CN202872184U - 110kV power distribution device breaker double-row arrangement structure with double bus wirings - Google Patents

110kV power distribution device breaker double-row arrangement structure with double bus wirings Download PDF

Info

Publication number
CN202872184U
CN202872184U CN 201220550328 CN201220550328U CN202872184U CN 202872184 U CN202872184 U CN 202872184U CN 201220550328 CN201220550328 CN 201220550328 CN 201220550328 U CN201220550328 U CN 201220550328U CN 202872184 U CN202872184 U CN 202872184U
Authority
CN
China
Prior art keywords
bus
circuit breaker
double
power distribution
breaker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220550328
Other languages
Chinese (zh)
Inventor
胡振兴
杨韬
齐春
李国荣
杨毅伟
龙西陵
李智
邓鹏�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Original Assignee
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group filed Critical Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority to CN 201220550328 priority Critical patent/CN202872184U/en
Application granted granted Critical
Publication of CN202872184U publication Critical patent/CN202872184U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a 110kV power distribution device breaker double-row arrangement structure with double bus wirings. The 110kV power distribution device buses are flexible leads and are divided into two groups. The first group of buses is divided into two segments which are connected thorough a flexible lead. An incoming circuit breaker and an outgoing circuit breaker are symmetrically arranged at two sides of the bus for forming a circuit breaker double-row arrangement. The arrangement direction of the two groups of buses is vertical with the direction of the incoming/outgoing circuit. A combined frame is adopted for the frames at the left side and the right side in a transformer station. A bus isolation switch is provided below the bus. The 110kV power distribution device breaker double-row arrangement structure with the double bus wirings overcomes the defects in single-row arrangement of the traditional 110kV circuit breaker. The incoming circuit breaker and the outgoing circuit breaker are arranged at two sides of the first group of buses and the second group of buses. The 110kV power distribution device breaker double-row arrangement structure with the double bus wirings has the following advantages: facilitating cross land occupation area reduction of the place, configuring the incoming circuit unit and the outgoing circuit unit in one interval, obtaining compact structure, satisfying the requirement by specific land and user, reducing land occupation area, and facilitating long-term period enlargement.

Description

The 110kV power distribution equipment circuit breaker dually arrayed structure of double bus scheme
Technical field
The utility model relates to a kind of 110kV power distribution equipment circuit breaker dually arrayed structure of double bus scheme.
Background technology
In tradition power plant or the Substation Design, because it is very little that the 110kV power distribution equipment takes up an area relative 220kV, 500kV, usually adopt the single-column type arrangement during double-bus, when this is arranged in place size restriction and owner specific (special) requirements is arranged, have the problems such as difficult arrangement.Therefore need to arrange basis research 110kV power distribution equipment circuit breaker double-row type arrangement form at traditional single-column type, under special circumstances, take up an area more and economize, can arrange with plant area better to cooperate.
The utility model content
The purpose of this utility model is for above-mentioned situation, and a kind of characteristics of compact layout, the horizontal 110kV power distribution equipment circuit breaker dually arrayed structure of little, the double bus scheme that is easy to extend of floor space are provided.
The purpose of this utility model realizes by following technical proposals:
A kind of 110kV power distribution equipment circuit breaker dually arrayed structure of double bus scheme, 110kV power distribution equipment bus is flexible conductor and is divided into two groups, first group of bus is divided into two sections, two sections connect with the flexible conductor cross-line, lead-in circuit breaker and wire-outgoing breaker are arranged symmetrically in the bus both sides, form the circuit breaker dually arrayed, the arranged direction of two groups of buses with into and out of the line perpendicular direction, left and right sides framework adopts combined frame work in the Substation Station, and the bus below is provided with bus isolating switch.
As optimal way, described bus hangs and is installed on the combined frame work.
As optimal way, each terminal board height of described bus isolating switch is on the same level face.
As optimal way, described circuit breaker into and out of line is the SF6 circuit breaker.
As optimal way, described bus isolating switch is the queen post isolating switch.
The beneficial effects of the utility model: the utility model has overcome the deficiency that traditional 110kV circuit breaker single-column type is arranged, become dually arrayed in the both sides of first group of bus, second group of bus into and out of the line circuit breaker, being furnished with like this is beneficial to the horizontal floor space that reduces the place, can in same interval, arrange inlet wire and outgoing line unit, compact conformation, can satisfy specific place and owner's requirement, reduce floor space, convenient enlarging at a specified future date.
Description of drawings
Fig. 1 is floor plan of the present utility model.
Fig. 2 is the line sectional drawing.
Fig. 3 is mother, stride bar and bus equipment interval sectional drawing.
Wherein, 1 is lead-in circuit breaker, and 11 is wire-outgoing breaker, and 2 is first group of bus, and 21 is second group of bus, and 3 is combined frame work, and 4 is the queen post isolating switch.
Embodiment
Below in conjunction with specific embodiments and the drawings the utility model is further described.
As shown in the figure, a kind of 110kV power distribution equipment circuit breaker dually arrayed structure of double bus scheme, 110kV power distribution equipment bus is flexible conductor and is divided into two groups: first group of bus 2 and second group of bus 21, first group of bus 2 is divided into two sections, two sections connect with the flexible conductor cross-line, lead-in circuit breaker 1 and wire-outgoing breaker 11 are arranged symmetrically in the bus both sides, form the circuit breaker dually arrayed, the arranged direction of two groups of buses with into and out of the line perpendicular direction, left and right sides framework adopts combined frame work 3 in the Substation Station, and the bus below is provided with bus isolating switch.
Described flexible conductor bus hangs and is installed on the combined frame work 3.
Each terminal board height of described bus isolating switch is on the same level face.
Described lead-in circuit breaker 1 and wire-outgoing breaker 11 are the SF6 circuit breaker.
Described bus isolating switch is queen post isolating switch 4.
The utility model has overcome the deficiency that traditional 110kV circuit breaker single-column type is arranged, become dually arrayed in the both sides of first group of bus, second group of bus into and out of the line circuit breaker, being furnished with like this is beneficial to the horizontal floor space that reduces the place, can in same interval, arrange inlet wire and outgoing line unit, compact conformation, can satisfy specific place and owner's requirement, reduce floor space, convenient enlarging at a specified future date.
The above only is preferred embodiment of the present utility model; not in order to limit the utility model; all any modifications of within spirit of the present utility model and principle, doing, be equal to and replace and improvement etc., all should be included within the protection range of the present utility model.

Claims (5)

1. the 110kV power distribution equipment circuit breaker dually arrayed structure of a double bus scheme, it is characterized in that: 110kV power distribution equipment bus is flexible conductor and is divided into two groups, first group of bus (2) is divided into two sections, two sections connect with the flexible conductor cross-line, lead-in circuit breaker (1) and wire-outgoing breaker (11) are arranged symmetrically in the bus both sides, form the circuit breaker dually arrayed, the arranged direction of two groups of buses with into and out of the line perpendicular direction, left and right sides framework adopts combined frame work (3) in the Substation Station, and the bus below is provided with bus isolating switch.
2. the 110kV power distribution equipment circuit breaker dually arrayed structure of double bus scheme as claimed in claim 1 is characterized in that: described bus hangs and is installed on the combined frame work (3).
3. the 110kV power distribution equipment circuit breaker dually arrayed structure of double bus scheme as claimed in claim 1 or 2, it is characterized in that: each terminal board height of described bus isolating switch is on the same level face.
4. the 110kV power distribution equipment circuit breaker dually arrayed structure of double bus scheme as claimed in claim 3, it is characterized in that: described is the SF6 circuit breaker into and out of line circuit breaker (1,11).
5. the 110kV power distribution equipment circuit breaker dually arrayed structure of double bus scheme as claimed in claim 4, it is characterized in that: described bus isolating switch is queen post isolating switch (4).
CN 201220550328 2012-10-25 2012-10-25 110kV power distribution device breaker double-row arrangement structure with double bus wirings Expired - Lifetime CN202872184U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220550328 CN202872184U (en) 2012-10-25 2012-10-25 110kV power distribution device breaker double-row arrangement structure with double bus wirings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220550328 CN202872184U (en) 2012-10-25 2012-10-25 110kV power distribution device breaker double-row arrangement structure with double bus wirings

Publications (1)

Publication Number Publication Date
CN202872184U true CN202872184U (en) 2013-04-10

Family

ID=48038874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220550328 Expired - Lifetime CN202872184U (en) 2012-10-25 2012-10-25 110kV power distribution device breaker double-row arrangement structure with double bus wirings

Country Status (1)

Country Link
CN (1) CN202872184U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103683069A (en) * 2013-12-26 2014-03-26 中国能源建设集团安徽省电力设计院 Disconnecting switch arrangement structure for transformer substation power distribution unit
CN103701045A (en) * 2013-12-26 2014-04-02 中国能源建设集团安徽省电力设计院 Arrangement method of dual-bus and dual-row arranged type AIS (air insulated switchgear) power distribution device of substation
CN104143768A (en) * 2014-06-30 2014-11-12 云南省电力设计院 220 kV outdoor compact power distribution unit
CN104184051A (en) * 2014-08-01 2014-12-03 国家电网公司 Arrangement structure of 220 kV distribution apparatus

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103683069A (en) * 2013-12-26 2014-03-26 中国能源建设集团安徽省电力设计院 Disconnecting switch arrangement structure for transformer substation power distribution unit
CN103701045A (en) * 2013-12-26 2014-04-02 中国能源建设集团安徽省电力设计院 Arrangement method of dual-bus and dual-row arranged type AIS (air insulated switchgear) power distribution device of substation
CN103701045B (en) * 2013-12-26 2016-04-06 中国能源建设集团安徽省电力设计院有限公司 A kind of transformer station double-bus dually arrayed AIS power distribution equipment arrangement
CN103683069B (en) * 2013-12-26 2016-05-04 中国能源建设集团安徽省电力设计院有限公司 Transformer station's power distribution equipment isolating switch arrangement
CN104143768A (en) * 2014-06-30 2014-11-12 云南省电力设计院 220 kV outdoor compact power distribution unit
CN104184051A (en) * 2014-08-01 2014-12-03 国家电网公司 Arrangement structure of 220 kV distribution apparatus

Similar Documents

Publication Publication Date Title
CN202872184U (en) 110kV power distribution device breaker double-row arrangement structure with double bus wirings
CN203747256U (en) 220 kV double-bus single-segment breaker single-row arranged arrangement structure
CN204045951U (en) A kind of arrangement of 220kV power distribution equipment
CN102427203A (en) Method for arranging air insulated switchgear (AIS) power distribution unit of smart substation
CN205141390U (en) Transformer substation's overhead wire outlet structure
CN204067880U (en) A kind of power distribution equipment arrangement back-to-back
CN203014185U (en) Line connecting structure for crossed matching of incoming lines and outgoing lines of 500kV power distribution device
CN201332249Y (en) Tangent tower in shape of goblet of same-tower and three-circuit transmission line
CN202103326U (en) Phase-splitting medium-sized layout structure of bridge wiring outdoor open type distribution device
CN207320577U (en) A kind of compact 220kV substations layout structure
CN204927819U (en) Adopt four angle scheme's 750kV HGIS arrangement structure
CN103354319B (en) A kind of 220 kilovolts of outdoor GIS double-dragonfly-typoutlet outlet wire arrangement structure
CN201985528U (en) Series compensation system adopting line iron towers
CN201312059Y (en) 35KV bus bar structure of transformer substation autotransformer lower voltage side delta connection
CN205135023U (en) Circuit framework and overhead line structure
CN201562890U (en) Power distribution device arranged in three rows for outdoor opening type circuit breaker
CN204271577U (en) A kind of three-phase pipe bus vertical stratification of 500kV transformer station
CN208015086U (en) Main transformer low-pressure side main breaker circuit arrangement based on vertical arrangement busbar
CN202217918U (en) Link structure of dually-arranged single busbar breaker
CN204190186U (en) The compact HGIS three-row power distribution equipment of single tube post framework pattern is entirely combined based on 220kV
CN208753817U (en) A kind of 750kV power distribution equipment arragement construction
CN203312636U (en) Double-flying dragonfly outgoing line arranging structure of 220 kilovolt outdoor GIS
CN204858288U (en) 110kV distribution device cell type arrangement structure
CN201927896U (en) Double-row type switch base
CN203289333U (en) Inverter device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER ENGINEERING CONSULTING GROUP SOUTHWEST

Free format text: FORMER NAME: SOUTHWEST ELECTRIC POWER DESIGN INSTITUTE OF CHINA POWER ENGINEERING CONSULTING GROUP CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 610021 Dongfeng Road, Chengdu, Sichuan, No. 18, No.

Patentee after: Southwest Electric Power Design Institute CO., Ltd. of China Power Engineering Consulting Group

Address before: 610021 Dongfeng Road, Chengdu, Sichuan, No. 18, No.

Patentee before: SOUTHWEST ELECTRIC POWER DESIGN INSTITUTE OF CHINA POWER ENGINEERING CONSULTING Group Corp.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130410