CN201428195Y - Drop ceiling node component - Google Patents

Drop ceiling node component Download PDF

Info

Publication number
CN201428195Y
CN201428195Y CN200920064969XU CN200920064969U CN201428195Y CN 201428195 Y CN201428195 Y CN 201428195Y CN 200920064969X U CN200920064969X U CN 200920064969XU CN 200920064969 U CN200920064969 U CN 200920064969U CN 201428195 Y CN201428195 Y CN 201428195Y
Authority
CN
China
Prior art keywords
drop ceiling
shaped connector
keel
furred ceiling
node component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920064969XU
Other languages
Chinese (zh)
Inventor
张华锋
陈富仲
刘琦江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN200920064969XU priority Critical patent/CN201428195Y/en
Application granted granted Critical
Publication of CN201428195Y publication Critical patent/CN201428195Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a drop ceiling node component, comprising a main keel, a sub-keel, a hanger, a suspender and a U-shaped connector, wherein the lower end of the U-shaped connector is provided with a holding rod with an adjusting nut, the upper end of the hanger penetrates on the holding rod, and the top end of the U-shaped connector is connected with the suspender in an up and down adjustable mode. The drop ceiling node component has the advantages of very convenient up and down adjusting and level adjusting, simple installation and easy operation, can greatly meet the fixation requirements of the main keel and the sub-keel in relative positions of each direction in the process of drop ceiling engineering construction, solves the technical problem that small displacement of eachdirection is difficultly met in the installation of the suspender, the hanger, the main keel and the sub-keel in the large area of drop ceiling decoration, can meet the requirement of quality controlof drop ceiling construction, and can greatly adapt to the need of shock load environment of industrial plants.

Description

The furred ceiling node component
Technical field
The utility model relates to a kind of construction work and decorates the suspension rod hanging piece node component that furred ceiling is used.
Background technology
In the existing engineering decorative furred ceiling construction, suspension rod, hanging piece node structure form mostly are fixed, it is fixedlyed connected with the keel hanging piece by suspension rod (making of the horned dinosaur bone usually) or Liftable type suspension rod (reinforcing bar mantle fiber), its advantage is that node is connected firmly, rigidity is big, when adopting the ascending/decending suspension rod to connect, can adjust the channel height, when adopting CB50, CB60, CB38, CS50, the connection of CS60 series hanging piece, the stage casing adds a bolt on hanging piece, main joist is embedded between hanging piece, and main joist is difficult for being subjected to displacement (as Fig. 3).The distinct disadvantage of this fixed node structure is its position in case fixing just being difficult to adjusted, especially the adjustment of horizontal direction is difficult especially, and the control of springing height requires very strict in the large tracts of land furred ceiling engineering, otherwise can influence the integral rigidity and stability of keel skeleton, especially in the follow-up use of furred ceiling, the skewness of load produces local distortion when being subjected to maintenance such as pipeline, badly influences the outward appearance vision.Therefore how solving the adjusting of furred ceiling node component in installation process, is present problem demanding prompt solution with the requirement of satisfying large tracts of land furred ceiling engineering and the requirement that makes things convenient for later maintenance.
The utility model content
The purpose of this utility model is to provide a kind of convenient adjusting, and can satisfy the furred ceiling node component of the requirement of large tracts of land furred ceiling engineering.
This furred ceiling node component that the utility model provides, comprise primary and secondary skeletal frame, hanging piece and suspension rod, also comprise the U-shaped connector, there is the cross bar of a band adjusting nut lower end of this U-shaped connector, the upper end of described hanging piece is through on this cross bar, but U-shaped connector top is connected with suspension rod up-down adjustment ground.
Described hanging piece is tabular, is fixed on the main joist.Described cross bar comprises screw rod and the sleeve pipe that is enclosed within on this screw rod.Adopt the angle sign indicating number to be connected between described main joist and the secondary joist or weld.
The utility model is that up-down adjustment or level are regulated all very convenient, and it is easy that simple operations is installed, can be fine satisfy in the furred ceiling engineering construction process primary and secondary skeletal frame in each fixedly requirement to relative position, solved in the large tracts of land ceiling decoration, each was to the implacable technical problem of micro-displacement during suspension rod hanging piece and primary and secondary skeletal frame were installed, the requirement of furred ceiling quality control on construction can be satisfied, the needs of industrial premises vibrations load environment can be adapted to again well.When if the factors such as skewness of load produce local distortion when being subjected to maintenance such as pipeline, the utility model can provide adjusting very easily in the follow-up use of this external furred ceiling, and continuing of effectively preventing to be out of shape increased the weight of, and reduced the cost of later maintenance.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the left view of Fig. 1.
Fig. 3 is the connection diagram of the primary and secondary keel among Fig. 1.
Fig. 4 is the node component of the furred ceiling of prior art.
The specific embodiment
From Fig. 1-Fig. 3 as can be seen, this furred ceiling node component of the present utility model comprises main joist 4, secondary joist 5, hanging piece 1, suspension rod 2, U-shaped connector 3, hanging piece 1 is fixedly connected on the main joist 4 (present embodiment adopt be welding), there is a cross bar 6 lower end of U-shaped connector 3, cross bar 6 comprises screw rod 61 and the sleeve pipe 62 that is positioned at U-shaped connector 3 centres that is enclosed within on this screw rod, cross bar 6 is fixed on the U-shaped connector 3 by screw rod 61 and nut 63, the lower end of hanging piece 1 is welded on the main joist 4, the upper end is through on the sleeve pipe 62, make hanging piece 3 on sleeve pipe 62, move horizontally fine setting, thereby regulate the position of main joist 4 horizontal directions.U type connector 3 connects suspension rod 2 by two nuts 21, regulates the relative position of suspension rod 2 and hanging piece 1 above-below direction by rotating two nuts 21, thereby reaches the upper-lower position of regulating main joist 4.Adopt the angle sign indicating number to connect or welding between main joist 4 and the secondary joist 5, guarantee the convenience of whole erection and adjusting and the intensity of guaranteeing whole ceiling structure thus, finally satisfy the engine request and the requirement that makes things convenient for later maintenance of large tracts of land furred ceiling.

Claims (4)

1, a kind of furred ceiling node component, comprise primary and secondary skeletal frame, hanging piece (1) and suspension rod (2), it is characterized in that also comprising U-shaped connector (3), there is the cross bar (6) of a band adjusting nut (63) lower end of this U-shaped connector (3), the upper end of described hanging piece (1) is through on this cross bar (6), U-shaped connector (3) top with suspension rod (2) but up-down adjustment ground be connected.
2,, it is characterized in that described hanging piece (1) for tabular, is fixed on the main joist (4) according to the described furred ceiling node component of claim 1.
3,, it is characterized in that described cross bar (6) comprises screw rod (61) and is enclosed within sleeve pipe (62) on this screw rod (61) according to claim 1 or 2 described furred ceiling node components.
4,, it is characterized in that adopting between described main joist (4) and the secondary joist (5) the angle sign indicating number to be connected or weld according to claim 1 or 2 described furred ceiling node components.
CN200920064969XU 2009-06-30 2009-06-30 Drop ceiling node component Expired - Fee Related CN201428195Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920064969XU CN201428195Y (en) 2009-06-30 2009-06-30 Drop ceiling node component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920064969XU CN201428195Y (en) 2009-06-30 2009-06-30 Drop ceiling node component

Publications (1)

Publication Number Publication Date
CN201428195Y true CN201428195Y (en) 2010-03-24

Family

ID=42031928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920064969XU Expired - Fee Related CN201428195Y (en) 2009-06-30 2009-06-30 Drop ceiling node component

Country Status (1)

Country Link
CN (1) CN201428195Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979235A (en) * 2011-12-14 2013-03-20 上海中建八局装饰有限责任公司 Ceiling T-bar transformation device
CN103388371A (en) * 2013-07-25 2013-11-13 苏州金螳螂建筑装饰股份有限公司 Bamboo-wood suspended ceiling
CN105587095A (en) * 2015-12-28 2016-05-18 王柏泉 Height-adjustable keel and floor installation system comprising same
CN106393415A (en) * 2016-11-29 2017-02-15 武威市津威环境科技有限责任公司 Special demolding machine for production line
CN109184061A (en) * 2018-09-29 2019-01-11 广东省建筑装饰工程有限公司 It cornices outside space structure ceiling system structure and construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979235A (en) * 2011-12-14 2013-03-20 上海中建八局装饰有限责任公司 Ceiling T-bar transformation device
CN103388371A (en) * 2013-07-25 2013-11-13 苏州金螳螂建筑装饰股份有限公司 Bamboo-wood suspended ceiling
CN103388371B (en) * 2013-07-25 2015-11-25 苏州金螳螂建筑装饰股份有限公司 Bamboo wood furred ceiling
CN105587095A (en) * 2015-12-28 2016-05-18 王柏泉 Height-adjustable keel and floor installation system comprising same
CN105587095B (en) * 2015-12-28 2017-10-24 王柏泉 Adjustable for height keel and the floor mounted systems including it
CN106393415A (en) * 2016-11-29 2017-02-15 武威市津威环境科技有限责任公司 Special demolding machine for production line
CN106393415B (en) * 2016-11-29 2020-08-14 武威市津威环境科技有限责任公司 Special stripper of production line
CN109184061A (en) * 2018-09-29 2019-01-11 广东省建筑装饰工程有限公司 It cornices outside space structure ceiling system structure and construction method
CN109184061B (en) * 2018-09-29 2023-10-27 广东省建筑装饰工程有限公司 Space structure overhanging eave suspended ceiling system structure and construction method

Similar Documents

Publication Publication Date Title
CN201428195Y (en) Drop ceiling node component
CN205604464U (en) Exterior wall cladding antidetonation is connecting piece down
CN205382615U (en) Adjustable cable suspension device of roof installation usefulness is decorated to large -span
CN206091259U (en) Adjustable steel configuration operation hanging flower basket
CN103243905B (en) A kind of reducing arc formwork
CN103758213B (en) A kind of assembled wallboard and beam body precise positioning mounting connection structure
CN204919902U (en) Fashioned curved surface curtain system of broken line unit
CN204098322U (en) Smallpox counter support structure
CN103615046B (en) Hyperbolic circular arc wood dome and construction installation method thereof
CN204098298U (en) A kind of metal energy-saving curtain wall
CN204127487U (en) Pipeline industry mounting support structure
CN200940348Y (en) Hozirontal regulating part for curtain wall skeleton
CN207499203U (en) A kind of three-dimensional adjustable supporting part for installing precast facade
CN203347247U (en) Preinstallation floor type support for brick masonry inner wire box
CN204609092U (en) A kind of combined type conversion layer connector
CN103266780B (en) Tree-shaped steel column assembled moulding bed combined system and tree-shaped steel column assembling and construction method
CN105040870A (en) Curved surface curtain wall system formed by broken line unit
CN204001308U (en) A kind of metal decking unit curtain wall system
CN203961092U (en) The anti-braced structures of a kind of suspension rod
CN206438605U (en) A kind of steel crane beam attachment structure
CN204531130U (en) A kind of telescopic conversion layer connector
CN203684709U (en) Adjusting device for assembly inclination angle of truss of steel structure
CN202925471U (en) Hydraulic formwork system for high pier construction
CN203223004U (en) Jig frame combination system for constructing and assembling tree-shaped steel column
CN205276487U (en) Connection structure of light steel prefabricated exterior wall and major structure with adjustable it is three -dimensional

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100324

Termination date: 20130630