CN201460318U - 集约化快速装配式基站 - Google Patents

集约化快速装配式基站 Download PDF

Info

Publication number
CN201460318U
CN201460318U CN2009201184581U CN200920118458U CN201460318U CN 201460318 U CN201460318 U CN 201460318U CN 2009201184581 U CN2009201184581 U CN 2009201184581U CN 200920118458 U CN200920118458 U CN 200920118458U CN 201460318 U CN201460318 U CN 201460318U
Authority
CN
China
Prior art keywords
base station
base
communication tower
communication
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201184581U
Other languages
English (en)
Inventor
张家琦
吴爱华
孙义红
黄永文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG RUINENG COMMUNICATION TECHNOLOGY CO., LTD.
Original Assignee
Zhejiang Ruineng Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ruineng Communication Technology Co Ltd filed Critical Zhejiang Ruineng Communication Technology Co Ltd
Priority to CN2009201184581U priority Critical patent/CN201460318U/zh
Application granted granted Critical
Publication of CN201460318U publication Critical patent/CN201460318U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及通信基站,尤其涉及装配式通信基站。包括底座(1)、通信塔(2)、支撑架(3)、钢梁(4)、机房(5),通信塔(2)固定安装在底座(1)上,机房(5)位于通信塔(2)一侧并固定连接在底座(1)上,位于通信塔(2)两侧的支撑架(3)固定安装在底座(1)上,并通过钢梁(4)与通信塔(2)连接。本实用新型针对现有技术中永久通信基站需现场施工、建设速度慢、突入资金大的不足,提供了一种集约化快速装配式基站。

Description

集约化快速装配式基站
技术领域
本实用新型涉及通信基站,尤其涉及装配式通信基站。
背景技术
最近今年,随着移动通信业务的不断增长,通信基站的建设需求也越来越大。基站是通信运营的基础设施,也是整个通信网络最为重要的部分,因此通信运营商对于建站的快速建设、降低基础设施和运营维护成本有着急切的需求。基站整建设周期和建设成本是通信行业亟待突破的瓶颈问题。传统基站建设模式是铁塔基础、机房均需要现场是同,土方开挖、混凝土浇捣及保养,其所耗费的时间是限制基站快速建设的主要问题,因此就需要一种能够快速建设的通信基站来解决以上问题。
为克服上面的缺点,有时会使用一种移动式基站,如马人乐等人在2004年5月25日申请的,2005年6月15日公告的,申请号为200420023063.0,公告号为CN2704647的实用新型,名称为移动式基站,公开了一种移动式基站,涉及移动通信基站的建造,用于作为临时移动通信基站或长期通信基站,由通信塔和机房组成。通信塔采用若干段钢管固定连接组成,机房采用钢结构框架结构,由预制钢结构构件牢固连接拼装而成,整个机房设置在地面上。该实用新型组成通信塔的钢管和组成机房的构件可工厂化生产,整个移动基站的占地面积可根据现场及时进行调整,且无需进行基础开挖,建设周期短,具有良好的适应性、灵活性、安全性,本实用新型与国内外同类功能的移动基站相比可节约造价60~70%。但是这种基站主要是应用于临时使用的移动基站,并不能作为永久基站进行使用,同时由于其本身就是用于临时使用,发射功率也不能满足永久基站的要求。
发明内容
本实用新型针对现有技术中永久通信基站需现场施工、建设速度慢、突入资金大的不足,提供了一种集约化快速装配式基站。
为了解决上述技术问题,本实用新型通过下述技术方案得以解决:
集约化快速装配式基站,包括底座、通信塔、支撑架、钢梁、机房,通信塔固定安装在底座上,机房位于通信塔一侧并固定连接在底座上,位于通信塔两侧的支撑架固定安装在底座上,并通过钢梁与通信塔连接。
按照本实用新型的技术方案,通信塔通过其底部法兰与底座用螺栓连接,支撑架位于通信塔两侧并通过螺栓固定连接在底座上,有钢梁铰接在支撑架上,并有另一端与通信塔铰接,一般钢梁与通信塔的铰接点在通信塔底部4到7米的位置,通信塔通过钢梁和支撑架来保持稳定,机房固定在底座上并位于通信塔旁,机房可以由通信运营商提供。
作为优选,底座为预制混凝土构件。
本实用新型中的主要部分,底座、通信塔、支撑架、钢梁均在工厂根据塔体高度、迎风面积等因素计算出符合要求的技术参数进行制作,在施工中只需将图碾压展平、铺设一定厚度砂石垫层即可安装底座,底座为预制混凝土构件,如场地地质较差,需要对场地做混凝土硬化处理,混凝土硬化面应大于底座与其的接触面,当基站用于特殊的高风压地区时,底座需采用螺旋地锚加固在地面,工厂预制的底座、通信塔、支撑架、钢梁在运抵现场后6个小时内即可完成基站的安装.
附图说明
图1为集约化快速装配式基站主视图
1-底座、2-通信塔、3-支撑架、4-钢梁、5-机房。
具体实施方式
下面结合附图与具体实施方式对本实用新型作进一步详细描述:
实施例,图1为集约化快速装配式基站主视图,包括底座1、通信塔2、支撑架3、钢梁4、机房5,其特征在于:通信塔2固定安装在底座1上,机房5位于通信塔2一侧并固定连接在底座1上,位于通信塔2两侧的支撑架3固定安装在底座1上,并通过钢梁4与通信塔2连接。底座1为预制混凝土构件。底座1、通信塔2、支撑架3、钢梁4均为工厂预制。施工现场将地面碾压整平,铺设一定厚度砂石垫层即可安置底座1,如果场地地质条件较差,对场地做混凝土硬化处理,地基夯实碾压后座100-150厚C25混凝土,截面大于底座1所接触面积。通信塔2通过底部法兰用螺栓固定在底座1上,支撑架3位于通信塔2两侧并通过螺栓连接在底座1上,在支撑架3上有通过铰链连接的钢梁4与通信塔2底部四至七米处铰接,机房5常用尺寸为5.0M×2.4M×2.7M(长×宽×高),也可根据实际情况调整尺寸,机房5固定在底座1上,并紧邻通信塔2。
总之,以上所述仅为本实用新型的较佳实施例,凡依本实用新型申请专利范围所作的均等变化与修饰,皆应属本实用新型专利的涵盖范围。

