CN201449531U - Energy-saving supporting device - Google Patents
Energy-saving supporting device Download PDFInfo
- Publication number
- CN201449531U CN201449531U CN2008201821937U CN200820182193U CN201449531U CN 201449531 U CN201449531 U CN 201449531U CN 2008201821937 U CN2008201821937 U CN 2008201821937U CN 200820182193 U CN200820182193 U CN 200820182193U CN 201449531 U CN201449531 U CN 201449531U
- Authority
- CN
- China
- Prior art keywords
- frequency converter
- power consumption
- energy
- data
- load equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/40—Display of information, e.g. of data or controls
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The utility model provides an energy-saving supporting device, in a picture, the power consumption saving effect of the energy-saving operation is displayed at any time, which is easy to master the power consumption saving effect during the energy-saving operation, and know the power consumption saving effect which is figured out, wherein the device comprises a transducer for controlling the rotation speed of an electromotor arranged in a loading device, a storing device for storing a first character which is decided by the relation between the actuating quantity and the power consumption which are set in the loading device before the transducer is guided into and a second character which is decided by the relation between the actuating quantity and the power consumption after the transducer is guided into, and a picture display which together outputs a first vertical line of the practically measured value of the power consumption which is obtained through measuring the power consumption all the time during the operation of the transducer by a measuring device, a second vertical line which shows the difference between the power consumption and the practically measured value on the first character before the transducer is guided into, a curve of the first character and a curve of the second character.
Description
Technical field
The present invention relates to a kind of energy-conservation service generator, for example relate to be suitable for being used for factory etc. carry out energy-saving run the energy-saving run assisting system.
Background technology
In general, the employed fan of factory, blower fan (blower) and pump machine etc. are to be rotated with certain speed by motor, control with air door restraining flows such as (damper).If above-mentioned motor is imported frequency converter (inverter), just can reduce power consumption.Known by the technology that the importing frequency converter is saved energy.This technology is before frequency converter imports, and the corresponding power consumptions of parameter such as storage and flow are in the work after frequency converter imports, with reference to this recorded content, calculate the power consumption before frequency converter imports, according to it with the power consumption of actual consumption between difference, calculate the electric weight of saving.This technology has been published in for example spy and has been opened on the 2001-155089 communique.
[patent documentation 1] spy opens the 2001-155089 communique
According to the support method of the described energy-saving run of above-mentioned patent gazette, customer need is provided with its drive motor that has a plurality ofly can realize energy-conservation frequency converter conscientiously.So, can reach obvious energy-saving effect, and at CO
2Play effectiveness in the reduction.
Under this environment, can derive following demand: wish on picture, easily to grasp the energy-saving effect that takes place constantly simultaneously and calculate energy-saving effect according to data.
Summary of the invention
The purpose of this case invention provides a kind of moment and carries out the energy-saving run assisting system that picture shows, it is in view of above-mentioned problem, it is in above-mentioned energy-saving run assisting system, follow energy-saving run, make it possible to easily on picture, to grasp the effect of the Power Cutback of calculating simultaneously and calculate energy-saving effect according to data.
The 1st technical scheme of the present invention provides a kind of energy-saving support device, possesses: frequency converter, the rotating speed that is arranged at the motor in the load equipment is controlled; Described the 2nd characteristic of making the relation between momentum and the power consumption after memory storage, storage import given the 1st characteristic of doing the relation decision between momentum and the power consumption in the preceding described load equipment and determine described frequency converter to import according to this frequency converter; And, image display, measured value the 1st ordinate of the power consumption that the power consumption all the time during to the operation of described frequency converter measures with measuring appliance with expression and the 2nd ordinate of representing described frequency converter on described the 1st characteristic power consumption and the difference described measured value before importing are exported in the lump with the curve of described the 1st characteristic and the curve of described the 2nd characteristic.
The 2nd technical scheme of the present invention, be in the energy-saving support device of the 1st technical scheme, also have: use the power consumption all the time and the described momentum of doing that measure by described measuring appliance that described energy dissipation behavior is revised, dwindle by the value of the power consumption of described energy dissipation behavior decision, with the data processing equipment of the difference of the measured value of the power consumption all the time that measures by described measuring appliance.
The 3rd technical scheme of the present invention, be in the energy-saving support device of the 1st technical scheme, also have: the measured value of the power consumption all the time that measures by described measuring appliance, with the situation bigger than setting by the difference of the value of the power consumption of described energy dissipation behavior decision under, warn the data presented treating apparatus.
In another technical scheme of the present invention, picture portion at the image display device of data processing equipment, form the 1st picture in the following manner, promptly, the object load equipment made momentum and power consumption as coordinate axis, show the treaty conditions curve, with show under the frequency converter when operation control speed conditions and the power consumption characteristics curve of making the corresponding power consumption of momentum all the time, power consumption display all the time when above-mentioned frequency converter is moved becomes the passing according to the figure line of power consumption characteristics curve, saving power consumption during with this frequency converter operation is set on the treaty conditions curve, the passing of the figure line of the difference of the power consumption when showing the power consumption that shows before frequency converter imports with the frequency converter operation of setting on the power consumption characteristics curve.
According to above-mentioned formation, just can provide a kind of easy grasp to save the energy-saving support device of power consumption effect.
Description of drawings
Fig. 1 is the formation concept map of the embodiment of the invention.
Fig. 2 is the formation concept map of another embodiment of the present invention.
Fig. 3 is the block diagram that a kind of mode under the situation of the present invention is implemented in expression.
Fig. 4 is the block diagram that the another kind of mode under the situation of the present invention is implemented in expression.
Fig. 5 is the figure of an example of expression blower fan power consumption characteristics.
Fig. 6 is the figure of the establishing method of the treaty conditions curve before the expression frequency converter imports.
Fig. 7 is the figure of the calculated example of expression Power Cutback effect.
Fig. 8 is the process flow diagram that expression is used for method of the present invention.
Fig. 9 is the figure that expression is passed as the picture and the picture of the embodiment of the invention.
Figure 10 is the figure that expression is passed as the picture and the picture of the embodiment of the invention.
Figure 11 is the figure that expression is passed as the picture and the picture of the embodiment of the invention.
Figure 12 is the figure that expression is passed as the picture and the picture of the embodiment of the invention.
Figure 13 is the figure that expression is passed as the picture and the picture of the embodiment of the invention.
Figure 14 is the figure that expression is passed as the picture and the picture of the embodiment of the invention.
Figure 15 is system's pie graph of the load equipment Long-Range Surveillance System under second embodiment of the present invention.
Figure 16 is the block diagram of the formation of the telemonitoring server under expression second embodiment of the present invention.
Figure 17 is the block diagram of the formation of the monitoring arrangement under expression second embodiment of the present invention.
Figure 18 is the collection of the load equipment Working state data under expression second embodiment of the present invention, the sequential chart that renewal is handled.
Figure 19 is the process flow diagram of the operation of the telemonitoring server under expression second embodiment of the present invention.
Figure 20 is the process flow diagram of the operation of the monitoring arrangement under expression second embodiment of the present invention.
Figure 21 is the key diagram of the employed message example of load equipment Long-Range Surveillance System under expression second embodiment of the present invention.
Figure 22 is the GUI that shows the basic picture of the load equipment working condition under second embodiment of the present invention.
Figure 23 is the GUI of setting picture that sets the displaying contents of the load equipment working condition under second embodiment of the present invention.
Figure 24 is the GUI that the load equipment working condition at the single strong point under second embodiment of the present invention is shown as the basic picture of data total value.
Figure 25 is shown as CO with the load equipment working condition under second embodiment of the present invention
2The GUI of the basic picture of reduction.
Figure 26 is the block diagram of the formation of the telemonitoring server under expression the 3rd embodiment of the present invention.
Figure 27 is the block diagram of the formation of the monitoring arrangement under expression the 3rd embodiment of the present invention.
Figure 28 is the collection of the load equipment Working state data under expression the 3rd embodiment of the present invention, the sequential chart that renewal is handled.
Figure 29 is the process flow diagram of the action of the telemonitoring server under expression the 3rd embodiment of the present invention.
Figure 30 is the process flow diagram of the action of the monitor unit under expression the 3rd embodiment of the present invention.
Among the figure: the 1-fan, blower fan, 2-pump machine, 3, the 4-motor, 5, the 6-frequency converter, the 7-monitor unit, 11,12,13,14,15,16, the 17-arrow, 20-Long-Range Surveillance System, 21-data processing equipment, 22-Working state data collection system, the 23-memory storage, 24-surveillance, 25-monitor unit, the 26-calculation element, the 27-communication system, 31-object load equipment, 33-galvanometer, the 34-voltmeter, the 35-modulator-demodular unit, 36-LAN, 50-picture portion, 51-the 1st picture, 52-the 2nd picture, 53-the 3rd picture, 54-the 4th picture, 55-the 5th picture, 60-treaty conditions curve, the power consumption characteristics curve the during operation of 61-frequency converter, the power consumption before the frequency converter that 62-is obtained by the treaty conditions curve imports, the figure line of the power consumption when 63-represents the frequency converter operation, the figure line of the difference of the power consumption when 64-represents the power consumption obtained by the power consumption characteristics curve and frequency converter operation, 71-represents by figure line 63, the passing of the figure line of 64 power consumption of obtaining, 72-represents the passing of the figure line of the power consumption number obtained by figure line 63,74-represents the passing of figure line 71 and the figure line of the difference of figure line 72,74-represents to do the line of the passing of momentum (running frequency), 85-model specification button, 88-voltage button, 89-electric current button, the 91-pressure-wire, 92-electric current line, 100-energy-saving run assisting system, the 200-image display device, A1-telemonitoring server, A2-monitor unit, A3-load equipment, the A4-motor, the A5-frequency converter, A6-strong point, A7-network.
Embodiment
Below, with reference to the accompanying drawings, embodiments of the present invention are described.
[embodiment 1]
At first,, calculation element, the method for the Power Cutback effect in energy-conservation operational support device, the method is described, then energy-saving run assisting system, the method for the effect of the Power Cutback of explanation demonstration energy-saving run according to above-mentioned patent documentation 1 described content.
The method of the embodiment of the invention, it is a kind of energy-conservation service method that provides, to having the object load equipment of motor, above-mentioned object load equipment is imported frequency converter, obtain and wish the power consumption (power consumption) of the energy-conservation user of equipment operation before frequency converter imports, obtain the Frequency Converter Control service data when carrying out motor speed control operation, in imagination is to move under the situation of corresponding operation with frequency converter, data when the power consumption data before importing according to frequency converter is moved with Frequency Converter Control poor, obtain the Power Cutback value according to the power consumption of saving, according to the Power Cutback value, obtain the benefit amount of money, on the treaty content that contracting paties decide through consultation in advance, embody the above-mentioned benefit amount of money and carry out the fee request processing.In this case, for the power consumption of the imagination before the frequency converter importing, as described later, use the treaty conditions curve.Thereby, the power consumption data when showing use equipment in the past and carrying out with the corresponding operation of frequency converter operation.
Method according to another embodiment of the present invention, be that above-mentioned object load equipment is imported frequency converter, working condition according to the object load equipment that has motor, obtain the power consumption before frequency converter imports, carry out the rotating speed control operation of the motor under this frequency converter effect, obtain the Frequency Converter Control service data, with above-mentioned same, poor according to above-mentioned present situation power consumption data and Frequency Converter Control service data, obtain and save the corresponding benefit amount of money of power, on the treaty content that contracting paties decide through consultation in advance, embody the above-mentioned benefit amount of money, carry out fee request and handle.
Above-mentioned Frequency Converter Control service data is collected by means of communication such as LAN or telephone wires by surveillance. and in addition, the power consumption data before frequency converter imports is used as based on imagination and continues to use the operational data of imagination situation of the load equipment of object to calculate.
Therefore, for the present invention, the user can not have under the situation of front-end investment, imports frequency converter, reaches the energy conservation standard of propositions such as government, perhaps it is contributed to some extent.Service providers can obtain energy-conservation interests easily.That is to say that for above-mentioned reason, the present invention is different from the past leases (lease) or short-term lease (rental) mode for a long time, need not to guarantee minimum amount of energy saving to the user, thereby the corresponding benefit expense of power is obtained and saved to service providers one surely.
Contracting paties B (producer who comprises energy-conservation service providers, energy-efficient equipment) as contracting paties one side, with frequency converter and new motor combination or independent frequency converter, import the equipment of wishing energy-conservation contracting paties A (client, user).In this case, if ISP and user are by mutual consent, except that frequency converter, motor, can also change employed pump machine, fan, blower fan etc. in the lump, or they are replaced with new equipment.Pump machine, fan, blower fan etc. are the object load equipments.
Contracting paties A is the people who wishes to obtain energy-conservation service, and contracting paties B can provide the service operator of energy-conservation service.
At first, contracting paties B is arranged on establishing in the load object-based device of contracting paties A with the Working state data collection system, measures the Working state data in this load object-based device, obtains the apparatus characteristic before frequency converter imports.Can use it when calculating the power consumption before frequency converter imports.When frequency converter imported, this feature was used, and became the basis of setting the preceding treaty conditions curve of Power Cutback.If the user is this object load equipment not, the power consumption data of the similarly existing load object-based device that the ISP can be possessed is as the prerequisite of user's treaty conditions setting.
The Working state data collection system is transformed object load equipment, machine, after changing, gather the operational data of its equipment, machine, use means of communication such as telephone wire, in the service beginning, as the surveillance of constructing, for example Long-Range Surveillance System inscape is brought into play function.The Working state data collection system, the data that obtain to the Long-Range Surveillance System transmission with the interval of necessity.Thus, the power consumption after just frequency converter imported after machine, equipment improved is just obtained, and according to this power consumption, calculates benefit and takes.
Contracting paties A (user) and energy-conservation ISP between, import the amount of saving energy that the back power consumption is obtained with reference to power consumption before importing according to frequency converter and frequency converter, the consideration benefit is taken, whether research is not having to import frequency converter under the situation of front-end investment, the energy-conservation service that energy-saving effect is calculated in acceptance is all the time signed a contract under situation about accepting.The ISP, even can carry out the improvement or the replacing of equipment, machine on unreal border, and under the already present situation of the data of similar devices, by calculating or approximate treatment, obtain power consumption, power consumption and benefit expense, whether can be to user's suggestion with this prerequisite as contract.
For treaty conditions, can consider following expense:, be provided with and change the needed expense of frequency converter, motor of establishing in the object load equipment that is set at according to the power consumption effect; The ISP is to the long-term lease person of frequency converter and motor or expense, the expense of maintenance and management of short-term lease person's payment; The needed expense of data acquisition.About these conditions,, can sign the contract that imports the Power Cutback system that comprises frequency converter if user and ISP are by mutual consent.In the transformation of carrying out the said equipment, machine, when changing, the user does not need front-end investment, and can also confirm or almost confirm to import energy-conservation success after, so that the user can realize at least is energy-conservation, even can also obtain the distribution that benefit is taken.
More particularly be exactly to sign the importing contract of the electric motor drive system of Power Cutback, in aforesaid Long-Range Surveillance System, calculate the amount of money of Power Cutback, according to the ratio of prior regulation, determine the usage charges of the electric motor drive system of Power Cutback, and pay.Here said " usage charges " are not " usage charges of the equipment of importing ", but after obtaining the saving amount of money of contracting paties A, some suitable amount of money of benefit expense that become obtained with contracting paties B.
When implementing this service, need not superfluous words, the service operator is for as (calling service-delivery machine in the following text) such as the motor of the inscape of the electric motor drive system of Power Cutback, frequency converter, data gathering system machines, can select to be to use service operator's self assets, still by using third-party assets to be used.
With reference to the accompanying drawings, more specifically illustrate.
Fig. 1 represents that contracting paties A provides object load equipment described later, and signs the contract (comprising the contract that the benefit expense is distributed) of regulation between contracting paties B, handles the situation that expense is drawn of carrying out by capital company.The contract that contracting paties A (user), contracting paties B (ISP) and capital company are signed is represented with arrow 14.
So-called object load equipment as previously mentioned, is the equipment with fan or blower fan 1, pump machine 2 etc. that uses in factory etc., and these are not the major equipments of producing or making, though power consumption greatly strategy of Saving Energy part not prompt enough become object.The object load equipment is not limited to fan, blower fan, pump machine.The equipment with motor of power consumption all can become object.In these equipment, various motor 3,4 are taken as drive source and use.Therefore, the user entertains a kind of expectation mostly for the operation of these equipment or machine, and that is exactly to make every effort to energy-conservation under the prerequisite of not investing as far as possible.
The ISP measures the current power consumption before frequency converter imports of the equipment of wishing energy-conservation user, perhaps considers various change essential factors, revises its power consumption, obtains the current power consumption before frequency converter imports of this equipment.These data and result of calculation are shown to the user.
Then, the ISP, the object load equipment to the energy-conservation user of hope is provided with frequency converter separately, or complete frequency converter and the new motor of being provided with.If the user wishes renewal of the equipment, so with complete settings such as new motor and frequency converter, fan, blower fans.Frequency converter 5,6 is connected with these motor 3,4, makes it possible to carry out the rotating speed control of the motor 3,4 that frequency converter 5,6 realizes.The contracting paties A that collects according to monitoring arrangement 7 establishes the power consumption data of motor before frequency converter imports that the object load equipment is connected, obtains the preceding function of Power Cutback.This performance as described later, is used to the setting of the preceding treaty conditions curve of Power Cutback.
Use frequency converter 5,6 to carry out the new equipment under the control of motor 3,4 rotating speeds, the power consumption of machine, the monitoring arrangement 7 that is provided with by contracting paties B monitors, Frequency Converter Control service data as the electricity usage amount is obtained, and is used in the calculating of this service data.
Machines such as frequency converter 5,6, monitoring arrangement 7 are paid by contracting paties B, and in this case, the user can not be required that machine pays needed expense.Based on more than, between user and the ISP, can inquire into the distribution of benefit expense.At this moment, the ISP will consider expenses such as the frequency converter that is arranged in the subscriber equipment, motor, fan, blower fan, pump machine (be mostly rent for a long time or short-term lease).That is to say that this expense be can't help burden for users, it is comparatively reasonable to take out from the benefit expense.
Except machine was paid, the relevant operational management and the after sale service of frequency converter 5,6 also was to be undertaken by the ISP.These are by arrow 11 expressions.
Between user and the ISP, sign the importing contract of Power Cutback electric motor drive system, it comprises the benefit expense that the frequency converter rotating speed is controlled the Power Cutback that is brought.
The Frequency Converter Control service data is used as Working state data and is obtained by the Long-Range Surveillance System 20 of contracting paties B.This is by arrow 13 expressions.
Contracting paties B is on Long-Range Surveillance System 20, calculate the frequency converter rotating speed and control the amount of money of the Power Cutback that is brought, according to the ratio of stipulating in advance, the usage charges of the electric motor drive system of calculating and definite Power Cutback, carry out Request Processing. that is to say, contracting paties A and B are according to the ratio of stipulating (Total Return Ratio) in advance, share energy-conservation part. still, in this contract, subject machine (the fan of its qualification, blower fan, the pump machine) amount of energy saving, meeting changes along with the variation of the working condition of the production line that comprises this machine, so can not become the object of assurance. for this reason, this contract is not only to distribute at " surpass a certain amount of energy-conservation part ", no matter but energy-conservation part is to be greatly little, all distribute together according to Total Return Ratio.
Gained benefit expense is made the benefit notice by contracting paties B to contracting paties A.This is by arrow 12 expressions.This Request Processing as shown in the figure, can utilize the financial institutions such as capital company that frequently used on money payment to carry out.In this case, as shown in arrow 14, also sign the contract that is used for intermediary between contracting paties A and the capital company.The benefit notice is also sent to capital company by contracting paties B.This is by arrow 15 expressions.
