CN205531261U - Subassembly is fixed to outrigger I -steel - Google Patents

Subassembly is fixed to outrigger I -steel Download PDF

Info

Publication number
CN205531261U
CN205531261U CN201620095226.9U CN201620095226U CN205531261U CN 205531261 U CN205531261 U CN 205531261U CN 201620095226 U CN201620095226 U CN 201620095226U CN 205531261 U CN205531261 U CN 205531261U
Authority
CN
China
Prior art keywords
buried
outrigger
steel
support bar
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620095226.9U
Other languages
Chinese (zh)
Inventor
徐洪广
魏炜
黄燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Strait Construction and Development Co Ltd
Original Assignee
CSCEC Strait Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Strait Construction and Development Co Ltd filed Critical CSCEC Strait Construction and Development Co Ltd
Priority to CN201620095226.9U priority Critical patent/CN205531261U/en
Application granted granted Critical
Publication of CN205531261U publication Critical patent/CN205531261U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a subassembly is fixed to outrigger I -steel, it includes that preburied bottom plate, two vertical pre -buried threaded bush, the bipartitions that set firmly on preburied bottom plate the side do not establish the roof pressure board of fixing the bracing piece on pre -buried threaded bush and lieing in two bracing piece upper portions soon, set up two on the roof pressure board and hold the through -hole that upper end of the support bar portion was passed, and still be equipped with fastening nut on the bracing piece of roof pressure board upside soon. An object of the utility model is to provide a simple structure, the subassembly is fixed to outrigger I -steel pre -buried, that demolish of being convenient for. The utility model has the advantages of: 1. The utility model discloses not only be convenient for install, need not to carry on cutting procedure, labour saving and time saving moreover when dismantling. 2. Pre -buried threaded bush can reuse with the top subassembly, practices thrift the cost. 3. Two pre -buried threaded bush lower extremes have set firmly preburied bottom plate, and the pre -buried degree of accuracy has also been guaranteed simultaneously in the pre -buried construction of not only being convenient for.

