CN201397232Y - 兆瓦级风力发电机组的试验装置 - Google Patents

兆瓦级风力发电机组的试验装置 Download PDF

Info

Publication number
CN201397232Y
CN201397232Y CN2009200421058U CN200920042105U CN201397232Y CN 201397232 Y CN201397232 Y CN 201397232Y CN 2009200421058 U CN2009200421058 U CN 2009200421058U CN 200920042105 U CN200920042105 U CN 200920042105U CN 201397232 Y CN201397232 Y CN 201397232Y
Authority
CN
China
Prior art keywords
belt pulley
dragging motor
generator
generating set
testing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009200421058U
Other languages
English (en)
Inventor
张雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Envision Energy Jiangsu Co Ltd
Original Assignee
JIANGYIN YUANJING ENERGY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGYIN YUANJING ENERGY TECHNOLOGY Co Ltd filed Critical JIANGYIN YUANJING ENERGY TECHNOLOGY Co Ltd
Priority to CN2009200421058U priority Critical patent/CN201397232Y/zh
Application granted granted Critical
Publication of CN201397232Y publication Critical patent/CN201397232Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Wind Motors (AREA)
  • Connection Of Motors, Electrical Generators, Mechanical Devices, And The Like (AREA)

Abstract

本实用新型涉及一种兆瓦级风力发电机组的试验装置,其特征在于它包括定位机架(1)、拖动电机(2)、皮带轮(3)和张紧机构(4),所述定位机架(1)悬挂固定于发电机机架(5)下方,所述拖动电机(2)设置于所述定位机架(1)上,所述拖动电机(2)输出端通过所述皮带轮(3)与发电机(6)输入端联轴器(7)相连接,所述皮带轮(3)上设置有张紧机构(4)。本实用新型兆瓦级风力发电机组的试验装置,在发电机输入端高速联轴器上安装皮带轮,通过拖动电机变频控制,达到不同转速和功率点的测试,经多次使用,性能安全可靠,拆装方便,节约了大量电能。本装置生产成本低、体积小、搬运方便。

Description

兆瓦级风力发电机组的试验装置
(一)技术领域
本实用新型涉及一种兆瓦级风力发电机组的试验装置,属于风力发电机组设备技术领域。
(二)背景技术
兆瓦级风力发电机组的传动链部件装配完成后,必须进行发电机组的试验。而常规的驱动方法是用600KW以上大马力电动机在主轴前端低速拖动,这样要有减速装置、固定支架等辅助设施,制造成本很高、且耗费电能。也有用两台风力发电机组在低速轴端对接后进行拖动试验,这样工程十分复杂,安装调试工作量大。
(三)发明内容
本实用新型的目的在于克服上述不足,提供一种拆装方便、节约电能、制造成本低、体较小、搬运方便的兆瓦级风力发电机组的试验装置。
本实用新型的目的是这样实现的:一种兆瓦级风力发电机组的试验装置,其特征在于它包括定位机架、拖动电机、皮带轮和张紧机构,所述定位机架悬挂固定于发电机机架下方,所述拖动电机设置于所述定位机架上,所述拖动电机输出端通过所述皮带轮与发电机输入端联轴器相连接,所述皮带轮上设置有张紧机构。
本实用新型兆瓦级风力发电机组的试验装置,在发电机输入端高速联轴器上安装皮带轮,通过拖动电机变频控制,达到不同转速和功率点的测试,经多次使用,性能安全可靠,拆装方便,节约了大量电能。本装置生产成本低、体积小、搬运方便。
(四)附图说明
图1为本实用新型兆瓦级风力发电机组的试验装置结构示意图。
图中:定位机架1、拖动电机2、皮带轮3、张紧机构4、发电机机架5、发电机6、联轴器7、齿轮箱8、主轴9、轴承座10。
(五)具体实施方式
参见图1,本实用新型涉及的兆瓦级风力发电机组的试验装置,由定位机架1、拖动电机2、皮带轮3和张紧机构4组成,所述定位机架1悬挂固定于发电机机架5下方,所述拖动电机2设置于定位机架1上,所述拖动电机2输出端通过皮带轮3与发电机6输入端联轴器7相连接,所述皮带轮3上设置有张紧机构4。
所述皮带轮3为三角带轮。

Claims (2)

1、一种兆瓦级风力发电机组的试验装置,其特征在于它包括定位机架(1)、拖动电机(2)、皮带轮(3)和张紧机构(4),所述定位机架(1)悬挂固定于发电机机架(5)下方,所述拖动电机(2)设置于所述定位机架(1)上,所述拖动电机(2)输出端通过所述皮带轮(3)与发电机(6)输入端联轴器(7)相连接,所述皮带轮(3)上设置有张紧机构(4)。
2、根据权利要求1所述的一种兆瓦级风力发电机组的试验装置,其特征在于所述皮带轮(3)为三角带轮。
CN2009200421058U 2009-03-20 2009-03-20 兆瓦级风力发电机组的试验装置 Expired - Lifetime CN201397232Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200421058U CN201397232Y (zh) 2009-03-20 2009-03-20 兆瓦级风力发电机组的试验装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200421058U CN201397232Y (zh) 2009-03-20 2009-03-20 兆瓦级风力发电机组的试验装置

Publications (1)

Publication Number Publication Date
CN201397232Y true CN201397232Y (zh) 2010-02-03

Family

ID=41619750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200421058U Expired - Lifetime CN201397232Y (zh) 2009-03-20 2009-03-20 兆瓦级风力发电机组的试验装置

Country Status (1)

Country Link
CN (1) CN201397232Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881814A (zh) * 2010-06-25 2010-11-10 西安久和能源科技有限公司 一种新型的兆瓦级风力发电机组试验系统及其试验方法
CN103076569A (zh) * 2012-12-31 2013-05-01 合肥工业大学 一种基于自然风复杂工况模拟装置的风力发电机试验台
CN107192950A (zh) * 2017-06-27 2017-09-22 北京奥博汽车电子电器有限公司 发电机环境动态试验装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881814A (zh) * 2010-06-25 2010-11-10 西安久和能源科技有限公司 一种新型的兆瓦级风力发电机组试验系统及其试验方法
CN101881814B (zh) * 2010-06-25 2013-08-21 西安久和能源科技有限公司 一种新型的兆瓦级风力发电机组试验系统及其试验方法
CN103076569A (zh) * 2012-12-31 2013-05-01 合肥工业大学 一种基于自然风复杂工况模拟装置的风力发电机试验台
CN103076569B (zh) * 2012-12-31 2014-12-03 合肥工业大学 一种基于自然风复杂工况模拟装置的风力发电机试验台
CN107192950A (zh) * 2017-06-27 2017-09-22 北京奥博汽车电子电器有限公司 发电机环境动态试验装置

Similar Documents

Publication Publication Date Title
CN104775980A (zh) 一种磁悬浮摇摆无定子发电装置
CN201397232Y (zh) 兆瓦级风力发电机组的试验装置
CN103573557A (zh) 潮汐风力一体发电机
CN201258826Y (zh) 行星群桨载复合风力发电机组
CN202007748U (zh) 惯性动力发电装置及其动力装置
CN203412696U (zh) 一种集风轴流式风力发电装置
CN203640925U (zh) 铁路用轴流式风力发电器
CN210977758U (zh) 永磁直驱风力发电机
CN202535238U (zh) 一种滑环电机用编码器支架安装结构
CN104863704A (zh) 节能发动机
CN201250763Y (zh) 一种发电机转速平稳的风力发电设备
CN204877798U (zh) 叶片除冰装置
CN106533126A (zh) 一种将磁场能转化为电能的装置
CN203067176U (zh) X型风力机
CN202926521U (zh) 利用风能和水能的发电机
CN101093954A (zh) 一种发电装置
CN201202594Y (zh) 一种风力发电机
CN203515966U (zh) 双联永磁直驱风力发电机组
CN201096057Y (zh) 风力发电动力装置
CN102979527A (zh) 风电传送装置
CN2744852Y (zh) 分组式动物力发电装置
CN202338449U (zh) 双向叶片风力发电机
CN204283740U (zh) 轮式直驱风力发电机
CN202250587U (zh) 一种转轮提速式发电机组
CN219139246U (zh) 一种水轮车用发电变速组结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHANG LEI

Free format text: FORMER OWNER: JIANGYIN YUANJING ENERGY TECHNOLOGY CO., LTD.

Effective date: 20120413

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120413

Address after: 214434 No. 159 middle Chengjiang Road, Jiangyin Development Zone, Jiangsu, China

Patentee after: Zhang Lei

Address before: 214434 No. 159 middle Chengjiang Road, Jiangyin Development Zone, Jiangsu, China

Patentee before: Jiangyin Yuanjing Energy Technology Co., Ltd.

ASS Succession or assignment of patent right

Owner name: YUANJIAN WIND ENERGY (JIANGYIN) CO., LTD.

Free format text: FORMER OWNER: ZHANG LEI

Effective date: 20120516

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 214434 WUXI, JIANGSU PROVINCE TO: 214443 WUXI, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120516

Address after: 214443 Jiangsu Jiangyin Lingang Economic Development Zone (Lingang New City Shengang village of Jiangyin city innovation)

Patentee after: Yuanjian Wind Power (Jiangyin) Co.,Ltd.

Address before: 214434 No. 159 middle Chengjiang Road, Jiangyin Development Zone, Jiangsu, China

Patentee before: Zhang Lei

C56 Change in the name or address of the patentee

Owner name: ENVISION ENERGY (JIANGSU) CO., LTD.

Free format text: FORMER NAME: YUANJIAN WIND ENERGY (JIANGYIN) CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 214443 Jiangsu Jiangyin Lingang Economic Development Zone (Lingang New City Shengang village of Jiangyin city innovation)

Patentee after: Envision Energy (Jiangsu) Co., Ltd.

Address before: 214443 Jiangsu Jiangyin Lingang Economic Development Zone (Lingang New City Shengang village of Jiangyin city innovation)

Patentee before: Yuanjian Wind Power (Jiangyin) Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20100203

CX01 Expiry of patent term