CN205531261U - Subassembly is fixed to outrigger I -steel - Google Patents
Subassembly is fixed to outrigger I -steel Download PDFInfo
- Publication number
- CN205531261U CN205531261U CN201620095226.9U CN201620095226U CN205531261U CN 205531261 U CN205531261 U CN 205531261U CN 201620095226 U CN201620095226 U CN 201620095226U CN 205531261 U CN205531261 U CN 205531261U
- Authority
- CN
- China
- Prior art keywords
- buried
- outrigger
- steel
- support bar
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a subassembly is fixed to outrigger I -steel, it includes that preburied bottom plate, two vertical pre -buried threaded bush, the bipartitions that set firmly on preburied bottom plate the side do not establish the roof pressure board of fixing the bracing piece on pre -buried threaded bush and lieing in two bracing piece upper portions soon, set up two on the roof pressure board and hold the through -hole that upper end of the support bar portion was passed, and still be equipped with fastening nut on the bracing piece of roof pressure board upside soon. An object of the utility model is to provide a simple structure, the subassembly is fixed to outrigger I -steel pre -buried, that demolish of being convenient for. The utility model has the advantages of: 1. The utility model discloses not only be convenient for install, need not to carry on cutting procedure, labour saving and time saving moreover when dismantling. 2. Pre -buried threaded bush can reuse with the top subassembly, practices thrift the cost. 3. Two pre -buried threaded bush lower extremes have set firmly preburied bottom plate, and the pre -buried degree of accuracy has also been guaranteed simultaneously in the pre -buried construction of not only being convenient for.
Description
Technical field
The utility model relates to the realm of building construction, particularly a kind of outrigger I-steel fixation kit.
Background technology
Skyscraper needs built-in fitting corresponding to suspension scaffold I-steel to carry out during setting up builder's jack
Pre-buried.Above-mentioned built-in fitting generally uses twice " U " steel bar, and with the lumps of wood at I-steel and " U " shaped steel
Fill between muscle and reinforce.
" U " steel bar, in pre-buried, is easily limited by the technology of operating personnel, causes " U " steel bar pre-
Bury not in place, and then make I-steel cannot pass twice " U " steel bar or the I-steel that passes cannot be arranged into
Position.Additionally, when builder's jack is removed, need that " U " steel bar is exposed floor parts and cut,
Waste time and energy.
Summary of the invention
The purpose of this utility model is to provide a kind of simple in construction, it is simple to pre-buried, the outrigger I-steel of dismounting
Fixation kit.
The purpose of this utility model is achieved through the following technical solutions: a kind of outrigger I-steel fixation kit, it
Including pre-buried base plate, two be vertically fixedly arranged on the pre-buried threaded sleeve of pre-buried base plate upper side, two respectively rotation set solid
It is scheduled on the support bar on pre-buried threaded sleeve and is positioned at the top pressing board on two support bar tops;On described top pressing board
Offer the through hole that two appearance post upper portions pass, and on the support bar on the upside of top pressing board, be also installed with fastening
Nut.
For prior art, the utility model has the advantage of:
1. the utility model is not only convenient for installing, and when dismounting without carrying out cutting action, time saving and energy saving.
The most pre-buried threaded sleeve above section assembly can reuse, cost-effective.
3. a liang pre-buried threaded sleeve lower end is installed with pre-buried base plate, is not only convenient for Embedment Construction, also ensures simultaneously
The pre-buried degree of accuracy.
At the most pre-buried threaded sleeve upper orifice, anti-blocking film or anti-clogging are set, can effectively prevent in Embedment Construction
In, concrete enters in pre-buried threaded sleeve.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model a kind of outrigger I-steel fixation kit embodiment.
Fig. 2 be outrigger I-steel fixation kit pre-buried time structural representation.
Label declaration: 1 pre-buried base plate, 2 pre-buried threaded sleeves, 3 support bars, 4 top pressing boards, 5 fastenings
Nut, 6 I-steel, 7 anti-cloggings.
Detailed description of the invention
Below in conjunction with Figure of description and embodiment, the utility model content is described in detail:
The embodiment of a kind of outrigger I-steel fixation kit provided for the utility model as shown in Figure 1 to Figure 2
Schematic diagram.
A kind of outrigger I-steel fixation kit, it includes that pre-buried base plate 1, two is vertically fixedly arranged on pre-buried base plate 1
The pre-buried threaded sleeve 2, two of side revolves respectively and sets the support bar 3 and position being fixed on pre-buried threaded sleeve 2
Top pressing board 4 in two support bar 3 tops;
The through hole that two appearance support bar 3 upper ends pass is offered on described top pressing board 4, and on the upside of top pressing board 4
Support bar 3 on be also installed with clamp nut 5.
Two pre-buried threaded sleeves 2 are fixed on pre-buried base plate 1, are not only convenient for Embedment Construction, also protect simultaneously
Demonstrate,prove the pre-buried degree of accuracy (hanging down of distance between the most pre-buried threaded sleeve 2 and each pre-buried threaded sleeve 2
Straight degree).
The bottom of described support bar 3 is provided with the screw thread coordinated with pre-buried threaded sleeve 2, described support bar 3
Upper end be provided with the screw thread coordinated with clamp nut 5.
In order to prevent concrete in Embedment Construction from blocking the upper orifice of pre-buried threaded sleeve 2, the utility model
Use following two ways.
The first:
It is enclosed with anti-blocking film at described pre-buried threaded sleeve 2 upper orifice.
The second:
It is inserted with anti-clogging 7 at described pre-buried threaded sleeve 2 upper orifice.
Operation principle:
Pre-buried base plate 1 is lain in a horizontal plane in predeterminated position;Then pour into a mould concrete, concrete be poured into in advance
Bury threaded sleeve 2 upper orifice flush position;After concrete setting, take off pre-buried threaded sleeve 2 upper orifice
The anti-blocking film at place or anti-clogging 7, set the rotation of support bar 3 bottom and be fixed on pre-buried threaded sleeve 2;Will
I-steel 6 is placed between two support bars 3, makes top pressing board 4 through support bar 3 upper end and be pressed against I-shaped
The upper surface of steel 6;Screw clamp nut 5, make top pressing board 4 tightly push down I-steel 6.
During dismounting, clamp nut 5 of only need to outwarding winding, takes off top pressing board 4 and support bar 3, pre-buried base plate
1 and pre-buried threaded sleeve 2 then stay in concrete, because pre-buried base plate 1 and pre-buried threaded sleeve 2 are all embedded in
In concrete, it is not necessary to carry out cutting action again.Additionally, top pressing board 4 and support bar 3 can reuse.
Claims (4)
1. an outrigger I-steel fixation kit, it is characterised in that: it includes pre-buried base plate (1), two vertical
Be fixedly arranged on the pre-buried threaded sleeve (2) of pre-buried base plate (1) upper side, two respectively rotation set and be fixed on pre-buried screw thread
Support bar (3) on sleeve pipe (2) and be positioned at the top pressing board (4) on two support bars (3) top;
The through hole that two appearance support bar (3) upper ends pass, and top pressing board is offered on described top pressing board (4)
(4) clamp nut (5) also it is installed with on the support bar (3) of upside.
Outrigger I-steel fixation kit the most according to claim 1, it is characterised in that: described support bar
(3) bottom is provided with the screw thread coordinated with pre-buried threaded sleeve (2), the upper end of described support bar (3)
Portion is provided with the screw thread coordinated with clamp nut (5).
Outrigger I-steel fixation kit the most according to claim 1 and 2, it is characterised in that: described pre-
Bury and be enclosed with anti-blocking film at threaded sleeve (2) upper orifice.
