CN201401032Y - Turning-shaped co-construction and sharing communication house of integral light color steel plate structure - Google Patents

Turning-shaped co-construction and sharing communication house of integral light color steel plate structure Download PDF

Info

Publication number
CN201401032Y
CN201401032Y CN2009201180839U CN200920118083U CN201401032Y CN 201401032 Y CN201401032 Y CN 201401032Y CN 2009201180839 U CN2009201180839 U CN 2009201180839U CN 200920118083 U CN200920118083 U CN 200920118083U CN 201401032 Y CN201401032 Y CN 201401032Y
Authority
CN
China
Prior art keywords
communication
communications equipment
equipment room
house
room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201180839U
Other languages
Chinese (zh)
Inventor
张家琦
孙义红
王卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG RUINENG COMMUNICATION TECHNOLOGY CO., LTD.
Original Assignee
Zhejiang Ruineng Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ruineng Communication Technology Co Ltd filed Critical Zhejiang Ruineng Communication Technology Co Ltd
Priority to CN2009201180839U priority Critical patent/CN201401032Y/en
Application granted granted Critical
Publication of CN201401032Y publication Critical patent/CN201401032Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

The utility model relates to a house for communication, in particular to an integral co-construction and sharing communication house, which comprises six communication houses, wherein each communication house is circularly connected in turn, the outer contours of the cross sections of the communication houses are all in square shapes, the communication houses are arrayed in three lines, and each line comprises two, the areas of the two middle communication houses (3, 6) are smaller than the upper line and the lower line of communication houses (1,2,4,5), the integral outer contours of the communication houses are in square shapes after being circularly connected, a square space (8) is arranged between the communication house (3) and the communication house (6), the communication house (6)is auxiliary, the auxiliary communication house (6) is provided with a left and a right symmetrical doors (61,62), the door (62) is communicated with the square space (8) of the auxiliary communication house (6), and a communication tower (7) is arranged in the middle of the square space (8). The integral co-construction and sharing communication house can greatly improve land utilization ratio, can supply six houses, and is shared by a plurality of communication operation businesses, and the communication tower is arranged in the middle of the square space, thereby greatly reducing the pilfered ratio of devices in a tower.

Description

The three-back-shaped Joint construction and sharing communications equipment room of integrated lightweight color steel structure
Technical field
The utility model relates to communication and uses machine room, relates in particular to integrated Joint construction and sharing communications equipment room.
Background technology
Along with the granting of telecommunications industry reorganization and 3G license, total China Telecom, China Mobile, three tame mobile communication carriers of CHINAUNICOM manage the mobile communication service on Chinese market.In order to improve the network coverage separately, three tame common carriers need continue to increase the dynamics of investment of the tower mast of communicating by letter in the base station construction, machine room fixed assets.On October 6th, 2008, State Assets Administration Committee, Ministry of Industry and Information unite in " about the emergency notice of propelling infrastructure of telecommunication Joint construction and sharing " that issues to emphasize to be to reduce the telecommunications repeated construction, improve infrastructure of telecommunication utilization rate, from on October 1st, 2008, China Mobile, China Telecom, the necessary Joint construction and sharing infrastructure of telecommunication of CHINAUNICOM.
The traditional base station is built by column foot, machine room, several parts of enclosure wall are formed, apply on June 20th, 2005 as Zhongda Dentsu Co., Ltd., on August 23rd, 2006 was announced, application number is 200520042642.4, notification number is the utility model of CN2809098, name is called the integrated machine room of communication base station, comprise: under(-)chassis, column, the floor, metope, upper bracket, the roof, the integral machine of this utility model is by channel-section steel, square steel, angle steel are formed a general frame closely, and each several part passes through connection strap, bolt connects, form a high strength structure skeleton, color steel is fixed in the skeleton, so the integral intensity height, it is antiseismic to satisfy machine room, the requirement of anti-high wind.But the integrated machine room of this communication base station is because every company independently has and column foot and machine room are separated, thus have floor space greatly, shortcomings such as theftproof performance difference.
Summary of the invention
Shortcoming and communications equipment room future development trend such as the utility model is not high at current machine room utilization rate, theftproof performance difference provide a kind of how tame communication common carrier the shared three-back-shaped Joint construction and sharing communications equipment room of integrated lightweight color steel structure.
In order to solve the problems of the technologies described above, the utility model is solved by following technical proposals:
The three-back-shaped Joint construction and sharing communications equipment room of integrated lightweight color steel structure, comprise six communications equipment rooms, successively around connection, each communications equipment room cross section outline is square, being divided into three rows arranges, two of every rows, the area of middle two communications equipment rooms is less than the communications equipment room of two rows, and communications equipment room is square around connecting the whole outline in back, is provided with square space between middle two communications equipment rooms, communications equipment room is provided with door, door is in the outside of communications equipment room integral body, and one of two communications equipment rooms in described centre are standby machine room, and standby machine room is provided with symmetrical door, door is communicated with standby machine room and square space, and communication tower places square space central authorities.
Described communications equipment room has six, wherein there is one to be standby machine room, six communications equipment rooms are successively around connection, forming outline is square building structure, and between middle two communications equipment rooms, square space is arranged, communication tower places square space central authorities, and such building structure design not only effectively improves land utilization ratio, and can significantly reduce the stolen probability of equipment in the tower.Because standby machine room has two doors can be communicated with standby machine room and square space, so standby machine room can be led to the communication tower place that is positioned over square space central authorities as passage, tower body is safeguarded, can solve well by the utility model that the machine room utilization rate is not high, the shortcoming of theftproof performance difference, and pair communication tower arranged easy to maintenance a bit, will become the trend of future communications base station development.
As preferably, body of wall is composited by internal layer, intermediate layer and skin, and the intermediate layer is a polyphenyl insulation central layer, and internal layer is the iron sheet layer with skin.
The machine room body of wall adopts polyphenyl insulation central layer to be composited with the ectonexine iron sheet, and polyphenyl insulation central layer and the compound body of wall that constitutes of ectonexine iron sheet can reach waterproof, heat insulation advantage, can better guarantee the good operation of the interior equipment of machine room.
According to the technical solution of the utility model, the three-back-shaped Joint construction and sharing communications equipment room of integrated lightweight color steel structure can improve the land use rate greatly, six machine rooms can be provided, and for how tame common carrier is shared, communication tower places square space central authorities can significantly reduce the stolen probability of equipment in the tower.
Description of drawings
The three-back-shaped Joint construction and sharing communications equipment room of the integrated lightweight color steel of Fig. 1 structure plan view.
The three-back-shaped Joint construction and sharing communications equipment room of the integrated lightweight color steel of Fig. 2 structure elevation.
The three-back-shaped Joint construction and sharing communications equipment room of the integrated lightweight color steel of Fig. 3 structure elevation cross-sectional view.
The toponym that each number designation referred in the above accompanying drawing is as follows:
1,2,3,4, the 5-communications equipment room, 11,21,31,41,51,61, the 62-door, the standby machine room of 6-, 7-communication tower, 8-square space, 9-body of wall, 91-internal layer, 92-intermediate layer, 93-skin.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is described in further detail:
Embodiment, the three-back-shaped Joint construction and sharing communications equipment room of accompanying drawing 1 integrated lightweight color steel structure plan view, now 1 describe with reference to the accompanying drawings, the three-back-shaped Joint construction and sharing communications equipment room of integrated lightweight color steel structure is by six communications equipment rooms 1,2,3,4,5,6 constitute, whole outline is square, be of a size of 10000mm * 10000mm * 3000mm (length * wide * height), cutting off four areas altogether is the communications equipment room 1 of 5000mm * 3500mm (long * wide), 2,4,5 and two areas are the communications equipment room 3 of 3500mm * 3000mm (long * wide), 6, communications equipment room 6 is standby machine room, communications equipment room 1,2,3,4,5,6 successively around connection, wherein communications equipment room 1,2 link to each other, communications equipment room 4,5 link to each other, communications equipment room 3 is positioned at communications equipment room 2, between 4, communications equipment room 6 is positioned at communications equipment room 1, between 5, there is square space 8 to vacate and is used to place communication tower 7, communication tower 7 places square space 8 central authorities, communications equipment room 6 has two doors, can lead to square space 8, communication tower 7 is keeped in repair, body of wall 9 adopts polyphenyl insulation central layer 92 and ectonexine iron sheet 91,93 are composited, waterproof is arranged, heat insulation advantage can better guarantee the good operation of equipment in the machine room.How tame shared communication tower 7 designs of existing operator, manufacturing, mounting technique be quite ripe, has not been a difficult problem, is easier to realize.
In a word, the above only is preferred embodiment of the present utility model, and all equalizations of being done according to the utility model claim change and modify, and all should belong to the covering scope of the utility model patent.

Claims (2)

1. the three-back-shaped Joint construction and sharing communications equipment room of integrated lightweight color steel structure, comprise six communications equipment rooms (1,2,3,4,5,6), it is characterized in that: communications equipment room (1,2,3,4,5,6) successively around connection, each communications equipment room (1,2,3,4,5,6) the cross section outline is square, being divided into three rows arranges, two of every rows, middle two communications equipment rooms (3,6) area is less than the communications equipment room (1 of two rows, 2,4,5), communications equipment room (1,2,3,4,5,6) be square around connecting the whole outline in back, be provided with square space (8) between communications equipment room (3) and the communications equipment room (6), communications equipment room (1,2,3,4,5) be provided with door (11,21,31,41,51), door (11,21,31,41,51) at communications equipment room (1,2,3,4,5,6) the Zheng Ti outside, described communications equipment room (6) is standby machine room, standby machine room (6) is provided with symmetrical door (61,62), door (62) is communicated with standby machine room (6) and square space (8), and communication tower (7) places square space (8) central authorities.
2. according to the three-back-shaped Joint construction and sharing communications equipment room of the described integrated lightweight color steel structure of claim 1, it is characterized in that: body of wall (9) is composited by internal layer (91), intermediate layer (92) and outer (93), intermediate layer (92) is polyphenyl insulation central layer, and internal layer (91) is the iron sheet layer with outer (93).
CN2009201180839U 2009-04-20 2009-04-20 Turning-shaped co-construction and sharing communication house of integral light color steel plate structure Expired - Fee Related CN201401032Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201180839U CN201401032Y (en) 2009-04-20 2009-04-20 Turning-shaped co-construction and sharing communication house of integral light color steel plate structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201180839U CN201401032Y (en) 2009-04-20 2009-04-20 Turning-shaped co-construction and sharing communication house of integral light color steel plate structure

Publications (1)

Publication Number Publication Date
CN201401032Y true CN201401032Y (en) 2010-02-10

Family

ID=41660831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201180839U Expired - Fee Related CN201401032Y (en) 2009-04-20 2009-04-20 Turning-shaped co-construction and sharing communication house of integral light color steel plate structure

Country Status (1)

Country Link
CN (1) CN201401032Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112367794A (en) * 2020-12-28 2021-02-12 中国建筑标准设计研究院有限公司 Modular data center

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112367794A (en) * 2020-12-28 2021-02-12 中国建筑标准设计研究院有限公司 Modular data center
CN112367794B (en) * 2020-12-28 2022-05-27 中国建筑标准设计研究院有限公司 Modular data center

Similar Documents

Publication Publication Date Title
CN201401032Y (en) Turning-shaped co-construction and sharing communication house of integral light color steel plate structure
CN101769081B (en) Co-construction and sharing type triangle-tube tower communication base station and setting method thereof
CN102605973A (en) Space station
CN204024180U (en) A kind of communication base station
CN204098590U (en) A kind of multiple antennas Joint construction and sharing base station
CN201460372U (en) Communication single-pipe tower with round platforms
CN201401031Y (en) Integral co-construction and sharing communication house
CN201460371U (en) Rocket type platform communication monotube tower
CN205296928U (en) Polymerization basic station
CN204609378U (en) A kind of combined type beautifies communication base station
CN204782184U (en) Many operators sharing type integration city station basic station
CN201460369U (en) Wheel type platform communication single-pipe tower
CN201605835U (en) Co-established and shared three-pipe tower communication base station
CN205116857U (en) Integration basic station
CN104265022A (en) Co-building and sharing integrated base station
CN204060062U (en) A kind of superposing type machine room
CN201794257U (en) Elevation-free floor board for machine room
CN202215036U (en) Prefabricated base station
CN205805096U (en) A kind of communication base station
CN201738613U (en) Dismountable antitheft device for protecting communication equipment
CN205976694U (en) Integrative communication in tower room base for tower
CN212626541U (en) Novel electrical control cabinet with modularization winding displacement
CN203716543U (en) Novel space station
CN204465889U (en) Composite type base station
CN204920321U (en) Communication base station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 311500 Tonglu Zhejiang Economic Development Zone, Hangzhou, Shu Shu Road, No. 17, No.

Patentee after: ZHEJIANG RUINENG COMMUNICATION TECHNOLOGY CO., LTD.

Address before: Hangzhou City, Zhejiang province 310020 Phoenix Road No. 137 Zhonghao Fengqi Plaza A block 805

Patentee before: Zhejiang Ruineng Communication Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100210

Termination date: 20180420