Contracting paties B also can sell self-produced motor, frequency converter to capital company, and with its contracting paties B that grants for a long time, contracting paties B also can import motor, frequency converter to contracting paties A.
According to the benefit notice, contracting paties A takes to contracting paties B payment benefit through capital company.This is by arrow 16,17 expressions.In addition, charge operation is not limited to capital company, also can utilize mechanisms such as bank and other financial mechanism, post and telecommunications office, convenience store.
When directly signing a contract between contracting paties A and contracting paties B, will become Fig. 2, essence is identical with Fig. 1, so no longer repeat specification.
Service-delivery machines such as motor, frequency converter, monitoring arrangement are the belongingss of contracting paties B, or the contract article of contracting paties B long-term lease, or the short-term lease article, and they are set at the factory of contracting paties A under the situation of not having the investment in early stage.Can formulate separately for the executive cost of installing, the scrap build expense of contracting paties A etc.
Contracting paties A uses the object load equipment by being fit to the rotating speed that frequency converter the carried out control of operation.Fig. 3 represents to collect the method for the power consumption before frequency converter imports.
In Fig. 3, object load equipment 31 in the system 30 is connected with drive motor (IM) 32, current transformer (CT) 33, transformer (VT) 34 are arranged on the circuit that connects motor 32, by the galvanometer and the voltmeter that are connected with them electric current, voltage are measured.In addition, detect flow, pressure even load from object load equipment 31.These signals that measure, detected signal are transferred into the monitor unit 25 of the surveillance 24 of Working state data collection system 22.According to the data of such collection, statistics, measure the operational data before frequency converter imports, its result is transferred into calculation element (PC) 26.
Above-mentioned Working state data collection system 22 is collected the working condition of object load equipment 31 as the preceding operational data of frequency converter importing.And, the operational data the when frequency converter when collection is carried out rotating speed control operation by frequency converter moves.The operational data that measures, described later as object load equipment 31, be used as the basic data of setting the treaty conditions curve.
Above-mentioned Working state data collection system 22 is by forming with the lower part: collect the frequency converter field evidence surveillance 24 (comprising monitor unit 25), possess the calculation element (PC) 26 of memory storage, with the communication system 27 of power consumption notification contracting paties B.The memory storage that calculation element 26 is had, the operational data of conservation object load equipment 31 before frequency converter imports.
The operational data that measures just with the object load device make the corresponding power consumption of momentum, the LAN36 through communication system 27, for example modulator-demodular unit (modem) 35 or contracting paties A reaches contracting paties B by e-mail.This delivers letters 1 time on the one automatically is enough to, but also can carry out all the time.The collection of above-mentioned information, as Fig. 1 or shown in Figure 2, the Long-Range Surveillance System 20 that can utilize contracting paties B to be had carries out.That is to say that above-mentioned power consumption can be received by Long-Range Surveillance System.Long-Range Surveillance System 20 plays the effect of data processing equipment, can carry out calculation process described later.
The data of Jie Shouing are reached the data processing equipment 21 in the Long-Range Surveillance System 20 like this, are kept in the memory storage 23.
Fig. 4 represent to frequency converter INV be arranged under the situation that is rotated control in the system, frequency converter after importing be rotated the control running by frequency converter the time operational data device, the method for collecting.The formation identical with Fig. 3 can be by additional phase numbering together, no longer repeat specification.
In example shown in Figure 4, system 30 is provided with frequency converter (INV) 5,6, and the upstream side of this frequency converter 5,6 has to be measured with current transformer 33, measuring transformer 34.The downstream of frequency converter 5,6 newly is provided with to be measured with current transformer 43, measuring transformer 44.
By electric current, the voltage that current transformer and transformer are measured, reached the monitor unit 25 of surveillance 24.In addition, the momentum of doing with the flow of object load equipment 31, object load equipment that the pressure even load is represented is reached monitor unit 25 too.In this case, the further temperature of detected object load equipment 31 and vibration reaches monitor unit 25.This detected value is used to keep in repair in the future.Like this, do with frequency converter imports back object load equipment that the corresponding power consumption of momentum is measured comes out, the operational data after importing as frequency converter is stored in the memory storage of calculation element 26.
Then, make the corresponding power consumption of momentum with frequency converter imports back object load equipment, i.e. operational data reaches the memory storage 23 of data processing equipment 20 of the Long-Range Surveillance System 20 of contracting paties B by communication system 27.This delivers letters 1 time on the one automatically is enough to, but also can carry out all the time.
Above-mentioned information gathering, as Fig. 1 or shown in Figure 2, the Long-Range Surveillance System 20 that utilizes contracting paties B to be had carries out.Operational data after the frequency converter of collecting imports can be stored in the Long-Range Surveillance System 23.
Fig. 5 and Fig. 6 represent to generate according to following two kinds of power consumptions the method for treaty conditions curve.The one, the object load equipment that the object load equipment 31 before importing at frequency converter is obtained make the pairing power consumption of momentum data; Another be the object load equipment obtained of the object load equipment 31 after importing at frequency converter make the pairing power consumption of momentum data.
At first, as shown in Figure 6, concern designated with the corresponding power consumption of momentum data of doing of object load equipment.Shown in Figure 6 is, uses blower fan as the object load equipment, adopts air quantity as making the momentum data, with situation about representing with respect to specified 100% ratio.According to measured value, make the pairing power consumption kw of air quantity % (X-axis) (Y-axis) after frequency converter imports.The two relation as shown in Figure 6, can be set at curve.Like this, the calculation element 26 of Working state data collection system 22, according to the working signal of frequency converter of input, the operational data all the time of the drive motor 32 after frequency converter imported is a power consumption data, carries out calculation process, generates this power consumption data.This power consumption data is set according to following relation, promptly with calculate frequency converter and import after all the time power consumption the time, the relation of making the momentum data of the object load equipment 31 that is detected and imports, for example as mentioned above and the relation between the air quantity %.
Be expressed as shown in Figure 5 with the corresponding power consumption % of air quantity % (consumption ratio) of such setting to specified 100%.Expression power consumption % is the power consumption characteristics curve to the figure line of the relation of this air quantity %, when its expression is carried out rotating speed control with frequency converter and the corresponding power consumption % of air quantity % all the time.
Before frequency converter imports, all the time the power consumption data of the object load equipment of measuring according to the calculation element 26 of Working state data collection system 22 31, the air quantity % (making the momentum data) of the object load equipment 31 before frequency converter imports is kept in the memory storage of calculation element 26 in advance with the relation of power consumption data.
Under this situation, in Fig. 5, frequency converter during the air quantity % of frequency converter rotating speed control power consumption characteristics curve down imports preceding power consumption, determine with reference to the air quantity % and the power consumption data that are kept in the memory storage, when distributing air quantity % to the air quantity % that is stored in the memory storage 23, when obtaining at some, set out a curve according to these points. the family curve before it imports as frequency converter, being configured to air quantity % is X-axis, power consumption kw is the coordinate of Y-axis. therefore, when determining all the time the air quantity % in frequency converter when operation, can be according to the illustrated blower fan power consumption characteristics of Fig. 5 figure line, promptly, point on the power consumption characteristics curve before frequency converter imports, with on the X-axis with it point on power consumption characteristics curve after corresponding frequency converter imports poor, obtain the saving power consumption. this saving power consumption is stored in the memory storage 23.
Like this, the data processing equipment that constitutes by Long-Range Surveillance Unit 20, receive detected all the time air quantity % (making the momentum data) and power consumption all the time when carrying out rotating speed control after frequency converter imports, the frequency converter that utilization is kept at as the treaty conditions curve in the memory storage 23 imports preceding air quantity % (making the momentum data) and the relation between the power consumption data, calculate the power consumption before the corresponding frequency converter of detected all the time air quantity % (making momentum) imports when carrying out rotating speed control after importing with frequency converter, according to the frequency converter with the treaty conditions curve calculation being imported the preceding power consumption that adds up of frequency converter importing that preceding power consumption all the time adds up and obtains, add up and the frequency converter the obtained power consumption that adds up after importing poor with the power consumption all the time after frequency converter is imported, calculate the amount of saving energy (amount of energy saving).
The example of the power consumption characteristics when like this, the load equipment 31 of Fig. 5 indicated object adopts blower fan.Among the figure, characteristic (1) is the power consumption characteristics curve of the relation of the corresponding power consumption (%) of the air quantity (%) when sucking air door control before the expression frequency converter imports.This characteristic (1) is prescribed as frequency converter and imports preceding Working state data, is adopted in treaty conditions, becomes the treaty conditions curve.Therefore, the power consumption characteristics curve that treaty conditions curve and characteristic (1) are showed is synonym on technological layer.
The treaty conditions curve is by 4 curves of ax4+bx3+cx2+e, 3 curves of bx3+cx2+dx+e, 2 curve representations of cx2+dx+e.Perhaps, in requirement aspect client etc. in particular cases, also can represent sometimes, in this case, become the treaty conditions straight line with 1 figure line of dx+e.Therefore, adopted treaty conditions line can be treaty conditions curve or straight line.Therefore, can unitedly call and make contract condition line.Below, the example that uses typical treaty conditions curve is described, but also comprises the situation that changes the treaty conditions straight line into.
Characteristic (2) is illustrated in not adopt and sucks air door control, and the corresponding relation of the air quantity (%) when adopting the rotating speed control of frequency converter and power consumption (%).This characteristic (2), the power consumption characteristics curve of the operational data when carrying out rotating speed control operation by frequency converter for expression.With with amount (%) as benchmark, deduct numerical value on the characteristic (2) by the numerical value on characteristic (1), calculate saving power.
Though above-mentioned example is the explanation to blower fan, fan, pump machine or miscellaneous equipment for other also can calculate saving power equally.
As above,, the parameter (example: air quantity, flow etc.) and the power consumption of this moment of expression equipment work situation are measured by Working state data collection system 22.According to measurement result, make the treaty conditions curve before frequency converter shown in Figure 6 imports, and regard it as treaty conditions.Fig. 6 represents the relation of air quantity % and power kw, and expression imports preceding treaty conditions example at the frequency converter of blower fan.
Fig. 7 represents the calculated example of Power Cutback effect.By Long-Range Surveillance System 20, the parameter (example: air quantity, flow etc.) and the power consumption of this moment of expression equipment work situation are measured.Treaty conditions curve before frequency converter when using measurement result and setting up contract imports, shown in the image pattern 7 like that, calculate the effect of Power Cutback.Expression is according to the electric weight kwh that adds up of moment unit among the figure.Among the figure, according to calculate by the treaty conditions opisometer, the power consumption of frequency converter before importing, add up the electric weight that adds up, then, the operating electric power that adds up of Spin Control that carries out according to frequency converter, add up the electric weight that adds up constantly, when finishing in one day, obtain the effect of one day Power Cutback according to the difference of the two.
Effect according to Power Cutback is promptly saved electric weight, by multiply by the electric weight of each unit, obtains the benefit expense, and contracting paties A, B can be according to circumstances, the benefit expense is embodied in and capital company between on the treaty content of deciding through consultation, carry out the Request Processing of expense.From this side of contracting paties A, for being used for the processing that requested fee uses.
Benefit part for the Power Cutback that equipment operation brought of new importing, pay contracting paties B. and that is to say as returning benefit for example being equivalent to its half the amount of money, after realizing energy-saving effect, a back pair benefit is taken. for the benefit of Power Cutback, the content that contracting paties B decides through consultation between the litigant as agreed in advance, operational data according to reality is calculated, notified contracting paties A. in every month in addition, for operational data, contracting paties B can confirm the data of contracting paties B before carrying out Request Processing.
Like this, take, just can carry out the Request Processing of expense according to benefit.In addition, about safeguarding that contracting paties B gratuitously implements, and also can allow contracting paties A carry out current check.
According to the power consumption as operational data that is transmitted, the data processing equipment 21 that can utilize contracting paties B to be had calculates the benefit expense of saving electric weight even reducing at once.In addition, in Working state data collection system 22, data processing function is set, this result is sent to data processing equipment 21, also can obtain identical result.The notified contracting paties A of operation result.In addition.Can calculate the benefit expense by Working state data collection system 22.In order to transmit result of calculation and two operational datas that benefit is taken, preferably on constituting, system uses the mode of Long-Range Surveillance System 20 to contracting paties B.Thus, form the operational management that determines by Long-Range Surveillance System 20.
Fig. 8 represents to be used for the process flow diagram of Request Processing.As shown in the drawing, the flow process that is used for Request Processing is: according to market survey, carry out pretesting (S1); Obtain the application data of contracting paties A, propose to allow contracting paties B that the scheme (S2) of service is provided by contracting paties A; Based on contract the device context of litigant A investigation, the research property adjusted (S3); Measure, collect the Working state data before frequency converter imports, it is collected (S4) as Working state data; The collection of these data was carried out for example 2 months, carried out data analysis, final accounting investigation (S5) thus; Sign the use contract (S6) of equipment then; Drop into frequency converter (S7), thereby frequency converter (S8) is set; The frequency converter that utilization imports is collected (S9) by the operational data that the Spin Control operation of frequency converter is carried out, and generates by the treaty conditions curve (S10) shown in the characteristic (1); Thus, calculate saving power, saving electric weight (S11).According to 2 Working state datas that obtain, calculate benefit, carry out benefit notice, fee request processing (S12); Implement after sale service (S13) thereafter.
According to such present embodiment, the benefit of contracting paties A (user) is as follows:
(1) can make power equipment realize energy-conservation with motor.
(2) can under the situation of not having the investment in early stage, realize energy-conservation.
(3) can not do useless investment confirming to set up contract after the power consumption effect.
(4) can realize saving the power operation, realize the funds saving of equipment initial setting.
(5) can cut down CO
2Discharging.
On the other hand, the benefit of contracting paties B (ISP) is as follows:
(1) can guarantee to take the income of bringing by benefit.
(2) can start the new markets of motor, frequency converter.
(3) by adopting remote system, can make contracting paties A carry out operational management easily, and reduce overhead cost.
As above,, constituted the energy-saving run assisting system 100 of the Power Cutback effect that calculates energy-saving run as Fig. 1, Fig. 2, shown in Figure 4.
The data processing equipment 21 of this energy-saving run assisting system 100 has image display device 200.
The picture portion 50 of Fig. 9 to Figure 14 presentation video display device 200.
The 1st picture 51 of the picture portion of image display device, above-mentioned object load equipment made momentum and power consumption as coordinate axis, show above-mentioned treaty conditions curve 60, with show under the situation of the rotating speed control in expression frequency converter when operation and all the time the above-mentioned power consumption characteristics curve 61 of making the corresponding power consumption of momentum, according to power consumption characteristics curve 61, all the time power consumption was carried out figure line and is shown when frequency converter was moved, utilize treaty conditions curve 60, energy-saving power during with the operation of this frequency converter, figure line 62. usefulness the figure lines 64 that are shown as the power consumption before the performance frequency converter imports show the poor of power consumption when power consumption before frequency converters import and the frequency converter on the power consumption characteristics curve 61 move.
The 2nd picture 52, be presented at one day each official hour of process, utilize treaty conditions curve 60, power consumption all the time before the frequency converter that calculates imported adds up and the frequency converter obtained add up electric weight 71 and the power consumption all the time when frequency converter move before importing adds up and the electric weight 72 that adds up during the frequency converter operation obtained, and with the difference of these two electric weight that add up with figure line 73 demonstrations.
The 3rd picture 53 shows the stipulated time corresponding to one day, and each stipulated time display object load equipment made momentum 74.This routine situation is to adopt running frequency as making momentum.
In these pictures, the P of Y-axis represents power consumption, and average running frequency hourly is represented in the below, and its below performance load is made momentum when promptly showing voltage, current constant.T represents 1 day institute's elapsed time.
The 4th picture 54 with numeric representation energy-saving power 81, power input 82 and running frequency 83.
The 5th picture 55, setting button 84, the start situation 86 of expression actuator state 84 and actuator state.Start situation 86, the state of expression pump 1, pump 2, pump 3 are normally or unusual.The 5th picture 55 is provided with model specification button 85.Treaty conditions curve 60 and power consumption characteristics curve 61, the support service object load equipment to each energy-saving run that is provided by the ISP all is kept in the memory storage 23 as model.Be presented at the model specification button 85 selected models on the 5th picture 55, on the 1st picture 51, set demonstration.Net connects 87 to be used when connecting Net.
The add up figure line 52 of electric weight of expression during the shown expression frequency converter operation of the figure line 63 of the power consumption all the time during to the shown expression frequency converters operation of the 1st picture 51 and the 2nd picture uses with a kind of color; The figure line 64 of the difference of the power consumption all the time when representing that power consumption all the time before the shown expression frequency converters of the 1st picture 51 import is moved with frequency converter, the figure line of the difference of all the time the power consumption of the electric weight that adds up before importing with the shown expression frequency converter of expression the 2nd picture during with the frequency converter operation uses with a kind of color, and the figure line employed color of this color when above-mentioned frequency converter moves is different.
The figure line of the difference of the above-mentioned power consumption of expression that the 1st picture 51 is shown is striden power consumption characteristics curve 61 and is shown, in the 4th picture 54, above-mentioned energy-saving power is carried out numerical value show.
In addition, in the 3rd picture 53, also be provided with voltage, the voltage button 88 of current situation, electric current button 89 when being used for observing the frequency converter operation.
The as above shown figure line of each picture of the picture portion 50 of Gou Chenging with the passing interlock of the various data of following operation, as Fig. 9-shown in Figure 12, is passed, transition.In these figure, the demonstration of the figure line 64 of the difference of the figure line 63 of shown performance power consumption and performance power consumption is passed all the time with the variation of running frequency, is changed on the 1st picture 51.Also have, the demonstration of the figure line of the power consumption of obtaining on the expression treaty conditions curve 60 62 is also passed all the time, is changed.Can confirm the figure line of these performance power consumptions, pass by switching to new demonstration all the time.Therefore, in the present embodiment, the so-called power consumption that shows all the time is not moment, but as the power consumption of the mean value in the short time.
In addition, the demonstration of the figure line 73 of the difference of the figure line 52 of the performance power consumption number of expression and performance power consumption number was appended on each stipulated time of process in the 2nd picture 52, the mode of understanding in one day with the passing of the difference of the power consumption number that adds up and power consumption number shows with the figure line of passing.Though these figure lines are to represent with bar-shaped, other display packing also can be selected for use.These are passed, and constantly are appended to show in the chart that adds up.
In order to calculate energy-saving effect, can confirm, understand its result at a glance, show power consumption and the relation of making momentum data (running frequency data), and the power consumption of being obtained by power consumption is very important.For ISP's side and customer side, these three elements are presented on the picture, a glance just can be understood its passing, and is extremely important for the correctness aspect of guaranteeing computing.
In addition, for the shown running frequency of the 3rd picture 53, also can continue to show one day operation process.To the division of a continuous time, choose the same scale of T that shows with the 2nd picture.
In the picture of Fig. 9-shown in Figure 11, running frequency almost is to pass in the same manner, but image pattern 12 is such sometimes, produces bigger vibration in the object load equipment.Under this situation shown in Figure 12, also can come display voltage situation 91 by clicking voltage button 88 as shown in figure 13, as shown in figure 14, show current situation line 92 by clicking voltage button 89, thereby confirm voltage or electric current.Usually, electric current and voltage is to fix with certain value.
Like this, in the 1st picture 51, according to power consumption characteristics curve 61, with the passing of figure line 63, the passing of the power consumption all the time when showing the frequency converter operation; On treaty conditions curve 60, with the passing of the figure line 62 that shows the power consumption before frequency converter imports, the passing of saving power when showing the frequency converter operation; With the passing of figure line 64, the passing of the difference of the power consumption when showing the operation of above-mentioned power consumption and power consumption characteristics curve upconverter.
The 2nd picture 52, one day each official hour of process, show: performance utilizes treaty conditions curve 60, the power consumption all the time before the frequency converter that calculates is imported adds up and the passing of the figure line of the passing of the frequency converter the obtained power consumption that adds up before importing; Power consumption all the time when performance moves frequency converter adds up and the passing of the figure line 72 of the electric weight that the adds up during operation of the frequency converter obtained; And, the passing of figure line 73 that shows the difference of these electric weight that add up.
The 3rd picture 53, corresponding one day stipulated time shows the passing of making momentum 74 of above-mentioned object load equipment to each stipulated time.
As above, the 1st picture of the picture portion of the image display device of data processing equipment, with above-mentioned object load equipment make momentum and power consumption as coordinate axis, show: said contract condition curve or straight line; Carry out during with the operation of the above-mentioned frequency converter of performance showing under the rotating speed control situation and all the time the above-mentioned power consumption characteristics curve of making the corresponding power consumption of momentum data, and the passing of the power consumption all the time when above-mentioned frequency converter is moved, be shown as passing according to the figure line of above-mentioned power consumption characteristics curve performance, the passing of saving power during with the operation of this frequency converter is shown as power consumption before the frequency converter that is set on the said contract condition curve imports, the passing of the figure line of the difference of the power consumption during with the frequency converter operation that is set on the power consumption characteristics curve.
The 2nd picture, to one day each official hour of process, above-mentioned power consumption all the time before the frequency converter that utilizes said contract condition curve or straight line to calculate imported adds up and the passing of the frequency converter the obtained power consumption that adds up before importing, and is shown as the passing of figure line; Above-mentioned power consumption all the time in the time of will be to the operation of above-mentioned frequency converter adds up and the electric weight that adds up during the frequency converter operation obtained is passed, and is shown as the passing of figure line; Passing with the difference of these electric weight that add up is shown as the passing of figure line.
The 3rd picture, shows the passing of making momentum of the above-mentioned object load equipment of each stipulated time at the corresponding above-mentioned one day stipulated time.
The 1st above-mentioned picture, the 2nd picture, the 3rd picture, can all arrange simultaneously and be presented in the above-mentioned picture portion 50, but also can for example only the 1st picture be presented at above-mentioned picture portion 50, operation according to the rules then, the 2nd picture that switches to other waits and shows.Certainly, show simultaneously that once any 2 pictures are also harmless.
Like this, according to present embodiment, the energy consumption in the time of can making the control of non-frequency device (comprises power consumption, CO
2Discharge capacity etc.) and the energy resource consumption during Frequency Converter Control, mode with image, constantly be presented on the same picture, be convenient to visual mutual comparison, like this, poor as above-mentioned energy consumption, energy-saving efficiency can be easy to be understood. and in addition, first picture shows the passing of Power Cutback all the time with the passing of figure line; Second picture shows the add up passing of the electric weight that adds up of the saving that obtains of the stipulated time of one day process with the passing of figure line; So what three-picture showed air quantity for example makes the momentum data., be easy to the saving power consumption effect that will calculate and its according to together grasping, can provide a kind of show with picture the passing all the time of saving the power consumption effect, energy-saving run assisting system and energy-saving run support method thereof.
[embodiment 2]
Below, the load equipment that utilizes the telemonitoring server to monitor simultaneously to be arranged on a plurality of strong points and second embodiment of frequency converter are described.In the present embodiment, the Working state data collection system 22 of embodiment 1 is become monitoring arrangement A2, combination with the data processing equipment 21 of embodiment 1 and memory storage 23 becomes telemonitoring server A 1 in addition, the telephone wire of embodiment 1 is become network A 7 describe.Here be that the part that distortion is appended is described, and the part of omission explanation is with reference to embodiment 1.Particularly, for the making of treaty conditions curve, can be similarly to Example 1.Certainly, also can make the treaty conditions curve with other method.
Figure 15 represents the formation of the load equipment Long-Range Surveillance System of the 2nd embodiment, it is the structural drawing of data distributing system, this data distributing system comprises: from connecting by network A 7 and being arranged on all load equipment A3, motor A4, frequency converter A 5 in the strong point A6 of each strong point A6, collect the monitoring arrangement A2 of the data of relevant working condition; From the monitor unit collection work status data at all strong points, point out the telemonitoring server A 1 of the working condition of load equipment according to the form of user's request.In each strong point, load equipment A3, motor A4, frequency converter A 5 in groups, monitor unit carries out the supervision of working condition, the collection of data to the group of all load equipments in the strong point.
Next, the details to each device below describes.
Figure 16 is that the device of telemonitoring server A 1 constitutes.Telemonitoring server A 1 comprises: CPU (A12), the storer A16, hard disk A14, output device A15, the network interface A10 that are connected with bus A18, the packet transmission acceptance division A101 by network interface A10 communicates with network A 7.Among the hard disk A14, deposited load equipment job information database (DB) A141 that preserves the information of relevant working conditions such as frequency converter identifier, frequency converter kind, power consumption, rotation speed of the fan; Load equipment regulation power information DBA143 with the computing method of the electric quantity consumption of the regulation of preserving load equipment is stored device A16 and goes up the load equipment operational data handling procedure A161 read-write of loading.Load equipment operational data handling procedure A161 can be kept on the recording mediums such as CR-ROM and issue.
Load equipment operational data handling procedure A161 on the storer A16 comprises: the load equipment operational data A1611 of management department that the load equipment working condition at each strong point of receiving from monitor unit A2 is managed; With according to customer requirements, the load equipment operational data handling part A1613 that the working condition of load equipment is handled, shown.The section of communicating by letter (session) between the communication monitoring timer A1615, monitoring remote monitor server A1 and monitor unit A2 detects wrong generation.
Each record of load equipment job information DBA141 is by constituting with the lower part: specify the group identifier that divides into groups under the frequency converter; Specify the frequency converter identifier of frequency converter; The frequency converter kind; Frequency converter work fate; The regulation electric weight that load equipment consumes under the idle situation of frequency converter; The power consumption that possesses the load equipment actual consumption of frequency converter; Be used for the rotating speed of fan of load equipment control or the flow of pump machine; As afore mentioned rules electric weight and differing from of above-mentioned power consumption and the energy-conservation electric weight that calculates; The energy-saving efficiency that calculates in the shared ratio of afore mentioned rules electric weight as above-mentioned energy-conservation electric weight; With the data aggregation moment.For group identifier, what generally use is the identifier of expression strong point name, but its purposes is not limited thereto.
Each record of load equipment regulation power information DB is by constituting with the lower part: specify the group identifier that divides into groups under the frequency converter; Specify the frequency converter identifier of frequency converter; The treaty conditions curve formula of the regulation electric weight that is consumed with computational load equipment under the idle situation of frequency converter. treaty conditions curve formula, be the calculating formula that output is used for the rotation speed of the fan or the pump machine flow of Motor Control, be used for asking the situation of regulation electric weight according to input value.
Next, Figure 17 is the device formation of monitor unit A2.Monitor unit A2 comprises: CPU (A22), the storer A26, hard disk A24, output device A25, the network interface A20 that are connected with bus A28, the packet transmission acceptance division A201 by network interface A20 communicates by letter with network A 7.Among the hard disk A24, deposited load equipment job information database (DB) A241 of the information of relevant load equipment working conditions such as preserving frequency converter identifier, frequency converter kind, power consumption, the load equipment supervisory programme A261 that go up to load by storer A26 and being read and write.Load equipment supervisory programme A261 is kept on the recording mediums such as CR-ROM and issues.
Load equipment supervisory programme A261 on the storer A26 comprises: the load equipment operational data A2611 of management department that the load equipment operational data that each load equipment A3, motor A4 in the strong point and frequency converter A 5 received manages; With the load equipment operational data sending part A2613 that the working condition of load equipment is sent to telemonitoring server A 1.The section of communicating by letter between the communication monitoring timer A2615, monitoring remote monitor server A1 and monitor unit A2 detects wrong generation.
Below, load equipment job information DB241 institute information of managing is described.Each record of load equipment job information DB241 is by constituting with the lower part: the frequency converter identifier of specifying frequency converter; The frequency converter kind; Frequency converter work fate; The regulation electric weight that load equipment consumes under the idle situation of frequency converter; The power consumption that possesses the load equipment actual consumption of frequency converter; Be used for the rotating speed of fan of load equipment control or the flow of pump machine; The energy-conservation electric weight that calculates as the difference of afore mentioned rules electric weight and above-mentioned power consumption; The energy-saving efficiency that calculates at the shared proportional meter of afore mentioned rules electric weight as above-mentioned energy-conservation electric weight; Collection time with data.In these information, frequency converter identifier, frequency converter kind are that frequency converter A 5 keeps as eigenvalue, can not change.The flow of the rotating speed of frequency converter work fate, power consumption, fan/pump machine, data aggregation are collected from load equipment A3, motor A4, frequency converter A 5 by various sensors constantly.Regulation electric weight, energy-conservation electric weight, energy-saving efficiency are by the telemonitoring server notification.Describe in detail after the update method of relevant these data.
Next, the sequential chart that reference is shown down, the molar behavior of the Long-Range Surveillance System of load equipment disclosed by the invention is described. Figure 18 is configured in strong point 1 (A6-1) respectively, monitor unit 1 (A2-1) on the strong point M (A6-M) and monitor unit M (A2-M), the basic sequence of the load equipment job information in telemonitoring server A 1 transmission strong point. monitor unit 1 (A2-1) utilizes various sensors, all load equipment A3-11~A3-1N from the strong point in 1 (A6-1), motor A4-11~A4-1N, frequency converter A 5-11~A5-1N collects essential information. for example, the frequency converter identifier, the frequency converter kind is the data that frequency converter possesses substantially, the work fate can calculate according to the work zero hour and the current time of load equipment, power consumption can be obtained from frequency converter, the flow of the rotating speed of fan or pump machine can be collected from the instrument of the fan that is used for Motor Control or pump machine, data aggregation obtains as the timestamp in the moment of collecting these data constantly. monitor unit A2-1, these data are sent (step S1-01) as the Working state data of strong point 1 (A6-1) to telemonitoring server A 1. Figure 21 represents the form of Working state data. Working state data PF-01, by constituting: transmission source address with the lower part, destination-address, the packet kind, the group identifier at expression strong point, the frequency converter identifier list of all frequency converters and frequency converter kind tabulation in the strong point, the working day ordered series of numbers table of all load equipments in the strong point, the power consumption tabulation, the all fan that is used for Motor Control or the rotation speed of the fan of pump machine or tabulation of pump machine flow in the strong point, the tabulation of the collection time of all these data. Working state data, load equipment A3 that can be in the strong point, motor A4, any one sends frequency converter A 5 when changing one by one, also can be when every certain unit interval through system regulation, no matter send to the tabulation of all data that receive till this moment. on which on opportunity, receive the telemonitoring server A 1 of Working state data from monitor unit A2-1, all with the group identifier among the Working state data PF-01 and frequency converter identifier as search key, DBA143 retrieves to load equipment regulation power information, extract corresponding record out. corresponding record, be and strong point 1 (A6-1) interior a certain load equipment, motor, the corresponding data of the group of frequency converter, specify by the frequency converter identifier. here, as an example, can think and obtain with load equipment 1-1 (A3-11), motor 1-1 (A4-11), the corresponding treaty conditions curve of frequency converter 1-1 (A5-11) formula. telemonitoring server A 1, according to the treaty conditions curve formula that obtains by above-mentioned steps, rotation speed of the fan/pump machine flow with the Working state data PF-01 that receives among the step S1-01, obtain the regulation electric weight of load equipment 1-1 (A3-11). then, poor according to the power consumption in regulation electric weight of calculating and the Working state data, calculate the energy-saving power of saving by frequency converter 1-1 (A5-11). obtain energy-saving efficiency as energy-conservation electric weight again in the shared ratio of afore mentioned rules electric weight then. the regulation electric weight that in above-mentioned steps, calculates, energy-conservation electric weight, energy-saving efficiency, with the group identifier that is included in the Working state data, the frequency converter identifier, the frequency converter kind, the work fate, power consumption, rotation speed of the fan/pump machine flow and data aggregation group constantly, be used as new data, sign in among the load equipment job information DB141. when login, pass through group identifier, whether frequency converter identifier and data obtain the time decision data is new data, if new data, just carry out data supplementing, if data with existing, just carry out Data Update. above-mentioned processing, all contained in the frequency converter identifier list to Working state data frequency converters carry out. its result, in this load equipment job information DB141, be added the new record that is equal to the quantity of frequency converter in the frequency converter identifier list. according to the tabulation of these new datas, extract group identifier respectively out, the frequency converter identifier, the frequency converter kind, the regulation electric weight, energy-conservation electric weight, energy-saving efficiency, data aggregation tabulation constantly, saving power notification message shown in the PF-02 of generation Figure 21, be sent to the monitor unit 1 (A2-1) (step S1-04) in the source that sends as Working state data, receive the monitor unit 1 (A2-1) of saving power notification, the frequency converter identifier list in the middle of the message is left in extraction in, the tabulation of frequency converter kind, the tabulation of regulation electric weight, energy-conservation electric weight tabulation, the energy-saving efficiency tabulation, the data aggregation time list. then, begin to handle from the front portion of tabulation, extract the frequency converter identifier out, the frequency converter kind, data aggregation constantly, with them as search key, load equipment job information DB (A241) is retrieved, obtain corresponding record, upgrade the regulation electric weight in this record, energy-conservation electric weight, the value of energy-saving efficiency.
The step that this is a succession of, with monitor unit A2 is that unit carries out, when the monitor unit M of strong point M (A2-M) when telemonitoring server A 1 sends Working state data (step S1-07), also carry out same processing, telemonitoring server A 1 will be saved power notification and be returned to monitor unit (step S1-10).
Next, with reference to the process flow diagram of Figure 19, the control that a routine telemonitoring server A 1 is carried out is described.This process flow diagram is that the cycle carries out according to the rules.Telemonitoring server A 1 is when starting (step F 1-01), and beginning message sink circulation (step F 1-04) receives the message from network A 7.Step F 1-07, judge that whether the message receive be the Working state data from monitor unit A2, if Working state data, just enter step F 1-16, from load equipment regulation power information DB (A143), take out be included in Working state data in group identifier and the corresponding treaty conditions curve of frequency converter identifier formula.Enter step F 1-19 then, the treaty conditions curve formula of obtaining according to step F 1-16, with the rotation speed of the fan/pump machine flow in the last Working state data that receives of step F 1-07, the computational rules electric weight, according to regulation electric weight that calculates and the power consumption in the Working state data, obtain energy-conservation electric weight and energy-saving efficiency.Then, at step F 1-22, judge whether obtain the time established data by the group identifier in the Working state data, frequency converter identifier, data is new data, if new data, just enter into step F 1-25, with new data supplementing to load equipment working condition DB (A141); If not new data, data are exactly data with existing, carry out the renewal of data with existing at step F 1-31.After finishing any processing, all enter step F 1-28, will save the load equipment monitor unit that power notification sends to relevant strong point.(F1-13) finished (F1-10) when message sink circulated in 1 shutdown of telemonitoring server A.By above processing, telemonitoring server A 1 manages the data from the monitor unit A2 at each strong point.
Next, process flow diagram with reference to Figure 20, the control that one routine monitor unit A2 is carried out is described. this process flow diagram is that the cycle carries out according to the rules. the circulation (step F 2-04) of monitor unit A2 (step F 2-01) beginning message sink when starting, reception is from the message of network A 7. and whether step F 2-07 judges to the Working state data of the load equipment that will collect and sends to opportunity of telemonitoring server A 1, if to the opportunity of delivering letters, just enter step F 2-19, will be from all load equipments in the strong point, motor, the frequency converter identifier that frequency converter is collected, the frequency converter kind, the work fate, power consumption, rotation speed of the fan/pump machine flow, data aggregation tabulation constantly, with group identifier, be sent to telemonitoring server A 1 as Working state data corresponding to the strong point; If be less than delivering letters opportunity of Working state data, just enter step F 2-10, if judge the saving power notification that whether receives from telemonitoring server A 1. receive the saving power notification, just enter step F 2-22, from save power notification message, extraction comprises the regulation electric weight, energy-conservation electric weight, all data of the tabulation of energy-saving efficiency. enter step F 2-25 then, with the frequency converter identifier, the frequency converter kind, data aggregation is search key constantly, retrieval load equipment job information DB (A241), obtain corresponding record, upgrade the regulation electric weight in this record, energy-conservation electric weight, the value of energy-saving efficiency. (F2-16) finished (F2-13) when message sink circulated in monitor unit A2 shutdown. and by above processing, monitor unit A2 manages the load equipment job information at each strong point.
Below, utilize Figure 22, in telemonitoring server and monitor unit, the basic picture of output load equipment work situation describes.Figure 22 is an example that monitors Guraphical User Interface (GUI) picture of load equipment working condition.Basic picture 01 is made up of following each several part: the title block G010 that shows strong point name and load equipment name; Load equipment the Show Button G011 that the load equipment that shows is switched; Set the display condition of display condition and set button G012; The state displaying panel G013 of performance load equipment running status; The power consumption numerical value display panel G014 that shows running frequency of energy-saving power, power input and performance rotation speed of the fan/pump machine water yield etc., data relevant with numerical value with power consumption; With regulation electric weight and the power consumption of reality and the relation of rotation speed of the fan/pump machine water yield of curve display load equipment, show the electric weight of saving and the powertrace display panel G015 of saving efficient with the vertical bar post; With the electric weight saved with save the electric weight sequential display panel G016 that efficient shows with strip chart as time series data; The variation of rotation speed of the fan/pump machine water yield is carried out the rotation speed of the fan/pump machine water yield sequential display panel G017 of curve display as time series data; Electric current and voltage the Show Button G018 with the display frame that is used for opening the voltage and current that shows frequency converter.
Figure 23 is an example from Figure 22 to the display condition of user prompt that set the GUI of picture G02 when pressing display condition setting button G012 among.Display condition is set picture G02, by constituting with the lower part: title G020; Be used for selecting the set condition of demonstration group to set panel G021; Be used for selecting the display items display of display items display to set panel G022; Further specify the Show Options of displaying contents to set panel G023 in detail with being used for.Set condition is set panel G021, and as the condition that is used for carrying out group selection, to two kinds of methods of user prompt: the strong point name is specified, the frequency converter kind is specified.In addition, for the monitor unit that monitors a strong point, the project of strong point name appointment is not shown.These two conditions also can and usefulness, can enumerate the frequency converter at certain strong point, perhaps enumerate specific frequency converter kind, and then only show the specific frequency converter kind at certain strong point.Display items display is set panel G022, and the condition to user prompt setting item display packing has as display packing: the method that shows the tabulation of all frequency converters that meet the specified condition of set condition setting panel G021; The method of total value that shows the data of all frequency converters meet above-mentioned condition; Meet the method for mean value of data of all frequency converters of above-mentioned condition with demonstration.Show Options is set panel G023, sets the data that panel G021 and display items display are set the condition that panel G022 sets to satisfying set condition, carries out the setting of subsidiary condition again.Have as setting the condition that panel G023 sets: the load equipment of energy-saving efficiency below the desired value of system's defined warned with Show Options; The load equipment of energy-saving efficiency below mean value warned; The load equipment that energy-saving efficiency is minimum is warned; The load equipment the highest to energy-saving efficiency highlights.The desired value of the energy-saving efficiency of system's defined is set when being started in system by the supvr.
Figure 24, it is the group setting panel G021 setting strong point 1 of setting picture G02 at display condition, each display items display of setting the basic picture G03. basic picture G03 under the situation of total value of panel G022 selection group internal burden equipment in display items display is identical with the basic picture G01 of Figure 22. the condition that sets at display condition setting picture G02, the title G030. that at first is reflected in basic picture G03 here, what title G030 showed is " strong point 1; total value ", the part at " strong point 1 " is represented strong point name or frequency converter kind class name, the part of " total value " is represented total value, mean value or current selecteed load equipment name. in display items display is under the situation of total value or mean value, all buttons of load equipment the Show Button G031 all are set as selection mode. and display condition is set the Show Options of picture G02 and is set the content that panel G023 sets, reflect by the color settings of load equipment the Show Button G031 being become to be different from usual color (Accent colour is if alarm is just with redness etc.).
Figure 25 is another example that monitors the GUI picture of load equipment working condition, is that the working condition with load equipment is shown as CO
2Basic picture G04 under the reduction situation.The fundamental that constitutes GUI is identical with Figure 22, but difference is also arranged: on the power consumption numerical value display panel G044 of the data that show relevant power consumption with numerical value, energy-conservation power consumption is used as CO
2Reduction shows, and possesses the switching push button G048 that demonstration is switched to energy-conservation electric weight.Like this, displaying contents just can be set picture G02 without display condition and be shown rapidly according to the form of customer requirements.
[embodiment 3]
In a second embodiment, the calculating of energy-conservation electric weight is carried out on the telemonitoring server, but also can allow the calculating of energy-conservation electric weight carry out in monitor unit, and reports to the telemonitoring server.Below, just the embodiment of situation that has a computing power of energy-conservation electric weight at monitor unit describes.
System's pie graph of embodiment 3 is identical with system's pie graph of embodiment 2.Formation occurs in Figure 15, so cast out explanation.
Figure 26 is that the device of the telemonitoring server A 1 of embodiment 3 constitutes.Telemonitoring server A 1 comprises: its packet by network interface A10 of CPU (A12), the storer A16 that is connected with bus A18, hard disk A14, output device A15, network interface A10 sends acceptance division A101, communicates by letter with network A 7.Deposited load equipment job information database (DB) A141 of the information of relevant working conditions such as preserving frequency converter identifier, frequency converter kind, power consumption, rotation speed of the fan among the hard disk A14, the load equipment operational data handling procedure A161 that go up to load by storer A16 and being read and write.Load equipment operational data handling procedure A161 can be kept on the recording mediums such as CR-ROM and issue.
Load equipment operational data handling procedure A161 on the storer A16 comprises: the load equipment operational data A1611 of management department that the load equipment working condition at each strong point of receiving from monitor unit A2 is managed; With according to customer requirements, the load equipment operational data handling part A1613 that the working condition of load equipment is handled, shown.Communication monitoring timer A1615 can monitoring remote the section of communicating by letter between monitor server A1 and the monitor unit A2, detect the generation of mistake.
Each record of load equipment job information DBA141 is by constituting with the lower part: specify the group identifier that divides into groups under the frequency converter; Specify the frequency converter identifier of frequency converter; The frequency converter kind; Frequency converter work fate; The regulation electric weight that load equipment consumes under the idle situation of frequency converter; The power consumption that possesses the load equipment actual consumption of frequency converter; Be used for the rotating speed of fan of load equipment control or the flow of pump machine; The energy-conservation electric weight that calculates as the difference of afore mentioned rules electric weight and above-mentioned power consumption; The energy-saving efficiency of calculating at the shared proportional meter of afore mentioned rules electric weight as above-mentioned energy-conservation electric weight; With the data aggregation moment.For group identifier, what generally use is the identifier of expression strong point name, but purposes is not limited thereto.
Next, Figure 27 is that the device of monitor unit A2 constitutes. monitor unit A2 comprises: CPU (A22), the storer A26, hard disk A24, output device A25, the network interface A20 that are connected with bus A28, it sends acceptance division A201 by the packet of network interface A20, with network A 7 communications. deposited the load equipment job information database A241 of the information of relevant load equipment working conditions such as preserving frequency converter identifier, frequency converter kind, power consumption among the hard disk A24; Load equipment regulation power information DB (A243) with the computing method of the regulation power consumption of preserving load equipment. go up the load equipment supervisory programme A261 that loads and read and write by storer A26. load equipment supervisory programme A261 can be kept on the recording medium such as CR-ROM and issue.
Load equipment supervisory programme A261 on the storer A 26 comprises: the load equipment operational data A2611 of management department that the load equipment operational data that each load equipment A3, motor A4 in the strong point and frequency converter A 5 received manages; With the load equipment operational data sending part A2613 that the working condition of load equipment is sent to telemonitoring server A 1.The section of communicating by letter between the communication monitoring timer A2615, monitoring remote monitor server A1 and monitor unit A2 detects wrong generation.
Below, load equipment job information DB241 information of managing is described.Each record of load equipment job information DB241 is by constituting with the lower part: the frequency converter identifier of specifying frequency converter; The frequency converter kind; Frequency converter work fate; The regulation electric weight that load equipment consumes under the idle situation of frequency converter; The power consumption that possesses the load equipment actual consumption of frequency converter; Be used for the rotating speed of fan of load equipment control or the flow of pump machine; The energy-conservation electric weight that calculates as the difference of afore mentioned rules electric weight and above-mentioned power consumption; The energy-saving efficiency that calculates in the shared ratio of afore mentioned rules electric weight as above-mentioned energy-conservation electric weight; Collection time with data.In these information, frequency converter identifier, frequency converter kind keep as frequency converter A 5 intrinsic values, can not change.The flow of the rotating speed/pump machine of work fate, power consumption, fan, data aggregation are collected from load equipment A3, motor A4, frequency converter A 5 by various sensors constantly.Regulation electric weight, energy-conservation electric weight, energy-saving efficiency are by the telemonitoring server notification.Describe in detail after the update method of relevant these data.
Each record of load equipment regulation power information DB (A243) is by constituting with the lower part: the frequency converter identifier of specifying frequency converter; The treaty conditions curve formula of the regulation electric weight that is consumed with computational load equipment under the idle situation of frequency converter.Treaty conditions curve formula is the calculating formula that output is used for the rotation speed of the fan or the pump machine flow of Motor Control, is used for asking according to input value the situation of regulation electric weight.
Next, with reference to the following sequential chart that shows, the molar behavior of the load equipment Long-Range Surveillance System of embodiment 3 is described.Figure 28 is monitor unit 1 (A2-1) and the monitor unit M (A2-M) that is configured in respectively on strong point 1 (A6-1), the strong point M (A6-M), the basic sequence of the load equipment job information in telemonitoring server A 1 transmission strong point.Monitor unit 1 (A2-1) utilizes various sensors, and all load equipment A3-11~A3-1N, motor A4-11~A4-1N, frequency converter A 5-11~A5-1N from the strong point in 1 (A6-1) collect essential information.For example, frequency converter identifier, frequency converter kind are the data that frequency converter possesses substantially, the work fate can calculate according to the work zero hour and the current time of load equipment, power consumption can be obtained from frequency converter, the flow of the rotating speed of fan or pump machine can be collected from the instrument of the fan that is used for Motor Control or pump machine, and data aggregation constantly can be a timestamp of collecting the moment of these data.
With the monitor unit A2 of above-mentioned data as the essential information reception, with the frequency converter identifier as search key, DBA143 retrieves to load equipment regulation power information, extract corresponding record out. corresponding record is and strong point 1 (A6-1) interior a certain load equipment, motor, the frequency converter corresponding data of dividing into groups, specify by the frequency converter identifier. here, as an example, can think and obtain with load equipment 1-1 (A3-11), motor 1-1 (A4-11), the pairing treaty conditions curve of frequency converter 1-1 (A5-11) formula. monitor unit A2, according to the treaty conditions curve formula that obtains by above-mentioned steps, with rotation speed of the fan/pump machine flow as essential information, obtain the regulation electric weight of load equipment 1-1 (A3-11). then, poor according to the power consumption in regulation electric weight of calculating and the essential information, calculate the energy-conservation electric weight of saving by frequency converter 1-1 (A5-11). and then obtain as the energy-saving efficiency of energy-conservation electric weight in the shared ratio of afore mentioned rules electric weight. the calculating that these are a series of, can when receiving essential information at every turn, carry out one by one monitor unit A2, also can be when telemonitoring server A 1 sends Working state data at monitor unit A2, so far all essential informations that receive are carried out in the lump, no matter which kind of method, the computational rules electric weight, energy-conservation electric weight, the monitor unit A2 of energy-saving efficiency, all will stipulate electric weight, energy-conservation electric weight, energy-saving efficiency, with the frequency converter identifier that is included in the essential information, the frequency converter kind, the work fate, power consumption, the upright tabulation of rotation speed of the fan/pump machine flow and data aggregation establishment constantly, with it as new Working state data, after load equipment job information DB (A241) upgraded, Working state data is sent to load equipment job information DB141 (step S2-01). the PF-03 of Figure 21 represents the form of the Working state data of embodiment 3. Working state data PF-03 is by constituting with the lower part: transmission source address, destination-address, the packet kind, the group identifier at expression strong point, the frequency converter identifier list of all frequency converters and frequency converter kind tabulation in the strong point, the working day ordered series of numbers table of all load equipments in the strong point, the power consumption tabulation, the regulation electric weight tabulation of in above-mentioned steps, calculating, energy-conservation electric weight tabulation, the energy-saving efficiency tabulation, the all fan that is used for Motor Control or the rotation speed of the fan of pump machine or tabulation of pump machine flow in the strong point, the tabulation of the collection time of all these data. Working state data, load equipment A3 that can be in the strong point, motor A4, any one sends frequency converter A 5 when changing one by one, also can be when every certain unit interval through system regulation, no matter send to the tabulation of all received till this moment data. which kind of on opportunity, receive the telemonitoring server A 1 of Working state data from monitor unit A2-1, all Working state data is signed in among the load equipment job information DB141. when login, pass through group identifier, frequency converter identifier and data obtain the time, come whether decision data is new data, if new data, just carry out data supplementing, if data with existing, just carry out Data Update. above-mentioned processing, all contained in the frequency converter identifier list to Working state data frequency converters carry out. its result, in load equipment job information DB141, be added the new record that the quantity of the frequency converter in quantity and the frequency converter identifier list equates.
The step that these are a series of is that unit carries out with monitor unit A2, when the monitor unit M of strong point M (A2-M) when telemonitoring server A 1 sends Working state data (step S2-04), also carry out same processing.
Next, with reference to the process flow diagram of Figure 29, the example of control of the telemonitoring server A 1 of embodiment 3 is described.This process flow diagram, the cycle carries out according to the rules.Telemonitoring server A 1 is when starting (step F 3-01), and the circulation (step F 3-04) of beginning message sink receives the message from network A 7.Step F 3-07, judge that whether the message receive be the Working state data from monitor unit A2, if Working state data, just enter step F 3-16, judge whether obtain determined data of time by group identifier, frequency converter identifier, data in the Working state data is new data.If new data just enter into step F 3-19, with new data supplementing to load equipment working condition DB (A141); If not new data, data are exactly data with existing, carry out the renewal of data with existing at step F 3-22.The message sink circulation, (F3-13) finishes (F3-10) when 1 shutdown of telemonitoring server A.By above processing, telemonitoring server A 1 manages the data from the monitor unit A2 at each strong point.
Next, process flow diagram with reference to Figure 30, the example of control of the monitor unit A2 of embodiment 3 is described. this process flow diagram, cycle carries out according to the rules. and monitor unit A2 is when starting (step F 4-01), beginning message sink circulation (step F 4-04), reception is from the message of network A 7. step F 4-07, whether judge to the Working state data of the load equipment that will collect and send to opportunity of telemonitoring server A 1, if arrived transmission opportunity, just enter step F 4-19, judge the regulation electric weight that need obtain by calculating in the Working state data, energy-conservation electric weight, whether energy-saving efficiency finishes as calculated, if these three data are not calculated as yet, just enter step F 4-22, with the frequency converter identifier as search key, DBA143 retrieves to load equipment regulation power information, extract corresponding treaty conditions curve formula out. then, enter step F 4-25, utilize the treaty conditions curve of extracting out, at first calculate the regulation electric weight, calculate energy-conservation electric weight and energy-saving efficiency then. in step F 4-19, if regulation electric weight, energy-conservation electric weight, energy-saving efficiency finishes as calculated, just enter step F 4-31, with the frequency converter identifier as search key, DBA143 retrieves to load equipment regulation power information, extraction becomes all working status data that sends object. send the Working state data of object, no matter for example be equivalent to the last Working state data that newly receives after the Working state data that sends. which of step F 4-25 or the method for step F 4-31 to obtain Working state data with, all enter step F 4-28 afterwards, will be from all load equipments in the strong point, motor, the frequency converter identifier of collecting in the frequency converter, the frequency converter kind, the work fate, power consumption, the regulation electric weight, energy-conservation electric weight, energy-saving efficiency, rotation speed of the fan/pump machine flow, data aggregation tabulation constantly, with group identifier corresponding to the strong point, be sent to the circulation of telemonitoring server A 1. message sinks as Working state data, (step F 4-16) finishes (step F 4-13) when monitor unit A2 shuts down. by above processing, monitor unit A2 manages the load equipment job information at each strong point.
In embodiment 3, the Working state data that telemonitoring server A 1 is managed is stored in load equipment working condition DB (A141).For the structure of above-mentioned database, embodiment 2 is identical with embodiment 3, and content shown on the picture does not change yet.Therefore, the picture of the working condition of output load equipment and Figure 22,23,24 among the embodiment 3,25 identical respectively are so cast out explanation.
Install after the frequency converter energy-efficient equipment, apparatus of load and on-the-spot aspects such as environment might change to some extent, and the theoretical curve of power consumption may change thereupon like this, so need the theoretical curve of power consumption behind the dynamic adjustment energy-saving and frequency-variable.
Suppose that this curve meets following model:
Wherein: P% is current running frequency and the percentage of the ratio of mains frequency
F% is the percentage that current operate power accounts for motor power frequency operation power.
Like this, if calculate coefficient { X in the model
N-1, X
N-2... ..X
0, need to gather in real time N group service data { F
N-1%, F
N-2% ... ..F
0%} and { P
N-1%, P
N-2% ... ..P
0%}.The formula that proposes like this, above can be converted into as follows:
Afterwards, factor arrays can be untied with following mode:
Like this, can be according to { the X that solves
N-1, X
N-2... ..X
0, the theoretical curve of the power consumption behind the energy-saving and frequency-variable equipment of packing into draws.The value of N is set according to operation experience in the past by the equipment supplier.
Claims (3)
1. energy-saving support device is characterized in that possessing:
Frequency converter is controlled the rotating speed that is arranged at the motor in the load equipment;
Described the 2nd characteristic of making the relation between momentum and the power consumption after memory storage, storage import given the 1st characteristic of doing the relation decision between momentum and the power consumption in the preceding described load equipment and determine described frequency converter to import according to this frequency converter; And,
Image display, measured value the 1st ordinate of the power consumption that the power consumption all the time during to the operation of described frequency converter measures with measuring appliance with expression and the 2nd ordinate of representing described frequency converter on described the 1st characteristic power consumption and the difference described measured value before importing are exported in the lump with the curve of described the 1st characteristic and the curve of described the 2nd characteristic.
2. energy-saving support device according to claim 1 is characterized in that,
Also have: use the power consumption all the time and the described momentum of doing that measure by described measuring appliance that described energy dissipation behavior is revised, dwindle by the value of the power consumption of described energy dissipation behavior decision, with the data processing equipment of the difference of the measured value of the power consumption all the time that measures by described measuring appliance.
3. energy-saving support device according to claim 1 is characterized in that,
Also have: the measured value of the power consumption all the time that measures by described measuring appliance, with the situation bigger than setting by the difference of the value of the power consumption of described energy dissipation behavior decision under, warn the data presented treating apparatus.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008201821937U CN201449531U (en) | 2008-05-30 | 2008-12-16 | Energy-saving supporting device |
JP2009130721A JP5479779B2 (en) | 2008-05-30 | 2009-05-29 | Energy saving operation support device and method for displaying the power saving effect of energy saving operation |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810099874.1 | 2008-05-30 | ||
CN2008201821937U CN201449531U (en) | 2008-05-30 | 2008-12-16 | Energy-saving supporting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201449531U true CN201449531U (en) | 2010-05-05 |
Family
ID=42554253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008201821937U Expired - Lifetime CN201449531U (en) | 2008-05-30 | 2008-12-16 | Energy-saving supporting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201449531U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111322740A (en) * | 2020-03-02 | 2020-06-23 | 中铁第六勘察设计院集团有限公司 | Energy saving rate calculation method for cooling season of variable-frequency hot air exhaust fan based on day-by-day adjustment |
-
2008
- 2008-12-16 CN CN2008201821937U patent/CN201449531U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111322740A (en) * | 2020-03-02 | 2020-06-23 | 中铁第六勘察设计院集团有限公司 | Energy saving rate calculation method for cooling season of variable-frequency hot air exhaust fan based on day-by-day adjustment |
CN111322740B (en) * | 2020-03-02 | 2021-04-13 | 中铁第六勘察设计院集团有限公司 | Energy saving rate calculation method for cooling season of variable-frequency hot air exhaust fan based on day-by-day adjustment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101592922B (en) | Device and method for supporting energy-saving operation and showing power-saving effect of energy-saving operation | |
JP5479779B2 (en) | Energy saving operation support device and method for displaying the power saving effect of energy saving operation | |
US11435772B2 (en) | Systems and methods for optimizing energy usage using energy disaggregation data and time of use information | |
CN105446299B (en) | A kind of data monitoring and Cost Accounting System | |
JP2015515246A (en) | Method, system, and article of manufacture including computer readable storage media for smoothing wind power output to a grid (smoothing power output from a wind farm) | |
KR101957797B1 (en) | Method for virtual electric power trading between microgrids based on bidding way and agent apparatus for the same | |
CN103123696A (en) | Electric power management apparatus and electric power management method | |
JP2008046926A (en) | Carbon dioxide emission trading system | |
Wang et al. | Manufacturing profit maximization under time-varying electricity and labor pricing | |
JP5382790B2 (en) | CO2 reduction media system and CO2 reduction support method | |
JP2018085850A (en) | Computation of business model in which enterprise having solar power generation facility installs facility in site of consumer to systematically coordinate | |
CN107508301A (en) | Electric energy processing method and device, unit energy system and energy system | |
CN201449531U (en) | Energy-saving supporting device | |
JP2003288476A (en) | Line capacity integrated evaluation/management operation system for production line and line capacity integrated evaluation/management operation method for the production line | |
Xu et al. | Multi-objective reinforcement learning based multi-microgrid system optimisation problem | |
CN103226745A (en) | Graph generating method, and production management device | |
CN103620420B (en) | System and method for determining communal facility cost savings | |
CN103853691A (en) | Operating efficiency estimating device and method | |
JP2021120888A (en) | Photovoltaic power generation system | |
TW200304603A (en) | Asset managing apparatus, asset managing method, trust/leasing method for asset management | |
CN110580590A (en) | income settlement device for battery energy storage equipment | |
JP5855548B2 (en) | Energy management system | |
WO2016147391A1 (en) | Controller, electricity cost display method, and program | |
JP7385190B1 (en) | Waste treatment equipment, billing amount calculation method, program, and waste treatment system | |
Tian et al. | The Value of Information: Game Model of Supply Chain Based on C2M |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20100505 |