Outrigger I-steel fixation kit the most according to claim 1 and 2, it is characterised in that: described pre-
Bury and at threaded sleeve (2) upper orifice, be inserted with anti-clogging (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620095226.9U CN205531261U (en) | 2016-01-29 | 2016-01-29 | Subassembly is fixed to outrigger I -steel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620095226.9U CN205531261U (en) | 2016-01-29 | 2016-01-29 | Subassembly is fixed to outrigger I -steel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205531261U true CN205531261U (en) | 2016-08-31 |
Family
ID=56774334
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620095226.9U Active CN205531261U (en) | 2016-01-29 | 2016-01-29 | Subassembly is fixed to outrigger I -steel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205531261U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060314A (en) * | 2017-06-20 | 2017-08-18 | 中国华西企业有限公司 | One kind is encorbelmented outrigger turnover type snap ring and its construction |
CN107190866A (en) * | 2017-06-30 | 2017-09-22 | 浙江省建工集团有限责任公司 | A kind of assembled architecture is encorbelmented the construction method of outrigger anchor hoop |
CN107512747A (en) * | 2017-09-26 | 2017-12-26 | 天津宝舟科技有限公司 | A kind of Novel sewage handles bacteria filter device |
CN109610818A (en) * | 2018-12-03 | 2019-04-12 | 广州景兴建筑科技有限公司 | A kind of fixed device of aluminum alloy pattern plate diagonal brace support built-in fitting |
CN110284656A (en) * | 2019-08-05 | 2019-09-27 | 郑州大学 | A kind of full assembled steel concrete combination beam |
CN113356563A (en) * | 2021-05-27 | 2021-09-07 | 武汉一冶建筑安装工程有限责任公司 | Method and device for fixing overhanging I-steel |
-
2016
- 2016-01-29 CN CN201620095226.9U patent/CN205531261U/en active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060314A (en) * | 2017-06-20 | 2017-08-18 | 中国华西企业有限公司 | One kind is encorbelmented outrigger turnover type snap ring and its construction |
CN107190866A (en) * | 2017-06-30 | 2017-09-22 | 浙江省建工集团有限责任公司 | A kind of assembled architecture is encorbelmented the construction method of outrigger anchor hoop |
CN107190866B (en) * | 2017-06-30 | 2019-11-08 | 浙江省建工集团有限责任公司 | A kind of construction method of assembled architecture overhanging outrigger anchor hoop |
CN107512747A (en) * | 2017-09-26 | 2017-12-26 | 天津宝舟科技有限公司 | A kind of Novel sewage handles bacteria filter device |
CN109610818A (en) * | 2018-12-03 | 2019-04-12 | 广州景兴建筑科技有限公司 | A kind of fixed device of aluminum alloy pattern plate diagonal brace support built-in fitting |
CN110284656A (en) * | 2019-08-05 | 2019-09-27 | 郑州大学 | A kind of full assembled steel concrete combination beam |
CN113356563A (en) * | 2021-05-27 | 2021-09-07 | 武汉一冶建筑安装工程有限责任公司 | Method and device for fixing overhanging I-steel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205531261U (en) | Subassembly is fixed to outrigger I -steel | |
CN106150087B (en) | A kind of combined frame column template and its construction method | |
CN105178591A (en) | Small-gap double-shear-wall deformation joint formwork and construction method thereof | |
CN204691247U (en) | Novel universal beam form strutting system | |
CN103075002A (en) | Early-dismantling template support head applicable to various template keels | |
CN105155830A (en) | Construction method for combined type fixed and integral lifting of elevator shaft stereotyped operation platform | |
CN202012190U (en) | Integral bench mould | |
CN204001731U (en) | A kind of shuttering supporting vertical rod base fixing device | |
CN110273543B (en) | Convenient floor-lowering formwork-hanging construction method for mounting and dismounting tool | |
CN211173080U (en) | Early-dismantling formwork support frame connecting device for building construction | |
CN210953357U (en) | Detection fixing device of building engineering scaffold | |
CN210289148U (en) | Be used for building aluminium template bracing piece iron pipe | |
CN203050148U (en) | Template supporting head capable of being easily disassembled and applied to various template keels | |
CN205063330U (en) | Close clearance double shear wall movement joint template | |
CN205153515U (en) | Overhanging bearing frame makes up positioner | |
CN204266571U (en) | A kind of builder's jack i iron pre-embedded device | |
CN201447862U (en) | Instrumental operating platform used for elevator shaft shear wall shuttering erection | |
CN201103240Y (en) | Expansion type drawknot screw | |
CN205224603U (en) | Strengthening construction device for door and window concrete arched lintel | |
CN205545078U (en) | Novel distributed roof photovoltaic support | |
CN211257760U (en) | Triangular supporting device for overhanging scaffold | |
CN205531285U (en) | Scaffold frame is encorbelmented shaped steel and is reserved bolt hole and establish structure | |
CN210529735U (en) | Building steel structure platform base | |
CN202787953U (en) | Template provided with plug and capable of being used for long time | |
CN201292656Y (en) | Inner formwork construction support of shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |