CN201391081Y - Fixed embedded part of lifting scaffolding - Google Patents

Fixed embedded part of lifting scaffolding Download PDF

Info

Publication number
CN201391081Y
CN201391081Y CN200920007059U CN200920007059U CN201391081Y CN 201391081 Y CN201391081 Y CN 201391081Y CN 200920007059 U CN200920007059 U CN 200920007059U CN 200920007059 U CN200920007059 U CN 200920007059U CN 201391081 Y CN201391081 Y CN 201391081Y
Authority
CN
China
Prior art keywords
base
screw mandrel
lead screw
section
concrete structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN200920007059U
Other languages
Chinese (zh)
Inventor
杨爱华
郝海涛
李文红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sunrise safety technology (Beijing) Co., Ltd.
Original Assignee
郝海涛
马千里
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 郝海涛, 马千里 filed Critical 郝海涛
Priority to CN200920007059U priority Critical patent/CN201391081Y/en
Application granted granted Critical
Publication of CN201391081Y publication Critical patent/CN201391081Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a fixed embedded part of a lifting scaffolding, which comprises a base and a lead screw. At least three through holes are drilled and evenly distributed at the edge of the base. One end of the lead screw is perpendicular to the base and is welded in the middle of the base. The cross section of the lead screw is much less than the area of the base. Trapezoidal threads are arranged at the other end of the lead screw and a round column is arranged at the end. The round column is concentric with the lead screw and the cross section of the round column is less than the cross section of the lead screw. The utility model has the advantages of high safety and reliability, convenient operation and high economy and practicability.

Description

A kind of fixedly built-in fitting of lifting false work
Technical field
The utility model belongs to the construction safety technical field, particularly relates to a kind of preburied component of reusable building operations attachment type raise scaffold.
Background technology
As shown in Figure 1, in the attachment type raise scaffold work progress, usually need the bracing frame that adheres to of attachment type raise scaffold is fixed on the horizontal reinforcement concrete structure plate 8, this adopts often on the bottom support template 6 of horizontal reinforcement concrete structure plate 8 service sleeve 13 vertically is set, when after concreting, reaching specified intensity, with screw rod 12 with the support shuttering 6 of horizontal reinforcement concrete structure plate 8 and its bottom and adhere to that bracing frame 9 threes penetrate and mode that pressing plate 10 and nut 11 by screw rod 12 two ends is clamped together fixes attachment type raise scaffold.
In the prior art, service sleeve 13 is often because of the fixing not firm positioning that occurs, tilt phenomenon, particularly because of the demoulding cycle in demoulding cycle of the bottom support template 6 of horizontal reinforcement concrete structure plate 8 much larger than vertical reinforcement concrete structure facade template, and three to four work floors generally lag behind, and the permission cover height of attachment type raise scaffold is five work floors, for the protection cover height that guarantees lifting false work meets the construction safety requirement, certainly will cause adhering to bracing frame 9 and must being fixed on the horizontal reinforcement concrete structure plate 8 of attachment type raise scaffold like this, and at this moment its bottom support template 6 does not also remove, can only adopt screw rod 12 with the support shuttering 6 of horizontal reinforcement concrete structure plate 8 and its bottom and adhere to that bracing frame 9 threes penetrate and mode that pressing plate 10 and nut 11 by screw rod 12 two ends are clamped together fixes attachment type raise scaffold, could remove Deng behind the horizontal reinforcement concrete structure plate Final 8 degree arrival design objective, clamped by the pressing plate 10 at screw rod 12 two ends and nut 11 owing to bottom support template 6 this moment, construct the phenomenon of the bottom support template 6 of plate 8 so the workman often occurs for removing the horizontal reinforcement concrete with pressing plate 10 and nut 11 dismountings, serious threat attachment type raise scaffold safe in utilization, the major safety risks that exist the dead group of group to hinder are badly in need of solving.
Summary of the invention
The purpose of this utility model is to provide in a kind of safe and reliable, easy to operate, economical and practical attachment type raise scaffold in order to fixedly to adhere to the preburied component of bracing frame.
For addressing the above problem, the fixedly built-in fitting of a kind of lifting false work that the utility model provides, comprise base 1, screw mandrel 2, the edge of described base 1 is drilled with equally distributed at least three through holes 3, one end vertical center of screw mandrel 2 be welded on the base 1 and the bar cross section of described screw mandrel 2 much smaller than the plane of base 1, the other end of described screw mandrel 2 is provided with trapezoidal thread 5 and this end end and is processed with concentric and less than the circular column cap 4 in screw mandrel 2 bar cross sections with screw mandrel 2.
Described base 1 is square or rectangle preferably.
The utility model provides a kind of preburied component that bracing frame is fixed that adheres to of attachment type raise scaffold, the utility model compared with prior art has the following advantages: one, because by base 1, screw mandrel 2, through hole 3, the built-in fitting that circular column cap 4 and trapezoidal thread 5 are formed is embedded in the top of the bottom support template 6 of horizontal reinforcement concrete structure plate 8, can not clamp the bottom support template 6 of horizontal reinforcement concrete structure plate 8 during use, stopped workman's fixing screw rod 12 of lifting false work when removing the bottom support template 6 of horizontal reinforcement concrete structure plate 8, pressing plate 10, the appearance of major safety risks has thoroughly been eradicated in the great operation against rules that nut 11 is removed on the technical measures of product.They are two years old, owing to be drilled with at least three through holes 3 on the base 1, at least three common iron nails easy to use will be by fixedly securing on the bottom support template 6 of horizontal reinforcement concrete structure plate 8 that base 1, screw mandrel 2, through hole 3, round end column cap 4 are formed, effectively avoided the positioning of preburied component, avoid the appearance of doing over again, improved construction efficiency.They are three years old; because base 1, screw mandrel 2 are the firmly integral body of welding; significantly reduced because of bolt assembly scattered and volume less cause lose phenomenon; simultaneously owing to have the end of trapezoidal thread 5 to be processed with, coenosarc 2 concentric on the screw mandrel 2 and less than the circular column cap 4 in screw mandrel 2 bar cross sections with screw mandrel; trapezoidal thread 5 with protection screw mandrel 2 tops is not damaged when preburied component is removed in hammering downwards; prolonged the reusable number of times of preburied component; reduced the overlapping investment of member; reduce cost, improved economic benefit.
The utlity model has safe and reliable, easy to operate, economical and practical characteristics.
Description of drawings
Fig. 1 is the fixed form schematic diagram of traditional bracing frame.
The enforcement schematic diagram that Fig. 2 provides for the utility model.
The member schematic diagram that Fig. 3 the utility model provides.
Number description:
Base 1, screw mandrel 2, through hole 3, circular column cap 4, trapezoidal thread 5, support shuttering 6, iron nail 7, horizontal reinforcement concrete structure plate 8, bracing frame 9, pressing plate 10, nut 11, screw rod 12, sleeve pipe 13.
The specific embodiment
In conjunction with the accompanying drawings 2,3, be elaborated in order to the preburied component that fixedly adheres to bracing frame in a kind of safe and reliable, easy to operate, the economical and practical attachment type raise scaffold that the utility model is provided:
As shown in Figure 2, after bottom support template 6 constructions of horizontal reinforcement concrete structure plate 8 finish, hammer in the through hole 3 with 4 iron nails, the assigned address that adheres to bracing frame 9 of lifting false work is installed at needs, will be by base 1, screw mandrel 2, through hole 3, the preburied component that round end column cap 4 and trapezoidal thread 5 are formed fixedly secures on the bottom support template 6 of horizontal reinforcement concrete structure plate 8, the trapezoidal thread 5 that has wrapped up screw mandrel 2 upper ends with plastic sheeting pollutes to prevent concrete, by the time the concreting of horizontal reinforcement concrete structure plate 8 finish reach specified intensity after, remove the parcel plastic sheeting of screw mandrel 2 upper end trapezoidal threads 5, what be inserted in lifting false work earlier adheres to bracing frame 9, be inserted in pressing plate 10 again, fastening nut 11, by by base 1, screw mandrel 2, through hole 3, the preburied component that round end column cap 4 and trapezoidal thread are 5 one-tenth is with horizontal reinforcement concrete structure plate 8, adhere to bracing frame 9 and firmly be tightened in together, reach the purpose that the utility model provides.

Claims (2)

1. the fixedly built-in fitting of a lifting false work, comprise base, screw mandrel, the edge of described base is drilled with equally distributed at least three through holes, one end vertical center of screw mandrel be welded on the base and the bar cross section of described screw mandrel much smaller than the plane of base, the other end of described screw mandrel is provided with trapezoidal thread and this end end and is processed with concentric and less than the circular column cap in screw mandrel bar cross section with screw mandrel.
2. the fixedly built-in fitting of a kind of lifting false work as claimed in claim 1, described base is square or rectangle.
CN200920007059U 2009-03-10 2009-03-10 Fixed embedded part of lifting scaffolding Expired - Lifetime CN201391081Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920007059U CN201391081Y (en) 2009-03-10 2009-03-10 Fixed embedded part of lifting scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920007059U CN201391081Y (en) 2009-03-10 2009-03-10 Fixed embedded part of lifting scaffolding

Publications (1)

Publication Number Publication Date
CN201391081Y true CN201391081Y (en) 2010-01-27

Family

ID=41597903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920007059U Expired - Lifetime CN201391081Y (en) 2009-03-10 2009-03-10 Fixed embedded part of lifting scaffolding

Country Status (1)

Country Link
CN (1) CN201391081Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103950847A (en) * 2014-04-29 2014-07-30 上海建工四建集团有限公司 Buttress reinforcement device of construction hoist and using method of buttress reinforcement device
CN110206291A (en) * 2019-06-28 2019-09-06 中建三局集团有限公司 It is not through walls to have enough to meet the need assembled overhanging beam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103950847A (en) * 2014-04-29 2014-07-30 上海建工四建集团有限公司 Buttress reinforcement device of construction hoist and using method of buttress reinforcement device
CN110206291A (en) * 2019-06-28 2019-09-06 中建三局集团有限公司 It is not through walls to have enough to meet the need assembled overhanging beam

Similar Documents

Publication Publication Date Title
CN202139833U (en) Cantilever scaffold for building construction
CN106638588B (en) Steel pipe pile cap bottom hanging device and installation method thereof
CN210239103U (en) Novel scaffold wall connecting piece structure
CN205531261U (en) Subassembly is fixed to outrigger I -steel
CN105507573B (en) The installation method of shaped steel Overhanging Outside Scaffold
CN201391081Y (en) Fixed embedded part of lifting scaffolding
CN204571288U (en) Floor slab preformed hole mould
CN209799317U (en) Can have enough to meet need use pre-buried ring of scaffold frame of encorbelmenting
CN205476545U (en) Multipurpose combined strength construction ground protection shed structure support frame
CN203701565U (en) Detachable cantilever scaffold anchor ring
CN102661035A (en) Tool type wall connecting piece for exterior wall scaffold
CN205805002U (en) A kind of safety rope fixing device for job site
CN106437261A (en) Concrete frame seismic reinforcement structure applying expanded metal
CN203795459U (en) Foundation structure of tower crane for high-altitude roofs
CN206091502U (en) Use concrete frame antidetonation reinforced structure of steel sheet net
CN204662926U (en) A kind of operating platform for steel pipe column top construction operation
CN204370826U (en) A kind of building operations safety barrier
CN202559710U (en) Dismountable anchoring device for overhanging type steel-steel beam
CN210888118U (en) Building faces limit structure post construction protection frame
CN208280725U (en) Safety barrier for foundation pit edge protection
CN204691201U (en) A kind of Liftable hanging formula scaffold system
CN110778095A (en) External protection frame of assembled structure
CN102605964B (en) Separately mounted grille on elevator shaft opening and construction method of separately mounted grille
CN211200705U (en) Prefabricated assembled air conditioner board, awning for sunshading board
CN210947421U (en) Reinforced structure of ancient building post and column foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Hao Haitao

Document name: Patent certificate of utility model

EE01 Entry into force of recordation of patent licensing contract

Assignee: Beijing Tosun Technology Development Co., Ltd.

Assignor: Hao Haitao|Ma Qianli

Contract record no.: 2010990000533

Denomination of utility model: Fixed embedded part of lifting scaffolding

Granted publication date: 20100127

License type: Exclusive License

Record date: 20100722

DD01 Delivery of document by public notice

Addressee: Hao Haitao

Document name: Notification to Pay the Fees

ASS Succession or assignment of patent right

Owner name: BEIJING TONSUN TECHNOLOGY DEVELOPMENT CO., LTD.

Free format text: FORMER OWNER: HAO HAITAO

Effective date: 20111026

Free format text: FORMER OWNER: MA QIANLI

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 101100 TONGZHOU, BEIJING TO: 101104 TONGZHOU, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20111026

Address after: 101104 Beijing city Tongzhou District niubaotun Zhang Feng No. 8

Patentee after: Beijing Tosun Technology Development Co., Ltd.

Address before: 101100 Beijing City, Tongzhou District Yi Ruixili Park family No. 12 Building 1 unit 202 room

Co-patentee before: Ma Qianli

Patentee before: Hao Haitao

CP03 Change of name, title or address

Address after: 101113 8 Guang Li street, Tongzhou District Industrial Development Zone, Beijing

Patentee after: Sunrise safety technology (Beijing) Co., Ltd.

Address before: 101104 No. 8, Zhang Feng Road, Niu Bao Tun, Tongzhou District, Beijing.

Patentee before: Beijing Tosun Technology Development Co., Ltd.

CP03 Change of name, title or address
CX01 Expiry of patent term

Granted publication date: 20100127

CX01 Expiry of patent term