Claims (2)

1.集约化快速装配式基站,包括底座(1)、通信塔(2)、支撑架(3)、钢梁(4)、机房(5),其特征在于:通信塔(2)固定安装在底座(1)上,机房(5)位于通信塔(2)一侧并固定连接在底座(1)上,位于通信塔(2)两侧的支撑架(3)固定安装在底座(1)上,并通过钢梁(4)与通信塔(2)连接。
2.根据权利要求1所述的集约化快速装配式基站,其特征在于:底座(1)为预制混凝土构件。
CN2009201184581U 2009-04-23 2009-04-23 集约化快速装配式基站 Expired - Fee Related CN201460318U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201184581U CN201460318U (zh) 2009-04-23 2009-04-23 集约化快速装配式基站

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201184581U CN201460318U (zh) 2009-04-23 2009-04-23 集约化快速装配式基站

Publications (1)

Publication Number Publication Date
CN201460318U true CN201460318U (zh) 2010-05-12

Family

ID=42387671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201184581U Expired - Fee Related CN201460318U (zh) 2009-04-23 2009-04-23 集约化快速装配式基站

Country Status (1)

Country Link
CN (1) CN201460318U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561745A (zh) * 2012-01-20 2012-07-11 黄国成 组装式风光互补自供电通信基站
CN105971325A (zh) * 2016-05-05 2016-09-28 华信咨询设计研究院有限公司 通过预制机房补偿通信塔配重的基站及其稳定性监测方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561745A (zh) * 2012-01-20 2012-07-11 黄国成 组装式风光互补自供电通信基站
CN105971325A (zh) * 2016-05-05 2016-09-28 华信咨询设计研究院有限公司 通过预制机房补偿通信塔配重的基站及其稳定性监测方法

Similar Documents

Publication Publication Date Title
CN211517947U (zh) 一种桥梁箱梁预制用型钢台座
CN201288328Y (zh) 梁板一体预制拼装式塔机固定基础
CN201116267Y (zh) 一种内爬塔吊的外挂支承装置
CN109763604A (zh) 一种中心钢管型钢异形柱
CN204851302U (zh) 矿山井下大跨度硐室起吊梁锚杆固定结构
CN201460318U (zh) 集约化快速装配式基站
CN201883720U (zh) 可调垂直度的风光电互补集约化自立式通信基站
CN202280149U (zh) 半刚性框架—开缝钢板剪力墙结构
CN106869379A (zh) 一种装配式钢结构外墙板下托上挂式连接结构
CN206607724U (zh) 一种装配式钢结构外墙板下托上挂式连接结构
CN201401040Y (zh) 移动通信天线抱杆混凝土预制配重块
CN209686923U (zh) 圆管组合支撑装置以及钢结构临时施工支撑装置
CN201133089Y (zh) 屋面梁改为楼面梁的荷载转移装置
CN103469892B (zh) 高层模块建筑空间的主次模块单元组合结构及连接方法
CN206607709U (zh) 一种装配式钢结构外挂式墙板下承式连接结构
CN212773578U (zh) 一种装配式建筑快拆独立支撑体系
CN202218418U (zh) 塔柜一体自带配重式基站
CN101307602A (zh) 架空式大型设备基础结构
CN210684349U (zh) 一种装配式龙门吊轨道基础
CN107268803B (zh) 一种外挂墙板底端仅对墙板有平面外约束的连接方法
CN207862963U (zh) 装配式可调基础
CN201908319U (zh) 用于蓄能地下水池的支撑构件
CN112127515A (zh) 预制混凝土外挂墙板连接装置
CN205945605U (zh) 分布式光伏组件地面安装结构
CN2441900Y (zh) 砼集成建筑板

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 311500 Tonglu Zhejiang Economic Development Zone, Hangzhou, Shu Shu Road, No. 17, No.

Patentee after: ZHEJIANG RUINENG COMMUNICATION TECHNOLOGY CO., LTD.

Address before: Hangzhou City, Zhejiang province 310020 Phoenix Road No. 137 Zhonghao Fengqi Plaza A block 805

Patentee before: Zhejiang Ruineng Communication Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100512

Termination date: 20180423

CF01 Termination of patent right due to non-payment of annual fee