Description

Outrigger I-steel fixation kit
Technical field
The utility model relates to the realm of building construction, particularly a kind of outrigger I-steel fixation kit.
Background technology
Skyscraper needs built-in fitting corresponding to suspension scaffold I-steel to carry out during setting up builder's jack Pre-buried.Above-mentioned built-in fitting generally uses twice " U " steel bar, and with the lumps of wood at I-steel and " U " shaped steel Fill between muscle and reinforce.
" U " steel bar, in pre-buried, is easily limited by the technology of operating personnel, causes " U " steel bar pre- Bury not in place, and then make I-steel cannot pass twice " U " steel bar or the I-steel that passes cannot be arranged into Position.Additionally, when builder's jack is removed, need that " U " steel bar is exposed floor parts and cut, Waste time and energy.
Summary of the invention
The purpose of this utility model is to provide a kind of simple in construction, it is simple to pre-buried, the outrigger I-steel of dismounting Fixation kit.
The purpose of this utility model is achieved through the following technical solutions: a kind of outrigger I-steel fixation kit, it Including pre-buried base plate, two be vertically fixedly arranged on the pre-buried threaded sleeve of pre-buried base plate upper side, two respectively rotation set solid It is scheduled on the support bar on pre-buried threaded sleeve and is positioned at the top pressing board on two support bar tops;On described top pressing board Offer the through hole that two appearance post upper portions pass, and on the support bar on the upside of top pressing board, be also installed with fastening Nut.
For prior art, the utility model has the advantage of:
1. the utility model is not only convenient for installing, and when dismounting without carrying out cutting action, time saving and energy saving.
The most pre-buried threaded sleeve above section assembly can reuse, cost-effective.
3. a liang pre-buried threaded sleeve lower end is installed with pre-buried base plate, is not only convenient for Embedment Construction, also ensures simultaneously The pre-buried degree of accuracy.
At the most pre-buried threaded sleeve upper orifice, anti-blocking film or anti-clogging are set, can effectively prevent in Embedment Construction In, concrete enters in pre-buried threaded sleeve.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model a kind of outrigger I-steel fixation kit embodiment.
Fig. 2 be outrigger I-steel fixation kit pre-buried time structural representation.
Label declaration: 1 pre-buried base plate, 2 pre-buried threaded sleeves, 3 support bars, 4 top pressing boards, 5 fastenings Nut, 6 I-steel, 7 anti-cloggings.
Detailed description of the invention
Below in conjunction with Figure of description and embodiment, the utility model content is described in detail:
The embodiment of a kind of outrigger I-steel fixation kit provided for the utility model as shown in Figure 1 to Figure 2 Schematic diagram.
A kind of outrigger I-steel fixation kit, it includes that pre-buried base plate 1, two is vertically fixedly arranged on pre-buried base plate 1 The pre-buried threaded sleeve 2, two of side revolves respectively and sets the support bar 3 and position being fixed on pre-buried threaded sleeve 2 Top pressing board 4 in two support bar 3 tops;
The through hole that two appearance support bar 3 upper ends pass is offered on described top pressing board 4, and on the upside of top pressing board 4 Support bar 3 on be also installed with clamp nut 5.
Two pre-buried threaded sleeves 2 are fixed on pre-buried base plate 1, are not only convenient for Embedment Construction, also protect simultaneously Demonstrate,prove the pre-buried degree of accuracy (hanging down of distance between the most pre-buried threaded sleeve 2 and each pre-buried threaded sleeve 2 Straight degree).
The bottom of described support bar 3 is provided with the screw thread coordinated with pre-buried threaded sleeve 2, described support bar 3 Upper end be provided with the screw thread coordinated with clamp nut 5.
In order to prevent concrete in Embedment Construction from blocking the upper orifice of pre-buried threaded sleeve 2, the utility model Use following two ways.
The first:
It is enclosed with anti-blocking film at described pre-buried threaded sleeve 2 upper orifice.
The second:
It is inserted with anti-clogging 7 at described pre-buried threaded sleeve 2 upper orifice.
Operation principle:
Pre-buried base plate 1 is lain in a horizontal plane in predeterminated position;Then pour into a mould concrete, concrete be poured into in advance Bury threaded sleeve 2 upper orifice flush position;After concrete setting, take off pre-buried threaded sleeve 2 upper orifice The anti-blocking film at place or anti-clogging 7, set the rotation of support bar 3 bottom and be fixed on pre-buried threaded sleeve 2;Will I-steel 6 is placed between two support bars 3, makes top pressing board 4 through support bar 3 upper end and be pressed against I-shaped The upper surface of steel 6;Screw clamp nut 5, make top pressing board 4 tightly push down I-steel 6.
During dismounting, clamp nut 5 of only need to outwarding winding, takes off top pressing board 4 and support bar 3, pre-buried base plate 1 and pre-buried threaded sleeve 2 then stay in concrete, because pre-buried base plate 1 and pre-buried threaded sleeve 2 are all embedded in In concrete, it is not necessary to carry out cutting action again.Additionally, top pressing board 4 and support bar 3 can reuse.

Claims (4)

1. an outrigger I-steel fixation kit, it is characterised in that: it includes pre-buried base plate (1), two vertical Be fixedly arranged on the pre-buried threaded sleeve (2) of pre-buried base plate (1) upper side, two respectively rotation set and be fixed on pre-buried screw thread Support bar (3) on sleeve pipe (2) and be positioned at the top pressing board (4) on two support bars (3) top;
The through hole that two appearance support bar (3) upper ends pass, and top pressing board is offered on described top pressing board (4) (4) clamp nut (5) also it is installed with on the support bar (3) of upside.
Outrigger I-steel fixation kit the most according to claim 1, it is characterised in that: described support bar (3) bottom is provided with the screw thread coordinated with pre-buried threaded sleeve (2), the upper end of described support bar (3) Portion is provided with the screw thread coordinated with clamp nut (5).
Outrigger I-steel fixation kit the most according to claim 1 and 2, it is characterised in that: described pre- Bury and be enclosed with anti-blocking film at threaded sleeve (2) upper orifice.
Outrigger I-steel fixation kit the most according to claim 1 and 2, it is characterised in that: described pre- Bury and at threaded sleeve (2) upper orifice, be inserted with anti-clogging (7).
CN201620095226.9U 2016-01-29 2016-01-29 Subassembly is fixed to outrigger I -steel Active CN205531261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620095226.9U CN205531261U (en) 2016-01-29 2016-01-29 Subassembly is fixed to outrigger I -steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620095226.9U CN205531261U (en) 2016-01-29 2016-01-29 Subassembly is fixed to outrigger I -steel

Publications (1)

Publication Number Publication Date
CN205531261U true CN205531261U (en) 2016-08-31

Family

ID=56774334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620095226.9U Active CN205531261U (en) 2016-01-29 2016-01-29 Subassembly is fixed to outrigger I -steel

Country Status (1)

Country Link
CN (1) CN205531261U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060314A (en) * 2017-06-20 2017-08-18 中国华西企业有限公司 One kind is encorbelmented outrigger turnover type snap ring and its construction
CN107190866A (en) * 2017-06-30 2017-09-22 浙江省建工集团有限责任公司 A kind of assembled architecture is encorbelmented the construction method of outrigger anchor hoop
CN107512747A (en) * 2017-09-26 2017-12-26 天津宝舟科技有限公司 A kind of Novel sewage handles bacteria filter device
CN109610818A (en) * 2018-12-03 2019-04-12 广州景兴建筑科技有限公司 A kind of fixed device of aluminum alloy pattern plate diagonal brace support built-in fitting
CN110284656A (en) * 2019-08-05 2019-09-27 郑州大学 A kind of full assembled steel concrete combination beam
CN113356563A (en) * 2021-05-27 2021-09-07 武汉一冶建筑安装工程有限责任公司 Method and device for fixing overhanging I-steel

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060314A (en) * 2017-06-20 2017-08-18 中国华西企业有限公司 One kind is encorbelmented outrigger turnover type snap ring and its construction
CN107190866A (en) * 2017-06-30 2017-09-22 浙江省建工集团有限责任公司 A kind of assembled architecture is encorbelmented the construction method of outrigger anchor hoop
CN107190866B (en) * 2017-06-30 2019-11-08 浙江省建工集团有限责任公司 A kind of construction method of assembled architecture overhanging outrigger anchor hoop
CN107512747A (en) * 2017-09-26 2017-12-26 天津宝舟科技有限公司 A kind of Novel sewage handles bacteria filter device
CN109610818A (en) * 2018-12-03 2019-04-12 广州景兴建筑科技有限公司 A kind of fixed device of aluminum alloy pattern plate diagonal brace support built-in fitting
CN110284656A (en) * 2019-08-05 2019-09-27 郑州大学 A kind of full assembled steel concrete combination beam
CN113356563A (en) * 2021-05-27 2021-09-07 武汉一冶建筑安装工程有限责任公司 Method and device for fixing overhanging I-steel

Similar Documents

Publication Publication Date Title
CN205531261U (en) Subassembly is fixed to outrigger I -steel
CN106150087B (en) A kind of combined frame column template and its construction method
CN105178591A (en) Small-gap double-shear-wall deformation joint formwork and construction method thereof
CN204691247U (en) Novel universal beam form strutting system
CN103075002A (en) Early-dismantling template support head applicable to various template keels
CN105155830A (en) Construction method for combined type fixed and integral lifting of elevator shaft stereotyped operation platform
CN202012190U (en) Integral bench mould
CN204001731U (en) A kind of shuttering supporting vertical rod base fixing device
CN110273543B (en) Convenient floor-lowering formwork-hanging construction method for mounting and dismounting tool
CN211173080U (en) Early-dismantling formwork support frame connecting device for building construction
CN210953357U (en) Detection fixing device of building engineering scaffold
CN210289148U (en) Be used for building aluminium template bracing piece iron pipe
CN203050148U (en) Template supporting head capable of being easily disassembled and applied to various template keels
CN205063330U (en) Close clearance double shear wall movement joint template
CN205153515U (en) Overhanging bearing frame makes up positioner
CN204266571U (en) A kind of builder's jack i iron pre-embedded device
CN201447862U (en) Instrumental operating platform used for elevator shaft shear wall shuttering erection
CN201103240Y (en) Expansion type drawknot screw
CN205224603U (en) Strengthening construction device for door and window concrete arched lintel
CN205545078U (en) Novel distributed roof photovoltaic support
CN211257760U (en) Triangular supporting device for overhanging scaffold
CN205531285U (en) Scaffold frame is encorbelmented shaped steel and is reserved bolt hole and establish structure
CN210529735U (en) Building steel structure platform base
CN202787953U (en) Template provided with plug and capable of being used for long time
CN201292656Y (en) Inner formwork construction support of shaft

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant