CN201367286Y - Platform lifting rail for fire prevention and rescue of high-rise buildings - Google Patents

Platform lifting rail for fire prevention and rescue of high-rise buildings Download PDF

Info

Publication number
CN201367286Y
CN201367286Y CNU2009200841482U CN200920084148U CN201367286Y CN 201367286 Y CN201367286 Y CN 201367286Y CN U2009200841482 U CNU2009200841482 U CN U2009200841482U CN 200920084148 U CN200920084148 U CN 200920084148U CN 201367286 Y CN201367286 Y CN 201367286Y
Authority
CN
China
Prior art keywords
guide rail
main guide
platform
climbs
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2009200841482U
Other languages
Chinese (zh)
Inventor
倪胡顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2009200841482U priority Critical patent/CN201367286Y/en
Application granted granted Critical
Publication of CN201367286Y publication Critical patent/CN201367286Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a platform lifting rail for fire prevention and rescue of high-rise buildings. The platform lifting rail comprises a main rail fixed on the outer wall of a building and extending upwards along the building (10) as well as racks (2) arranged on the outer wall of the main rail, wherein the axis of the racks (2) is parallel to that of the main rail. According to the above structure, a rescue platform can climb a high-rise building or an overhigh-rise building to any height through the rail and the racks so as to create conditions for fire prevention and rescue on the high-rise building or the overhigh-rise building. A plurality of rescue platforms can climb to different heights or onto different floors for conducting fire prevention and rescue through the rail, thereby striving for more time for extinguishing fire and maximally reducing the disaster.

Description

Be used for platform that high building fire fighting the sues and labours guide rail that climbs
Technical field
The utility model relates to fire-fighting rescue equipment, is specifically related to the fire-fighting rescue equipment of skyscraper or high-rise building, particularly the fire-fighting and rescue jacking equipment.
Background technology
At present, be in the world a great problem to the fire-fighting and rescue of skyscraper or high-rise building, skyscraper or high-rise building are when presence of fire, once the fire-fighting ladder access shrouded by cigarette, below the fire fighter do not increase, above trapped personnel be unable to come down.At skyscraper of building or high-rise building, because of the fire fighting equipment construction is influenced by integrated engineering, before handing over examination, integrated engineering can't provide the actv. fire-fighting to ensure, and existing state-of-the-art fire appliance biggest advance height has only 100 meters, and be subjected to environment (as road, electric wire, strong wind etc.) influence, often can not carry out fire-fighting and rescue the personnel in building and the building.
Summary of the invention
Technical problem to be solved in the utility model is: a kind of platform that high building fire fighting sues and labours guide rail that climbs that is used for is provided, and this platform guide rail that climbs is that the fire-fighting and rescue of skyscraper or high-rise building has been created condition.
The utility model solves the problems of the technologies described above the technical scheme that is adopted:
Be used for platform that high building fire fighting the sues and labours guide rail that climbs, it comprises and is fixed on the skin and along building main guide rail upwards, the outer wall of main guide rail is provided with tooth bar that the parallel axes of tooth bar is in the axis of main guide rail.
In the such scheme, also be provided with positioning guide rail on the outer wall of main guide rail, the parallel axes of positioning guide rail is in the axis of main guide rail.
In the such scheme, main guide rail is formed by many main guide rail unit butt joints, is equipped with tooth bar, positioning guide rail on each main guide rail unit, the tooth bar on the main guide rail after the butt joint, positioning guide rail butt joint and continuous.
In the such scheme, main guide rail is a hollow tubular, and the outer wall of main guide rail is provided with valve.
In the such scheme, be equipped with flange on each butt end, main guide rail unit, adjacent main guide rail unit docks by flange.
In the such scheme, be provided with partition in the main guide rail, partition separates the main guide rail segmentation.
In the such scheme, valve comprises flood valve and outlet valve, comprises a flood valve and an outlet valve at least on each of main guide rail section.
In the such scheme, cut off the joint that is arranged on the main guide rail unit.
In the such scheme, being equipped with leg on each main guide rail unit, captives joint with building by leg in the main guide rail unit.
In the such scheme, valve also comprises water jet.
Advantage of the present utility model is:
1, the platform guide rail that climbs makes progress along building, the outer wall of main guide rail is provided with tooth bar, the platform of suing and labouring can climb on guide rail by tooth bar, make can climb the arbitrary height on skyscraper or the high-rise building of platform of suing and labouring, for the fire-fighting and rescue of skyscraper or high-rise building has been created condition.
2, platform climb guide rail can be by a plurality of flat-bed modes of suing and labouring of climbing on it, carry out rescue work of extinguishing fire at a plurality of height or floor simultaneously, strive for protecting your time for catching the fire extinguishing calamity, disaster is reduced to a minimum.
3, also be provided with positioning guide rail on the outer wall of main guide rail, can climb to the flat-bed of suing and labouring and do location further, the platform that guarantees to sue and labour climbs more stable.
4, main guide rail is formed by many main guide rail unit butt joints, be equipped with tooth bar, positioning guide rail on each main guide rail unit, the platform guide rail that climbs can follow main body construction to construct together, one installs main guide rail successively, at building engineering construction, building is formal use before, after the formal use of building, all can provide effective fire-fighting guarantee.
5, main guide rail is a hollow tubular, and the outer wall of main guide rail is provided with valve, and main guide rail can be used as the independent tubes of fire-fighting system and uses, and not restricted by the interior fire-fighting system of building.
6, be equipped with flange on each butt end, main guide rail unit, adjacent main guide rail unit docks by flange, helps the butt joint and the UNICOM of main guide rail.
7, be provided with partition in the main guide rail, partition separates the main guide rail segmentation, and the moisture level that helps in the main guide rail promotes.
8, valve comprises flood valve and outlet valve, comprises a flood valve and an outlet valve at least on each of main guide rail section, helps supplying water to the main guide rail internal classification, helps a plurality of platforms of suing and labouring simultaneously and puts out a fire simultaneously at a plurality of height or floor.
9, cut off the joint be arranged on the main guide rail unit, partition easy for installation.
10, being equipped with leg on each main guide rail unit, captives joint with building by leg in the main guide rail unit, makes main guide rail easy for installation, stressed even.
11, valve also comprises water jet, when water jet is opened, can to platform climb guide rail around water spray, for platform climb guide rail and on the platform cooling of suing and labouring, protection personnel, device security.
Description of drawings
Fig. 1 is the structural representation of the utility model running condition
Fig. 2 is the main guide rail block construction front view of the utility model embodiment
Fig. 3 is the main guide rail block construction back view of the utility model embodiment
Fig. 4 is the A-A cutaway view of Fig. 3
Fig. 5 is the B-B cutaway view of Fig. 3
Fig. 6 is the structural representation that platform combines with the utility model embodiment of suing and labouring
Among the figure: 1-main guide rail unit, 2-tooth bar, 3-positioning guide rail, 4-flange, 5-leg, 6-outlet valve, 7-water jet, 8-partition, 9-flood valve, 10-building, 11-sue and labour platform, 12-motor, 13-running roller.
The specific embodiment
Below in conjunction with accompanying drawing and the utility model embodiment the utility model is described in further detail:
As shown in Figure 1, the utility model is used for platform that high building fire fighting the sues and labours guide rail embodiment that climbs, and it comprises and is fixed on building 10 exterior walls and along building main guide rail upwards, main guide rail is installed on the concrete shear force wall exterior wall.
Shown in Fig. 2,3, the outer wall of main guide rail is provided with tooth bar 2, positioning guide rail 3, and the parallel axes of tooth bar 2, positioning guide rail 3 is in the axis of main guide rail.
Main guide rail is formed by 1 butt joint of many main guide rail unit, is equipped with tooth bar 2, positioning guide rail 3 on each main guide rail unit 1, the tooth bar 2 on the main guide rail after the butt joint, positioning guide rail 3 butt joints and continuous.Be equipped with flange 4 on each 1 butt end, main guide rail unit, adjacent main guide rail unit 1 is by flange 4 butt joints.Being equipped with leg 5 on each main guide rail unit 1, captives joint with building 10 by leg 5 in main guide rail unit 1.Be provided with in the main guide rail and cut off 8, cut off 8 the main guide rail segmentation separated.Partition 8 is arranged on the joint of main guide rail unit 1.
Shown in Fig. 4,5, main guide rail is the solid drawn pipe hollow tubular, and the outer wall of main guide rail is provided with valve, and valve comprises flood valve 9 and outlet valve 6, water jet 7, at least comprise a flood valve 9 and an outlet valve 6 on each of main guide rail section, outlet valve 6 is fire-fighting double end valve.The pressurized equipment of corresponding height in flood valve 9 and the building, also can with the water tank UNICOM of fire extinguishing tanker.Water jet 7 is the automatic water jetting mouth, can open automatically when ambient temperature is higher than 90 ℃.
The principle of work of the utility model embodiment is: after skyscraper or high-rise building fire alarm are received in fire-fighting 119, set out to be equipped with the fire extinguishing tanker of generator set, carry the platform 11 of suing and labouring and arrive the scene that catches fire, as shown in Figure 6, first platform 11 of suing and labouring combined with the utility model embodiment, the platform 11 of suing and labouring comprises the drive motor 12 that climbs, running roller 13, driving gear wheel and rack 2 engagements of motor 12 mouths, running roller 13 is stuck on the positioning guide rail 3, the fire fighter enters the platform 11 of suing and labouring, starter motor 12, the platform 11 of suing and labouring upwards climbs along the utility model platform guide rail embodiment that climbs, and second platform 11 of suing and labouring is combined with the utility model embodiment, after the platform 11 of suing and labouring arrives the fire-fighting operation height again, the fire fighter controls the platform 11 of suing and labouring and stops to climb, and carries out fire-fighting and rescue work.
When carrying out fire-fighting operation, the fire fighter can connect climb fire-fighting double end valve fire extinguishing on the guide rail of platform, and water jet 7 is opened for operating area cooling, support equipment and personal security.The platform 11 of suing and labouring also is provided with a rescue evacuation mouthful attic ladder and is connected with bottom fire-fighting and rescue platform, is transported by several platform 11 relays of suing and labouring, and uses during for the trapped personnel emergency escape.
The utility model is used for platform that skyscraper the sues and labours guide rail that climbs, and the partition 8 on it can be arranged on the joint of each main guide rail unit 1, also can be provided with one every a plurality of main guide rails unit 1 (70-100 rice) and cut off 8.

Claims (10)

1, is used for platform that high building fire fighting the sues and labours guide rail that climbs, it is characterized in that: it comprises the main guide rail that is fixed on the skin and makes progress along building (10), the outer wall of main guide rail is provided with tooth bar (2), and the parallel axes of tooth bar (2) is in the axis of main guide rail.
2, the platform as claimed in claim 1 guide rail that climbs, it is characterized in that: also be provided with positioning guide rail (3) on the outer wall of main guide rail, the parallel axes of positioning guide rail (3) is in the axis of main guide rail.
3, the platform as claimed in claim 2 guide rail that climbs, it is characterized in that: main guide rail is formed by many main guide rail unit (1) butt joint, be equipped with tooth bar (2), positioning guide rail (3) on each main guide rail unit (1), the tooth bar on the main guide rail after the butt joint (2), positioning guide rail (3) butt joint and continuous.
4, the platform as claimed in claim 3 guide rail that climbs, it is characterized in that: main guide rail is a hollow tubular, and the outer wall of main guide rail is provided with valve.
5, the platform as claimed in claim 4 guide rail that climbs is characterized in that: be equipped with flange (4) on each butt end, main guide rail unit (1), adjacent main guide rail unit (1) is by flange (4) butt joint.
6, the platform as claimed in claim 5 guide rail that climbs is characterized in that: be provided with partition (8) in the main guide rail, cut off (8) the main guide rail segmentation is separated.
7, the platform as claimed in claim 6 guide rail that climbs, it is characterized in that: valve comprises flood valve (9) and outlet valve (6), comprises a flood valve (9) and an outlet valve (6) at least on each of main guide rail section.
8, the platform as claimed in claim 6 guide rail that climbs is characterized in that: cut off the joint that (8) are arranged on main guide rail unit (1).
9, the platform as claimed in claim 3 guide rail that climbs is characterized in that: be equipped with leg (5) on each main guide rail unit (1), captive joint with building (10) by leg (5) main guide rail unit (1).
10, the platform as claimed in claim 7 guide rail that climbs, it is characterized in that: valve also comprises water jet (7).
CNU2009200841482U 2009-03-13 2009-03-13 Platform lifting rail for fire prevention and rescue of high-rise buildings Expired - Fee Related CN201367286Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009200841482U CN201367286Y (en) 2009-03-13 2009-03-13 Platform lifting rail for fire prevention and rescue of high-rise buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009200841482U CN201367286Y (en) 2009-03-13 2009-03-13 Platform lifting rail for fire prevention and rescue of high-rise buildings

Publications (1)

Publication Number Publication Date
CN201367286Y true CN201367286Y (en) 2009-12-23

Family

ID=41486181

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009200841482U Expired - Fee Related CN201367286Y (en) 2009-03-13 2009-03-13 Platform lifting rail for fire prevention and rescue of high-rise buildings

Country Status (1)

Country Link
CN (1) CN201367286Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102974056A (en) * 2012-12-03 2013-03-20 刘璐 Special fire-fighting rescue device
CN108861967A (en) * 2018-06-21 2018-11-23 陈冬菊 External wall climbs track rescue system
CN110255328A (en) * 2019-05-20 2019-09-20 泸州天府液压件有限公司 Skyscraper external hydraulic goes up and down fire-fighting system
CN113530193A (en) * 2021-07-09 2021-10-22 山东新活新材料科技有限公司 Building protection platform capable of being used for processing emergency situations and processing method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102974056A (en) * 2012-12-03 2013-03-20 刘璐 Special fire-fighting rescue device
CN102974056B (en) * 2012-12-03 2014-11-05 刘璐 Special fire-fighting rescue device
CN108861967A (en) * 2018-06-21 2018-11-23 陈冬菊 External wall climbs track rescue system
CN110255328A (en) * 2019-05-20 2019-09-20 泸州天府液压件有限公司 Skyscraper external hydraulic goes up and down fire-fighting system
CN113530193A (en) * 2021-07-09 2021-10-22 山东新活新材料科技有限公司 Building protection platform capable of being used for processing emergency situations and processing method thereof

Similar Documents

Publication Publication Date Title
CN102886107A (en) Firefighting and lifesaving device for high-rise building
CN103007453B (en) High building fire fighting rescue system
CN107261347B (en) Super high-rise building fire rescue and fire extinguishing system
CN201367286Y (en) Platform lifting rail for fire prevention and rescue of high-rise buildings
CN102100953A (en) Remote control type fire extinguishing apparatus for high-rise building
CN201710830U (en) Flexible high-building escape tunnel storage case
CN107308569A (en) A kind of fire extinguishing system and fire-fighting mode
CN109499035B (en) Multifunctional mobile intercommunication fire-fighting platform for high building and fire-fighting method thereof
CN102179016A (en) High-rise fire accident rescue system
CN210583401U (en) Self-climbing fire-fighting platform
CN202036716U (en) Long-distance remote fire extinguishing device for high-rise building
CN201906365U (en) Hanging basket-type climbing fire-fighting life-saving cabin
CN205031779U (en) Building with fire -fighting and rescuing system
CN202061288U (en) Super high-rise fire disaster rescuing system
KR20140133378A (en) The method of forming the fire emergency elevator system in a high rise building
CN203075490U (en) High-rise building fire rescue system
CN203663308U (en) Building
CN105056410A (en) System with fire-fighting and rescue function
CN205031775U (en) Building with fire -fighting and rescuing system
CN209612075U (en) A kind of high building Multifunctional mobile intercommunication fire control platform
CN205031783U (en) Rescue system of putting out a fire of building
CN205031784U (en) Building with fire -fighting and rescuing system
CN205031776U (en) Building with fire -fighting and rescuing function
CN104800998A (en) Method and matched equipment for performing fire-fighting and rescue in building
CN106869310A (en) The outdoor fire-fighting rack of fire water box protection is installed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091223

Termination date: 20130313