩帽的顶部。作为优选,受压桩和受拉桩的表面设有由钢筋混凝土结构围成的钢筋笼,更进一步地,桩帽的表面上也设有由钢筋混凝土结构围成的钢筋笼。将抗滑桩的桩身分成受压桩和受拉桩两个部分,利于增强整个抗滑桩的受力强度,外部用钢筋笼捆绑,增强了整个装置的抗弯性能以及抵抗侧向力的能力,该实用新型具有施工安全、简便、排水效果好,受弯性能好等特点。
Description
技术领域
本实用新型涉及一种抗滑桩,尤其涉及一种适用于复杂地质条件下的,提供强抗弯力的抗滑桩。
背景技术
一些路段经常发生大规模滑坡,从工程地质方面综合分析,矿区工程地质条件复杂,制成边坡的岩石松软,软弱夹层分布密集,局部区段边坡受构造断层影响较大。在河岸护坡或地下水威胁的边坡防护工程中,土体中压力水的存在严重威胁边坡的安全,为排除压力水,一般采用预埋排水管的方法与挡墙、护面等配合,这种方法虽然能排水,但加固土体的效果并不明显,而常用的一些锚杆、锚索、抗滑桩又只能够起到锚固、抗剪作用,不能够排水。在边坡、基坑支护中,排桩应用较广泛,它是由钻孔灌注桩直线排列,并由联系梁连接,共同抵抗侧向土压力或滑坡推力的结构形成。在一些滑坡、边坡工程治理的支挡结构中应用广泛,典型的是人工挖孔的矩形抗滑桩,但是该抗滑桩存在着耐久性差,安全性低等问题,因此使用受到限制。对滑坡推力或下滑力的治理工程,往往首选桩径的抗滑桩,但是这一抗滑桩的施工安全性差,而且施工周期长,受季节影响严重。
实用新型内容
针对上述现有技术的不足,本实用新型提供一种抗滑桩,能有效的解决上述现有技术存在的问题。
本实用新型的技术方案是:一种抗滑桩,包括桩帽、受压桩和受拉桩,受压桩和受拉桩固定连接成为桩身,受压桩和受拉桩的上端与桩帽固定连接,其特征在于:桩身底部设有桩尖,桩身内部设有泄水孔,泄水孔与分布在桩身下部的排水孔连通,泄水孔开口于桩帽的顶部。
作为优选,受压桩和受拉桩的表面设有由钢筋混凝土结构围成的钢筋笼;
更进一步地,桩帽的表面上也设有由钢筋混凝土结构围成的钢筋笼。
本实用新型的有益效果在于:将抗滑桩的桩身分成受压桩和受拉桩两个部分,利于增强整个抗滑桩的受力强度,外部用钢筋笼捆绑,增强了整个装置的抗弯性能以及抵抗侧向力的能力,该实用新型具有施工安全、简便、排水效果好,受弯性能好等特点。
附图说明
图1为本实用新型实施例1的示意图;
图2为本实用新型实施例2的示意图。
具体实施方式
作为本实用新型的一种实施方式,如图1所示,一种抗滑桩,包括桩帽1、受压桩22和受拉桩21,受压桩22和受拉桩21固定连接成为桩身2,受压桩22和受拉桩21的上端与桩帽1固定连接。桩身2底部设有桩尖5,桩身2内部设有泄水孔6,泄水孔6与分布在桩身2下部的排水孔4连通,泄水孔6开口于桩帽1的顶部。受压桩22和受拉桩21的表面设有由钢筋混凝土结构围成的钢筋笼3。
作为本实用新型的另外一种实施例,如图2所示,一种抗滑桩,包括桩帽1、受压桩22和受拉桩21,受压桩22和受拉桩21固定连接成为桩身2,受压桩22和受拉桩21的上端与桩帽1固定连接。桩身2底部设有桩尖5,桩身2内部设有泄水孔6,泄水孔6与分布在桩身2下部的排水孔4连通,泄水孔6开口于桩帽1的顶部。桩帽1、受压桩22和受拉桩21的表面均设有由钢筋混凝土结构围成的钢筋笼3。
将抗滑桩的桩身分成受压桩22和受拉桩21两个部分,利于增强整个抗滑桩的受力强度,外部用钢筋笼3捆绑,增强了整个装置的抗弯性能以及抵抗侧向力的能力,泄水孔6和排水孔4的设置可以起到快速泄流的作用,同时,桩尖5的设置,在施工时能够更加方便,钢筋笼3的表面做防腐处理,以防止整个装置由于钢筋笼3的腐蚀而影响使用。
Claims (3)
1.一种抗滑桩,包括桩帽(1)、受压桩(22)和受拉桩(21),受压桩(22)和受拉桩(21)固定连接成为桩身(2),受压桩(22)和受拉桩(21)的上端与桩帽(1)固定连接,其特征在于:桩身(2)底部设有桩尖(5),桩身(2)内部设有泄水孔(6),泄水孔(6)与分布在桩身(2)下部的排水孔(4)连通,泄水孔(6)开口于桩帽(1)的顶部。
2.根据权利要求1所述的一种抗滑桩,其特征在于:受压桩(22)和受拉桩(21)的表面设有由钢筋混凝土结构围成的钢筋笼(3)。
3.根据权利要求2所述的一种抗滑桩,其特征在于:桩帽(1)的表面设有由钢筋混凝土结构围成的钢筋笼(3)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201570100U CN201473945U (zh) | 2009-05-22 | 2009-05-22 | 一种抗滑桩 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201570100U CN201473945U (zh) | 2009-05-22 | 2009-05-22 | 一种抗滑桩 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201473945U true CN201473945U (zh) | 2010-05-19 |
Family
ID=42410192
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201570100U Expired - Fee Related CN201473945U (zh) | 2009-05-22 | 2009-05-22 | 一种抗滑桩 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201473945U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493842A (zh) * | 2011-11-15 | 2012-06-13 | 中铁十二局集团有限公司 | 一种隧道全风化深埋富水花岗岩水平旋喷造孔泄水方法 |
CN114592531A (zh) * | 2022-03-11 | 2022-06-07 | 重庆三峡学院 | 一种岩土边坡的锚固装置 |
-
2009
- 2009-05-22 CN CN2009201570100U patent/CN201473945U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493842A (zh) * | 2011-11-15 | 2012-06-13 | 中铁十二局集团有限公司 | 一种隧道全风化深埋富水花岗岩水平旋喷造孔泄水方法 |
CN114592531A (zh) * | 2022-03-11 | 2022-06-07 | 重庆三峡学院 | 一种岩土边坡的锚固装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201473959U (zh) | 一种抗滑支挡结构 | |
CN101476466B (zh) | 巨厚层滑坡预应力锚索抗滑隧道施工方法及防治新结构 | |
CN108867200B (zh) | 一种抗隆起高速铁路岩石路堑结构及设计方法 | |
CN207633352U (zh) | 一种用于快速抢险施工的边坡加固结构 | |
CN202466594U (zh) | 水平旋喷土锚和灌注桩复合基坑支护结构 | |
CN201671108U (zh) | 一种沿河路肩预应力锚索桩板墙 | |
CN104674802B (zh) | 预应力碎石锚拉桩及其滑坡治理施工方法 | |
CN101736738A (zh) | 一种抗压、抗拔两用型注浆碎石桩 | |
CN104727340B (zh) | 高切坡锚索空间框架支挡结构 | |
CN103233473A (zh) | 高聚物多棱桩注浆方法 | |
CN103603379A (zh) | 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系及其施工工艺 | |
CN210395412U (zh) | 一种适用于山区架空输电线路的预应力锚桩抗拔基础 | |
CN108385715A (zh) | 一种装配式桩拱组合挡土墙及其施工方法 | |
CN201473945U (zh) | 一种抗滑桩 | |
CN107938685A (zh) | 一种新型斜撑复合支护装置 | |
Lillis et al. | Compression and uplift of rammed aggregate piers in clay | |
CN101418574A (zh) | 地基梁加固施工方法 | |
CN206143823U (zh) | 一种黄土冲沟区桥梁下部结构效应识别系统 | |
CN100451246C (zh) | 一种挡水围堰结构及其施工方法 | |
CN209066456U (zh) | 打入预应力超强混凝土管桩护壁式小型组合抗滑桩结构 | |
CN201502065U (zh) | 一种锚杆联合开挖类复合基础 | |
CN215441846U (zh) | 一种地基防沉降结构 | |
CN219060059U (zh) | 一种位于基坑外部的支护桩加强结构 | |
CN203583501U (zh) | 一种抵抗岩体滑动的深层抗剪装置 | |
CN206052770U (zh) | 一种使用钻孔灌注桩结合压密注浆的挡土墙 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100519 Termination date: 20100522 |